Loading...
HomeMy WebLinkAboutZP-24-041 - 1820 Shelburne Road 3/6/2024ZP-24-041 X interior remodel to construct a reception cubicle with one wall, a door, and sliding glass see attached email authorizing this permit application 2/23/2024 63.00 ALLEN RD X 3/6/2024 3/5/20253/22/2024 X 1 Marty Gillies From:Greg Desautels <gregdesautels@me.com> Sent:Friday, February 23, 2024 2:13 PM To:Charlie Meli Cc:Marty Gillies Subject:'EXTERNAL'Re: Heartworks South Burlington Wall Build Approval This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Yes, I approve. Please advise if anything more than this email is needed. Thanks, Greg Sent from my iPhone On Feb 23, 2024, at 2:12 PM, Charlie Meli <charlie.meli@heartworksvt.com> wrote: Hi Greg, Marty needs your written approval for us to move forward with the wall project. Do you approve of Heartworks building the wall to create an office space for our ED? Best regards, Charlie Meli Facilities Manager | Heartworks PO Box 339, Shelburne, VT 05482 Cell : (802) 373-7698 heartworksvt.com Inline image PROVIDE NEW WALL, ALIGN WITH EXISTING A PROVIDE NEW 3' DOOR ED OFFICE CODE SUMMARY 1820 SHELBURNE RD General Summary Project Description Enclose a new office in existing Day Care tenant space. Use & Occupancy Classification Building Occupancy -Mixed -Business (B), Day Care (DC) Separated -Residential (R) Type of Construction Building is type 5B -wood construction was used in previous remodel projects. Accessibility Requirements Americans with Disabilities Act Areas open to the public to have entry and interior passage doors 32" min. clear (36" door) and to provide req. maneuvering clearances Egress Requirements Max Travel Distance to Exit (non-sprinklered):NFPA101: 39.2.6.2, 17.2.6.2 (B) 200' (DC) 150' Max Common Path of Travel (non-sprinklered):NFPA101: 39.2.5.3.3, 17.2.5.3 (B) 75'(DC) 75' Travel Distances Egress Requirements (2) means of egress required from each story or portion of a story (NFPA101: 7.4.1.2). Per NFPA101 17.2.4.2(2), exits shall be accessible from every part of every story however exit access travel shall be permitted to be common for the distance permitted as common path of travel by 17.2.5.3. Employee work areas to have accessible route for entering and exiting. Applicable Codes *Note that other codes and regulations not listed that may apply to this building. VTProject State:2010, Americans with Disabilities Act Fair Housing Amendments Act, 1988 Type of Project New Construction Building Addition Reconstruction Modification Renovation 2015 Vermont Fire and Building Safety Code NFPA 101-2015 - Life Safety Code IBC-2015 with VT Amendments NFPA 1-2015 - Fire Code 2012 - Vermont Access Rules , 2013 amend. Vermont Plumbing Rules, 2021 IPC-2021 with VT Amendments Vermont Electrical Safety Rules, 2020 NFPA 70-2020 - NEC, with amend. 2020 Vermont Commercial Building Energy Standards 2020 Vermont Residential Building Energy Standards Fire Protection Existing fire alarm systems to be maintained. Day Care occupancies require a fire alarm system in accordance with NFPA 101. Means of Egress Building egress is not impacted by modified configuration. 1. THE CONTRACTOR IS RESPONSIBLE FOR MEANS, METHODS & SEQUENCE OF CONSTRUCTION; & ALL SAFETY & SECURITY AT THE PROJECT SITE. 2. THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT WORK AT THE SITE & FIELD VERIFYING ALL DIMENSIONS & MEASUREMENTS. NOTIFY THE ARCHITECT/ENGINEER IF ANY DISCREPANCIES ARE DISCOVERED. 3. THE OWNER IS RESPONSIBLE FOR LAND SURVEYS, TOPOGRAPHIC SURVEYS, BOUNDARY & PROPERTY SURVEYS. THE OWNER IS RESPONSIBLE FOR ZONING & PLANNING BOARD APPROVALS & PERMITS. 4. THE CONTRACTOR IS RESPONSIBLE FOR THE BUILDING PERMIT, ELECTRICAL INSPECTIONS & ANY OTHER PERMITS/INSPECTIONS REQUIRED FOR THE PROJECT REQUIRED BY THE AUTHORITIES HAVING JURISDICTION. 5. RELINQUISH ANY CONSTRUCTION MATERIALS, EQUIPMENT, & FIXTURES REQUESTED BY OWNER. 6. DISCONNECT & PROPERLY TERMINATE ALL PLUMBING, HEATING & ELECTRICAL SYSTEMS IN STRUCTURE TO BE DEMOLISHED. 7. PROVIDE TEMPORARY SHORING OF ALL STRUCTURES PRIOR TO & DURING WORK & PROTECT REMAINING STRUCTURE FROM DAMAGE. 8. MAINTAIN STRUCTURE IN WEATHERTIGHT CONDITION AT ALL TIMES. 9. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL SUB-CONTRACTORS, SUPPLIERS & VENDORS; AS WELL AS DELIVERIES, OFF-LOADING & HANDLING OF ALL MATERIALS & EQUIPMENT. 10. "DEMO" SHALL MEAN DEMOLISH, REMOVE, & PROPERLY DISPOSE OF DESIGNATED BUILDING COMPONENTS. 11. THE OWNER IS RESPONSIBLE FOR THE DISCOVERY & DISCLOSURE OF HAZARDOUS CONSTRUCTION MATERIALS/FINISHES AT THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER PROTECTION OR REMOVAL OF HAZARDOUS CONSTRUCTION MATERIALS/FINISHED DURING CONSTRUCTION, IN COMPLIANCE WITH ALL STATE & FEDERAL REGULATIONS (I.E. ASBESTOS, LEAD PAINT/PIPING, PCB'S, ETC.). 12. ALL DIMENSIONS OF EXTERIOR WALLS ON PLANS ARE BASED ON FACE OF FOUNDATION WALL, CMU & SHEATHING (NOT FINISH SIDING OR EIFS). 13. ALL CONSTRUCTION MATERIALS & PRODUCTS SHALL BE INSTALLED STRICTLY IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. 14. CONTRACTOR SHALL VERIFY ALL LOAD BEARING WALLS, POSTS, BEAMS, ETC. & NOTIFY ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS WITH NEW WORK. GENERAL NOTES: INTERIOR PARTITION: 5/8" GWB STEEL FRAMING 5/8" GWB FINISH TO MATCH EXISTING KEY: EXISTING WALL DEMO WALL NEW WALL NOTE: MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DESIGN BY OTHERS. A Plo t D a t e : Fil e P a t h : DRAWING TITLE: AES PROJ. #: PROGRESS SET - NOT FOR CONSTRUCTION 1" 2" 3" DRAWN BY:DESIGNED BY: ISSUE #:DESCRIPTION:DATE: SHEET NO. : 10-12 City Hall Place, Plattsburgh, NY 12901 www.aesnortheast.com © Copyright AES Northeast All Rights Reserved Note: It is a violation of law for any person, unless they are acting under the direction of a licensed Professional Engineer, Architect, and a specific description of the alteration. Landscape Architect, or Land Surveyor, to alter an item in any way. If an item bearing the stamp of a licensed professional is altered, the altering Engineer, Architect, Landscape Architect, or Land Surveyor shall stamp the document and include the notation "altered by" followed by their signiture, the date of such alteration, SUBCONSULTANT: 2/ 2 1 / 2 0 2 4 9 : 5 6 : 2 7 A M P: \ 5 2 \ 5 2 0 9 D e s a u t e l s , G r e g - V a r i o u s P r o j e c t s \ F D r a wi n g s \ 2 E n g _ A r c h \ 6 C o n D o c s \ 5 A \ L e a p s a n d B o u n d s - SB N e w W o r k - R e v 2 . r v t 2/21/2024 9:56:27 AM PLAN LLKPCY A-101 DE S A U T E L S 18 2 0 S H E L B U R N E R O A D 18 2 0 S H E L B U R N E R D . SO U T H B U R L I N G T O N , V T 5209 SCALE: 1/8" = 1'-0"A-101 2 LEVEL 1 - NEW CONSTRUCTION