Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation WWA-24-111*Flow Calculations (You may substitute an engineer’s calculation or letter for the information requested below) For residential projects, list number of bedrooms and units requested: Number of Bedrooms Number of Units X Gallons per day per unit = Total Flows 1 140 2 or more 210 TOTAL Notes: ___________________________________________________ ________________________________________________________ For commercial and industrial projects, list existing and proposed tenants, uses and flows: Tenant/ Type of use Number of Flows per Other Total Business seats, SF, etc X unit Adjustments Flow TOTAL *Total development wastewater flow requested: ________gallons per day Flow characteristics (for commercial and industrial projects) Volume: ____________________________________________________________ __________________________________________________ Flow rate: ____________________________________________________________ __________________________________________________ Strength: ____________________________________________________________ __________________________________________________ additional for a total of 2,120 gallons per day Please do not write below this line Application & Recording Fee received: _____________ ________ Name Date Receiving Plant: ______Airport Pkwy _____Bartlett Bay City Center District: ____Yes _____No Approved by Water Pollution Control Department (Commercial and Industrial Projects) ______________________ _____________ Director of Water Pollution Control Date Preliminary allocation issued: (payment of fee is not required) _______________________ _____________ Director of Planning and Zoning Date Final allocation issued: (payment of fee is required, either in full or pro-rated for projects with multiple zoning permits involved) _______________________ _____________ Director of Planning and Zoning Date Final allocation expires _________________with permit #____-____-____ (Date) Zoning permit issued___________________with permit#____-____-____ (Date) Associated WW connection permit (if applicable) #____-____-____ For extensions of Final Allocation Only EXTENSION GRANTED ____________to______________ (Date) (Date of Expiration) 50% EXTENSION FEE PAID _________ $___________ (Date) (Amount) Existing Water flows:Existing Sewer flows:Existing Office Building at 4 Laurel Hill Drive - Municipal Connection Existing Office Building at 4 Laurel Hill Drive - Municipal Connection Green Mountain Credit Union Green Mountain Credit Union·13 Employees x 15 gpd/employee =195 gpd ·13 Employees x 15 gpd/employee =195 gpd·200 Customers x 4 gpd/customer =800 gpd ·200 Customers x 4 gpd/customer =800 gpd 802 Eye Care 802 Eye Care·5 Employees x 15 gpd/employee =75 gpd ·5 Employees x 15 gpd/employee =75 gpd·25 Patient x 4 gpd/patient =100 gpd ·25 Patient x 4 gpd/patient =100 gpd Vermont Women's Magazine Vermont Women's Magazine·3 Employees x 15 gpd/employee =45 gpd ·3 Employees x 15 gpd/employee =45 gpd State Farm Insurance Agent State Farm Insurance Agent·1 Employees x 15 gpd/employee =15 gpd ·1 Employees x 15 gpd/employee =15 gpd Art Instructor Art Instructor·1 Employees x 15 gpd/employee =15 gpd ·1 Employees x 15 gpd/employee =15 gpd·10 Customers x 4 gpd/customer =40 gpd ·10 Customers x 4 gpd/customer =40 gpd Lawyer Office Lawyer Office·1 Employees x 15 gpd/employee =15 gpd ·1 Employees x 15 gpd/employee =15 gpd·1 Customers x 15 gpd/customer =15 gpd ·1 Customers x 15 gpd/customer =15 gpd Counselor Counselor·1 Employees x 13 gpd/employee =13 gpd ·1 Employees x 13 gpd/employee =13 gpd·6 Patient x 4 gpd/employee =24 gpd ·6 Patient x 4 gpd/employee =24 gpd Massage Therapist Massage Therapist·1 Employees x 32 gpd/employee =32 gpd ·1 Employees x 32 gpd/employee =32 gpd·6 Client x 4 gpd/Client =24 gpd ·6 Client x 4 gpd/Client =24 gpd Total Existing Water Flow as of January 2007 = 1,408 gpd Total Existing Sewer Flow as of January 2007 = 1,408 gpd Proposed Water flows:Proposed Sewer flows: ·20 Employees x 15 gpd/employee =300 gpd ·20 Employees x 15 gpd/employee =300 gpd·1 1-Bedroom Apts x 150 municipal connection =150 gpd ·1 1-Bedroom Studio x 140 municipal connection =140 gpd·6 1-Bedroom Apts x 150 municipal connection =900 gpd ·6 1-Bedroom Apts x 140 municipal connection =840 gpd·4 2-Bedroom Apts x 300 municipal connection =1,200 gpd ·4 2-Bedroom Apts x 210 municipal connection =840 gpd Total Proposed Water Flow = 2,550 gpd Total Proposed Sewer Flow = 2,120 gpd Municipal Water Allocation Needed =1,142 gpd Municipal Sewer Allocation Needed =712 gpd Prepared by: Civil Engineering Associates 10 Mansfield View Lane - South Burlington, VT 05403 January 23, 2024 Proposed Residential Conversion at 4 Laurel Hill Drive - Municipal Connection Proposed Residential Conversion at 4 Laurel Hill Drive - Municipal Connection Proposed Water and Sewer Design Flows Laurel Hill Apartments, LLC 4 Laurel Hill Drive, South Burlington, Vermont 05403 P:\AutoCADD Projects\2023\23151-West\3-Permitting\3-State Applications\Wastewater\Design Flows Table - 4 Laurel Hill-1-23-2024