Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation Supplemental Info (7) 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com May 25, 2012 Debra Bell, Senior Project Manager Trudell Consulting Engineers P.O. Box 308 478 Blair Park Road Williston, Vermont 05495 Re: 1,325 Shelburne Road Wastewater Allocation Dear Deb, This letter is to confirm that the property on which the above listed facility is located is presently connected to the city’s water and wastewater system. Based on the information you have provided us, no additional wastewater capacity allocation is necessary. Your information includes:  The addition does not warrant additional flow increase based on the EPR criteria.  The current water usage is 457 gpd times 80 percent reduction for connection to municipal system equals 366 gpd for wastewater flow.  Floor drains are connected to the municipal system via an oil/grit separator at the rear of the building as shown on the site plan approved plans  Hand car washing occurs for new cars  The applicant anticipates 25 employees at the Audi dealership Please note that any proposed increases in wastewater flows, as determined by State regulations, will require a permit for allocation from the City. Please contact me should you have any questions. Sincerely, Paul Conner, AICP Director of Planning & Zoning cc: Justin Rabidoux, Director of Public Works