Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda 07_SD-24-01_0 Catamount Drive_UVM_SK
CITY OF SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD SD-24-01_0 Catamount Drive_UVM_SK_2024-02-06.docx DEPARTMENT OF PLANNING & ZONING Report preparation date: January 24, 2024 Application received: December 21, 2023 0 Catamount Drive/870 Williston Road MASTER PLAN SKETCH PLAN APPLICATION #SD-24-01 Meeting date: February 6, 2024 Owner 1/Applicant (0 Catamount Drive) University of Vermont & State Agricultural College 31 Spear Street; Marsh Hall Suite 10 Burlington, VT 05401 Owner 2 (870 Williston Road) AAM Catamount Woods, LLC 78 Blanchard Road, Suite 100 Burlington, MA 01803 Property Information Tax Parcel IDs: 1810-00870.L 87.56 acres Commercial 1-Residential 12 Zoning District Engineer Krebs & Lansing Consulting Engineers 164 Main Street, Suite 201 Colchester, VT 05446 Location Map #SD-24-01 UVM Master Sketch Plan 2 PROJECT DESCRIPTION Master plan sketch plan application #SD-24-01 of University of Vermont & State Agricultural College to establish a master plan for an existing 87.6 acre lot developed with a parking lot, supporting driveways, and a helipad. The master plan consists of 275 units of housing in two five- story buildings over two phases, and associated site improvements on 5.7 acres, 0 Catamount Drive. PROJECT CONTEXT As described by the applicant, the project consists of constructing two residential buildings for use by University of Vermont students. Concurrently with this project, the applicant intends to submit a form based code application for development of a parking garage and hotel addition on the adjacent Doubletree Hotel lot. These applications will be closely related and the development on the adjacent lot will be an important component of the Development Context Analysis required to be submitted at the next stage of master plan review. COMMENTS Development Review Planner Marla Keene and Planning and Zoning Director Paul Conner, herein after referred to as Staff, have reviewed the plans submitted by the applicant on December 21, 2023 and offer the following comments. A) 15.B Master Plan Review 15.B.03 Master Plan Review Process C. Combined Review. Master plan review is required prior to or in association with preliminary subdivision review, or site plan review if no subdivision of land is proposed. The DRB may simultaneously review the Master Plan with any area proposed for preliminary subdivision or site plan review, but must issue separate findings of fact, and any conditions of approval, specific to each type of review. 1. Staff recommends the Board ask the applicant to describe their proposed phasing (including geography and timing) and whether they plan to seek concurrent approval for all or part of the project at the same time as the master plan approval. The applicant is reminded that they can obtain full final plat approval and still phase construction within a final plat area if that is a configuration that works best for them. 15.B.04 Master Plan Components An application for master plan requires a specific set of submission requirements that have the effect of describing the project and how it relates to the surrounding area, both in terms of natural features and development. Specific requirements include the following, which will need to be submitted at the next stage of review. B. Project Description This submission requirement includes the overall vision for and scope of the proposed development, as well as any requested modifications or waivers. The applicant in their cover letter for this sketch plan application indicated they will be seeking waivers for minimum required parking and front setbacks. These elements are discussed below. #SD-24-01 UVM Master Sketch Plan 3 G. Buildout Analysis and Budget This submission requirement provides totals of coverage, unit count, affordable units, civic spaces, trip generation, and water/wastewater demand for the entire master plan and for each phase. The buildout budget needs to fit within the allowable calculations for each subject area and sets the stage for future subsequent reviews within the master plan area. While the Buildout Budget is largely focused on statistics pertaining to the number of units, given the unusual makeup of the planned residents (1 adult per bedroom), Staff recommends the applicant also consider in their analysis the anticipated number of residents to get a relative scale of the project. H. Design Standards The master plan must propose standards for a number of project features, including the following. • Natural resource protection • Typical street cross sections by Street Type • Typical Civic Space types • Building heights and setbacks • Overall landscaping and lighting plan Staff recommends the Board discuss the following aspects of the design with the applicant. Natural Resource Protection. The project parcel includes large areas of natural resources protected by the LDRs, including wetlands, river corridors, very steep slopes, and habitat blocks. All of these features exist in proximity to the proposed development area. It appears the project is proposing to avoid impacts to these areas except for proposed stormwater treatment within an area of river corridor. The proposed river corridor impacts will be prohibited unless the applicant can demonstrate that the river corridor is incorrect, in accordance with the procedure described in LDR 12.07F(4). 2. Staff recommends the Board work with the applicant to determine at what stage of review it would be appropriate to demonstrate that the proposed stormwater treatment may be allowed. Staff considers that this should occur before the first phase that depends on the proposed stormwater treatment system. Street cross section. Since buildings must front on streets, the project requires upgrading the existing site drive from a driveway to a street. 15.14C(3) requires the street to be offered to the City as a public street since it will provide future extension to an adjoining unaffiliated property or another existing, proposed, or planned public street. The street may, however, remain private. 3. Staff recommends the Board ask the applicant to describe the proposed street configuration, including the lane, greenbelt, pedestrian accommodation widths as well as streetscape features including edge treatment, landscaping, and other features, and provide feedback on whether the proposed design is heading in the right direction at this stage of review. Staff notes the street must meet one of the approved street types in LDR 11.A. J. Management Plan The applicant must include at the next stage of review a proposed management structure responsible for project development, and, following project completion, long term ownership and management. #SD-24-01 UVM Master Sketch Plan 4 4. Staff recommends the Board ask the applicant to describe the project team in order to determine if an entity other than the University of Vermont need be included in the required management plan. 15.B.05 Review Standards A. Findings The purpose of the required master plan findings is to establish sufficient detail to provide the framework and standards for future development under the plan. The Board must establish a Buildout Budget, design standards, a phasing plan, and a management plan at the master plan stage of review This application consists of a sketch of a master plan, the purpose of which is to get a broad understanding of the project and to have sufficient information to classify the next stage(s) of review. 15.B.06 Master Plan Approval, Effect, Duration, Amendment B. Subsequent Regulatory Review The master plan approval both requires the Board establish and gives the applicant the opportunity to request process waivers for subsequent applications filed under the master plan. Phases of the proposed project which are described in greater detail and are reviewed comprehensively by the Board at the Master Plan level can be permitted with a simple site plan review. Phases of the proposed project which are still relatively in flux at the Master Plan level will need to be heard by the Board again, as preliminary subdivision applications, before they can be permitted. By right, sketch plan review is not required for any application for preliminary subdivision or site plan review that complies with the approved Master Plan, and associated conditions of approval. The DRB may also waive preliminary subdivision or site plan review for specified phases, or specify changes which may be reviewed administratively. These process waivers are one of the main benefits of a Master Plan afforded an applicant. With the Master Plan submission, the applicant should propose what levels of review they are seeking for subsequent phases. In order of lowest to highest level of detail required at master plan, potential levels of review are: • Preliminary and final plat • DRB Site plan • Administrative Site plan • Zoning permit. 5. The applicant has not requested any process waivers as part of this sketch plan application. Staff recommends the Board afford the applicant the opportunity to bring up potential process waivers and provide feedback on the viability of such a request. C. Effect For the master plan approval, the Board must make specific findings as to which components of the Master Plan are vested, based on the type, level, and detail of information provided in the Master Plan, and the amount of time the plan is intended to remain in effect. The Board may approve components or elements of the Master Plan as applicable to all subsequent applications; or determine those components or elements of the Master Plan that are vested, or not vested, for the duration of the plan. #SD-24-01 UVM Master Sketch Plan 5 6. This has historically been a challenging concept to convey to applicants. However, when done well, it can significantly simplify subsequent reviews. Staff recommends the Board discuss with the applicant for which components or elements of the project they intend to ask approval at the master plan level. B) Subdivision Standards The project involves subdivision of land in that it creates a lease line between the development area on the south of the site and the portion of the lot that is largely encumbered by habitat block to the north. 15.A.11 General Standards A(3) Buildable Area The allowed number of dwelling units within a subdivision is calculated based on Buildable area of the parcel. The buildable area is defined as the total land area of the subdivision minus the area occupied by Hazards, Level 1 resources, existing and planned rights of way, and transmission lines and corridors. The total parcel size reported by the applicant is 87.56 acres. The applicant is proposing 275 units. As noted above, a large portion of the subject property is encumbered by protected natural resources. The applicant has calculated buildable area to be 57.7 acres, but it appears the applicant has incorrectly included habitat block and river corridor as buildable area. 7. Staff estimates, based on provided plan sheet DP-1.0, there are only approximately 11 buildable acres, which would allow construction of only approximately 130 units without consideration for affordable housing bonus units or transferred development rights or creation of a conservation PUD, discussed below under 15.C Planned Unit Development Review. Staff recommends the Board ask the applicant to describe how they will achieve the desired density. C(2) Multiple Districts For subdivision of land located in more than one zoning district, the standards specific to the portion of land within each district shall apply. The applicant has not shown zoning district boundaries on their submitted plans, but it appears the project encompasses lands in both the T4 and the C1-R12 zoning districts in the proximity of Williston Road. This section permits the Board to extend zoning district standards up to 50-ft in either direction beyond the district boundary line as necessary to avoid a subdivision or building lot split by a zoning district boundary, but it appears 50-ft is insufficient to accommodate the applicant’s proposed development. If the building is split between zoning districts, Staff considers it will be required to meet the standards of the T4. If the building is entirely within the C1-R12, it may be possible to consider the circulation within the T4 as an allowed use within that district. 8. Staff recommends the Board require the applicant to show the zoning district boundaries on the plans showing proposed development, and discuss the implications thereof. 15.A.12 Resource Protection Standards D. Resource Protection Areas Subdivision boundaries must be located to avoid, or, where deemed necessary by the DRB, to minimize the subdivision and physical fragmentation of natural resources. Sheet DP-1 shows the involved natural resource areas. The applicant has largely avoided natural resource impacts as described above. Staff notes that when the applicant applies for final plat review of the proposed subdivision and PUD, they will be required to demonstrate they have met the details of resource protection. #SD-24-01 UVM Master Sketch Plan 6 15.A.14 Street Network B. Street Layout The arrangement of streets serving the subdivision must incorporate and extend the network of existing and planned arterial, collector and local streets in the vicinity, including existing and planned streets serving adjoining subdivisions, and as shown on the City’s Official Map. Streets must be extended to other connecting rights-of-way or easements through adjoining properties. C. Street Design All streets, including both public and private streets, must be designed and constructed by the applicant or developer to City specifications, unless otherwise specifically authorized by the DRB under final subdivision approval. (3) Public Streets. The DRB shall require a street to be offered for dedication to the City as a public street in accordance with the following: (a) The proposed street will or could provide a future extension to an adjoining unaffiliated property or to another existing, proposed, or planned public street. (6) All streets must be designed and constructed with sidewalks, greenbelts, bike facilities, medians, travel lanes and on-street parking as specified for each street type, unless an acceptable alternative is approved by the DRB under Subsection (7) below. The street type standard applicable to a proposed street or section of roadway shall be determined by the Development Review Board, in consultation with the Public Works and Planning & Zoning Departments, based on supporting documentation and the following criteria: (a) Any street type listed for a specific section of roadway, as shown on the Official Map or the Official Zoning Map, shall be the applicable street type for purposes of these regulations. (b) The street type must be listed as an eligible or allowed street type as specified by Zoning District, Transect Zone Building Envelope Standard, or PUD type. (c) The proposed street must conform to the stated intent of an applicable street type and intended uses and activities listed for that type. (d) The street type must be consistent with planned, proposed or anticipated connections to or extensions of existing streets. (e) The street type must be consistent with the specified design speed and design vehicle and accommodate projected traffic volumes at buildout. (f) The street type, including associated facilities, must accommodate all anticipated users, including motorists, pedestrians, cyclists and transit riders. (g) The street type must conform to Comprehensive Plan policies, and any long range studies, capital plans, and other related city planning and policy documents specific to the street, the location, and the planned pattern of development in the vicinity of the subdivision. The applicant is proposing to create a new public street where the existing driveway west of the Doubletree exists. The proposed right-of-way is 50-ft wide. There exists the ability for the Board to modify required street standards, but there is a rigorous set of seven standards that must be met in order to do so. Staff of the Department of Public Works offer the following comments relevant to the proposed street. #SD-24-01 UVM Master Sketch Plan 7 • In a future submission, please provide cross sections for all roads. • In a future submission the applicant should assess the condition of Catamount Drive and make recommendations for maintenance/upgrade/improvement. • Why are they proposing a 50’ ROW when it is 60’ near the Doubletree? 60’ would avoid easements for the path. Staff recommends the applicant to incorporate the comments of the Department of Public Works and work with Staff as necessary prior to the next submission to arrive at a proposed road type. 15.A.15 Sidewalks, Bike Lanes, and Recreation Paths This section pertains to bicycle and pedestrian access and circulation throughout a subdivision. Staff of the Department of Public Works offer the following comments relevant to this section. • The greenbelt between the road and the path should be at least 7’ wide for the trees to stay healthy and avoid root damage to the path. Since the new path connects to the existing path on a curve, this should be easy to make a smooth transition to a wider green belt. • Since they’re repaving in the drop off area on the back of the Doubletree, is this an opportunity to reconfigure this area? It’s kind of a free for all and this seems like a good chance to improve it. • Can the sidewalk along the driveway be brought back from the road? Ideally at least 5’, 7’ if they want trees. This would make it much more comfortable for users. • The sidewalks off the courtyard areas shouldn’t be going into the road unless there’s another sidewalk or path to connect to. They go through the fence anyway so I’m not sure of their purpose. • I realize it’s early on in the planning but based on other UVM buildings, they’ll likely need more bike racks (ideally these will be sheltered indoors when we get the next phase’s application). Staff notes that they have been working with the applicant to address some of these comments, while others have not yet been discussed. Staff recommends the applicant incorporate the comments of the Department of Public Works into their plans prior to the next submission. 9. Further, due to the importance of this project’s location relative to connectivity between different existing and proposed shared use path connectors, Staff recommends the Board refer the project to the City Bicycle and Pedestrian Committee for review. If the Board agrees, Staff recommends the Board determine the timing they will require relative to the other pending stages of review (master plan, preliminary plat, or final plat). 15.A.18 Infrastructure, Utilities and Services This section pertains to capacity of community facilities, water and wastewater, fire protection, stormwater, utilities, street lighting, and renewable energy services. The following comments pertaining to these standards have been provided by various City department heads. Department of Public Works • Does this plan limit our ability to treat stormwater as specified in Flow Restoration Plans approved by Vermont DEC? • In a future submission, please be sure to provide information on the wastewater collection system on the project site and leading to the connection point on Williston Road. #SD-24-01 UVM Master Sketch Plan 8 • Will the fire lane be limited access? Will it have a stop sign at the intersection with the main driveway? • On the road, they’re calling out new subbase and asphalt, so we’ll just want to make sure we spec out the right thicknesses. They’re showing 24’ feet which is more than enough width. Fire Department • The “fire lane” is a dead end with no turn around at the end or does it connect back into a parking lot? • What is the hydrant/water flow capacity in the area. • What is the weight capacity of the bridge on Catamount Dr.? • What is the impact on traffic with the UVM-MC parking area to the NE? • Are these building conjoined or separate structures? • All structures shall be fully fire protected. As above, Staff recommends the applicant incorporate the comments of the City Directors into their plans as part of the next submission. C) 15.C Planned Unit Development Review 15.C.02 Applicability There are three PUD types available in South Burlington. In the case of a property in this zoning district that is greater than 4 acres, a PUD is optional. Allowed options include the General PUD, and, because at least 50% of the area of the property is encumbered by Hazards, Level 1 Resources, and/or Level 2 resources, the Conservation PUD. 15.C.04C. Compliance with Regulations (2)(a) Official Map. The City’s official map includes an existing recreation path on the subject property. The path must, and is proposed to, continue to exist. (3) Alternative Compliance Site plan standards and subdivision standards permit the Board to modify most dimensional standards, but standards that are not dimensional may only be modified by Alternative Compliance. Alternative compliance is permitted “to provide the flexibility necessary to address unique site conditions or constraints; to enable compatibility with existing or planned development in the vicinity; or to allow for exceptional and innovative design. Note that alternative compliance does not constitute an exemption from a PUD standard. Allowed modifications include proposed functional or design alternatives that may be considered in place of a specific requirement under this Article, only if the intent of the requirement is met or exceeded.” The applicant has indicated in their cover memorandum that at this sketch plan stage of review they know that they intend to request modification of the minimum required parking and minimum required front setback. Staff also notes it appears the applicant will be seeking a side setback waiver. Since parking is not a dimensional standard, Staff considers the applicant must seek approval as a PUD. • Parking Minimum: 1 space per unit required (275 units and 94 parking spaces #SD-24-01 UVM Master Sketch Plan 9 proposed) • Front Setback: 30 ft required (7 ft proposed) • Side Setback: 10 ft required (3 ft proposed) 10. Staff recommends the Board discuss with the applicant whether they intend to pursue a Conservation or General PUD. Specifics of each type are discussed below, which Staff recommends the Applicant and Board review before the hearing in order to inform this and the subsequent discussion. In order to approve a modified standard, the Board must find, based on the applicant’s provided materials, that the proposed alternative: (a) Conforms to the intent, description, and defining characteristics of the selected PUD type(s); (b) Achieves the intent of the PUD standard to be modified; (c) Results in development that is equivalent or demonstrably superior in function, design, and quality to that required under the standard to be modified; and (d) Does not adversely impact properties, uses or facilities within, adjacent to, or in the vicinity of the planned development (e.g., regarding walkability, traffic, parking, drainage). The DRB in approving an alternative form of compliance may attach conditions as necessary to ensure compliance, or to mitigate any adverse impacts resulting from a proposed alternative. 11. Staff recommends the Board begin the discussion of how reduced parking and reduced front setback achieves the above criteria, specifically letters (c) and (d) as they pertain to parking. Within all potentially applicable PUD types, the following apply. Development Context The applicant must demonstrate that the proposed PUD is compatible with the Planning Area, as determined from a detailed analysis of a provided “Development Context,” which includes details of the allowed development in the project area, the predominant pattern of development in terms of geometry (lot sizes, height, setbacks), streetscapes, and building styles. 12. Staff recommends the Board ask the applicant to provide an initial description of the proposed form of the development and how it has been designed to complement the development context. Civic Spaces and Site Amenities. 10% of the total buildable area must be allocated as civic spaces for all conservation PUDs and for general PUDs consisting of three or more lots. Civic spaces are separate from site amenities. However 14.06C(4) permits the DRB to reduce the site amenity requirement up to 50% when a civic space is provided on site or directly accessible 13. Civic Spaces must meet one of the qualifying types in Article 11. Staff recommends the Board ask the applicant to describe how the proposed civic spaces relate to the development context. 15.C.05 Conservation Development If the applicant considers they will pursue a Conservation PUD, the Board should review this section. #SD-24-01 UVM Master Sketch Plan 10 A. Description. A Conservation PUD (CON PUD) is a type of planned development intended to permanently conserve natural resource and other open space areas identified by the City for protection in conformance with the Comprehensive Plan, and supplemental open space plans and resource inventories; while also allowing for compatible, clustered forms of land subdivision and development on a portion of the tract or parcel to be conserved. The primary objective of this PUD type is to conserve large or contiguous tracts of open space in one or more designated “Conservation Areas” while allowing for the transfer of development density from these areas to a designated “Development Area,” delineated to exclude adjacent Conservation Areas, as shown on the PUD Master Plan. C. Applicability A conservation PUD would be allowed for this project because of criterion 3(b): In any other underlying zoning district that allows for Planned Unit Development, for any tract or parcel of two (2) or more acres in which a minimum of 50% of the total tract or parcel area consists of Hazards and/or Level I Resources identified for protection under Article 12. E. Conservation PUD Sub-Zones The conservation area must comprise 70% of the total lot and must contain all hazards and level 1 resources as defined in Article 12. The remaining lands to make up the 70% minimum must prioritize conservation of other resources, buffers, woodlands, scenic areas, significant natural communities, and historic sites. The Conservation Area must be conserved as permanently protected Open Space through a conservation easement or dedication to the City or to a nonprofit conservation organization. Within the remaining Development Area, the applicant must provide a concentrated, clustered form of development compatible with the density of development allowed within the underlying zoning district, but which may incorporate density transferred from the conservation area. The total number of units permitted is calculated as follows. Assigned Housing Units = (Total Tract Area – Hazards Area) x Zoning District Base Density (DU/A) In the case of this project, hazards include only floodplain and river corridor. Development as a Conservation PUD would permit the applicant to construct the desired number of housing units without requiring the use of bonus housing for provision of inclusionary housing or Transfer Development Rights. There is also a minimum density, which is equal to four units per acre in the Development Area. Other standards of the Development Area are generally similar to that of the underlying zoning district, with the following exceptions. (e) Building Types. (iii) Principal buildings and building entrances must be oriented to and accessed from the street, an adjoining courtyard, or civic space. Secondary entrances may open onto side or rear garages or parking areas. The placement of garages and parking areas within the Development Area, if not specified otherwise specified by zoning district or associated PUD type, must meet applicable standards under Section 13.17 and 9.10 as applicable. (f) Housing Mix. A mix of two or more housing types and styles must be provided as allowed within the applicable zoning district pursuant to Section 15.A.17, as required for affordable housing, or as specified for an associated PUD Type, for any residential or mixed-use development that includes four (4) or more residential building lots. Within these #SD-24-01 UVM Master Sketch Plan 11 developments, the Development Area must include an integrated mix of housing types and styles within neighborhoods, blocks, and along street frontage, rather than segregating or compartmentalizing housing types by block or street. 14. If the applicant is inclined to pursue a conservation PUD, Staff recommends the Board enter into a preliminary discussion of how buildings will meet the orientation requirements, and the required housing mix. 15.C.07 General PUD If the applicant considers they will pursue a General PUD, the Board should review this section. A. Authority Within a General PUD, the Board is prohibited from modifying the following standards a) Density restrictions b) Requirements of Transit Overlay District c) Lot and building coverage maximums across the PUD as a whole d) Environmental Protection Standards e) Parking and building location requirements I. General PUD Design Standards (6) Housing Mix. In a General PUD with more than four (4) residential dwelling units, a mix of two or more dwelling unit types (as allowed within the applicable zoning district) must be provided as described by Section 15.A.17. Types of dwelling units are differentiated by either housing type under Article 11.C or, within multi-family structures with more than four (4) dwelling units, by number of bedrooms per unit. If the applicant is inclined to pursue a general PUD, Staff recommends the Board ask the applicant to describe their proposed mix of bedrooms and provide feedback on whether the Board will find this mix to be acceptable. D) Inclusionary Zoning 15. 18.01B(3) exempts project that are developed by an educational institution for the exclusive residential use and occupancy of its students from inclusionary housing requirements. Given the proposed partnership arrangement for development of this housing, Staff recommends the Board ask the applicant to confirm this exemption applies. E) Other Staff considers there are a handful of other subject areas which will have high importance for this project in future stages of review. Subject areas that have already been identified include stormwater management, bicycle parking and storage, commercial building energy standards. The applicant has not yet submitted any information pertaining to these subject areas at this sketch plan stage of review, though they have begun discussion of these subjects with Staff. Staff simply calls these areas to the Board’s attention as matters for future consideration. RECOMMENDATION Staff recommends that the Board discuss the project with the applicant and conclude the meeting. #SD-24-01 UVM Master Sketch Plan 12 Respectfully submitted, Marla Keene, Development Review Planner DEPARTMENT of PLANNING, DESIGN and CONSTRUCTION Planning │16 Colchester Avenue │ Burlington, VT 05405 │ (802) 656-3208 │ plan@uvm.edu Design and Construction │31 Spear Street │ Marsh Hall Suite 10 │ Burlington, VT 05405 │ (802) 656-3291 │ arch@uvm.edu To: Marla Keene PE, Development Review Planner City of South Burlington 180 Market Street South Burlington VT, 05403 December 18, 2023 Dear Marla, Re: Sketch Plan and Preliminary Master Plan Application for Catamount Woods Please find attached a sketch plan and preliminary master plan application for Catamount Woods, a multi-family housing project. This project is a collaborative effort between the University of Vermont and AAM 15 Management, LLC, the manager of AAM Burlington Hotel LLC, which is the owner of the Doubletree by Hilton hotel at 870 Williston Road. The applicant is AAM Catamount Woods LLC (a Vermont LLC) whose members include both AAM 15 Management and the University of Vermont. The project will be located on an existing parking lot behind the Double Tree Hotel. There will be approximately 184 independent apartment units in the 5-story building. Our goal is to house UVM students in 1-4 bedroom apartments as much as possible. As this is also a Master Plan application, in the future UVM intends to construct an additional housing complex closer to Williston Road, near the existing UVM Rugby Field, on the same parcel, within the City of South Burlington. This building will also be designed as a multi-family residential structure, with the intent to house UVM students. This building will include a 5-story structure with approximately 91 units. While this project is still at sketch plan stage, we already know we will need to request a parking waiver and a waiver for the front yard setback, as follows: Minimum parking according to the land development regulations would require parking for approximately 302 vehicles. We are currently showing parking spaces for approximately 94 vehicles. The University has a large suite of transportation demand management programs which significantly reduce the need for residents to own cars. In addition, this area is highly accessible via public transit, shops and the university are located nearby, and the area is served by the Car Share and Bird bike share systems. The minimum front yard setback in the C1-R12 zoning district is 30’. In this case we would like to match the 0-12’ front yard setback of the nearby future garage structure, which will be the closest structure to the proposed building on the (new) street, and is located in the FBC district. We calculated the application fee to be $5,138, based on 184 residential units. We would like to have this application reviewed at the DRB as soon as possible. Please let us know if you have any questions or would like any further information. Thank you, Lani Ravin, AICP > CATAMOUNT DRIVE WI L L I S T O N R O A D City o f S o . B u r l i n g t o n City o f B u r l i n g t o n WIL L I S T O N R O A D o o o o o o o o o o CATA M O U N T D R I V E o o o o o o o o o o o o o o o INT E R S T A T E 8 9 Exit 1 4 O f f R a m p Inte r s t a t e H i g h w a y O v e r l a y D i s t r i c t Com m e r c i a l 1 - R e s i d e n t i a l 1 2 D i s t r i c t City C e n t e r F o r m B a s e d C o d e T - 4 Tr a n s i t O v e r l a y D i s t r i c t LOCATION MAP SCALE: 1" = 2,000 FT SITE LAT: N44° 28' 21" LONG: W73° 11' 11" Soil Test Pit Log DoubleTree by Hilton 870 Williston Rd, South Burlington Vermont Date:May 3, 2023 Weather:50° F, Rain, ±2.1" of rain in the previous thee days Present:Cameron Goodrich, Krebs & Lansing Consulting Engineers, Inc. NLTD = no ledge to depth HSWT = high seasonal water table NWTD = no water to depth TP-1 0” - 13”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, roots, few gravels 13” - 29”2.5Y 4/3 Olive Brown, gravelly loamy sand, single grain, loose, few roots, damp, heavy seeps @ 29” NLTD, Water = 29” TP-2 0” - 12”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, roots, few gravels 12” - 18”2.5Y 5/3 Light Olive Brown, cobbly loamy sand, single grain, loose, damp, roots, few gravels 18” - 48”10YR 5/3 Brown, gravelly loamy sand, single grain, loose, few roots, few cobbles, redox begins @ 48”, heavy seep @ 28” 48” - 66”10YR 5/3 Brown, gravelly loamy sand, single grain, loose, few cobbles, redox throughout layer NLTD Water = 102” SHWT = 48” TP-3 0” - 8”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, heavy root density, few gravels 8” - 20”10YR 5/3 Brown, loamy sand, single grain, loose, structures, roots, damp 20” - 46”10Yr 5/6, Yellowish Brown, fine loamy sand, sub angular blocky, friable, few roots, damp, Redox begins @ 46” 46” - 52”2.5Y 5/1 Gray, fine loamy sand, single grain, soft, friable, damp, redox bands until 49” and clean below NLTD, NWTD HSWT = 46” TP-4 0” - 6”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, roots, few gravels 6” - 17”2.5Y 4/4 Olive Brown, loamy sand, single grain, loose, structures, soft, damp, redox begins @ 17” 17” - 52”2.5Y 5/1 Gray, loamy fine sand, sub angular blocky, moderate firm, saturated with moisture, redox throughout layer, seeps @ 50” NLTD Water = 50” HSWT = 17” TP-5 0” - 14”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, roots, few gravels, ledge @ 14” Ledge = 14” TP-6 0” - 6”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, roots, few gravels 6” - 16”7.5YR 5/4 Brown, gravel fill, very gravelly sand, loose, single grain, damp, landscape fabric @ 16”, redox begins below landscape fabric 16” - 32”2.5Y 4/1 Dark Gray, gravelly sandy silt, massive, very firm, models and redox throughout layer, seeps @ 32” NLTD Water = 32” HSWT = 16” TP-7 0” - 2”10YR 2/2 Very Dark Brown, gravely loamy sand, single grain, loose, organic layer, damp, roots 2” - 10”7.5YR 5/4 Brown, gravel fill, very gravelly sand, loose, single grain, damp 10” - 15”10YR 3/3 Dark Brown, loamy sand, single grain, loose, soft, damp, few gravels, roots 15” - 31”10YR 5/4 Yellowish Brown, loamy fine sand, single grain, loose, damp, few roots and gravels, redox begins @ 31” 31” - 43” 2.5Y 5/3 Light Olive Brown, loamy fine sand, sub angular blocky, friable in hand, very damp, roots, redox throughout layer NLTD, NWTD HSWT = 31” TP-8 0” - 12”10YR 3/3 Dark Brown, loamy sand, single grain, loose, damp, roots, few gravels 12” - 20”2.5Y 4/3 Olive Brown, cobbly loamy sand, single grain, loose, damp, multiple seeps @ 18”, redox begins @ 20” 20” - 32”2.5Y 5/2 Gray, loamy silt, massive, moderate firm, water pooling at bottom of test pit, NLTD, Water = 18” HSWT = 20”C-2.0 OVERALL EXISTING CONDITIONS PLAN 1 60 81 Maple Street - Burlington VT 05401 802-864-6844 - www.fffInc.com Architecture - Planning - Interiors SOUTH BURLINGTON, VERMONT 2228.1 tME 164 Main Street, Suite 201 Colchester, Vermont 05446 (802) 878-0375 www.krebsandlansing.com CIVIL ENGINEER 12202 CATAMOUNT :OODS HOUSING X.BASE.dwg S.ETCH PLAN ORIGINATION DATE: SCALE: DRAWN BY:CHECKED BY: K&L PROJECT NO: ISSUE LOG: SHEET CONTENTS: SHEET NO: © 2020 Freeman French Freeman Inc. DOUBLE TREE HOTEL ^ ^ ^ ^ ^ o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o PAT C H E N R O A D PAT C H E N R O A D PATC H E N R O A D VALLE Y R I D G E R D VALL E Y R I D G E R D VALLEY RIDG E R D VALL E Y R I D G E R D VALLEY RIDGE R D PA T C H E N R O A D INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTER S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTER S T A T E 8 9 INTE R S T A T E 8 9 INTER S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 o o o o o o o o o o o o o o o o o o o o o INTE R S T A T E 8 9 INTE R S T A T E 8 9 ^ o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o WILLIS T O N R O A D WILLIS T O N R O A D WILLIS T O N R O A D WILLIS T O N WILLIS T O N R O A D WILLIST O N R O A D INT E R S T A T E 8 9 INT E R S T A T E 8 9 INT E R S T A T E 8 9 INT E R S T A T E 8 9 INT E R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 INTE R S T A T E 8 9 o o o o o o o o o o o o o o o o o o o o o o o o o ooo o o o o o o o o o o o o o o o o o o o WILLISTO N R O A D WILLISTO N R O A D o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o FP FP SAT.DISH SAT.DISH SAT.DISH SAT.DISH SAT.DISHSAT.DISH 304.2 302.3 303.1 301.9 299.8 302.2 303.6 290.0 287.7 320.0 310.0 302.3 302.7 301.3 312.1 305.4 314.5 293.6 292.0 290.0 282.2 280.1 277.2 291.9 289.9277.3 289.5 290.8 292.0 279.0 293.8291.9 276.0 291.7 284.2281.4 291.7 284.0 283.4 289.8 287.7 280.3 280.2 296.7 289.2 301.5 304.5300.2 292.0 292.9 301.6 299.5 294.1 282.7 286.5 295.9 291.7 289.7274.8 301.6 299.7 289.0 293.5286.0 282.9 290.5 289.5 300.6 298.8 296.9 261.4 268.6 266.0 265.1 265.3265.6 265.6 265.6 261.0 263.6 260.8 258.2 255.5 302.8 308.4 304.5 313.7 305.0 CFC - BASEBALL CONCESSIONS0972 LAKE MONSTERS ^ ^ ^ 302.8 308.4 313.7 305.0 CFC - BASEBALL CONCESSIONS0972 LAKE MONSTERS 287 COLCHESTER AVE CFC MAINTENANCE BARNCENTENNIAL FIELD0971 City o f B u r l i n g t o n City o f S o u t h B u r l i n g t o n ^ WILLI S T O N R O A D o o o o o o CATAMOU N T D R I V E o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o CATAMOUNT DRIVE CEN T E N N I A L C O U R T ( P r i v a t e l y O w n e d ) CEN T E N N I A L C O U R T ( P r i v a t e l y O w n e d ) FAHC HELICOPTER LANDING PAD (PRIVATE)FACULTY AND STAFF APARTMENTSCENTENNIAL COURT EAS T A V E CATAMOUNT DRIVE CARRI G A N D R I V E MAIN EAS T A V E EAS T A V E 256 260 FAHC HELICOPTER LANDING PAD MAIN S T WILLI S T O N R O A D SPEA R S T EA S T A V E ANTENNA 393.2 387.2 392.4 386.2386.2 374.0 377.2 376.8 368.1 367.4 366.7 370.4 384.3 368.4 358.1 350.3 348.2 352.7 352.7 346.0 346.0 362.3 350.4 360.5 364.4 360.7 354.0 348.6 370.1 370.1 370.1367.9 364.3 364.4 367.9 344.2 345.7 346.0 375.6 376.4 375.6 370.2 370.2 373.1 373.1 349.9 350.8 349.5 City o f S o . B u r l i n g t o n City o f B u r l i n g t o n T G C 284 EAST AVE 0001 IMF280 EAST AVE0198 LIBRARY RESEARCH ANNEX282 EAST AVE0199 RESCUE FACILITY60 EAST AVE0197 Ins t i t u t i o n a l & A g r i c u l t u r a l - N o r t h D i s t r i c t Co m m e r c i a l 1 - R e s i d e n t i a l 1 2 D i s t r i c t Inte r s t a t e H i g h w a y O v e r l a y D i s t r i c t Int e r s t a t e H i g h w a y O v e r l a y D i s t r i c t Tr a f f i c O v e r l a y D i s t r i c t - Z o n e 1 Com m e r c i a l 1 - R e s i d e n t i a l 1 2 D i s t r i c t City C e n t e r F o r m B a s e d C o d e T - 4 Tra n s i t O v e r l a y D i s t r i c t NATURAL RESOURCES MAP, ZONING & DENSITY PLAN Catamount Woods Housing South Burlington, Vermont 22283 TJB 1" = 200' 12/20/2023 DP-1.0 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com Very Steep Slope (>25%) Wetlands & Buffer 18.4 ac - 800,740 sf 28.3 ac - 1,233,550 sf PROJECT INFORMATION Property Owner:University of Vermont Zoning:C1-R12 & IA NORTH Project Area/Zoning District 87.6 ac - 3,813,980 sf DoubleTree by Hilton Burlington DENSITY CALCULATIONS Density calculations based on Buildable Area which removes Hazard Areas (Very Steep Slopes, wetlands, river corridor, street Right of Ways, Special Flood Hazard Areas, and other possible environmental limitations). Refer to Density Note #1 below for removal of Habitat Blocks and Very Steep Slopes from these calculations. Buildable Area = 87.6 ac - 28.3 ac - 1.2 ac - 0.4 ac = 57.7 ac Allowable Density = 12 units/acre Maximum Density = 57.7 x 12 = 692.4 units = 692 units allowed Density Calculation Notes: 1.Applicant believes review of this application is subject to limitations set forth in 24 V.S.A § 4413, titled “Limitations on municipal bylaws,” which limits regulation of qualified uses, including schools and educational institutions, to specified criteria and only to the extent the regulation does not have the effect of interfering with the intended functional uses. Habitat Blocks and Steep Slopes are not subject to regulation per 24 V.S.A § 4413. Other mapped natural resources apply per state environmental regulations. 2.The wetland analysis was performed as a desktop review by Arrowwood Environmental and is based on LiDAR contours, soils, VSWI advisory information, and available imagery. 3.Very steep slope areas are based on orthophoto based topographic mapping prepared by the SELLS Mapping Company for the University of Vermont. 4.The River Corridor limit is based on information extracted from the South Burlington City Map Viewer. Habitat Block and Wildlife Corridor Limit Stormwater Ponds 1.2 ac - 50,890 sf Right of Ways 0.4 ac - 16,290 sf DMR East Pond Main Street Pond LAND USE LEGEND Special Flood Hazard Area River Corridor Limit INT E R S T A T E 8 9 > CATAMOUNT DRIVE WI L L I S T O N R O A D City o f S o . B u r l i n g t o n City o f B u r l i n g t o n WIL L I S T O N R O A D o o o X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X XXXXXXXX X X X X o o o o o o o o o INT E R S T A T E 8 9 Exit 1 4 O f f R a m p FAHC HELICOPTER L A N D I N G P A D EA S T A V E FAHC HELICOPTE R L A N D I N G P A D WIL L I S T O N R O A D EA S T A V E 360.5 City o f S o . B u r l i n g t o n City o f B u r l i n g t o n T G C RESCUE FACILITY 60 EAST AVE 0197 Inte r s t a t e H i g h w a y O v e r l a y D i s t r i c t Tra f f i c O v e r l a y D i s t r i c t - Z o n e 1 Com m e r c i a l 1 - R e s i d e n t i a l 1 2 D i s t r i c t City C e n t e r F o r m B a s e d C o d e T - 4 Tr a n s i t O v e r l a y D i s t r i c t 30.0 0 ' VP co 312 311 314313312311313 303302 304 306 307 308 309 311 312 313 310 314 313 312 311 309 308 307 306 304 303 314 312 308 306 304 303 x 3 0 3 . 7 304 304 304 304 New 5' wide concrete walk Xref ..\xref\G-REF.dwg A B Dri v e w a y New 10' Paved Recreation Path ex. 10' wide paved recreation path 5' wide green belt B BB B B B B B rec y c l i n g tra s h com p o s t b i n s H H H H EV EV EV EV EV EV EV EV EV EV EV BUILDING BUILDING Hotel Addition x320. 0 0 F F E 127 S p a c e s Buildi n g C o n n e c t o r CATAMOUNT WOODS New Multi-Level Parking Garage FUTURE HOUSING PROJECT VAN VAN H H H HH H EV 327 328 329 330 331 332 333 338 334 335 336 337 325 338 338 H H MEC H 10. 6 1 ' 10. 2 6 ' 320 Courtyard / Open Space Site Amenity (13,470 sf.) Int e r s t a t e H i g h w a y O v e r l a y D i s t r i c t Tr a n s i t O v e r l a y D i s t r i c t Courtyard / Open Space Site Amenity (11,840 sf.) Courtyard / Open Space Site Amenity (12,750 sf.) LEGEND FINISH GRADE CONTOUR LINES (5 FOOT INTERVALS) FINISH GRADE CONTOUR LINES (1 FOOT INTERVALS) NEW CONCRETE WALK NEW BUILDING REPLACE PAVEMENT (NO SUBBASE) NEW GRAVEL SURFACE NEW ASPHALT & SUBBASE SITE LAT: N44° 28' 21" LONG: W73° 11' 11" LOCATION MAP SCALE: 1" = 2,000 FT NEW CONCRETE PAD MP-1.0 UVM MASTER PLAN 1 50 Gravel Wetland Cell #2 Gravel Wetland Cell #1 Forebay 81 Maple Street - Burlington VT 05401 802-864-6844 - www.fffInc.com Architecture - Planning - Interiors SOUTH BURLINGTON, VERMONT 2228.1 tME CIVIL ENGINEER 12202 SH-Site.dwg S.ET&H PLAN ORIGINATION DATE: SCALE: DRAWN BY:CHECKED BY: K&L PROJECT NO: ISSUE LOG: SHEET CONTENTS: SHEET NO: © 2023 Freeman French Freeman Inc. &ATAMOUNT :OO'S HOUSING Gravel Wetland Cell #2A Gravel Wetland Cell #1A Forebay 'OUBLETREE HOTEL FUTURE BUILDING Future Stormwater Treatment Facility Expansion 164 Main Street, Suite 201 Colchester, Vermont 05446 (802) 878-0375 www.krebsandlansing.com FF 326.0 Proposed Building 30.0 0 ' 13 12 12 14 14 14 14 FF 315.0 FF 326.0 VP co Xref ..\xref\G-REF.dwg Gravel Wetland Cell #2 Gravel Wetland (Separate Project) Forebay (Separate Project) B BB B B B B B rec y c l i n g tra s h com p o s t b i n s H H H H EV EV EV EV EV EV EV EV EV EV EV VA N VA N H H H HH H EV Int e r s t a t e H i g h w a y O v e r l a y D i s t r i c t Tr a n s i t O v e r l a y D i s t r i c t > CATAMOUNT DRIVE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X S70° 0 8 ' 4 4 " E 777.7 6 N67°49 ' 1 7 " E 316.96 ' S78°54'10 " E 805.44' S43 ° 5 2 ' 0 9 " W 366 . 5 8 ' New Sidewalk Courtyard Courtyard Fire Lan e ( N o P a r k i n g ) ( P a v e d ) New Precast Block Retaining Wall New 10' wide Asphalt Recreation Path Dro p - O f f A r e a 2:1 stone stabilized slope ADA Accessible ADA Accessible Drop-Off A r e a New Bike Racks New Bike Racks (5) New 50 ft Right of Way Courtyard Place boulders to delineated wetland buffer Dro p - O f f A r e a New security and privacy fencing New 6' wide concrete walk New Screened Trash Enclosure 5' greenbelt 5' greenbelt New EV Charging Stations (8) 81 Maple Street - Burlington VT 05401 802-864-6844 - www.fffInc.com Architecture - Planning - Interiors SOUTH BURLINGTON, VERMONT SP-1.0 2228.1 tME SUBDIVISION/LEASE LINE MAP 164 Main Street, Suite 201 Colchester, Vermont 05446 (802) 878-0375 www.krebsandlansing.com CIVIL ENGINEER 1 0 FUTURE PARKING GARAGE 1/0/24 &ATAMOUNT :OODS HOUSING DOUBLE TREE HOTEL SH-Site.dwg SKET&H PLAN REVISION ORIGINATION DATE: SCALE: DRAWN BY:CHECKED BY: K&L PROJECT NO: ISSUE LOG: SHEET CONTENTS: SHEET NO: © 2020 Freeman French Freeman Inc. LEGEND NEW CONCRETE WALK NEW BUILDING REPLACE PAVEMENT (NO SUBBASE) NEW GRAVEL SURFACE NEW ASPHALT & SUBBASE NEW CONCRETE PAD ZONING DISTRICT LINE PROPERTY LINE EASEMENT LINE Original lease limit line 60' R.O.W. Orig i n a l P r o p e r t y L i n e Lease Li m i t L i n e Pro p o s e d L e a s e L i m i t L i n e EXISTING RIGHT OF WAY NEW RIGHT OF WAY SCALE: 1” = 30’ 01.05.24CATAMOUNT WOODS | LANDSCAPE CONCEPT ROTARY WITH SCULTPURE & MOUNTABLE CURB FOR LARGER VEHICLES CONFERENCE DROP-OFF & NEW ENTRY PLAZA ADA RAMP COURTYARD ACCESS PLANTING BUFFER FOR ROOM PRIVACY WALLS TO TRANSITION GRADE + 325.5 + 319.7 + 320 REDI-ROCK WALL ROTATED PARKING BREAK-AWAY GATE CONCRETE 2-TRACK FOR FIRE ACCESS AND PLOWING RECESSED LAWN BETWEEN. PENDING FIRE MARSHALL APPROVAL. ASPHALT DRIVE WETLAND OVERLOOK DECK PAVERS BETWEEN 2 - TRACK AT COURTYARDS OVERLOOK / SEATING IN SUNNIEST PART OF COURTYARD + 325.5 BOCCE COURT SECURITY FENCE AT BOTTOM OF SLOPE SUN A N G L E 87 SPACES BUS DROP-OFF SEATWALLS TO WAIT FOR BUS + 316 + 325.5 + 325.5 + 319 + 315 + 315 LOWER LEVEL LIGHT WELL / COURTYARD / EGRESS WETLAND OVERLOOK DECK + 325.5 MOUNTABLE CURB FOR TRUCKS / BUS TRASH / RECYCLING ENCLOSURE EXISTING TREE TO REMAIN, TYP. + 325.5 SEATING AREA EV PARKING CONCRETE RETAINING WALL WITH STONE CAP STAIR ACCESS OPEN LAWN + 317 STONE DUST SEATING COURT 5% WALKWAY STAIR ACCESS CONCRETE RETAINING WALL WITH STONE CAP OVERLOOK / SEATING IN SUNNIEST PART OF COURTYARD PLANTING BUFFER FOR ROOM PRIVACY OPEN LAWN PEDESTRIAN ENTRANCE TO BIKE PARKING PLANTERS FOR SEASONAL COLOR SHORT-TERM BIKE PARKING SHORT-TERM BIKE PARKING SECURITY FENCE AT BOTTOM OF SLOPE > CATAMOUNT DRIVE City o f S o . B u r l i n g t o n X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X XXXXXXXXX X X X X X X o o o o o o FF 326.0 Proposed Building 30 6 30 8 310 311 313 319 325 320 324 3 1 9 320 320 319 31 7 318 3 1 5 3 1 4 322 30.0 0 ' 13 12 12 14 14 14 14 6 S S NEW 4 " F O R C E M A I N SPR I N K L E R S E R V I C E ( 8 " ) DO M E S T I C S E R V I C E ( 4 " ) FM FM FM FM FM FM FM FM FM FM FM FM FM S S HYD NE W W A T E R M A I N W W W W W W W W W W W W 317 315 316 317 315 318 FF 315.0 FF 326.0 321 320 323 S 3 1 4 320 325 310 315 x 30 5 . 0 ' 310 305 310 305 310 305 305 305 305 305 Xref ..\xref\G-REF.dwg 320 B BB B B B B B rec y c l i n g tra s h com p o s t b i n s H H H H EV EV EV EV EV EV EV EV EV EV EV VA N VAN H H H H 3 2 5 320 H H 3 1 5 318 3 1 6 321 324 316 3 1 7 31 8 EV 321 324 325 326 320 324 324 323 323 330 335 325 323 320 321 318 319 317 325 New Sidewalk Courtyard Courtyard Fire Lan e ( N o P a r k i n g ) (Paved) New Precast Block Retaining Wall New 10' wide Asphalt Recreation Path Dro p - O f f A r e a 2:1 stone stabilized slope ADA Accessible ADA Accessible Drop-Off A r e a New Bike Racks New Bike Racks (5) 50 ft Right of Way Courtyard Place boulders to delineated wetland buffer Dro p - O f f A r e a New security and privacy fencing New 6' wide concrete walk New Screened Trash Enclosure Alt e r n a t e En t r a n c e 5' greenbelt 5' greenbelt New EV Charging Stations (8) 314 320 320 314 3 1 6 31 7 318 319 318 321 31 4 324 322 Int e r s t a t e H i g h w a y O v e r l a y D i s t r i c t Tr a n s i t O v e r l a y D i s t r i c t LEGEND FINISH GRADE CONTOUR LINES (5 FOOT INTERVALS) FINISH GRADE CONTOUR LINES (1 FOOT INTERVALS) S ST G UGP W PROPOSED GAS LINE/VALVE PROPOSED SEWER LINE/MANHOLE PROPOSED STORM LINE/MANHOLE/BASIN NEW UNDERGROUND POWER NEW WATER LINE/SHUTOFF/VALVE PRECONSTRUCTION EXCAVATION NEW LIGHT POLE AND BASE FINISH GRADE FLOW DIRECTION FINISH GRADE SPOT ELEVATIONx363.9 NEW CONCRETE WALK NEW BUILDING REPLACE PAVEMENT (NO SUBBASE) NEW GRAVEL SURFACE NEW ASPHALT & SUBBASE SITE LAT: N44° 28' 21" LONG: W73° 11' 11" LOCATION MAP SCALE: 1" = 2,000 FT NEW CONCRETE PAD CW-1.0 OVERALL SITE MATERIAL PLAN 1 40 FUTURE PARKING GARAGE CATAMOUNT HOUSING DOUBLE TREE HOTEL 81 Maple Street - Burlington VT 05401 802-864-6844 - www.fffInc.com Architecture - Planning - Interiors SOUTH BURLINGTON, VERMONT 2228.1 tME 164 Main Street, Suite 201 Colchester, Vermont 05446 (802) 878-0375 www.krebsandlansing.com CIVIL ENGINEER 12202 CATAMOUNT :OODS HOUSING SH-Site.dwg SKETCH PLAN ORIGINATION DATE: SCALE: DRAWN BY:CHECKED BY: K&L PROJECT NO: ISSUE LOG: SHEET CONTENTS: SHEET NO: © 2020 Freeman French Freeman Inc. > CATAMOUNT DRIVE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X FF 326.0 x 3 2 5 . 5 x 319.5 x 314.95 x 325.5 3 2 5 . 5 x 3 2 5 . 9 5 x 3 2 5 . 5 x x 325.5 x 313.9 Proposed Building x 314. 9 5 x 3 2 3 . 5 x 31 9 . 7 5 x 319.60 x 319.5 319.5 x x 3 1 9 . 7 x 3 2 0 . 5 x 3 2 0 . 1 0 x 320 . 7 0 x 3 2 0 . 1 0 x 3 1 4 . 9 5 x 319.3 x 3 1 8 . 7 0 316.8x 310 313.4 x 325 320 x 3 1 8 . 5 0 x 319.1 x 3 1 4 . 8 0 320 3 1 7 . 3 x 320 3 1 5 x 31 4 . 8 313.9 x x 318.4 tw 319.5 x x 314.0 bw x 31 9 . 5 t w tw 3 2 1 . 5 x x 320. 6 x 3 1 8 . 5 30.0 0 ' 13 12 12 14 14 14 14 6 x 3 1 6 . 0 x 315.5 x 314.3 315 315 FF 315.0 FF 326.0 x 314.5 x 326.0 x 3 2 5 . 9 320 VP co x 319.7 320 x 314.5 x 325.8 325. 8 x 325 305 Xref ..\xref\G-REF.dwg Gravel Wetland Cell #2 Gravel Wetland (Separate Project) Forebay (Separate Project) 320 B BB B B B B B rec y c l i n g tra s h com p o s t b i n s H H H H EV EV EV EV EV EV EV EV EV EV EV VA N VA N H H H H x 3 1 4 . 7 5 x 3 1 4 . 9 0 x 314.70 x 314.50 314.1 0 x x 314.45 x 315.30 x 315.3 x 314.9 x 314.5 x 3 1 5 . 5 0 x 315.55 x 3 1 4 . 8 5 x 314 . 5 x 314.5 x 314.4 x 314.3 x 3 1 3 . 7 x 314.2 3 2 5 . 7 7 x 3 2 5 . 6 5 x 3 2 5 . 4 5 x 3 2 5 3 2 4 . 1 x 3 2 2 . 1 x 3 2 2 . 0 x 325. 9 5 x 325.85 x x 322.1 x 3 2 1 . 1 x 322.45 x 3 2 0 . 9 x 324.95 x 324.45 3 2 4 . 3 5 x x 325.75 322 . 7 5 x x 318.9 x 319.0 320 H H x 315.9 x 3 1 6 . 4 x 316.05 3 1 5 3 1 4 . 5 x x 314.9 x 326.1 EV 32 5 . 8 x x 3 2 4 . 5 x 3 2 5 . 2 x 325.7 325 32 0 x 321 . 5 x 320 . 7 x 3 2 0 . 1 0 x 320.6 x 320.7 x 32 1 . 2 3 2 5 . 8 5 x 3 2 5 . 7 5 x 3 2 5 . 5 5 x 3 2 5 . 9 x 3 2 5 . 5 5 x 3 2 6 . 1 x 325 320 New Sidewalk Courtyard Courtyard Fire Lan e ( N o P a r k i n g ) ( P a v e d ) New Precast Block Retaining Wall New 10' wide Asphalt Recreation Path Dro p - O f f A r e a 2:1 stone stabilized slope ADA Accessible ADA Accessible Drop-Off A r e a New Bike Racks New Bike Racks (5) 50 ft Right of Way Courtyard Place boulders to delineated wetland buffer Dr o p - O f f A r e a New security and privacy fencing New 6' wide concrete walk New Screened Trash Enclosure Alt e r n a t e En t r a n c e 5' greenbelt 5' greenbelt New EV Charging Stations (8) x 3 1 3 . 9 320 x 3 2 1 . 6 31 4 3 1 6 31 7 318 319 318 321 x 3 2 1 . 4 x 314.5 x 314.5 31 4 324 322 Int e r s t a t e H i g h w a y O v e r l a y D i s t r i c t Tr a n s i t O v e r l a y D i s t r i c t LEGEND FINISH GRADE CONTOUR LINES (5 FOOT INTERVALS)230 FINISH GRADE CONTOUR LINES (1 FOOT INTERVALS) PRECONSTRUCTION EXCAVATION NEW LIGHT POLE AND BASE FINISH GRADE FLOW DIRECTION FINISH GRADE SPOT ELEVATIONx363.9 NEW CONCRETE WALK NEW BUILDING REPLACE PAVEMENT (NO SUBBASE) NEW ASPHALT & SUBBASE NEW GRAVEL SURFACE NEW CONCRETE PAD 231 CW-1.1 SITE & GRADING PLAN 1 0 FUTURE PARKING GARAGE DOUBLE TREE HOTEL 81 Maple Street - Burlington VT 05401 802-864-6844 - www.fffInc.com Architecture - Planning - Interiors SOUTH BURLINGTON, VERMONT 2228.1 tME 164 Main Street, Suite 201 Colchester, Vermont 05446 (802) 878-0375 www.krebsandlansing.com CIVIL ENGINEER 12202 &ATAMOUNT :OODS HOUSING SH-Site.dwg SKET&H PLAN ORIGINATION DATE: SCALE: DRAWN BY:CHECKED BY: K&L PROJECT NO: ISSUE LOG: SHEET CONTENTS: SHEET NO: © 2023 Freeman French Freeman Inc. > X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X FF 326.0 x 3 2 5 . 5 x 319.5 x 314.95 x 325.5 3 2 5 . 5 x 3 2 5 . 9 5 x 3 2 5 . 5 x x 325.5 x 313.9 Proposed Building x 314 . 9 5 x 3 2 3 . 5 x 31 9 . 7 5 x 319.60 x 319.5 319.5 x x 3 1 9 . 7 x 3 2 0 . 5 x 3 2 0 . 1 0 x 320 . 7 0 x 3 2 0 . 1 0 x 3 1 4 . 9 5 x 319.3 x 3 1 8 . 7 0 316.8x 310 313.4 x 325 320 x 3 1 8 . 5 0 x 319.1 x 3 1 4 . 8 0 320 3 1 7 . 3 x 320 3 1 5 x 314 . 8 313.9 x x 318.4 tw 319.5 x x 314.0 bw x 31 9 . 5 t w tw 3 2 1 . 5 x x 320 . 6 x 3 1 8 . 5 30.0 0 ' 13 12 12 14 14 14 14 6 S S ST ST ST ST ST ST ST ST ST ST GA S S E R V I C E NE W 4 " F O R C E M A I N ST ST ST ST ST ST ST ST ST ST SPR I N K L E R S E R V I C E ( 8 " ) DO M E S T I C S E R V I C E ( 4 " ) FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM New Pump Station and Emergency Storage G G G G G G G G G G G S S S 8" RD RD RD RD 8" R D RD HYD NEW W A T E R M A I N ST ST ST S T ST ST ST x 3 1 6 . 0 x 315.5 W W W W W W W W W W W W W W W W x 314.3 315 315 Un d e r g r o u n d S t o r m w a t e r C h a m b e r s FF 315.0 FF 326.0 x 314.5 x 326.0 x 3 2 5 . 9 8" R D 320 Core & boot new penetration into existing sewer manhole SMh A rim 319.1 inv. in 314.60 inv. out 314.50 SMh B rim 317.40 inv. in 313.10 inv. out 313.00 SMh C rim 317.05 inv. in 311.50 inv. out 311.40 CB A rim 324.5 inv. in 319.10 inv. out 319.00 CB B rim 317.50 inv. in 312.10 inv. out 312.00 CB C rim 318.00 inv. in 311.10 inv. out 311.00 CB D rim 317.30 inv. in 310.60 inv. out 310.50 VP CB E rim 319.30 inv. in 313.10 inv. out 313.00 CB F rim 314.1 inv. in 310.10 inv. out 310.00 CB G rim 313.40 inv. in 309.1 inv. out 309.00 CB H rim 313.90 inv. in 308.60 inv. out 308.50 CB I rim 315.60 inv. in 307.60 inv. out 307.50 CB J rim 318.90 inv. in 313.10 inv. out 313.00 STMh A rim 321.10 inv. in 315.10 (CBK) inv. in 315.5± (CB4A) inv. out 315.00 CB L rim 320.60 inv. out 316.00 CB K rim 320.25 inv. in 315.60 inv. out 315.50 CB N rim 325.70 inv. in 320.10 inv. out 320.00 CB O rim 322.10 inv. out 316.00 inv. out 312.50 6" P V C S D R 3 5 6" PVC SDR35 6" PV C 6" PV C 6" PVC SD R 3 5 12" AD S 15" ADS 15" ADS 15" ADS 15" A D S 18" AD S 1 8 " A D S 12" A D S 15" A D S 12" A D S 12 " A D S 15" A D S 12" AD S CB B1 rim 319.90 inv. in 313.10 inv. out 313.00 S S co 8" 15 " A D S 8" R D 18" A D S 18" ADS x 319.7 320 ES inv. 304.0 x 314.5 CB E1 rim 320.30 inv. in 315.10 inv. out 315.00 CB E rim 320.30 inv. in 315.10 inv. out 315.00 x 325.8 325. 8 x 325 CB N1 Rim 328.30 Inv. out 324.0 x 331.5 x 331.5 x 330.1 x 3 2 9 . 6 305 Xref ..\xref\G-REF.dwg 3 3 1 . 4 x 331.4 x ST ST ST Gravel Wetland Cell #2 Gravel Wetland (Separate Project) Forebay (Separate Project) CB M rim 320.80 inv. in 315.10 inv. out 315.0012" A D S 320 B BB B B B B B rec y c l i n g tra s h com p o s t b i n s H H H H EV EV EV EV EV EV EV EV EV EV EV VA N VA N H H H H x 3 1 4 . 7 5 x 3 1 4 . 9 0 x 314.70 x 314.50 314.1 0 x x 314.45 x 315.30 x 315.3 x 314.9 x 314.5 x 31 5 . 5 0 x 315.55 x 3 1 4 . 8 5 x 314 . 5 x 314.5 x 314.4 x 314.3 x 3 1 3 . 7 x 314.2 3 2 5 . 7 7 x 3 2 5 . 6 5 x 3 2 5 . 4 5 x 3 2 5 3 2 4 . 1 x 3 2 2 . 1 x 3 2 2 . 0 x 325. 9 5 x 325.85 x x 322.1 x 3 2 1 . 1 x 322.45 x 3 2 0 . 9 x 324.95 x 324.45 3 2 4 . 3 5 x x 325.75 32 2 . 7 5 x x 318.9 x 319.0 320 H H x 315.9 x 3 1 6 . 4 x 316.05 3 1 5 3 1 4 . 5 x x 314.9 x 326.1 EV 32 5 . 8 x x 3 2 4 . 5 x 3 2 5 . 2 x 325.7 325 32 0 x 32 1 . 5 x 320 . 7 x 3 2 0 . 1 0 x 320.6 x 320.7 x 32 1 . 2 ST ST ST ST 18" A D S 3 2 5 . 8 5 x 3 2 5 . 7 5 x 3 2 5 . 5 5 x 3 2 5 . 9 x 3 2 5 . 5 5 x 3 2 6 . 1 x 325 320 32 4 32 5 New Sidewalk Courtyard Courtyard Fire Lan e ( N o P a r k i n g ) ( P a v e d ) New Precast Block Retaining Wall New 10' wide Asphalt Recreation Path Dro p - O f f A r e a 2:1 stone stabilized slope ADA Accessible ADA Accessible Drop-Off A r e a New Bike Racks New Bike Racks (5) 50 ft Right of Way Courtyard Place boulders to delineated wetland buffer Dro p - O f f A r e a New security and privacy fencing New Screened Trash Enclosure Alt e r n a t e En t r a n c e 5' greenbelt New EV Charging Stations (8) x 3 1 3 . 9 320 x 3 2 1 . 6 314 3 1 6 31 7 318 319 318 321 x 3 2 1 . 4 x 314.5 x 314.5 31 4 324 322 S ST G W FM RD CW-1.2 UTILITY PLAN 1 0 FUTURE PARKING GARAGE DOUBLE TREE HOTEL 81 Maple Street - Burlington VT 05401 802-864-6844 - www.fffInc.com Architecture - Planning - Interiors SOUTH BURLINGTON, VERMONT 2228.1 tME 164 Main Street, Suite 201 Colchester, Vermont 05446 (802) 878-0375 www.krebsandlansing.com CIVIL ENGINEER 12202 &ATAMOUNT :OODS HOUSING SH-Site.dwg SKET&H PLAN ORIGINATION DATE: SCALE: DRAWN BY:CHECKED BY: K&L PROJECT NO: ISSUE LOG: SHEET CONTENTS: SHEET NO: © 2020 Freeman French Freeman Inc.