Loading...
HomeMy WebLinkAboutPermit Certificate of Occupancy TCO-23-23 (2) 180 Market Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com December 11, 2023 Beta Technologies c/o Art Klugo 1150 Airport Drive South Burlington, VT 05403 Re: Certificate of Occupancy Conditions of Approval – 154 Davinci Drive Dear Mr. Klugo: The following conditions must be rectified prior to issuance of a permanent certificate of occupancy. 1. DRB Site Plan amendment. You have submitted a site plan application to modify SD-21-28 in the following ways. • Remove trees required to be planted on north west side of building • Install trees along Davinci Drive west of the building • Reconfigure driveway to 355 Valley Road The Board is scheduled to hear that application on January 17, 2024. If the Board approves your requested amendment, you must comply with the conditions of that approval, including obtaining a zoning permit and completion of the work described therein demonstrated by obtaining a certificate of occupancy. If the Board denies, or approves in part, the requested amendments, you must complete the work as shown on SD-21-28 as originally approved. 2. Complete work which is physically at conflict with the work approved in SP-22-055 / ZP-23-092 (Taxiway “G” and South Apron Expansion) 3. Complete installation of grading, stormwater treatment, landscaping, and all other approved features which was unable to be completed due to unanticipated and necessary removal of hazardous soils. 4. Complete installation of required showers. 5. Correct stone berm in Bioretention Basin 2A to the satisfaction of the City Stormwater Division. Plans that incorporate approved field changes include the following. Requested changes listed in #1 above are not approved as field changes but are shown on the revised sheets. If the Board denies, or approves in part, the requested amendments, you must revise the updated plans to remove the rejected changes. Sheet No: Sheet Title: Prepared By: Last Revised Date: C‐200A Overall Site Plan (A‐Build) Stantec 10/27/2023 C‐201A Site Plan (A‐Build) Stantec 10/27/2023 C‐202A Site Plan(A‐Build) Stantec 10/27/2023 C‐203A Grading And Drainage Plan (A‐Build) Stantec 10/27/2023 C‐204A Grading And Drainage Plan (A‐Build) Stantec 10/27/2023 180 Market Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com L‐000A Overall Landscape Plan (A‐Build) Stantec 10/27/2023 L‐004A Tree Protection Plan (A‐Build) Stantec 10/27/2023 L‐200A Landscape Plan (A‐Build) Stantec 10/27/2023 L‐201A Landscape Plan (A‐Build) Stantec 10/27/2023 L‐202A Plant Schedule (A‐Build) Stantec 10/27/2023 L-204 Planting Plan (Da Vinci Drive) Stantec 10/27/2023 EA‐000A Luminaire Schedule and Lighting Legend Stantec 10/27/2023 EA‐101A Site Lighting Area A Stantec undated EA‐102A Site Lighting Area B Stantec undated EA‐103A Site Lighting Area C Stantec 10/27/2023 EA‐104A Site Lighting Area D Stantec undated A‐101A Floor Plan ‐ Level 1 (A‐Build) Stantec 08/18/2023 A‐101MA Floor Plan ‐ Mezzanine (A‐Build) Stantec 10/06/2022 A‐102A Floor Plan ‐ Level 2 (A‐Build) Stantec 01/26/2023 A‐103A Roof Drainage Plan (A‐Build) Stantec 10/06/2022 A‐200A Building Perspectives (A‐Build) Stantec 10/06/2022 A‐201A Building Elevations (A‐Build) Stantec 01/23/2023