Loading...
HomeMy WebLinkAboutSD-23-15 Sketch Plan - Supplemental - 0850 Hinesburg Road (11)1 Marla Keene From:Tom DiPietro Sent:Wednesday, November 8, 2023 6:08 PM To:Marla Keene Subject:RE: SD-23-15 850 Hinesburg Road Marla, My comments are on this sketch plan are:  In a future submission the applicant should provide informaƟon related to wastewater conveyance. Will the exisƟng buildings be connected to city sewer at this Ɵme? Presumably the applicant plans to connect to an exisƟng wastewater gravity pipe located to the east without needing a pump staƟon. Please note that any sewer mains should be included in road ROW and not in their own easements that run across private lots.  In a future submission the applicant should provide informaƟon related to stormwater treatment and permiƫng. If the applicant requires a state stormwater permit then please provide informaƟon showing that all lots subject to that permit will be part of an AssociaƟon.  I support construcƟon of roads to the property boundary.  Driveways: Consider the use of shared driveways to minimize impervious surfaces.  In a future submission the applicant should idenƟfy what, if any, porƟons of the development they’d like the City to consider accepƟng as public infrastructure aŌer the project is completed.  Is it feasible for a building lot to be located in the center of the “circle” made by the proposed road? Consider whether or not that area be beƩer uƟlized as the “civic space”.  Consider renumbering lots so that they do not need dashes.  Hinesburg Road is owned by the State of Vermont and coordinaƟon with VTrans will be necessary for work within the ROW. Thank you for the opportunity to comment. -Tom From: Marla Keene <mkeene@southburlingtonvt.gov> Sent: Monday, October 30, 2023 10:57 AM To: Paul Conner <pconner@southburlingtonvt.gov>; Tom DiPietro <tdipietro@southburlingtonvt.gov>; Erica Quallen <equallen@southburlingtonvt.gov>; Terry Francis <tfrancis@southburlingtonvt.gov>; Ed Spooner <espooner@southburlingtonvt.gov> Subject: SD-23-15 850 Hinesburg Road Hi Team, We have received a sketch plan applicaƟon to subdivide the Wright’s property on Hinesburg Road for the purpose of an 11-lot single family home PUD. They’re quesƟoning the requirement for a public street connecƟng to the property boundary, but without it, their project is prohibited on several counts. My strong suspicion is that the road configuraƟon will be reworked but will sƟll potenƟally include a loop with a “tail” on the northwest and southeast corners. There will be at least one if not two more stages of review. Please provide your comments by Friday 11/10 for incorporaƟon into the report. TentaƟve Project descripƟon: 2 Sketch plan applicaƟon #SD-23-15 of WGM Associates to subdivide an exisƟng approximately 10.0 acre lot developed with three homes into a general PUD consisƟng of 11 single family home lots ranging from 0.38 acres to 1.14 acres and one 1.0 acre open space lot, 850 Hinesburg Road. Direct link to project folder: SD-23-15_850 Hinesburg_WGM Associates_SK_2023-12-05 I am working with IT to get a link that opens in a windows explorer window instead of on the web and will send an update if that becomes available. Sincerely, Marla Keene, PE Development Review Planner City of South Burlington 180 Market Street South Burlington, VT 05403 (802) 846-4106 www.southburlingtonvt.gov Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation.