HomeMy WebLinkAboutSP-23-044 - Decision - 0052 Timber Lane#SP-23-044
- 1 -
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
FIRST RESPONSE LABOR, LLC – 52 TIMBER LANE
SITE PLAN APPLICATION #SP-23-044
FINDINGS OF FACT AND DECISION
First Response Labor, LLC, hereinafter referred to as the applicant, is seeking to amend a
previously approved plan for a 45,903 sf medical office building. The amendment consists of site
modifications to add a 200 sf concrete dumpster pad and associated site improvements, 52
Timber Lane.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a previously approved plan for a 45,903 sf medical
office building. The amendment consists of site modifications to add a 200 sf concrete
dumpster pad and associated site improvements, 52 Timber Lane.
2. The owner of record of the subject property is Brian Huber.
3. The subject property is located in the Residential-7 Zoning District and the Transit
Overlay District.
4. The application was received on November 8, 2023.
5. The plans submitted consist of one sheet, titled “Site Proposal for Concrete Pad”,
prepared and last edited by Andrew Ede on 11/6/2023.
ZONING DISTRCIT & DIMENSIONAL REQUIREMENTS
Setbacks, Coverages & Lot Dimensions
R7 Zoning District Required Existing Proposed
Min. Lot Size 40,000 sf 172,863 sf No Change
Max. Building Height Flat Roof 40 ft Not Provided No Change
Max. Building Coverage 40% Not Provided No Change
Max. Overall Coverage 60% 55.85% 55.97%
Max. Front Setback Coverage 30% Not Provided No Change
Min. Front Setback 30 ft Not Provided No Change
Min. Side Setback 10 ft Not Provided No Change
Min. Rear Setback 30 ft Not Provided No Change
#SP-23-044
- 2 -
SITE PLAN REVIEW STANDARDS
Only the standards below are affected by this application. All other standards will continue to be
met.
14.07 Disposal of Wastes
Per Article 14.07.I, dumpsters “shall be accessible, secure and properly screened with
opaque fencing to ensure that trash and debris do not escape the enclosure(s)”. The
applicant has testified that the proposed dumpster pad will be constructed in conjunction
with an opaque, secure dumpster enclosure that includes an opaque gate – this enclosure
will be at least as tall as the dumpsters held within. As such, the Administrative Officer
finds this criterion met.
SUPPLEMENTAL STANDARDS
13.03 Bicycle Parking and Storage
Per Table 13-3, this use has a short-term bicycle parking requirement of one space per
5,000 sf GFA and a minimum requirement of nine spaces. The applicant is proposing to
meet the minimum requirement with the installation of five ‘inverted U’ bike racks
dispersed across the site, including one on the north side of the building, one on the east
side of the building, and three on the southwest side of the building. The five ‘inverted U’
bike racks will provide two short-term bicycle parking spaces each, for a total of ten
spaces, and will meet the standards of Article 13.03 and Appendix G. Specifically, all five
bike racks will be secured to stabilized surfaces and installed in locations that are
protected from motor vehicles and in reasonable proximity to building entrances. The two
southern-most bike racks are being installed in a location that was formerly a parking
space but was recently eliminated in an effort to enhance ADA compliance. The
Administrative Officer finds this criterion met.
13.04.B Snow Storage
Per Article 13.04B.(7), “snow storage areas must be specified and located in an area that
minimizes the potential for erosion and contaminated runoff into any adjacent or nearby
surface water.” The snow storage areas are indicated on the site plan. The Administrative
Officer finds this criterion met.
13.07 Exterior Lighting
Per Article 13.07.A, exterior lighting “shall have such shielding as will direct the light
downward and will prevent the source of light from being visible from any adjacent
residential property or street.” There are no lighting impacts proposed as part of this
application.
Vehicle Trip Generation
The proposed dumpster pad does not constitute a change of use for this educational
facility and will not increase the trip generation of the existing use. As such, the
Administrative Officer finds that the proposed project does not represent a vehicle trip
generation impact.
#SP-23-044
- 3 -
Water & Wastewater
The proposed dumpster pad does not constitute a change or increase in the estimated
water or wastewater allocations for this property. As such, the Administrative Officer finds
that the proposed project does not represent a water or wastewater impact.
DECISION
Based on the above Findings of Fact, the Administrative Officer herby approves site plan
application #SP-23-044 of First Response Labor, LLC, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall
remain in effect.
2. This project shall be completed as shown on the plan(s) and shall be on file in the South
Burlington Department of Planning and Zoning.
3. The Administrative Officer concurrently issues Zoning Permit #ZP-23-386.
4. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications must be underground.
5. Any new exterior lighting must be installed or shielded in such a manner as to conceal
light sources and reflector surfaces from view beyond the perimeter of the area to be
illuminated.
6. The proposed project must adhere to standards for erosion control as set forth in
Section 16.03 of the South Burlington Land Development Regulations.
7. Bicycle racks must meet the minimum requirements of 13.14 and Appendix G.
8. The applicant must continue to maintain the approved landscaping in a vigorous
growing condition throughout the duration of the use.
9. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to occupancy and/or use of the approved dumpster pad.
10. Any change to the site plan shall require approval by the South Burlington Development
Review Board or the Administrative Officer, as applicable.
Signed on this 22nd day of November 2023 by
______________________________________
Marty Gillies, Acting Administrative Officer
#SP-23-044
- 4 -
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing
a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal
must be accompanied with a $233 filing fee and be filed within 15 days of the date of this
decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant
state permits for this project. Call 802.879.5676 to speak with the regional Permit Specialist.