HomeMy WebLinkAboutZP-23-386 - 0052 Timber Lane 11/22/202311/6/2023 Huber, Brian 1
Brian Huber
ZP-23-386
11/6/2023 Huber, Brian 2
10/11/2023 43.00 R7
installation of 200sf concrete dumpster pad & associated site improvements
SP-23-044
X
11/22/2023
11/22/2023
11/21/202412/8/2023
X
1
Marty Gillies
From:Andrew Ede <aede@redstonevt.com>
Sent:Monday, November 6, 2023 1:38 PM
To:Marty Gillies
Cc:First Response Labor LLC
Subject:RE: 'EXTERNAL'RE: Timber Lane dumpster pad permit
Attachments:zoning.pdf; Site Proposal.jpg; plan zone.pdf
Hi Marty, I think I have everything. Please see attached. I will have First Response put the correct
opaque covering on the dumpster gate. I will also make sure that the northern bike rack you spoke
of will meet requirements and will be secured and stabilized.
Andrew Ede | Asset Manager | Redstone
Mailing Address: P.O. Box 790 | Burlington, VT 05402
Physical Address: 100 Bank Street | Suite 200 | Burlington, VT 5401
O. 802.658.7400 | C. 802.557.7164
www.redstonevt.com | aede@redstonevt.com
From: Marty Gillies <mgillies@southburlingtonvt.gov>
Sent: Friday, November 3, 2023 2:58 PM
To: Andrew Ede <aede@redstonevt.com>
Cc: First Response Labor LLC <firstresponselabor@gmail.com>
Subject: RE: 'EXTERNAL'RE: Timber Lane dumpster pad permit
Hi Andrew,
Sorry – one final thing!
- All plan sheets must identify the snow storage areas on the site – these areas must not disrupt site circulation,
affect stormwater treatment system effectivity, or potentially damage shrubs/trees/other required landscaping
features. Please revise the screenshot that is being used as your plan sheet to identify the existing/proposed
snow storage areas.
Best,
Marty
Marty Gillies
Development Review Planner
City of South Burlington Planning & Zoning Department
180 Market Street, South Burlington, VT 05401
(802) 846-4106
www.sbvt.gov
2
From: Marty Gillies
Sent: Friday, November 3, 2023 2:49 PM
To: Andrew Ede <aede@redstonevt.com>
Cc: First Response Labor LLC <firstresponselabor@gmail.com>
Subject: RE: 'EXTERNAL'RE: Timber Lane dumpster pad permit
Hi Andrew,
Just following up on this real quick – apologies, but I missed a couple of additional issues with the application package:
- Thank you for getting the property owner’s signature on the Site Plan application – the Zoning Permit
application form also needs to be signed by the property owner (or you, if you can provide an affidavit signed by
the property owner that identifies that you are eligible to sign on the property owner’s behalf).
- The submitted screenshot can be used as your plan sheet – it will, however, need to be dated, titled, and
attributed to someone. Please revise the screenshot to include a date, title, and author name.
Thank you!
Marty
Marty Gillies
Development Review Planner
City of South Burlington Planning & Zoning Department
180 Market Street, South Burlington, VT 05401
(802) 846-4106
www.sbvt.gov
From: Marty Gillies
Sent: Friday, November 3, 2023 2:20 PM
To: Andrew Ede <aede@redstonevt.com>
Cc: First Response Labor LLC <firstresponselabor@gmail.com>
Subject: RE: 'EXTERNAL'RE: Timber Lane dumpster pad permit
Hi Andrew,
Thanks for this submittal. I’ll get started on drafting an approval for this application – in the meantime, I have a few final
items for your attention:
- Field #2 (property owner) is not filled out on the application form. Please update and re-submit.
- The provided estimate from First Response Labor identifies the dumpster fence as being transparent; please
note that dumpster enclosures must be opaque. The contractor can add privacy slats if the fence is proposed to
be chain link. Please submit plans, a revised estimate, or an acknowledgment in response to this email that
demonstrates that the proposed dumpster enclosure will be opaque.
- One of the three proposed bike rack locations appears to be on grass; please note that the bike racks must be
installed on a paved or concrete surface, and must be bolted into the ground. Please submit plans or an
3
acknowledgement in response to this email that demonstrates that the proposed bike racks will meet those
requirements & will be secured to a stabilized surface.
You have paid for all applicable permits – thank you for that! Please note that your payment included the Certificate of
Occupancy inspection fee – we can come to inspect for your CO as soon as the project is complete, but please note that
we cannot issue the CO until all aspects of the projects are done, including the installation of the bike racks and
dumpster enclosure.
I’ll go ahead and prepare a draft approval for this application but cannot officially issue the Site Plan and Zoning Permit
approvals until we clean up the three items identified above. Let me know if you have any questions or need any
support in addressing those items!
Best,
Marty
Marty Gillies
Development Review Planner
City of South Burlington Planning & Zoning Department
180 Market Street, South Burlington, VT 05401
(802) 846-4106
www.sbvt.gov
From: Andrew Ede <aede@redstonevt.com>
Sent: Monday, October 30, 2023 2:44 PM
To: Marty Gillies <mgillies@southburlingtonvt.gov>
Cc: First Response Labor LLC <firstresponselabor@gmail.com>
Subject: 'EXTERNAL'RE: Timber Lane dumpster pad permit
This message has originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Good afternoon. I believe I have all the required information that is needed. Please find attached:
- Permit application signed by owner Brian Huber.
- Plans which include property lines, scale, north arrow, dimensions of the concrete pad,
and the locations for future installation of 3 spot bike racks.
- The bike rack design
- An estimate from First Response Labor for the dumpsters to comply with the minimum
requirements, to be completed after the pad installation.
4
Please reach out with any questions, after discussing this permit with you over the phone I believe
it to be completed to your requirements.
Andrew Ede | Asset Manager | Redstone
Mailing Address: P.O. Box 790 | Burlington, VT 05402
Physical Address: 100 Bank Street | Suite 200 | Burlington, VT 5401
O. 802.658.7400 | C. 802.557.7164
www.redstonevt.com | aede@redstonevt.com
---------- Forwarded message ---------
From: Marty Gillies <mgillies@southburlingtonvt.gov>
Date: Fri, Sep 29, 2023, 11:24 AM
Subject: Timber Lane dumpster pad permit
To: firstresponselabor@gmail.com <firstresponselabor@gmail.com>
Good Afternoon,
Thank you for submitting Site Plan and Zoning Permit applications to pour a 200-sf dumpster pad at Timber Lane medical
center. I was able to take a look through those applications and have the following feedback:
· The fee for an Administrative Site Plan application is $153. Our minimum fee for a Zoning Permit is $43 ($30 + a
$13 digitization fee). At the time of Zoning Permit application, we require the applicant to also pay the fee for
the Certificate of Occupancy application, which is another $153. As a result, the applicant at this time owes a
total of $349. We received a check for $30 which I am holding here at our office – we will need to receive the full
permit fee before we can issue any permits.
· In checking our records, it doesn’t appear that Redstone owns the property on which the project is proposed –
maybe I’m misunderstanding something, but the application form requires the property owner’s signature or
authorization, and I don’t believe that Andrew Ede is eligible to sign as the property owner.
· All plans submitted to our office need to be scaled and include property lines and a north arrow to orient the
viewer. We also need to see the dimensions of the proposed concrete pad identified on the plan.
Additionally, all Site Plan applications in South Burlington trigger compliance with our minimum bike parking standards
and our dumpster enclosure standards.
· The minimum number of short-term bike parking spaces required for this development is 1 per every 5,000
square feet of GFA, or a total of 9 bike parking spaces. One ‘inverted-U’ style bike rack provides 2 bike parking
spaces. In instances where the building on a property has multiple primary entrances, the regulations require
the bike parking spaces to be spread out across the property to serve as many entrances as possible. The
regulations also require bike racks to be ‘secured to a stabilized surface’ – we normally see property owners
anchoring bike racks to concrete pads to comply with this criterion. Let me know if you have any questions on
this requirement – we will need to see an updated plan showing any existing bike racks/all proposed bike racks
before we can issue this permit.
5
· All dumpsters in South Burlington have to be enclosed an all four sides with opaque fencing that is at least as tall
as the dumpster is. We will need to see your plans for complying with this requirement before we can issue this
permit.
Please feel free to reach out with any questions or to discuss any part of this email further!
Best,
Marty
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
Marty Gillies
Development Review Planner
City of South Burlington Planning & Zoning Department
180 Market Street, South Burlington, VT 05401