HomeMy WebLinkAboutPermit Wastewater Allocation WWA-23-129 (3)
*Flow Calculations
(You may substitute an engineer’s calculation or letter for the information requested
below)
For residential projects, list number of bedrooms and units requested:
Number of
Bedrooms
Number of Units
X
Gallons per day
per unit =
Total Flows
1 140
2 or more 210
TOTAL
Notes: ___________________________________________________
________________________________________________________
For commercial and industrial projects, list existing and proposed tenants, uses and
flows:
Tenant/ Type of use Number of Flows per Other Total
Business seats, SF, etc X unit Adjustments Flow
TOTAL
*Total development wastewater flow requested: ________gallons per
day
Flow characteristics (for commercial and industrial projects)
Volume:
____________________________________________________________
__________________________________________________
Flow rate:
____________________________________________________________
__________________________________________________
Strength:
____________________________________________________________
__________________________________________________
17 2,380
58 12,180
75 14,560
Allocation for the commercial space to be determined once the uses are known.
14,560
Preliminary water allocation of 18,270 GPD previously granted on 06/06/2023. Net decrease
of 3,710 GPD requested with this application due to a decrease in the number of dwelling units.
Please do not write below this line
Application & Recording Fee received: _____________ ________
Name Date
Receiving Plant: ______Airport Pkwy _____Bartlett Bay
City Center District: ____Yes _____No
Approved by Water Pollution Control Department (Commercial and Industrial
Projects)
______________________ _____________
Director of Water Pollution Control Date
Preliminary allocation issued: (payment of fee is not required)
_______________________ _____________
Director of Planning and Zoning Date
Final allocation issued: (payment of fee is required, either in full or pro-rated for
projects with multiple zoning permits involved)
_______________________ _____________
Director of Planning and Zoning Date
Final allocation expires _________________with permit #____-____-____
(Date)
Zoning permit issued___________________with permit#____-____-____
(Date)
Associated WW connection permit (if applicable) #____-____-____
For extensions of Final Allocation Only
EXTENSION GRANTED ____________to______________
(Date) (Date of Expiration)
50% EXTENSION FEE PAID _________ $___________
(Date) (Amount)
267
23 129
*Flow Calculations
(You may substitute an engineer’s calculation or letter for the information requested
below)
For residential projects, list number of bedrooms and units requested:
Number of
Bedrooms
Number of Units
X
Gallons per day
per unit =
Total Flows
1 140
2 or more 210
TOTAL
Notes: ___________________________________________________
________________________________________________________
For commercial and industrial projects, list existing and proposed tenants, uses and
flows:
Tenant/ Type of use Number of Flows per Other Total
Business seats, SF, etc X unit Adjustments Flow
TOTAL
*Total development wastewater flow requested: ________gallons per
day
Flow characteristics (for commercial and industrial projects)
Volume:
____________________________________________________________
__________________________________________________
Flow rate:
____________________________________________________________
__________________________________________________
Strength:
____________________________________________________________
__________________________________________________
42 5,880
59 12,390
101 18,270
Allocation for the commercial space to be determined once the uses are known.
18,270
Please do not write below this line
Application & Recording Fee received: _____________ ________
Name Date
Receiving Plant: ______Airport Pkwy _____Bartlett Bay
City Center District: ____Yes _____No
Approved by Water Pollution Control Department (Commercial and Industrial
Projects)
______________________ _____________
Director of Water Pollution Control Date
Preliminary allocation issued: (payment of fee is not required)
_______________________ _____________
Director of Planning and Zoning Date
Final allocation issued: (payment of fee is required, either in full or pro-rated for
projects with multiple zoning permits involved)
_______________________ _____________
Director of Planning and Zoning Date
Final allocation expires _________________with permit #____-____-____
(Date)
Zoning permit issued___________________with permit#____-____-____
(Date)
Associated WW connection permit (if applicable) #____-____-____
For extensions of Final Allocation Only
EXTENSION GRANTED ____________to______________
(Date) (Date of Expiration)
50% EXTENSION FEE PAID _________ $___________
(Date) (Amount)
302.5302.5
302.5302.5 302.5
LLLL
L
LL 310 309 309
310311311 310305
3123123143153143123
1
1
3113113113103103123123
1
2
31
2 298308 308305305308305300 300
300305308298
299305310
3
1
0
31031
0
309311310308309307309312314314DDD305307UUUUUU312311311311310310 3
1
0
3
10
311312MARKET STLOT M410' WIDE SHARED USE PAVED PATH6' WIDE CONCRETE SIDEWALKEX. SIDEWALKEXISTING BOXSTORM POND 1SEE PLANS BY WAGNERHODGSON FOR LAYOUT ANDLANDSCAPING IN MINI PARKGARDEN STREETLOT M5110.2'
1
0
0
.0
'209.1'NEW CONCRETE SIDEWALK6'
C
ON
CR
E
TE
S
I
D
EW
A
LK6' CONCRETE SIDEWALKPROPOSED 61 UNITRESIDENTIAL BUILDINGBIKE RACKS(4 HOOPS)6' WIDE CONCRETE SIDEWALK5'
CONCRE
T
E
S
I
D
EW
A
L
K20' R.30' R.10' R.20' R.22'20'20' R.CONCRETE CURBCONC
R
E
T
E
CU
R
B RAMPTRASH & RECYCLING CONTAINERSTO BE LOCATED IN PARKING GARAGEBLDG B1MARKET STREETCI
T
Y
H
A
L
L
/
SCHOO
L
DR
I
V
EWAY
FU
TURE
PUB
L
IC
S
TREE
T
3
2
4
'LOT B-B2LOT B-B1TRANSECT T-4TRANSECT T-5TRANSECT T-4TRANSECT T-56' WIDE CONCRETE SIDEWALK8
6
.
5
'L=136.9
'28.7'3.3'L=91.0'289.6'181.3'137.8'61
.2
'
2
4
8
.
1
'60'6'
W
I
D
E
CON
CRE
TE
S
I
DEW
A
L
K
10' WIDE SHARED USE PAVED PATH1
0
'
W
IDE
SH
A
RED
U
S
E
P
A
V
ED
PA
TH BUILDING A2BUILDING A1BUILDING A3FU
TUR
E
PUB
L
IC
S
TRE
E
TBIOERETENTION AREAPOCKET PLAZALOT N13.71 AC.LOT N21.79 AC.TRASH & RECYCLINGSTRUCTUREPLAZA AT STREETLEVEL OVER RAMPTO PARKING GARAGETYPICAL RAILING ALONGTOP OF RETAINING WALL22'22'15' R.TRANSECT T-5TRANSECT T-4TRANSECT
T
-
5TRANSECT T
-
4 MOUNTABLECONCRETE CURBMOUNTABLECONCRETE CURBCONCR
E
T
E
C
UR
B
CONCRETE CURB5' R
.5' R.15' R.15' R.30' R.54' R.22'20'10' R.30' R.22'EXISTING PAVED DRIVEPROPOSED 20' WIDE PEDESTRIANEASEMENT TO THE CITY OF SOUTHBURLINGTON20'CLASS 2 WETLAND50'50' WETLAND BUFFEREXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CON
CRE
TE
S
I
DEW
A
L
K
(4) BIKE RACKS(8 SPACES)(4) BIKE RACKS(8 SPACES)5' WIDE CONCRETE SIDEWALK
5' WIDE CONCRETE SIDEWALK5' WIDE CONC. SIDEWALKEXISTING PAVED PARKINGEXISTINGPAVEDPARKINGSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILS20'20'8'8'22'15' R.15' R.10' R.15' R.12' R.18'8'8'8'9'EL
E
CELEC ELEC18'8'8'8'9'24'18'9'24'8'8'8'8' R.15'
R
.10' R.10' R.1
5
8
.
6
'L=81.0
'L=89.0'L=11.2'L=180.5'357.6'14.6'110.8'L
=
89
.
4
'L=54.6'L=215.8'430.5'S
PEEDTABLE
SPEEDTABLE20.3'(3) BIKE RACKS(6 SPACES)(3) BIKE RACKS(6 SPACES)(4) BIKE RACKS(8 SPACES)CONCRETE CURB
CONCR
E
T
E
CUR
B
SOUTH BURLINGTON CITY CENTERCATAMOUNT RUN - PH.IIMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing03-17-23KBABRB>HE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN1OVERALL SITE PLANWILLISTON ROADLOCATION MAPNOT TO SCALEMAR
Y
S
T
R
E
E
T EXIT 14INTERSTATE 89MIDAS RDHINESBURG ROADINTERSTATE 89MARKET STREETMARCOTTECENTRALSCHOOLDORSET STREETAPPLICANTTHE SNYDER-BRAVERMANDEVELOPMENT COMPANY, LLC4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VT 05482LANDOWNERSOUTH BURLINGTON CITY CENTER, LLCP.O. BOX 2204SOUTH BURLINGTON, VT 05407WHITE
STSITENOTES:1.THE PURPOSE OF THIS PLAN IS TO PRESENT THE PROPOSED LAYOUT OF LOT N AND THEASSOCIATED BUILDING AND SITE IMPROVEMENTS. SEE THE MARKET STREET ANDGARDEN STREET DESIGN PLANS FOR STREET AND UTILITY RELATED INFORMATIONWITHIN THE RIGHT OF WAY.2.FOR LOT N PERIMETER BOUNDARY INFORMATION, SEE THE SOUTH BURLINGTON CITYCENTER, LLC SUBDIVISION PLAT BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS,INC., LAST REVISED 10-19-21 AND RECORDED IN SLIDE 646.3 OF THE CITY LAND RECORDS.3.LOT N IS SUBJECT TO A PROPOSED SUBDIVISION. SEE THE SUBDIVISION SURVEY PLATDATED 05-04-23 BY BARNARD & GERVAIS, LLC FOR DETAILED INFORMATION ON LOTSN1-N3.GRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.GARDENSTREETLEGENDPROJECT BOUNDARY 310EXISTING TREELINEABUTTING PROPERTY LINESIDELINE OF EASEMENTEXISTING CONTOUR#155 MARKET STREETMIXED USE BUILDINGLOT BBUILDING B2BIKE PARKINGBLDGDWELLINGUNITSNON-RESIDENTIALSPACESHORT TERM BIKE SPACESLONG TERM BIKE SPACESCHANGINGFACILITYUNISEXSHOWERCLOTHESLOCKERREQUIREDPROVIDEDREQUIREDPROVIDEDBLDG A110113,500 SF14 (10.1 + 4 MIN.)14103 (101 + 2)104NOTREQUIREDNOTREQUIRED1REQUIREDBLDG A26213,500 SF10 (6.2 + 4 MIN.)1464 (62 + 2)64NOTREQUIREDNOTREQUIRED1REQUIREDBLDG A350NONE585054N/AN/AN/AZONING TRANSECT BOUNDARYEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLELOT BBUILDING B1#112 GARDEN STREET#303 MARKETSTREETSHEET INDEX1OVERALL SITE PLAN2EXISTING CONDITIONS PLAN3GRADING PLAN - BLDG A1 & A24GRADING PLAN - BLDG A35UTILITY & LAYOUT PLAN - BLDG A1 & A26UTILITY & LAYOUT PLAN - BLDG A37EPSC PLAN8LIGHTING PLAN9DETAILS - SITEWORK10DETAILS - SITEWORK & STORM11DETAILS - EPSC & STORM12DETAILS - WATER13DETAILS - WATER & INSETS14PAVEMENT MARKING & SIGN PLAND2STORMWATER DETAILS (BY VHB)LOT N3FUTURE STREET ROW0.36 AC.PROJECT DATA:ZONING DISTRICT: FORM BASED CODETRANSECT ZONE T4 & TRANSECT ZONE T5LOT DATA:LOT N1 = 3.71 ACRELOT N2 = 1.79 ACRE (STORM POND)LOT N3 = 0.36 ACRE (FUTURE ROW)PROPOSED BUILDING:BUILDINGS A1 & A2: MIXED USE BUILDINGBASEMENT - PARKING GARAGEFLOOR 1T-4:RESIDENTIAL UNITST-5:NON-RESIDENTIALFLOORS 2-4T-4 & T-5: RESIDENTIAL UNITSBUILDING A3: RESIDENTIALBASEMENT - PARKING GARAGEFLOORS 1-4T-4:RESIDENTIAL UNITSPARKING STANDARDS (T-4 & T-5)FORM BASED CODE REQUIREMENTS:VEHICLE PARKINGMAXIMUM 2 SPACES PER RESIDENTIAL UNITBIKE PARKINGSHORT TERM BIKE PARKING1 SHORT TERM SPACE REQUIRED PER 10 DWELLING UNITS1 SHORT TERM SPACE PER 5,000 SF FOR RETAIL / RESTAURANT / OFFICELONG TERM BIKE PARKING1 LONG TERM SPACE PER 1 DWELLING UNITLONG TERM SPACES = 50% OF SHORT TERM SPACES FOR RETAIL / RESTAURANT / OFFICEVEHICLE PARKINGBUILDING / LOTDWELLINGUNITSPROPOSED PARKING SPACESGARAGESURFACETOTALBLDG A1 / LOT N11017944123BLDG A2 / LOT N262483482BLDG A3 / LOT N350341549OPEN SPACE REQUIREMENTS (T-4)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITOPEN SPACE REQUIREMENTS (T-5)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITNON-RESIDENTIAL, <20,000 SF·5% OF NON-RESIDENTIAL GROSSFLOOR AREAOPEN SPACEBLDGDWELLINGUNITSNON-RESIDENT.SPACEOPEN SPACEREQUIREDPROPOSED OPEN SPACELDA O/S CREDITPROVIDEDTOTALBLDG A110113,500 SF6,735 SF(6,060 + 675)3,367.5 SF(50% MAX.)990 SF SNIPPET (A1) +1,300 SF SNIPPET (A1)+ 2,400 SFPOCKET PLAZA +1,175 SF SNIPPET (A2)+ 3,500 SFRAIN GARDEN (A3)16,430 SFBLDG A26213,500 SF4,395 SF(3,720 + 675)2,197.5 SF(50% MAX.)BLDG A350NONE3,000 SF1,500 SF(50% MAX)TOTAL14,130 SF7,065 SF9,365 SFBUILDING ENVELOPE STANDARDS - FRONTAGE BUILDOUT:REQUIRED FRONTAGE BUILDOUTT-470% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)T-585% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)PROPOSEDMARKET STREET - LOT N1 / BLDG A2TOTAL STREET FRONTAGE = 430.5 FT (ALL IN T-5)TOTAL FRONTAGE BUILDOUT = 185.6 FT + 185.5 FT = 371.1 FTTOTAL FRONTAGE BUILDOUT = 86% (371.1 FT / 430.5 FT = 86%)FUTURE PUBLIC STREET - LOT N1 / BLDG A2TOTAL STREET FRONTAGE = 239.6 FT (T-5 = 150 FT T-4 = 89.6 FT)TOTAL FRONTAGE BUILDOUT = 191.4 FTTOTAL FRONTAGE BUILDOUT = 80% (191.4 FT / 239.6 FT = 80%)THE PROPOSED FRONTAGE BUILDOUT FOR THE FUTURE PUBLIC STREET (191.4 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (190.2 FT) FOR THE T-4 & T-5.[(150 FT X 0.85) + (89.6 FT X 0.70) = 190.2 FT)]GARDEN STREET - LOT N1 / BLDGS A1 & A3TOTAL STREET FRONTAGE = 761.5 FT (T-5 = 151.3 FT T-4 = 610.2 FT)TOTAL FRONTAGE BUILDOUT= 590.0 FT = 369.9 FT (BLDG A1) + 220.1 FT (BLDG A3)TOTAL FRONTAGE BUILDOUT = 77% (590.0 FT / 761.5 FT)THE PROPOSED FRONTAGE BUILDOUT FOR GARDEN STREET (590.0 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (555.8 FT) FOR THE T-4 & T-5.[(151.3 FT X 0.85) + (610.3 FT X 0.70) = 555.8 FT)]05-05-23COORDINATION WITH PROPERTY PLATABR05-19-23REV DRIVE OFF GARDEN STABR