PROJECT DESCRIPTION
Site plan application #SP-23-036 of Engineers Construction, Inc., for after-the-fact approval for a
contractor’s yard and alteration of grade. The project consists of authorizing the continued use of a
contractor’s yard to place fill materials, 24 Berard Drive.
COMMENTS
The Board reviewed this application on September 14, 2023. The Board continued the hearing for the
purpose of allowing the applicant to address Board feedback, particularly on the southern access to the
site. The applicant provided a vehicle turning movement plan to demonstrate their proposal.
A) SITE PLAN REVIEW STANDARDS
14.07 Specific Review Standards
C. Access and Circulation. All proposed development shall comply with site access and circulation
standards of Section 15.A.14.
The site has two access points on Berard Drive, one at the north off the cul-de-sac and a second at the
southern end of the public street frontage. The Board on September 19 expressed concern that the
southern entrance created unsafe conditions on Berard Drive due to the extremely limited sight distance
of approximately 40-ft.
As noted in the September 19 report, the speed limit on Berard Drive is 25 mph and on-street parking is
permitted on either side. The southern access point was developed for the adjoining property but
merged with the subject property in 2004 when a subdivision took place to convey land from the
southern property to the subject property.
The applicant is proposing an equipment storage area near the southern end of the frontage on Berard
Drive that would be accessed via the southern entrance.
The Board directed the applicant to provide a design that modified the southern entrance to create a
safe configuration.
The plan submitted by the applicant entitled “Southern Access Drive Plan,” dated 9/27/2023, depicts the
entrance movement of a 29-foot non-articulated three axle vehicle, a representation of which is shown
on the plan. The truck is depicted as not crossing the center line of Berard Drive when it enters the site
2
at 6 mph, or a crawl speed. The applicant has proposed to widen the entrance radius to 30-ft on both
north and south sides of the driveway, though it is unclear why widening on the north is proposed since
the entrance is proposed to be one-way in only, and Berard Drive is a dead end street.
Given the existence of a northern entrance which does not appear to have as many potential issues, Staff
recommend the Board discuss the following aspects of the proposal with the applicant.
1. The design vehicle. As Staff alluded to on September 19, construction equipment is typically
moved on articulated “low-boy” trailers much larger than the vehicle shown on the submitted
plan.
2. The design speed. Staff considers the design should default to success rather than provide a
solution that only works in limited circumstances. What is a typical speed for an entering
vehicle?
3. The northern curb radius. Based on the discussion on 9/19, it seems a one-way in entrance
should not require anything but a very modest radius on the northern side. If the objective is
sight distance, a tree clearing zone should instead be proposed.
RECOMMENDATION
Staff recommends that the Board work with the applicant to address the issues identified herein.
1.This plan is in no way a boundary survey. Property lines shown are
based on tax map information from the City of South Burlington and a
plan entitled "Property To Be Conveyed By Alan & Maureen Pidgeon
Boundary Line Adjustment for Alan & Maureen Pidgeon & K&S
Properties, LLC To Vermont Transco LLC, Berard Drive, South
Burlington, Vermont" by Vermont Surveying and Engineering, dated
12-28-10 and recorded in Map Slide 557, Page 2 of the City of South
Burlington Land Records.
2.The horizontal coordinate system is based on NAD83 Vermont State
Plane 4400 (US Survey Feet). Elevations are based on the NAVD88
datum (US Survey Feet).
3.Existing utilities shown are not warranted to be exact or complete.
Contractor shall contact DIG SAFE and other non-member utilities
prior to beginning any excavation.
4.Existing conditions shown are based on 2014 LiDAR data from the
Vermont Center for Geographic Information (VCGI), and a
topographic survey by Krebs & Lansing Consulting Engineers in May
2023. Background imagery shown is 2022 orthoimagery from VCGI.
5.Wetlands shown were delineated by Arrowwood Environmental on
June 27, 2023 and located by Krebs & Lansing Consulting Engineers
on July 10, 2023.
6.The Base Flood Elevation (BFE) of the 100-year flood adjacent to the
site is approximately 204.5 feet in elevation, based on FEMA FIRM
Map No.50007C0256D with effective date July 18, 2011. The limits
of the 100-year floodplain shown on this plan are based on VCGI
data and do not reflect the changes in elevation in this area.
C-1.0
Drawing No.
Project No.
No. Date Description
Drawing Title
Drawn by
Checked by
JBC
Scale
Revisions
Date
1" = 80'
23168
7/28/2023
ECI Berard
Drive Facility
Overall Plan
NOTES
164 Main Street, Suite 201 P: (802) 878-0375
Colchester, Vermont 05446 www.krebsandlansing.com
SITE
LOCATION MAP
SCALE: 1" = 2,500'
JBC
24 Berard Drive
South Burlington
ISSUED FOR PERMIT REVIEW
NOT FOR CONSTRUCTION
EXISTING GRADE 5 FOOT CONTOUR LINES
EXISTING GRADE 1 FOOT CONTOUR LINES
100-YEAR FLOODPLAIN BOUNDARY (VCGI)
RIVER CORRIDOR (VCGI)
REGULATORY FLOODWAY AREA (VCGI)
IRON PIPE / CONCRETE MONUMENT FOUND
PROJECT PROPERTY LINE
EXISTING OVERHEAD POWER LINES
APPROXIMATE PROPERTY LINES
LEGEND:
AIRPORT APPROACH ZONE BOUNDARY
WETLANDS (LOCATED BY ARROWWOOD)
EXISTING STORM PIPE / CATCH BASIN
EXISTING CONCRETE BARRIERS
50' WETLAND BUFFER
EXISTING GRAVEL BERM
HABITAT BLOCK (VCGI)
EXISTING TREELINE
EXISTING CHAINLINK FENCE
Track
Width :
:Steering Angle
Lock to Lock Time
:
:
feet
2015 Tandem Plow Truck
35.0
6.0
8.50
8.50
Articulating Angle AA:
18.003.83
29.00
EXISTING TREELINE
EXISTING CHAINLINK FENCE
164 Main Street, Suite 201 P: (802) 878-0375
Colchester, Vermont 05446 www.krebsandlansing.com
ISSUED FOR
PERMIT REVIEW
NOT FOR
CONSTRUCTION
SK-2
Drawing No.
Project No.
No. Date Description
Drawing Title
Drawn by
Checked by
JBC
Scale
Revisions
Date
1" = 10'
23168
9/27/2023
ECI Berard
Drive Facility
Southern Access
Drive Plan
JBC
24 Berard Drive
South Burlington
SITE
LOCATION MAP
SCALE: 1" = 2,500'
EXISTING GRADE 5 FOOT CONTOUR LINES
EXISTING GRADE 1 FOOT CONTOUR LINES
EXISTING ACCESS DRIVE
IRON PIPE / CONCRETE MONUMENT FOUND
PROJECT PROPERTY LINE
PROPERTY LINE SETBACKS
EXISTING OVERHEAD POWER LINES
APPROXIMATE PROPERTY LINES
LEGEND:
AIRPORT APPROACH ZONE BOUNDARY
EXISTING STORM PIPE / CATCH BASIN
EXISTING CONCRETE BARRIERS
EXISTING DRAINAGE SWALE>>
NEW GRAVEL AREA
NEW PAVEMENT AREA