Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation WWA-23-129 (2) *Flow Calculations (You may substitute an engineer’s calculation or letter for the information requested below) For residential projects, list number of bedrooms and units requested: Number of Bedrooms Number of Units X Gallons per day per unit = Total Flows 1 140 2 or more 210 TOTAL Notes: ___________________________________________________ ________________________________________________________ For commercial and industrial projects, list existing and proposed tenants, uses and flows: Tenant/ Type of use Number of Flows per Other Total Business seats, SF, etc X unit Adjustments Flow TOTAL *Total development wastewater flow requested: ________gallons per day Flow characteristics (for commercial and industrial projects) Volume: ____________________________________________________________ __________________________________________________ Flow rate: ____________________________________________________________ __________________________________________________ Strength: ____________________________________________________________ __________________________________________________ 17 2,380 58 12,180 75 14,560 Allocation for the commercial space to be determined once the uses are known. 14,560 Preliminary water allocation of 18,270 GPD previously granted on 06/06/2023. Net decrease of 3,710 GPD requested with this application due to a decrease in the number of dwelling units. Please do not write below this line Application & Recording Fee received: _____________ ________ Name Date Receiving Plant: ______Airport Pkwy _____Bartlett Bay City Center District: ____Yes _____No Approved by Water Pollution Control Department (Commercial and Industrial Projects) ______________________ _____________ Director of Water Pollution Control Date Preliminary allocation issued: (payment of fee is not required) _______________________ _____________ Director of Planning and Zoning Date Final allocation issued: (payment of fee is required, either in full or pro-rated for projects with multiple zoning permits involved) _______________________ _____________ Director of Planning and Zoning Date Final allocation expires _________________with permit #____-____-____ (Date) Zoning permit issued___________________with permit#____-____-____ (Date) Associated WW connection permit (if applicable) #____-____-____ For extensions of Final Allocation Only EXTENSION GRANTED ____________to______________ (Date) (Date of Expiration) 50% EXTENSION FEE PAID _________ $___________ (Date) (Amount) 267 23 129 *Flow Calculations (You may substitute an engineer’s calculation or letter for the information requested below) For residential projects, list number of bedrooms and units requested: Number of Bedrooms Number of Units X Gallons per day per unit = Total Flows 1 140 2 or more 210 TOTAL Notes: ___________________________________________________ ________________________________________________________ For commercial and industrial projects, list existing and proposed tenants, uses and flows: Tenant/ Type of use Number of Flows per Other Total Business seats, SF, etc X unit Adjustments Flow TOTAL *Total development wastewater flow requested: ________gallons per day Flow characteristics (for commercial and industrial projects) Volume: ____________________________________________________________ __________________________________________________ Flow rate: ____________________________________________________________ __________________________________________________ Strength: ____________________________________________________________ __________________________________________________ 42 5,880 59 12,390 101 18,270 Allocation for the commercial space to be determined once the uses are known. 18,270 Please do not write below this line Application & Recording Fee received: _____________ ________ Name Date Receiving Plant: ______Airport Pkwy _____Bartlett Bay City Center District: ____Yes _____No Approved by Water Pollution Control Department (Commercial and Industrial Projects) ______________________ _____________ Director of Water Pollution Control Date Preliminary allocation issued: (payment of fee is not required) _______________________ _____________ Director of Planning and Zoning Date Final allocation issued: (payment of fee is required, either in full or pro-rated for projects with multiple zoning permits involved) _______________________ _____________ Director of Planning and Zoning Date Final allocation expires _________________with permit #____-____-____ (Date) Zoning permit issued___________________with permit#____-____-____ (Date) Associated WW connection permit (if applicable) #____-____-____ For extensions of Final Allocation Only EXTENSION GRANTED ____________to______________ (Date) (Date of Expiration) 50% EXTENSION FEE PAID _________ $___________ (Date) (Amount) 302.5302.5 302.5302.5 302.5 LLLL L LL 310 309 309 310311311 310305 3123123143153143123 1 1 3113113113103103123123 1 2 31 2 298308 308305305308305300 300 300305308298 299305310 3 1 0 31031 0 309311310308309307309312314314DDD305307UUUUUU312311311311310310 3 1 0 3 10 311312MARKET STLOT M410' WIDE SHARED USE PAVED PATH6' WIDE CONCRETE SIDEWALKEX. SIDEWALKEXISTING BOXSTORM POND 1SEE PLANS BY WAGNERHODGSON FOR LAYOUT ANDLANDSCAPING IN MINI PARKGARDEN STREETLOT M5110.2' 1 0 0 .0 '209.1'NEW CONCRETE SIDEWALK6' C ON CR E TE S I D EW A LK6' CONCRETE SIDEWALKPROPOSED 61 UNITRESIDENTIAL BUILDINGBIKE RACKS(4 HOOPS)6' WIDE CONCRETE SIDEWALK5' CONCRE T E S I D EW A L K20' R.30' R.10' R.20' R.22'20'20' R.CONCRETE CURBCONC R E T E CU R B RAMPTRASH & RECYCLING CONTAINERSTO BE LOCATED IN PARKING GARAGEBLDG B1MARKET STREETCI T Y H A L L / SCHOO L DR I V EWAY FU TURE PUB L IC S TREE T 3 2 4 'LOT B-B2LOT B-B1TRANSECT T-4TRANSECT T-5TRANSECT T-4TRANSECT T-56' WIDE CONCRETE SIDEWALK8 6 . 5 'L=136.9 '28.7'3.3'L=91.0'289.6'181.3'137.8'61 .2 ' 2 4 8 . 1 '60'6' W I D E CON CRE TE S I DEW A L K 10' WIDE SHARED USE PAVED PATH1 0 ' W IDE SH A RED U S E P A V ED PA TH BUILDING A2BUILDING A1BUILDING A3FU TUR E PUB L IC S TRE E TBIOERETENTION AREAPOCKET PLAZALOT N13.71 AC.LOT N21.79 AC.TRASH & RECYCLINGSTRUCTUREPLAZA AT STREETLEVEL OVER RAMPTO PARKING GARAGETYPICAL RAILING ALONGTOP OF RETAINING WALL22'22'15' R.TRANSECT T-5TRANSECT T-4TRANSECT T - 5TRANSECT T - 4 MOUNTABLECONCRETE CURBMOUNTABLECONCRETE CURBCONCR E T E C UR B CONCRETE CURB5' R .5' R.15' R.15' R.30' R.54' R.22'20'10' R.30' R.22'EXISTING PAVED DRIVEPROPOSED 20' WIDE PEDESTRIANEASEMENT TO THE CITY OF SOUTHBURLINGTON20'CLASS 2 WETLAND50'50' WETLAND BUFFEREXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CON CRE TE S I DEW A L K (4) BIKE RACKS(8 SPACES)(4) BIKE RACKS(8 SPACES)5' WIDE CONCRETE SIDEWALK 5' WIDE CONCRETE SIDEWALK5' WIDE CONC. SIDEWALKEXISTING PAVED PARKINGEXISTINGPAVEDPARKINGSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILS20'20'8'8'22'15' R.15' R.10' R.15' R.12' R.18'8'8'8'9'EL E CELEC ELEC18'8'8'8'9'24'18'9'24'8'8'8'8' R.15' R .10' R.10' R.1 5 8 . 6 'L=81.0 'L=89.0'L=11.2'L=180.5'357.6'14.6'110.8'L = 89 . 4 'L=54.6'L=215.8'430.5'S PEEDTABLE SPEEDTABLE20.3'(3) BIKE RACKS(6 SPACES)(3) BIKE RACKS(6 SPACES)(4) BIKE RACKS(8 SPACES)CONCRETE CURB CONCR E T E CUR B SOUTH BURLINGTON CITY CENTERCATAMOUNT RUN - PH.IIMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing03-17-23KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN1OVERALL SITE PLANWILLISTON ROADLOCATION MAPNOT TO SCALEMAR Y S T R E E T EXIT 14INTERSTATE 89MIDAS RDHINESBURG ROADINTERSTATE 89MARKET STREETMARCOTTECENTRALSCHOOLDORSET STREETAPPLICANTTHE SNYDER-BRAVERMANDEVELOPMENT COMPANY, LLC4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VT 05482LANDOWNERSOUTH BURLINGTON CITY CENTER, LLCP.O. BOX 2204SOUTH BURLINGTON, VT 05407WHITE STSITENOTES:1.THE PURPOSE OF THIS PLAN IS TO PRESENT THE PROPOSED LAYOUT OF LOT N AND THEASSOCIATED BUILDING AND SITE IMPROVEMENTS. SEE THE MARKET STREET ANDGARDEN STREET DESIGN PLANS FOR STREET AND UTILITY RELATED INFORMATIONWITHIN THE RIGHT OF WAY.2.FOR LOT N PERIMETER BOUNDARY INFORMATION, SEE THE SOUTH BURLINGTON CITYCENTER, LLC SUBDIVISION PLAT BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS,INC., LAST REVISED 10-19-21 AND RECORDED IN SLIDE 646.3 OF THE CITY LAND RECORDS.3.LOT N IS SUBJECT TO A PROPOSED SUBDIVISION. SEE THE SUBDIVISION SURVEY PLATDATED 05-04-23 BY BARNARD & GERVAIS, LLC FOR DETAILED INFORMATION ON LOTSN1-N3.GRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.GARDENSTREETLEGENDPROJECT BOUNDARY 310EXISTING TREELINEABUTTING PROPERTY LINESIDELINE OF EASEMENTEXISTING CONTOUR#155 MARKET STREETMIXED USE BUILDINGLOT BBUILDING B2BIKE PARKINGBLDGDWELLINGUNITSNON-RESIDENTIALSPACESHORT TERM BIKE SPACESLONG TERM BIKE SPACESCHANGINGFACILITYUNISEXSHOWERCLOTHESLOCKERREQUIREDPROVIDEDREQUIREDPROVIDEDBLDG A110113,500 SF14 (10.1 + 4 MIN.)14103 (101 + 2)104NOTREQUIREDNOTREQUIRED1REQUIREDBLDG A26213,500 SF10 (6.2 + 4 MIN.)1464 (62 + 2)64NOTREQUIREDNOTREQUIRED1REQUIREDBLDG A350NONE585054N/AN/AN/AZONING TRANSECT BOUNDARYEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLELOT BBUILDING B1#112 GARDEN STREET#303 MARKETSTREETSHEET INDEX1OVERALL SITE PLAN2EXISTING CONDITIONS PLAN3GRADING PLAN - BLDG A1 & A24GRADING PLAN - BLDG A35UTILITY & LAYOUT PLAN - BLDG A1 & A26UTILITY & LAYOUT PLAN - BLDG A37EPSC PLAN8LIGHTING PLAN9DETAILS - SITEWORK10DETAILS - SITEWORK & STORM11DETAILS - EPSC & STORM12DETAILS - WATER13DETAILS - WATER & INSETS14PAVEMENT MARKING & SIGN PLAND2STORMWATER DETAILS (BY VHB)LOT N3FUTURE STREET ROW0.36 AC.PROJECT DATA:ZONING DISTRICT: FORM BASED CODETRANSECT ZONE T4 & TRANSECT ZONE T5LOT DATA:LOT N1 = 3.71 ACRELOT N2 = 1.79 ACRE (STORM POND)LOT N3 = 0.36 ACRE (FUTURE ROW)PROPOSED BUILDING:BUILDINGS A1 & A2: MIXED USE BUILDINGBASEMENT - PARKING GARAGEFLOOR 1T-4:RESIDENTIAL UNITST-5:NON-RESIDENTIALFLOORS 2-4T-4 & T-5: RESIDENTIAL UNITSBUILDING A3: RESIDENTIALBASEMENT - PARKING GARAGEFLOORS 1-4T-4:RESIDENTIAL UNITSPARKING STANDARDS (T-4 & T-5)FORM BASED CODE REQUIREMENTS:VEHICLE PARKINGMAXIMUM 2 SPACES PER RESIDENTIAL UNITBIKE PARKINGSHORT TERM BIKE PARKING1 SHORT TERM SPACE REQUIRED PER 10 DWELLING UNITS1 SHORT TERM SPACE PER 5,000 SF FOR RETAIL / RESTAURANT / OFFICELONG TERM BIKE PARKING1 LONG TERM SPACE PER 1 DWELLING UNITLONG TERM SPACES = 50% OF SHORT TERM SPACES FOR RETAIL / RESTAURANT / OFFICEVEHICLE PARKINGBUILDING / LOTDWELLINGUNITSPROPOSED PARKING SPACESGARAGESURFACETOTALBLDG A1 / LOT N11017944123BLDG A2 / LOT N262483482BLDG A3 / LOT N350341549OPEN SPACE REQUIREMENTS (T-4)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITOPEN SPACE REQUIREMENTS (T-5)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITNON-RESIDENTIAL, <20,000 SF·5% OF NON-RESIDENTIAL GROSSFLOOR AREAOPEN SPACEBLDGDWELLINGUNITSNON-RESIDENT.SPACEOPEN SPACEREQUIREDPROPOSED OPEN SPACELDA O/S CREDITPROVIDEDTOTALBLDG A110113,500 SF6,735 SF(6,060 + 675)3,367.5 SF(50% MAX.)990 SF SNIPPET (A1) +1,300 SF SNIPPET (A1)+ 2,400 SFPOCKET PLAZA +1,175 SF SNIPPET (A2)+ 3,500 SFRAIN GARDEN (A3)16,430 SFBLDG A26213,500 SF4,395 SF(3,720 + 675)2,197.5 SF(50% MAX.)BLDG A350NONE3,000 SF1,500 SF(50% MAX)TOTAL14,130 SF7,065 SF9,365 SFBUILDING ENVELOPE STANDARDS - FRONTAGE BUILDOUT:REQUIRED FRONTAGE BUILDOUTT-470% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)T-585% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)PROPOSEDMARKET STREET - LOT N1 / BLDG A2TOTAL STREET FRONTAGE = 430.5 FT (ALL IN T-5)TOTAL FRONTAGE BUILDOUT = 185.6 FT + 185.5 FT = 371.1 FTTOTAL FRONTAGE BUILDOUT = 86% (371.1 FT / 430.5 FT = 86%)FUTURE PUBLIC STREET - LOT N1 / BLDG A2TOTAL STREET FRONTAGE = 239.6 FT (T-5 = 150 FT T-4 = 89.6 FT)TOTAL FRONTAGE BUILDOUT = 191.4 FTTOTAL FRONTAGE BUILDOUT = 80% (191.4 FT / 239.6 FT = 80%)THE PROPOSED FRONTAGE BUILDOUT FOR THE FUTURE PUBLIC STREET (191.4 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (190.2 FT) FOR THE T-4 & T-5.[(150 FT X 0.85) + (89.6 FT X 0.70) = 190.2 FT)]GARDEN STREET - LOT N1 / BLDGS A1 & A3TOTAL STREET FRONTAGE = 761.5 FT (T-5 = 151.3 FT T-4 = 610.2 FT)TOTAL FRONTAGE BUILDOUT= 590.0 FT = 369.9 FT (BLDG A1) + 220.1 FT (BLDG A3)TOTAL FRONTAGE BUILDOUT = 77% (590.0 FT / 761.5 FT)THE PROPOSED FRONTAGE BUILDOUT FOR GARDEN STREET (590.0 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (555.8 FT) FOR THE T-4 & T-5.[(151.3 FT X 0.85) + (610.3 FT X 0.70) = 555.8 FT)]05-05-23COORDINATION WITH PROPERTY PLATABR05-19-23REV DRIVE OFF GARDEN STABR