Loading...
HomeMy WebLinkAboutSP-23-035 - Supplemental - 0267 Market Street (4) 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com Application Number SP-______-__________ (office use only) APPLICATION FOR SITE PLAN REVIEW (City Center FBC District) All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review. 1. Street Address of Project: _________________________________________________________________ 2. Brief project description (explain what you want approval for): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ 3. Applicant Name __________________________________ Address________________________________ _______________________________________ Email _____________________________________ Telephone_________________________________ 4. Primary Contact (person who will receive all correspondence from Staff) Name __________________________________ Address________________________________ _______________________________________ Email _____________________________________ Telephone_________________________________ 5. Owner(s) of Record (Name(s) as shown on deed, mailing address, phone and fax #): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ 6. Project Summary a. Existing Uses on Property (including description and size of each separate use): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ 225 Market Street, 267 Market Street, & 113 Garden Street Amend prior FBC site plan approval for phased construction of two mixed use buildings and one multi-family building containing a total of 213 residential units and 27,000 sf of non-residential space. This application requests approval to modify the design of the residential units in Building A1 (by adding 3 bedroom units), resulting in a revised total 187 residential units. kb@bravermancompany.comThe Snyder-Braverman Development Co, LLC Shelburne, VT 05482 4076 Shelburne Road, Suite 6 802-343-6330 Andrew Rowe Shelburne, VT 05482 arowe@snyderhomesvt.com 4076 Shelburne Road, Suite 6 802-985-5722 South Burlington City Center, LLC c/o South Burlington Realty Co. P.O. Box 2204 South Burlington, VT 05407 tim@southburlingtonrealty.com office 802-863-9039 x3 cell 802-233-5302 temporary structure and staging area for construction of buildings on Lot B & Lot N 2 b. Proposed Uses on property (include description and size of each new use and existing uses to remain): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ c. Building size (GFA) Existing _______________ Proposed _______________ d. Residential Units Existing _______________ Proposed _______________ e. Does this project require meeting Section 18.01, Inclusionary Zoning?  Yes  No If yes to above, please indicate below the number of dwelling units that will be reserved in perpetuity for households in each income category. Please see 18.01(C) for the proportion that must be devoted to each income category and how to calculate fractional dwelling units. Affordable Units #s 80% of Median _______ 100% of Median _______ 120% of Median _______ f. Qualifying open space (SF) Existing _______________ Proposed _______________ 7. Project Details. a. Completed Submission checklist □ b. Completed BES checklist & self-evaluation □ c. Supporting documents and narrative for certain circumstances (including but not limited to): i. Section 8.06, Special Standards; Section 8.07 Materials; Section 8.08 Open Space Standards; Section 8.09 Nonconformities ii. Article 10, Overlay Districts iii. Article 12, Surface Water Protection Standards iv. Article 13, Supplemental Requirements 8. Total Parcel Size (sq. ft.) ______________ Total Impervious coverage (sq. ft.) ______________ 9. Total area to be disturbed during construction (sq. ft.) ______________* * Projects disturbing more than one-half acre of land must follow the City’s specifications for erosion control in Article 16 and Stormwater Management in Article 12 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. 10. Cost Estimates. a. Building (including interior renovations). $____________________ b. Landscaping: $____________________ c. Other site improvements (please list with cost): ____________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ 10. Traffic / Trip Generation. Building A1: 75 dwelling units with amenity/support space plus 13,500 s.f. of commercial tenant space Building A2: 62 dwelling units with amenity/support space plus 13,500 s.f. of commercial tenant space Building A3: 50 dwelling units 0 sf 0 187 dwelling units n 0 0 0 0 sf 15,650 sf 255,083 s.f. (5.86 ac.)136,020 sf (Lot N1, N2 & N3) 192,000 s.f. 30,914,000 376,931 $ 890,000 utilities and sitework A1: 122,240 sf plus 30,560 sf garage A2: 81,900 sf plus 20,475 sf garage A3: 59,260 sf plus 14,815 sf garage See #MS-18-05 and attached Inclusionary Housing summary (3,500 sf rain garden + 2,400 sf pocket plaza + 990 sf snippet + 1,300 sf snippet + 1,175 sf snippet + 6,285 LDA O/S credit = 15,650 sf) No changes proposed to building envelope standards (Lots N1, N2 & N3)