Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation WWA-21-XXX CITY OF SOUTH BURLINGTON APPLICATION for WASTEWATER ALLOCATION *Items marked with an asterisk must be filled in by ALL applicants *APPLICANT INFORMATION Applicant: ______________________________________________ Contact Person: ________________________________________________ Mailing Address: _______________________________________________ _______________________________________________ Telephone & Fax for Contact Person: __________________________________ Property Owner Name (if not applicant): _______________________________ Property Owner Mailing Address: ____________________________________ ____________________________________ *Physical Location of Project: ________________________________ __________________ ______________________ *Signature of Applicant *Signature of Property Owner (Both applicant and property owner MUST sign the application!) *Project Information If the project is a single-family home, please check one: ____New ____Existing If not a single-family home, project name: __________________________ *Application or Permit Numbers: (from Planning & Zoning office) #____-____-____ #____-____-____ #____-____-____ Engineer’s Information for flows over 1,000 gpd Name of Engineer: ____________________________________________ Firm: _____________________________________________________ Mailing Address: _____________________________________________ Phone & Fax: ________________________________________________ PE License #: ________________________________________________ FOR INTERNAL USE ONLY WWA Permit #___-____ *Flow Calculations (You may substitute an engineer’s calculation or letter for the information requested below) For residential projects, list number of bedrooms and units requested: Number of Bedrooms Number of Units X Gallons per day per unit = Total Flows 1 140 2 or more 210 TOTAL Notes: ___________________________________________________ ________________________________________________________ For commercial and industrial projects, list existing and proposed tenants, uses and flows: Tenant/ Type of use Number of Flows per Other Total Business seats, SF, etc X unit Adjustments Flow TOTAL *Total development wastewater flow requested: ________gallons per day Flow characteristics (for commercial and industrial projects) Volume: ____________________________________________________________ __________________________________________________ Flow rate: ____________________________________________________________ __________________________________________________ Strength: ____________________________________________________________ __________________________________________________ Please do not write below this line Application & Recording Fee received: _____________ ________ Name Date Receiving Plant: ______Airport Pkwy _____Bartlett Bay City Center District: ____Yes _____No Approved by Water Pollution Control Department (Commercial and Industrial Projects) ______________________ _____________ Director of Water Pollution Control Date Preliminary allocation issued: (payment of fee is not required) _______________________ _____________ Director of Planning and Zoning Date Final allocation issued: (payment of fee is required, either in full or pro-rated for projects with multiple zoning permits involved) _______________________ _____________ Director of Planning and Zoning Date Final allocation expires _________________with permit #____-____-____ (Date) Zoning permit issued___________________with permit#____-____-____ (Date) Associated WW connection permit (if applicable) #____-____-____ For extensions of Final Allocation Only EXTENSION GRANTED ____________to______________ (Date) (Date of Expiration) 50% EXTENSION FEE PAID _________ $___________ (Date) (Amount) Engineers Scientists Planners Designers 40 IDX Drive, Building 100 Suite 200, South Burlington, VT 05403 P 802.497.6100 www.vhb.com December 1, 2021 Ref: 57913.01 Justin Rabidoux Public Works Director/City Engineer City of South Burlington 104 Landfill Rd. South Burlington, VT 05403 Re: Holiday Inn Redevelopment 1068 Williston Road, South Burlington Water Design Flow Calculations Dear Justin, On behalf of the landowner, Champlain School Apartments Partnership, VHB is writing to request an allocation in wastewater demand of 24,235 GPD for the Hampton Inn building. The previously approved wastewater demand for the Hampton Inn building was 17,122 GPD issued on January 17,2019. This new amount reflects an increase in demand of 7,113 GPD. South Burlington, VT 05403 Ref: 57913.01 December 1, 2021 Page 2 Wastewater Demand Table 1 Proposed Wastewater Design Flow Calculations* Hampton Inn Use Quantity Unit GPD/Unit Wastewater Design Flow (GPD) Assembly Area; Banquet Hall; Conference Room with food service -For Each Use 249 Seat 14 3,486 Hotels -For Each Use 310 Sleeping Space 50 15.500 -Meals served only to guests 310 Meal per sleeping space 5 1,550 -On premise laundry 1 Machine 450 450 Office, Factory, Welcome Center and Place of Employment -Without showers 15 Employee Per Shift 15 225 Restaurant service a max. of 2 meals per day 12 Seat licensed by the Department of Health 27 3,024 Total 24,235 *Based on the State Environmental Protection Rules, Chapter 1, Subchapter 8, Table 8-3 Please let me know if you have any questions or need additional information. Sincerely, VHB Stephanie Wyman, PE Civil Engineer cc: Peter Smiar, PE (Director of Land Development, VHB) Deb Sherman (Larkin Realty)