Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation WWA-23-15723 152 Engineers Scientists Planners Designers 40 IDX Drive, Building 100 Suite 200, South Burlington, VT 05403 P 802.497.6100 www.vhb.com June 22, 2023 Ref: 57913.01 Mr. Tom DiPietro Director of Public Works City of South Burlington 180 Market Street South Burlington, VT 05403 Re: Holiday Inn Redevelopment – Mixed-Use Building II (NDMF II) 1068 Williston Road, South Burlington Wastewater Design Flow Calculations Dear Tom, The previously permitted Holiday Inn Redevelopment Project (“Project”), which consisted of the renovation of the existing Holiday Inn building, a new hotel building and a Mixed-Use residential/commercial building (NDMF I), has since undergone design changes. These changes include removal of the existing Holiday Inn Building and construction of a new Mixed-Use Multi-Family Building (NDMF II). NDMF II will consist of 24 studio units, 16 1-bedroom Units, 12 2-bedroom units and 2,882 SF of restaurant space (75 seats total serving 3 meals a day). NDMF I and the Future Hotel remain unchanged. On behalf of the landowner, Champlain School Apartment Partnership, VHB is requesting a reduction of wastewater allocation in the amount of 7,720 GPD for NDMF II (the existing Holiday Inn replacement). There are no changes proposed for the previously permitted NDMF I and future Hotel. Wastewater Demand The newly proposed wastewater design flows for the proposed NDMF II (Holiday Inn replacement) building are calculated below, followed by a table summarizing the previously permitted flows and proposed flows: Table 1 Proposed Wastewater Design Flow Calculations* Mixed-Use Building II (NDMF II) Use Quantity Unit GPD/Unit Wastewater Design Flow (GPD) Residential Use -Studio/One Bedroom Units** 40 Living Unit 140 5,600 -Two Bedroom Units 12 Living Unit 210 2,520 Restaurant serving 3 meals/day 75 Seat 40 3,000 Total 11,120 *Based on the State Environmental Protection Rules, Chapter 1, Subchapter 8, Table 8-1 and Table 8-3 **Based on design flow of 70 gallons per day per person at the max. residential occupancy proposed for each living unit Director of Public Works Ref: 57913.01 June 22, 2023 Page 2 Table 2 Project Wastewater Design Flow Summary Building Previously Permitted Flow (GPD) Change (GPD) Proposed Flow (GPD) NDMF I 12,412 0 12,412 NDMF II 18,840 -7,720 11,120 Future Hotel 24,235 0 24,235 Total 55,487 -7,720 47,767 The previously allocated wastewater demand for this parcel based on tabulated-unitized flows from proposed uses is 55,487 GPD. The proposed wastewater demands for this parcel are 12,412 GPD for NDMF I, 11,120 GPD for NDMF II and 24,235 GPD for the future hotel for a total combined demand of 47,767 GPD. This represents a decrease of -7,720 GPD. Please let me know if you have any questions or need additional information. Sincerely, Daniel Heil, PE Civil Engineer cc: Joe Larkin (Larkin Realty) 3 22 23 23 9 Ground Flo o r Second Floo r Ground Floor Second Floor PHASE 2B BOUNDARY TOTAL GSF = 78,000 SF FFE = 314.5' HOTEL TOTAL GSF = 136,561 SF FFE = 313.9' MULTI-FAMILY BUILDING NDMF I STANDARD DUTY FLEXIBLE PAVEMENT STANDARD DUTY FLEXIBLE PAVEMENT BITUMINOUS CONCRETE PAVEMENT MILL AND OVERLAY PAVEMENT 18.0' 24.0' SNOW STORAGE AREA 9.0' 16 2 12 6 2 12 LA LA LA LA LA LA 10 R5.0' R5.0' R3.0'R5.0' R5.0' R5.0' R7-8 R2.0' R15.0' R5.0' R5.0' R6.0' R25.0' R5.0' R5.0'R5.0' R10.0' R2.0' R20.0' R25.0' R2.0' R5.0' LA 24.0' PROPOSED CONCRETE DUMPSTER PAD. SEE DETAILS PROPOSED TRANSFORMER PAD LOCATION PROPOSED GENERATOR PAD PROPOSED TRANSFORMER PAD LOCATION WOOD GUARDRAIL (TYP) BOLLARD (TYP) 6.0' 6.0' 13.5' 9.0'18.0'9.5' 13.8' BIKE RACKS PLANTER BOXES FUTURE PHASE 2 3 R7-8 78 STRUCTURED PARKING SPACES 32 STRUCTURED PARKING SPACES TOTAL GSF = 77,436 SF FFE = 314.0' MULTI-FAMILY II BUILDING NDMF II FUTURE CITY ROW EXISTING PROPERTY LINE 47 STRUCTURED PARKING SPACES ACCESSIBLE CURB RAMP TYPE 'C-D' (SEE DETAILS) COVERED PATIO 22.0' 8.0' 24.0' 20.0' 12.0' EDGE OF PAVER BRICK PAVERS ON CONCRETE BASE PHASE 2B BOUNDARY R6-1 LANDSCAPE SEAT WALL WILLISTON ROADTO I-89PRIMARY BUILDING FACADE12' PRIMARY STREET FRONTAGE=192.3' BUILDING FRONTAGE =165.4'BUILDING FRONTAGE=75.5'BUILDING FRONTAGE =79'PRIMARY STREET FRONTAGE =136'PRIMARY BUILDING FACADE SECONDARY BUILDING FACADESECONDARY STREET BUILD TO ZONEPRIMARY BUILD TO ZONE 12'SECONDARY STREET FRONTAGE=95.2'of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment-Phase 2B 1068 Williston Rd. South Burlington, Vermont Permitting - Phase 2B Not Approved for Construction July 17, 2023 33 57913.01 Feet6030015 NOTE: SNOW STORAGE WILL BE LOCATED ONSITE WHERE SHOWN. EXCESS SNOW WILL BE MOVED TO AN OFFSITE LOCATION IN RESPONSE TO THE FACILITY PARKING NEEDS. FOOTNOTES: 1.REFER TO LANDSCAPE PLAN SHEET L4.03 FOR OPEN SPACE REQUIREMENTS. NOTE: CITY PARKING REQUIREMENT FOR RESIDENTIAL: 0.75 SPACES/1-BR-STUDIO-UNIT + 1.5 SPACES/2-BR-UNIT+ 0.75 SPACES/4 UNITS NDMF I =(0.75*72 UNITS)+(1.5*11 UNITS)+ ((0.75)*(83 UNITS/4) = 86 RESIDENTIAL SPACES REQUIRED FOR NDMF I NDMF II =(0.75*40 UNITS)+(1.5*12 UNITS)+ ((0.75)*(52 UNITS/4) = 58 RESIDENTIAL SPACES REQUIRED FOR NDMF II TOTAL PARKING REQUIRED FOR RESIDENTIAL: 144 SPACES; 144 SPACES PROVIDED 4 C2.01 VMA DJH Vehicular Parking Summary Chart Description Spaces Existing Proposed Zoning Summary Chart Zoning District(S):Form Based Code - Transect Zone 4 Overlay District(S):Major Intersections - Zone 1, Transit Overlay District Zoning Regulation Requirements Existing Required Provided Use Summary Table Bicycle Parking Summary Chart Description Spaces Required Proposed Overall Site Plan 1 Betsy Brown From:Tom DiPietro Sent:Thursday, September 7, 2023 2:41 PM To:Dan Heil Cc:Marla Keene; Betsy Brown Subject:RE: [External] RE: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation Attachments:HolidayInnNDMF2_Preliminary approval.pdf; C2.01 Proposed Site Plan 7-17-23.pdf; 20230622 Wastewater Allocation Request - NDMF II.pdf All - AƩached please find the preliminary wastewater allocaƟon for this project. Marla / Betsy – When you save this preliminary allocaƟon in our files, please include the map that Dan provided as well as the memo (both aƩached). Thanks, Tom From: Dan Heil <dheil@vhb.com> Sent: Tuesday, August 29, 2023 9:41 AM To: Tom DiPietro <tdipietro@southburlingtonvt.gov> Cc: Marla Keene <mkeene@southburlingtonvt.gov> Subject: RE: [External] RE: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation Good Morning Tom, Please see aƩached for a PDF calling out the different buildings with their requested water and sewer flows. I believe the most recent preliminary allocaƟon leƩer the City issued was the 6/7/22 preliminary allocaƟon leƩer. Since this Ɵme the breakdown of studio/1 bedroom units vs. 2 bedroom units for NDMF I were revised resulƟng in a total wastewater flow for the development of 55,487 GPD. This is reflected in the aƩached WW Permit. A computaƟon can be found below: Existing Wastewater Allocation Holiday Inn Use Quantity Unit Demand Hotel Rooms 318 Sleeping Space 50 gpd/sleeping space Meals Served Only to Guests 318 Meals / Sleeping Space 5 Meals per sleeping space On Premise Laundry 3 Machines 450 gpd/emp *Based on the State Environmental Protection Rules, Chapter 1, Section § 1-803 Existing Wastewater Allocation - North Dorset Multi-Family I (NDMF I) 2 Use Quantity Unit Demand Residential Use Studio/One Bdrm Units 75 Units 140 gpd Two Bedroom Units 8 Units 210 gpd/100 SF Retail 5789 SF 4 gpd/100 SF *Based on the State Environmental Protection Rules, Chapter 1, Section § 1-803 Existing Wastewater Allocation - Future Hotel Use Quantity Unit Demand Banquet Hall / Conference Room 249 Seats 14 gpd/seat Hotels For Each Use 310 Units 50 Sleeping Space Meals Served Only to Guests 310 Units 5 Meal per sleeping space On Premise Laundry 1 Machine 450 Machine Restaurant (2 meals / day) 112 Seats 27 gpd/seat Employees 15 Employees 15 gpd/emp Total Future Hotel Total Existing Development Wastewater Allocation You are correct that per VHB’s 6/22/23 allocaƟon memo, the revised wastewater flow for the enƟre development is 47,767 GPD, a reducƟon in 7,720 GPD. I hope this clears things up. Please reach out with any addiƟonal quesƟons. Thanks, Dan Daniel Heil, P.E. Site/Civil Project Manager 3 Licensed in VT P 802.391.5566 www.vhb.com From: Tom DiPietro <tdipietro@southburlingtonvt.gov> Sent: Monday, August 28, 2023 3:52 PM To: Dan Heil <dheil@vhb.com> Cc: Marla Keene <mkeene@southburlingtonvt.gov> Subject: [External] RE: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation Hi Dan, Can you send me a site plan that labels the different buildings and indicates the allocaƟon requested for each. We seem to have changed the naming convenƟon since the last request, so I’d like to make sure the WW allocaƟon applicaƟon shows the following buildings clearly:  NDMF I  NDMF II  Future Hotel There have been enough iteraƟons of this plan that I think it would be difficult for someone to follow how these allocaƟons were determined. A map would help clear this up. Also, I’m not sure we have the same current approved total flow. I reviewed our records and see that the current approved final allocaƟon from 3/14/22 is for a total of 53,485 GPD based on an 8/27/21 memo from VHB. I also see an approved 6/7/22 preliminary allocaƟon that approved a total of 55,697 GPD based on a 5/25/22 memo from VHB. However, my understanding is that this current request revises that preliminary allocaƟon request such that the total allocaƟon for the property would now be 47,767 GPD, based on a 6/22/23 memo from VHB. The current memo states that the approved allocaƟon is 55,487, but I’m not sure where that number comes from? Thanks, Tom From: Dan Heil <dheil@vhb.com> Sent: Wednesday, August 23, 2023 10:00 AM To: Marla Keene <mkeene@southburlingtonvt.gov> Cc: Tom DiPietro <tdipietro@southburlingtonvt.gov>; Jay Nadeau <jay.nadeau@champlainwater.org>; Joe Larkin - Larkin Realty (joelarkin@larkinrealty.net) <joelarkin@larkinrealty.net>; Deborah Sherman - Larkin Realty (DebSherman@larkinrealty.net) <DebSherman@larkinrealty.net>; Peter Smiar <PSmiar@VHB.com>; Victor Amesoeder <vamesoeder@vhb.com> Subject: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Good Morning Marla, 4 Has DPW and P&Z had the chance to review our request for preliminary water and sewer allocaƟon for NDMF II? AƩached are the signed allocaƟon request applicaƟons submiƩed as part of the NDMF II applicaƟon back in June. We’d like to proceed with our State WW permit submiƩal but will need the approved allocaƟon from the City prior to doing so. Do you have an esƟmate of when this will be ready? Thanks, Dan Daniel Heil, P.E. Site/Civil Project Manager Licensed in VT P 802.391.5566 www.vhb.com 40 IDX Drive Building 100, Suite 200 South Burlington VT 05403-7771 This communication and any attachments to this are confidential and intended only for the recipient(s). Any other use, dissemination, copying, or disclosure of this communication is strictly prohibited. If you have received this communication in error, please notify us and destroy it immediately. Vanasse Hangen Brustlin, Inc. is not responsible for any undetectable alteration, virus, transmission error, conversion, media degradation, software error, or interference with this transmission or attachments to this transmission. Vanasse Hangen Brustlin, Inc. | info@vhb.com