June 22, 2023
Ref: 57913.01
Mr. Tom DiPietro
Director of Public Works
City of South Burlington
180 Market Street
South Burlington, VT 05403
Re: Holiday Inn Redevelopment – Mixed-Use Building II (NDMF II)
1068 Williston Road, South Burlington
Wastewater Design Flow Calculations
Dear Tom,
The previously permitted Holiday Inn Redevelopment Project (“Project”), which consisted of the renovation of the
existing Holiday Inn building, a new hotel building and a Mixed-Use residential/commercial building (NDMF I), has
since undergone design changes. These changes include removal of the existing Holiday Inn Building and construction
of a new Mixed-Use Multi-Family Building (NDMF II). NDMF II will consist of 24 studio units, 16 1-bedroom Units, 12
2-bedroom units and 2,882 SF of restaurant space (75 seats total serving 3 meals a day). NDMF I and the Future
Hotel remain unchanged.
On behalf of the landowner, Champlain School Apartment Partnership, VHB is requesting a reduction of wastewater
allocation in the amount of 7,720 GPD for NDMF II (the existing Holiday Inn replacement). There are no changes
proposed for the previously permitted NDMF I and future Hotel.
Wastewater Demand
The newly proposed wastewater design flows for the proposed NDMF II (Holiday Inn replacement) building are
calculated below, followed by a table summarizing the previously permitted flows and proposed flows:
Table 1 Proposed Wastewater Design Flow Calculations* Mixed-Use Building II (NDMF II)
Use Quantity Unit GPD/Unit Wastewater
Design Flow (GPD)
Residential Use
-Studio/One Bedroom Units** 40 Living Unit 140 5,600
-Two Bedroom Units 12 Living Unit 210 2,520
Restaurant serving 3 meals/day 75 Seat 40 3,000
Total 11,120
*Based on the State Environmental Protection Rules, Chapter 1, Subchapter 8, Table 8-1 and Table 8-3
**Based on design flow of 70 gallons per day per person at the max. residential occupancy proposed for each living unit
Director of Public Works
Ref: 57913.01
June 22, 2023
Page 2
Table 2 Project Wastewater Design Flow Summary
Building Previously
Permitted Flow
(GPD)
Change (GPD) Proposed Flow
(GPD)
NDMF I 12,412 0 12,412
NDMF II 18,840 -7,720 11,120
Future Hotel 24,235 0 24,235
Total 55,487 -7,720 47,767
The previously allocated wastewater demand for this parcel based on tabulated-unitized flows from proposed uses is
55,487 GPD. The proposed wastewater demands for this parcel are 12,412 GPD for NDMF I, 11,120 GPD for NDMF II
and 24,235 GPD for the future hotel for a total combined demand of 47,767 GPD. This represents a decrease of -7,720
GPD.
Please let me know if you have any questions or need additional information.
Sincerely,
Daniel Heil, PE
Civil Engineer
cc: Joe Larkin (Larkin Realty)
3
22
23
23
9
Ground Flo
o
r
Second Floo
r
Ground Floor
Second Floor
PHASE 2B BOUNDARY
TOTAL GSF = 78,000 SF
FFE = 314.5'
HOTEL
TOTAL GSF = 136,561 SF
FFE = 313.9'
MULTI-FAMILY BUILDING
NDMF I
STANDARD DUTY
FLEXIBLE PAVEMENT
STANDARD DUTY
FLEXIBLE PAVEMENT
BITUMINOUS
CONCRETE PAVEMENT
MILL AND OVERLAY
PAVEMENT
18.0'
24.0'
SNOW
STORAGE AREA
9.0'
16
2
12
6
2
12
LA
LA
LA
LA
LA
LA
10
R5.0'
R5.0'
R3.0'R5.0'
R5.0'
R5.0'
R7-8
R2.0'
R15.0'
R5.0'
R5.0'
R6.0'
R25.0'
R5.0'
R5.0'R5.0'
R10.0'
R2.0'
R20.0'
R25.0'
R2.0'
R5.0'
LA
24.0'
PROPOSED CONCRETE
DUMPSTER PAD. SEE
DETAILS
PROPOSED TRANSFORMER PAD
LOCATION
PROPOSED
GENERATOR PAD
PROPOSED TRANSFORMER PAD
LOCATION
WOOD GUARDRAIL (TYP)
BOLLARD (TYP)
6.0'
6.0'
13.5'
9.0'18.0'9.5'
13.8'
BIKE RACKS
PLANTER BOXES
FUTURE PHASE
2
3
R7-8
78 STRUCTURED PARKING
SPACES
32 STRUCTURED PARKING
SPACES
TOTAL GSF = 77,436 SF
FFE = 314.0'
MULTI-FAMILY II BUILDING
NDMF II
FUTURE CITY ROW EXISTING PROPERTY
LINE
47 STRUCTURED PARKING
SPACES
ACCESSIBLE
CURB RAMP
TYPE 'C-D' (SEE
DETAILS)
COVERED PATIO
22.0'
8.0'
24.0'
20.0'
12.0'
EDGE OF
PAVER
BRICK PAVERS ON
CONCRETE BASE
PHASE 2B BOUNDARY
R6-1
LANDSCAPE SEAT WALL
WILLISTON ROADTO I-89PRIMARY BUILDING FACADE12'
PRIMARY STREET FRONTAGE=192.3'
BUILDING FRONTAGE =165.4'BUILDING FRONTAGE=75.5'BUILDING FRONTAGE =79'PRIMARY STREET FRONTAGE =136'PRIMARY BUILDING FACADE
SECONDARY BUILDING FACADESECONDARY STREET BUILD TO ZONEPRIMARY BUILD TO ZONE 12'SECONDARY STREET FRONTAGE=95.2'of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment-Phase 2B
1068 Williston Rd.
South Burlington, Vermont
Permitting - Phase 2B
Not Approved for Construction
July 17, 2023
33
57913.01
Feet6030015
NOTE:
SNOW STORAGE WILL BE LOCATED ONSITE WHERE
SHOWN. EXCESS SNOW WILL BE MOVED TO AN OFFSITE
LOCATION IN RESPONSE TO THE FACILITY PARKING
NEEDS.
FOOTNOTES:
1.REFER TO LANDSCAPE PLAN SHEET L4.03 FOR OPEN SPACE REQUIREMENTS.
NOTE:
CITY PARKING REQUIREMENT FOR RESIDENTIAL:
0.75 SPACES/1-BR-STUDIO-UNIT + 1.5 SPACES/2-BR-UNIT+ 0.75 SPACES/4 UNITS
NDMF I =(0.75*72 UNITS)+(1.5*11 UNITS)+ ((0.75)*(83 UNITS/4) = 86 RESIDENTIAL SPACES REQUIRED FOR NDMF I
NDMF II =(0.75*40 UNITS)+(1.5*12 UNITS)+ ((0.75)*(52 UNITS/4) = 58 RESIDENTIAL SPACES REQUIRED FOR NDMF II
TOTAL PARKING REQUIRED FOR RESIDENTIAL: 144 SPACES; 144 SPACES PROVIDED 4
C2.01
VMA DJH
Vehicular Parking Summary Chart
Description
Spaces
Existing Proposed
Zoning Summary Chart
Zoning District(S):Form Based Code - Transect
Zone 4
Overlay District(S):Major Intersections - Zone 1,
Transit Overlay District
Zoning Regulation Requirements Existing Required Provided
Use Summary Table Bicycle Parking Summary Chart
Description
Spaces
Required Proposed
Overall Site Plan
1
Betsy Brown
From:Tom DiPietro
Sent:Thursday, September 7, 2023 2:41 PM
To:Dan Heil
Cc:Marla Keene; Betsy Brown
Subject:RE: [External] RE: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water
and Sewer Allocation
Attachments:HolidayInnNDMF2_Preliminary approval.pdf; C2.01 Proposed Site Plan 7-17-23.pdf;
20230622 Wastewater Allocation Request - NDMF II.pdf
All - AƩached please find the preliminary wastewater allocaƟon for this project.
Marla / Betsy – When you save this preliminary allocaƟon in our files, please include the map that Dan provided as well
as the memo (both aƩached).
Thanks,
Tom
From: Dan Heil <dheil@vhb.com>
Sent: Tuesday, August 29, 2023 9:41 AM
To: Tom DiPietro <tdipietro@southburlingtonvt.gov>
Cc: Marla Keene <mkeene@southburlingtonvt.gov>
Subject: RE: [External] RE: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation
Good Morning Tom,
Please see aƩached for a PDF calling out the different buildings with their requested water and sewer flows.
I believe the most recent preliminary allocaƟon leƩer the City issued was the 6/7/22 preliminary allocaƟon leƩer. Since
this Ɵme the breakdown of studio/1 bedroom units vs. 2 bedroom units for NDMF I were revised resulƟng in a total
wastewater flow for the development of 55,487 GPD. This is reflected in the aƩached WW Permit. A computaƟon can be
found below:
Existing Wastewater Allocation Holiday Inn
Use Quantity Unit Demand
Hotel Rooms 318 Sleeping Space 50 gpd/sleeping space
Meals Served Only
to Guests 318 Meals / Sleeping Space 5 Meals per sleeping space
On Premise Laundry 3 Machines 450 gpd/emp
*Based on the State Environmental Protection Rules, Chapter 1, Section § 1-803
Existing Wastewater Allocation - North Dorset Multi-Family I (NDMF I)
2
Use Quantity Unit Demand
Residential Use
Studio/One
Bdrm Units 75 Units 140 gpd
Two
Bedroom
Units
8 Units 210 gpd/100 SF
Retail 5789 SF 4 gpd/100 SF
*Based on the State Environmental Protection Rules, Chapter 1, Section § 1-803
Existing Wastewater Allocation - Future Hotel
Use Quantity Unit Demand
Banquet Hall /
Conference Room 249 Seats 14 gpd/seat
Hotels
For Each
Use 310 Units 50 Sleeping Space
Meals
Served
Only to
Guests
310 Units 5 Meal per sleeping space
On
Premise
Laundry
1 Machine 450 Machine
Restaurant (2 meals
/ day) 112 Seats 27 gpd/seat
Employees 15 Employees 15 gpd/emp
Total Future Hotel
Total Existing Development Wastewater Allocation
You are correct that per VHB’s 6/22/23 allocaƟon memo, the revised wastewater flow for the enƟre development is
47,767 GPD, a reducƟon in 7,720 GPD.
I hope this clears things up. Please reach out with any addiƟonal quesƟons.
Thanks,
Dan
Daniel Heil, P.E.
Site/Civil Project Manager
3
Licensed in VT
P 802.391.5566
www.vhb.com
From: Tom DiPietro <tdipietro@southburlingtonvt.gov>
Sent: Monday, August 28, 2023 3:52 PM
To: Dan Heil <dheil@vhb.com>
Cc: Marla Keene <mkeene@southburlingtonvt.gov>
Subject: [External] RE: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation
Hi Dan,
Can you send me a site plan that labels the different buildings and indicates the allocaƟon requested for each. We seem
to have changed the naming convenƟon since the last request, so I’d like to make sure the WW allocaƟon applicaƟon
shows the following buildings clearly:
NDMF I
NDMF II
Future Hotel
There have been enough iteraƟons of this plan that I think it would be difficult for someone to follow how these
allocaƟons were determined. A map would help clear this up.
Also, I’m not sure we have the same current approved total flow. I reviewed our records and see that the current
approved final allocaƟon from 3/14/22 is for a total of 53,485 GPD based on an 8/27/21 memo from VHB. I also see an
approved 6/7/22 preliminary allocaƟon that approved a total of 55,697 GPD based on a 5/25/22 memo from VHB.
However, my understanding is that this current request revises that preliminary allocaƟon request such that the total
allocaƟon for the property would now be 47,767 GPD, based on a 6/22/23 memo from VHB. The current memo states
that the approved allocaƟon is 55,487, but I’m not sure where that number comes from?
Thanks,
Tom
From: Dan Heil <dheil@vhb.com>
Sent: Wednesday, August 23, 2023 10:00 AM
To: Marla Keene <mkeene@southburlingtonvt.gov>
Cc: Tom DiPietro <tdipietro@southburlingtonvt.gov>; Jay Nadeau <jay.nadeau@champlainwater.org>; Joe Larkin -
Larkin Realty (joelarkin@larkinrealty.net) <joelarkin@larkinrealty.net>; Deborah Sherman - Larkin Realty
(DebSherman@larkinrealty.net) <DebSherman@larkinrealty.net>; Peter Smiar <PSmiar@VHB.com>; Victor Amesoeder
<vamesoeder@vhb.com>
Subject: 'EXTERNAL'57913.01 - Holiday Inn Redevelopment - NDMF II Water and Sewer Allocation
This message has originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Good Morning Marla,
4
Has DPW and P&Z had the chance to review our request for preliminary water and sewer allocaƟon for NDMF II?
AƩached are the signed allocaƟon request applicaƟons submiƩed as part of the NDMF II applicaƟon back in June.
We’d like to proceed with our State WW permit submiƩal but will need the approved allocaƟon from the City prior to
doing so. Do you have an esƟmate of when this will be ready?
Thanks,
Dan
Daniel Heil, P.E.
Site/Civil Project Manager
Licensed in VT
P 802.391.5566
www.vhb.com
40 IDX Drive
Building 100, Suite 200
South Burlington VT 05403-7771
This communication and any attachments to this are confidential and intended only for the recipient(s). Any other use,
dissemination, copying, or disclosure of this communication is strictly prohibited. If you have received this communication in error,
please notify us and destroy it immediately. Vanasse Hangen Brustlin, Inc. is not responsible for any undetectable alteration, virus,
transmission error, conversion, media degradation, software error, or interference with this transmission or attachments to this
transmission.
Vanasse Hangen Brustlin, Inc. | info@vhb.com