AGENDA
South Burlington Bicycle & Pedestrian Committee
City Hall 3rd Floor, Room 301 at 180 Market Street South Burlington, VT 05403
Participation Options: In Person: Room 301 – 180 Market St
Assistive Listening Service Devices Available upon request
Electronically: https://meet.goto.com/SBCity/bike_ped_committee_08-09-2023
Join By Phone: +1 (669) 224-3412 Access Code: 877-260-733
5:30 PM Wednesday August 09, 2023
1. Welcome, Emergency Exit and Virtual Meeting Instructions, Gratitude – Havaleh (5:30 PM)
2. Changes or additions to the agenda – Havaleh (5:35 PM)
3. Comments from the public not related to the agenda – Havaleh (5:40 PM)
4. Consideration of minutes from June 16, 2023– Havaleh (5:45 PM)
5. Election of Committee Officers (6:55 PM)
6. SB Bikes Out Final Plans (6:10 PM)
7. ***City Updates- Erica (6:25PM)
8. ***Priorities for Path Maintenance (6:40 PM)
9. ***Review Final FY24 Policy Priorities and Strategies (7:00 PM)
10. Updates Ongoing Committee/Liaison Work: (7:20 PM)
1. Discuss Accomplishments/Goals/Barriers for the next year
2. Chair updates
3. DRB Update (still need volunteers)
4. DPW/Safety – Bob, Dana, Amanda, Doug
5. Bike Friendly Community Planning/Greenway progress – Nic
6. Communications/Outreach – Donna
7. Mapping – Amanda, Nic
8. Signs – Nic, Donna, Dana
11. Confirm Sept 13, 2023 Meeting (7:55PM)
12. Adjourn (by 8:00 PM)
*** Attachments Included
1
To: South Burlington Bicycle and Pedestrian Committee
From: Erica Quallen, Deputy Director of Capital Projects and Staff Liaison
Date: August 8, 2023
Re: DPW Updates to Bicycle and Pedestrian Committee
Since our committee meeting on June 14, 2023, I have the following updates to report on behalf of Public
Works and City staff:
• SB Bikes Out is this Thursday, August 10th as part of SB Nite Out at Veterans Park. Thank you to all
who have been involved in planning and will be volunteering.
• The Hubbard Park shared use path design is progressing and we anticipate going to bid in the
winter of 2023 with construction in summer 2024.
• Summer maintenance is in full swing. A lot of ongoing brush and tree trimming around the paths is
occurring. DPW staff are planning the key areas based on SBBPC recommendations for large
improvements.
o The stormwater crew will be replacing a culvert on Dorset Street near Veterans Park this
summer which has been causing issues with the path.
• Spear Street has been repaved from Swift Street to Pinnacle Drive. Restriping has been completed
from Swift Street to Allen Road. The centerline was shifted, and lanes narrowed to create 5-6’ bike
lanes in both directions.
• The crosswalk with RRFB at Jaycee Park is planned for installation in August/September 2023.
• RRFB upgrades continue with 3 locations remaining. These are being upgraded as timing and
weather allows.
• Crosswalk striping continues and most high-priority crossings have been restriped. This will
continue throughout the summer.
• The Dorset Street path ROW process is still ongoing. Construction is likely for 2025.
• The Spear Street path has moved into Preliminary (60%) design phase. Construction is likely for
2025 as ROW is expected to be faster than Dorset Street.
• The Bike/Ped Master Plan scope is in development with kick-off happening in September. SBBPC is
expected to play a large role in this project and serve as an Advisory Committee for the project.
2
• The crosswalks at Dorset Street/Songbird Road and Spear Street/Pheasent Way are in the FY24 and
FY25 CIPs. The Songbird Road crossing will likely occur first in tandem with the Spear Street path
so that the crosswalk will be present when the Spear Street path is constructed.
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Potholes & Tree Root
Location Date Reported Date Fixed
Can this be
done in
winter?
Rec Path off Deerfield Road as it winds down
hill to Szymanski Park 6/19/2018
Numerous pothole and tree root
damage. Also listed on the Re-paving
Priority tab.
3 No
DPW marked most of the
issues with spray paint in
Spring 2018, but that has now
Photo 1
Rec Path just north of Fairway Drive along 16th
hole fairway 8/21/2022 Path is severly broken up from the
roots of a Poplar tree 3 No Photo 1
Start of Rec Path leading from Stonehedge Condos
toward Farrell Park 4/12/2023 Extensive cracking and now a pothole
forming on path 2 No
Could be an easy quick fix for
DPW Staff Photo 1
Near crest of Rec path leading down to Farrell Park 6/7/2023 Jun-23
An animal may have dug a hole next the
Rec path and it now undercuts the path
that could crumble if left unrepaired.
0 No Photo 1
Pothole on Nowland Farm Road path between
Vale and Four Sisters closer to Four Sisters 6/24/2023 Pothole keeps growing in size and
another one is forming aside of it 3 No
Patching now may give a few
years of life to path before the
entire Rec path is repaved
Photo 1 Photo 2
Park Road shared-use path at top of hill near the
"Geezer" bench 8/3/2023 Pothole in center of path needs filling 3 No Photo 1
Shared-use path parallel to Swift Street leading
up to the UVM white barn at bottom of hill 7/17/2023 Pothole (or sink hole) in center of
path 3 No Photo 1
Shared-use path on Dorset Street north of Kennedy
Road in the asphalt bike lane 8/3/2023 A number of roots are starting to pop on
bike path section.1 Getting very bumpy for riders Photo 1 Photo 2
Near crest of Rec path leading down to Farrell Park 6/7/2023
There is also some erosion just
below/west of the fixed pothole where
the path appears to being undercut that
could cause the breaking off of chucks
of the asphalt.
1
A wooden brace on the side fixed
with rock and covered in asphalt
should fix it, but what do I know?
Photo 2
Farrell Park path near ball field 8/3/2023 root damage troughout 2 Photo 1
Rec Path Potholes & Tree Root Damage
Other Remarks
Severity of
problem
1 = Small
2 = Medium
3 = Severe
Description of condition Links to images
(if you have one)
Page 1 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Brush & Tree Overgrowth
Location Date Reported Date Fixed
Can this be
done in
winter?
Nowland Farm Road rec path at the Vale Drive
intersection 08/21/22 Spring 2023
Evergreen bush has grown into path
and needs to be trimmed back 0 No Photo 1
Along Rec Path between Deerfield and
Szymanski Park 04/12/23
Vines on trees in this area are pulling
down trees at a rapid rate. Should the
City cut down the vines to save the
trees or should this be just considered
nature?
? Yes
Shared-use path on Dorset Street north of
Kennedy Road 08/03/23 Low branches hanging down into
the path and sidewalk 3 Yes Photo 1 Photo 2
Farrell Park near ball field 08/03/23
Lots of brush and tree branches
encroaching on already narrow path 3 Yes Photo 1
Rec Path Brush & Tree Overgrowth Locations
Links to images
(if you have one)Other Remarks
Severity of problem
1 = Small
2 = Medium
3 = Severe
Description of condition
Page 2 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Cracking Locations
Location Date
Reported Date Fixed
Rec Path on Dorset Street from Midland Ave. to
Saddie Lane 09-12-18
Severe cracking in section in front of
1700 Dorset Street and in the area
near the end of path just before the
Midland Ave crosswalk
3 Photo 1 Photo 2 Photo 3
Rec Path on hill section between Butler Farms and
Park Rd 8/1/2019 2
Rec Path along 189 - cracks intermittently along
whole section between Farrell and Spear 8/23/2019
Cracks aren't really wide currently, but
many are long. Sealing will slow their
widening and keep this path in good
shape.
1
Generally this path is in very good
shape - let's keep it that way as
long as possible
Patchen Rd heading south, crack/gouged hole
between Williston Rd and grocery entrance 8/23/2019 2
Nowland Farm Road from Pinnacle to Four Sisters 8/23/2019
cracking througout, but not as
progressed as the Pinacle to Spear
section
2
Lots of horizontal cracks, but not
as severe as east end of
Nowland Farm Rd.
Noland Farm Road from Four Sisters to Dorset 9/27/2019 medium vertical cracks throughout 2
weeds starting to grow through
pavement Photo 1 Photo 2 Photo 3
Path between Dorset and Crispen Drive (along
Sadie Lane) before and after wooden bridge
heading east
9/27/2019 medium vertical cracks throughout 2 Photo 1 Photo 2
Short section of rec path along Old Cross Rd 1/21/2020
major vertical cracks in 30-50 foot
section as path winds behind foliage.2
Dorset Street rec path between I-189 bridge and
Swift Extension along ball fields 4/20/2020 moderate vertical cracks 2 Photo 1 Photo 2
Dorset Street rec path between Wheeler House
and Park Road.4/20/2020 vertical cracks forming 1 Photo 1 Photo 2
Sections of rec path between Butler Farm
neighborhood and Golf Course Road 1/21/2020
Major vertical cracks as path flattens
out closer to Butler Farm side. Maybe
too late for crack filler, so also listed
under Re-paving Tab.
3
Cracks wide enough to trap
road bike tire resulting in
severe injury
Photo 1 Photo 2 Photo 3
Rec Path that parrallels Swift Street near
intersection with Meadowood Drive 4/12/2023 Moderate cracking on hill 2 Photo 1
Rec Path Cracking Locations
Other Remarks
Severity of
problem
1 = Small
2 = Medium
3 = Severe
Description of condition Links to images
Page 3 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Re-paving Priorities
Path Location Date Reported Date Fixed
Rec Path just north of Fairway Drive along
16th hole fairway 8/21/2022 Path is broken up severly from the roots of
a Poplar tree 3 Tree roots under path need to be
severed and section repaved Photo
Nowland Farms Rec Path - Full length 4/12/2023
Entire length may need complete repaving
sometime in the 2 to 3 year timeframe due to
numerous potholes, major cracking and
crumbling asphalt. Needs to be on a watchlist.
Resurficing maybe tied to repaving of Nowland
Farm Road itself.
2 Photo 1 Photo 2
Photo 3 Photo 4
Sections of rec path between Butler Farm
neighborhood and Golf Course Road 1/21/2020
Major vertical cracks as path flattens out
closer to Butler Farm side. May be too late
to use crack filler as pavement is starting
to crumble.
3 Cracks wide enough to trap road
bike tire resulting in severe injury. Photo 1
Sidewalk on Hinesburg Road near
Awasuwu Trail crossing 4/12/2023 Major sidewalk failure with pothole and
extensive cracking in 20 ft. section 3 Photo 1
Rec Path Re-Paving Priority List
Links to images
(if you have one)Other Remarks
Severity of problem
1 = Small
2 = Medium
3 = Severe
Description of condition
Page 4 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Malfunctioning RRFBs
Road Direction Date Reported Date Fixed
Report immediately to DPW via "How do I
report a Maintenance Issue" on Home Page of
City's website. If not repaired within a week,
report again to DPW.
Malfunctioning RRFB Locations
Links to images
(if you have one)Other Remarks
Severity of problem
1 = Small
2 = Medium
3 = Severe
Description of condition
Page 5 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Southeast Quadrant
Dorset St and Midland Ave 04/12/23
Heavy traffic area - Presently, it
observes as a low priority, but the
current paint will not make it through
the 23/24 winter.
3 Due to high traffic volume, this will most
likely need to be painted annually
Dorset St and Nowland Farm Rd/Old Cross Road 04/12/23 Done Heavy traffic area 3
Due to high traffic volume, this will most
likely need to be painted annually
Spear St. at Deerfield/Nowland Farm Rd 04/12/23 Heavy traffic area 3
Due to high traffic volume, this will most
likely need to be painted annually Photo 1
Spear St. at Swift Street (location of new crosswalk
light)04/12/23 Done Heavy traffic area 3
Due to high traffic volume, this will most
likely need to be painted annually
Spear St. at Swift Street (east from intersection near
Episcopal Church)04/12/23 Done Heavy traffic area 3
Due to high traffic volume, this will most
likely need to be painted annually
Cider Mill Drive at location of where rec path crosses
road near mailboxes 04/12/23 Heavy traffic area 0
Due to high traffic volume on Cider Mill
Drive, this will most likely need to be painted
annually
Cider Mill Drive at Crispin Drive 04/12/23 Crosswalk Visable 0
Due to high traffic volume on Cider Mill
Drive, this will most likely need to be painted
annually
Cider Mill Drive at Royal Drive (where rec path pops out
from Dorset Heights)04/12/23 Crosswalk Visable 0
Due to high traffic volume on Cider Mill
Drive, this will most likely need to be painted
annually
Braeburn St. at Crispin 04/12/23 Crosswalk Visable 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Braeburn St. at Royal Dr. 04/12/23 Crosswalk Visable 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Braeburn St. at Winesap Lane 04/12/23 Crosswalk Visable 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Braeburn St. at Summerfield Ave 04/12/23 Crosswalk Visable 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Winesap Lane at Cider Mill Drive as it crosses to rec
path 04/12/23
Striping still visable, but fading.
Considered a #0 since not a thru street;
road ends.
2
Due to no traffic volume at this time, this will
most likely need to be painted every 5 years
if road is lengthened
Windswept Lane & Dorset Street 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Holbrook & Dorset Street 04/12/23 1
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Foulsham Hollow Rd & Dorset Street 04/12/23
Crosswalk connects Dorset rec path -
never been painted 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Medalist Drive & Dorset 04/12/23
Crosswalk connects Dorset rec path -
never been painted 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Rec Path crossing at Holbrook & Old Cross 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Page 6 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Rec Path crossing at Golf Course Rd near Old Cross 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Rec Path crossing on Fairway Drive 04/12/23
Well worn as it looks like it has never
been painted 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Crosswalk connecting 10th hole to 11th hole across Golf
Course Road 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Sidewalk crossing at Fairway Dr & Golf Course Rd. 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Sidewalk crossing east/west at first (north) intersection of
Park Rd & Golf Course Rd.04/12/23 1
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Sidewalk crossing at second (south) entrance to Park
Rd. and Golf Course Rd.04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Crosswalk connecting rec path across Park Road on the
hill almost to Golf Course Road 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Rec Path Crossing at intersection of Dorset Street and
Park Road 04/12/23 0
Due to mid- traffic volume, this will most
likely need to be painted biennially.
Intersection at Swift & Dorset - both crosswalks 04/12/23 High Traffic Area 3
Due to high traffic volume, these will
most likely need to be painted annually
Entrance to Veterans Memorial Park off Swift Street
Extension 04/12/23 2
Due to mid- traffic volume, this will most
likely need to be painted biennially.
Swift Street Extension & Brand Farm Dr. 04/12/23 1
Due to mid- traffic volume, this will most
likely need to be painted biennially.
Brand Farm Drive & Blue Star Lane 04/12/23 well worn 3 Raised crosswalk located here
Brand Farm Drive & Lupine Lane 04/12/23 1
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Swift Street Extension/Brand Farm Drive & Wheeler
Hiking Trail Entrance 04/12/23 Appears to have never been painted
before 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Economou Farm Rd across to Swift Street Rec Path 04/12/23
Appears to have never been painted
before 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Twin Oaks Terrace crosswalk at the Edge Sports
building 08/21/22
Hays & Twin Oaks Terrace 08/21/22 Well worn 3
Twin Oaks Terrace crosswalk at Twin Oaks N Road 08/21/22 2
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Grandview Drive at Dorset Street 08/21/22 2
Pinacle Drive near entrance from Spear Street -
north/South crosswalk 04/12/23 Appears to have never been painted
before 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Pinacle Drive internally ~100 yards in from Nowland
Farm Rd - north/South crosswalk 08/18/22 Appears to have never been painted
before 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Page 7 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Pinacle Drive & Nowland Farm Rd 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Vale Drive & Nowland Farm Rd 04/12/23 1
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Four Sisters & Nowland Farm Rd 04/12/23 2
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Old Schoolhouse Rd & Nowland Farm Rd 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Midland Ave at the intersection with east entrance to
Bower St/Catkin Dr (crosswalk running north/south)04/12/23 1
Due to mid- traffic volume, this will most
likely need to be painted biennially.
Catkin Dr east entrance & Midland Av (crosswalk
running east/west)04/12/23 1
Due to mid- traffic volume, this will most
likely need to be painted biennially.
Midland Ave at the intersection with west entrance to
Bower St (crosswalk running north/south)04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Catkin Dr west entrance & Midland Av (crosswalk
running east/west)04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Midland Ave at Stafford - East entrance 04/12/23 1
Midland Ave at RRFB crossing near Stafford 04/12/23 Crosswalk needs painting 3 High Traffic crossing
Midland Ave at Stafford - West entrance - 2
crosswalks 04/12/23 Crosswalk needs painting 3
Midland Ave at South Jefferson 04/12/23 Crosswalk needs painting 3
South Jefferson crosswalk at Rec Path along Spear
Street 04/12/23 Crosswalk needs painting - may
never have been painted in paste 3
South Village internal crosswalks 04/12/23 Generally seem in good condition 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Southwest Quadrant
Deerfield Ave. at Summit at Spear Condominium
Entrance 04/12/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Harbor Ridge & Pheasant Way at mailboxes 04/07/23
No paint evident. May not have ever
been painted before. Will need a
"landing pad" on mailbox side of
Harbor Ridge.
3 Due to mid- traffic volume, this will most
likely need to be painted biennially.
Harbor Ridge & Keari Lane 04/07/23 well worn 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Harbor Ridge & Baycrest Dr. 04/07/23
Possibly could go one more year, but
the paint should be refreshed while
DPW is repainting nearby crosswalks.
3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Baycrest & Bay CT 04/07/23 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Bay CT & Baycrest Park Entrance 04/07/23 0
Page 8 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Keari Lane & Bay CT 04/07/23 well worn 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Baycrest at Harbor View Rd 04/07/23 2
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Baycrest at the entrance to Bay Court Condos 04/07/23 well worn, no longer visable 3
Due to low traffic volume, this will most
likely need to be painted every three
years or so.
Irish Farm and Haymaker 04/07/23 1
Irish Farm and Baycrest 04/07/23 0
Allen Road and Baycrest 3
Harbor View Rd & Harbor Village Senior Community - 3
crosswalks grouped 04/07/23 1 Due to low traffic volume, this will most likely
need to be painted every three years or so.
Fayette Drive and Real Street - crosses rec path 08/21/22
Looks like it has never been painted
before 3
Fayette Drive and Olde Orchard Park - crosses rec
path 08/21/22 Looks like it has never been painted
before 3
Across Hannaford Dr at Fayette Dr 08/21/22 3
New Hannaford's entrance at Queen City Park Rd 08/21/22 3
Queen City Park Road and entrance to the Humane
Society on sidewalk to remind drivers that this is a
sidewalk and bike lane entrance
08/21/22 This has never been painted 3
Queen City Park Road and entrance to Burlington
Rec Path near Pine Street 08/21/22 3
All the City side road north/south crosswalks along the
sides of Shelburne Road including at Laurell Hill Dr,
McIntosh, Tumblebrook, Imperial, etc.
08/21/22
If confirmed that the City is responsible
for painting these crosswalks, each
crosswalk should be broken out
separately.
Most fine at this point.
According to Justin Rabidoux, VTrans is
responsible for painting all directions of
these intersections; need to confirm. A
separate list of VTrans crosswalks should
also be built.2 crosswalks at Spear Street and East Terrace
intersection 08/21/22 0
Due to mid- traffic volume, this will most
likely need to be painted biennially.
The furthest north UVM crosswalks on Spear Street 08/21/22 Heavy traffic area 0
Due to high traffic volume, this will most
likely need to be painted annually
The UVM crosswalk at the rec path and driveway to
Gutterson Fieldhouse 08/21/22 Heavy traffic area 0
Due to high traffic volume, this will most
likely need to be painted annually
Spear Street and Quarry Hill Road 08/21/22 Heavy traffic area 0
Due to high traffic volume, this will most
likely need to be painted annually
Farrell Street crosswalk just north of the I-189 overpass 08/21/22 0
Farrell Street Crosswalk from rec path to apartments just
south of the Eastwood Drive intersection 08/21/22 2
Note: The vehicle stop lines at 3-way
stop intersection with Eastwood Drive
need to be painted annually to avoid
accidents
Swift Street and Farrell Street insection crosswalks 04/12/23
Intersection has not been repainted
since reconstructed 3 Requires green paint for bike lane and
bike boxes
Page 9 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
6 Farrell Street raised-crosswalks west of the
insection with Eastwood and before the Shaws
Driveway - These crosswalks have never been
repainted since they were installed
04/12/23
well worn; crosswalk lines have not
been repainted by the City since the
crosswalks were first installed
3 Red paint previously used.
Farrell Street crosswalk between Shaws shopping
center entrance closest to Shelburne Rd crossing to
Walgreens
04/12/23 3
Farrell Street and Shelburne Road 04/12/23 well worn 3
Due to high traffic volume, this will most
likely need to be painted annually
Joy Drive and Eastwood Drive intersection - both
directions 08/21/22 0
Due to high traffic volume, this will most
likely need to be painted annually
Joy Drive and Lund Building entrance 08/21/22 0
Due to low traffic volume, this will most likely
need to be painted every three years or so.
Crosswalk across Eastwood Drive to sidewalk in
front of Hallam Building 08/21/22 well worn or never done in past; curb
cuts are present 3
Hadley and Meadows Roads 08/21/22
well worn or never done in past; curb
cuts are present 3 Paint on diagonal to connect sidewalks
Hadley Rd at Pizzagalli Parking lot 08/21/22 0
Hadley Road and Shelburne Road 08/21/22 well worn 3 Again, not sure if Vtran's responsibility
White Place and Shelburne Road 08/21/22 well worn 3 Again, not sure if Vtran's responsibility
Bacon Road and Shelburne Road 08/21/22 well worn 3 Again, not sure if Vtran's responsibility
Proctor Ave and Shelburne Road 08/21/22 0
Due to high traffic volume, this will most
likely need to be painted annually
Proctor Ave and Apple Tree CT 08/21/22
well work or perhaps never done
before 3
Proctor Ave and Birchwood CT 08/21/22
well work or perhaps never done
before 3
Proctor Ave and Orchard Road 08/21/22
well work or perhaps never done
before 3
Proctor Ave and Meadow Road 08/21/22 0
Due to high traffic volume, this will most
likely need to be painted annually
Central District & Northwest Quadrant
Hinesberg Road Intersection with:
1060 @ Sphinx Building 06/06/21 2
Business Driveway ? Marking for non road
intersection
Tilley Drive 08/21/22 0
Unclear if this will be VTrans' responsibilty
or South Burlington's
O'Brien Farm Road, Hayes Ave 06/06/21 3
RRFB's present, paint faint, heavy traffic,
high ped use.
Entrance of Country Estates 06/06/21 3
Residental driveway. Has stop sign, no
crosswalk. ? Marking for non road
intersection
Page 10 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Kennedy Drive Intersection 06/06/21 3 Lights at intesection, paint worn off .
Deane St 06/06/21 1
Woodcrest Dr 06/06/21 2
Lilac Lane 06/06/21 2
Sunset Ave 06/06/21 1
Simpson Ct 06/06/21 1
Barrett Street 06/06/21 1
Ruth St 06/06/21 0
Unclear if this will be VTrans' responsibilty
or South Burlington's
St. John Vianny Church 06/06/21 0
Unclear if this will be VTrans' responsibilty
or South Burlington's
Wright Court 06/06/21 Never painted 3
Will need Vtrans authorization to install
crosswalk at this location. May need
RRFB. Project to be added to the FY24-
FY33 CIP
Prouty Parkway 06/06/21 0
Unclear if this will be VTrans' responsibilty
or South Burlington's
Awasiwi Trail 06/06/21 0
Unclear if this will be VTrans' responsibilty
or South Burlington's
Iby Street 06/06/21 2 OK
Market Street, Intersection with:06/06/21
Entrance of strip mall (Price Chopper, etc) 06/06/21 2
minimal marking, ? Marking for non-road
intersection
Market Street Intersection with:
Paved path/parallell to Hinesburg Rd.06/06/21 1
Dorset Street 06/06/21 1
Crossing over bridge to park. Not named 06/06/21 1
Kennedy Drive Intersection With:
CITCO Station, corner of Rt 116 and Kennedy 06/06/21 ? Marking for non-road intersection. 3
Heavy Traffic, Heavy ped use basic but not
great markings.
Timberlane, condo complex intesection with traffic lights 06/06/21
Hard to see path users when exiting
Manor Woods. Path users don't always
look up either.
3 High priority, heavy traffic, heavy ped use,
paint worn off
High School entrance heading west on Kennedy just
before Dorset intersection where it crosses rec path 08/21/22
Has not been painted in 4 years - not
okay. Assume it will finally be done
as part of repaving project.
3 Heavy Traffic. Perhaps green paint.
Dorset and Kennedy Drive intersection at South
Burlington High School 08/21/22 Has not been painted in 4 years - not
okay 3 High priority, heavy traffic, heavy ped
use, paint worn off
Entrance of 140/150 Kennedy Dr 06/06/21
? Marking for non-road intersection.
Also, Yield sign not at eye level for
bike/ped users. Gagne couldn't reach
bottom of the sign. If important, should
be eye level.
3 Business entrance, not great markings
Treetop/Kimball Ave Intersection 06/06/21 3
Heavy Traffic, Heavy ped use basic but not
great markings.
Entrance 1795 Williston Rd 06/06/21 ? Marking for non-road intersection.3
Page 11 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Eldredge St 06/06/21
entrance to O'Brien Estates, would be
good location for cross walk across
Kennedy Dr.
0
Dorset Street Intersection with:
Hummingbird Lane 06/01/21 Proposed 0
Grandview 06/01/21 3 completley worn off
1 Kennedy Drive 06/01/21 0
Private office complex. ? Marking for non-
rad intersection
Kennedy Drive Intersection @ HS 06/01/21
High Priority: high traffic, high ped use,
near school 3 across 189- fresh paint, across dorset 3,
across kennedy dr-3.
South of Firestation 06/01/21 worn, given near school, high priority 2
North of Firestation 06/01/21 worn, given near school, high priority 2
MiddleSchool 06/01/21 all very worn, near school 3
San Remo Drive (South)06/01/21 3
Hickory Lane 06/01/21 1
San Remo Drive (North)06/01/21 3
Greenwood Drive (near derm office)06/01/21 ?
Mall Entrance South 06/01/21 1 all paint in good shape
Blue Mall Entrance 06/01/21 1 paint in good shape
Mall Entrance North and Market St 06/01/21 1
some wear noted, will need frequent
repainting
Barnes & Noble Shopping Entrance 06/01/21 2
Dorset st paint a little faint, entrance to B&N
ok
Williston Rd 06/01/21 3
YIKES! PAINT GONE! ?Marking at Holiday
Inn Entrance.
Wiliston Rd Intersection with:
Delata Hotel/Moe's Intersection 06/01/21 ?marking across entrance from Moe's to
Phone Depot. Sidewalk crosses 4 lanes.3 Signal light for peds, no paint, at all.
Mary Street 06/01/21
great short cut from Williston Rd to
Market st for peds!3 missing paint
Midas Road 06/01/21 intersection needs a re-do 3 Missing paint
White Street 06/01/21 intersection needs a re-do 3 side walk present, no crosswalk, etc.
Hinesburg Rd 06/01/21 3 YIKES NO PAINT
Cottage Grove 06/01/21 2 visible could be better
Heath St 06/01/21 3
Pine Tree Terrace 06/01/21 3
Davis Pkway 06/01/21 3
Hayden Pkwy 06/01/21 3
Gilbert Street 06/01/21 3
Elsom Pkwy 06/01/21 3
Victory Drive 06/01/21 3
Victoria Drive 06/01/21 3
Mills Ave 06/01/21 3
Airport Road 06/01/21 3
Intersection with Kennedy Dr 06/01/21 3 YIKES- Lights, no crosswalks at all.
Page 12 of 13
Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping
Location Last Date
Observed
Date Painted
(City Use)
Crosswalk Striping Needed
Other Remarks
Severity of problem
0 = None
1 = Low
2 = Medium
3 = Severe
Description of condition Photos
Other Crosswalks in Northwest Quadrant
The rest of the Northwest Quadrant not surveyed
Northeast Quadrant
No survey done as of 8/22/22
Page 13 of 13
City of South BurlingtonFY24 Policy Priorities & StrategiesRole of Council"This is the vision for our community"Committee Strategy DescriptionBike/Ped Provide guidance to City Staff on the development and deployment of the Recreation Path wayfinding package and regulatory signage.Bike/Ped Work with Local Motion to support community events, resources, etc. (e.g., bicycle valet parking at events, community rides)Bike/Ped Participate in scoping studies, planning efforts, and development review applications that impact bike and pedestrian modes of travel and monitor the integration of the preferred alternative or permit condition through to construction.Bike/Ped Coordinate with Local Motion and other state bicycling advocacy organizations to bring about better bike/ped facilities.Bike/Ped Coordinate with the Recreation & Parks Department, Public Works, and appropriate City Committees to ensure City trails and paths are accessible and maintained. Bike/Ped Support City Staff in conveying the progress of projects funded by the Penny for Paths Initiative with signage and announcements to indicate infrastructure improvements “coming soon” or completed.Bike/Ped Identify partnerships to aid the education of all modes of travel (automobile, e‐assist devices, and non‐motorized) on the rules of the road and use of the South Burlington network.Bike/Ped Increase awareness of South Burlington as a bikeable, walkable city through community outreach, digital/paper maps, signage and community surveys Bike/Ped Communicate with City staff to develop ways of reducing vehicle speeds to promote a safer environment for bicyclists and pedestrians.Bike/Ped Work with City staff and the CCRPC to develop the Walk/Bike Master Plan.Bike/Ped Communicate bike and pedestrian network needs, priorities, successes through announcements, events, meetings, digital/paper maps, and publicity.Bike/Ped Publicly advocate for greater alternative transportation use to reduce use of fossil fuel burning vehicles for local trips.Bike/Ped Engage closely with City Staff on the allocation of the Penny for Paths Fund through the CIP development and grant applications, as well as assist in strategically planning for implementing priority projects. Bike/Ped In coordination with City Staff, monitor the condition of the bike and pedestrian network (paint, signage, surface condition) and report maintenance concerns. Comprehensive Plan UpdateBike/Ped Annually review and provide updates to the mapped data of bike and pedestrian infrastructure (existing and proposed GIS datasets) to maintain an accurate record of the system. Bike/Ped Support City staff in their plans for the I‐89 East‐West Crossing.Bike/Ped Participate in the City’s implementation of the Climate Action Plan through a Committee liaison, cognizant of the important roles micromobility and non‐vehicular travel play in a carbon‐neutral future. Bike/Ped, EnergyPartner with Energy Committee and communicate with South Burlington schools to increase bus, public transit, bicycle and pedestrian commuting for students, staff, and residents (statewide Way to Go School program, Safe Routes to School program and Committee's Neighborhood to Schools Greenway pilot).Green & Clean: Emphasizing sustainability for long‐term viability of a clean and green South BurlingtonCore Municipal Services and AdministrationCity Center and Tax Increment Financing DistrictClimate Action PlanRole of Committee"This is how our resident committees can inform policy and help implement policy."Affordable and Community Strong: Creating a robust sense of place and opportunity for our residents and visitors.Opportunity Oriented: Being a supportive and engaged member of the larger regional and statewide community.Walkable: Bicycle and pedestrian friendly with safe transportation infrastructure.