Loading...
HomeMy WebLinkAboutAgenda - Bicycle & Pedestrian Committee - 08/09/2023 AGENDA South Burlington Bicycle & Pedestrian Committee City Hall 3rd Floor, Room 301 at 180 Market Street South Burlington, VT 05403 Participation Options: In Person: Room 301 – 180 Market St Assistive Listening Service Devices Available upon request Electronically: https://meet.goto.com/SBCity/bike_ped_committee_08-09-2023 Join By Phone: +1 (669) 224-3412 Access Code: 877-260-733 5:30 PM Wednesday August 09, 2023 1. Welcome, Emergency Exit and Virtual Meeting Instructions, Gratitude – Havaleh (5:30 PM) 2. Changes or additions to the agenda – Havaleh (5:35 PM) 3. Comments from the public not related to the agenda – Havaleh (5:40 PM) 4. Consideration of minutes from June 16, 2023– Havaleh (5:45 PM) 5. Election of Committee Officers (6:55 PM) 6. SB Bikes Out Final Plans (6:10 PM) 7. ***City Updates- Erica (6:25PM) 8. ***Priorities for Path Maintenance (6:40 PM) 9. ***Review Final FY24 Policy Priorities and Strategies (7:00 PM) 10. Updates Ongoing Committee/Liaison Work: (7:20 PM) 1. Discuss Accomplishments/Goals/Barriers for the next year 2. Chair updates 3. DRB Update (still need volunteers) 4. DPW/Safety – Bob, Dana, Amanda, Doug 5. Bike Friendly Community Planning/Greenway progress – Nic 6. Communications/Outreach – Donna 7. Mapping – Amanda, Nic 8. Signs – Nic, Donna, Dana 11. Confirm Sept 13, 2023 Meeting (7:55PM) 12. Adjourn (by 8:00 PM) *** Attachments Included 1 To: South Burlington Bicycle and Pedestrian Committee From: Erica Quallen, Deputy Director of Capital Projects and Staff Liaison Date: August 8, 2023 Re: DPW Updates to Bicycle and Pedestrian Committee Since our committee meeting on June 14, 2023, I have the following updates to report on behalf of Public Works and City staff: • SB Bikes Out is this Thursday, August 10th as part of SB Nite Out at Veterans Park. Thank you to all who have been involved in planning and will be volunteering. • The Hubbard Park shared use path design is progressing and we anticipate going to bid in the winter of 2023 with construction in summer 2024. • Summer maintenance is in full swing. A lot of ongoing brush and tree trimming around the paths is occurring. DPW staff are planning the key areas based on SBBPC recommendations for large improvements. o The stormwater crew will be replacing a culvert on Dorset Street near Veterans Park this summer which has been causing issues with the path. • Spear Street has been repaved from Swift Street to Pinnacle Drive. Restriping has been completed from Swift Street to Allen Road. The centerline was shifted, and lanes narrowed to create 5-6’ bike lanes in both directions. • The crosswalk with RRFB at Jaycee Park is planned for installation in August/September 2023. • RRFB upgrades continue with 3 locations remaining. These are being upgraded as timing and weather allows. • Crosswalk striping continues and most high-priority crossings have been restriped. This will continue throughout the summer. • The Dorset Street path ROW process is still ongoing. Construction is likely for 2025. • The Spear Street path has moved into Preliminary (60%) design phase. Construction is likely for 2025 as ROW is expected to be faster than Dorset Street. • The Bike/Ped Master Plan scope is in development with kick-off happening in September. SBBPC is expected to play a large role in this project and serve as an Advisory Committee for the project. 2 • The crosswalks at Dorset Street/Songbird Road and Spear Street/Pheasent Way are in the FY24 and FY25 CIPs. The Songbird Road crossing will likely occur first in tandem with the Spear Street path so that the crosswalk will be present when the Spear Street path is constructed. Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Potholes & Tree Root Location Date Reported Date Fixed Can this be done in winter? Rec Path off Deerfield Road as it winds down hill to Szymanski Park 6/19/2018 Numerous pothole and tree root damage. Also listed on the Re-paving Priority tab. 3 No DPW marked most of the issues with spray paint in Spring 2018, but that has now Photo 1 Rec Path just north of Fairway Drive along 16th hole fairway 8/21/2022 Path is severly broken up from the roots of a Poplar tree 3 No Photo 1 Start of Rec Path leading from Stonehedge Condos toward Farrell Park 4/12/2023 Extensive cracking and now a pothole forming on path 2 No Could be an easy quick fix for DPW Staff Photo 1 Near crest of Rec path leading down to Farrell Park 6/7/2023 Jun-23 An animal may have dug a hole next the Rec path and it now undercuts the path that could crumble if left unrepaired. 0 No Photo 1 Pothole on Nowland Farm Road path between Vale and Four Sisters closer to Four Sisters 6/24/2023 Pothole keeps growing in size and another one is forming aside of it 3 No Patching now may give a few years of life to path before the entire Rec path is repaved Photo 1 Photo 2 Park Road shared-use path at top of hill near the "Geezer" bench 8/3/2023 Pothole in center of path needs filling 3 No Photo 1 Shared-use path parallel to Swift Street leading up to the UVM white barn at bottom of hill 7/17/2023 Pothole (or sink hole) in center of path 3 No Photo 1 Shared-use path on Dorset Street north of Kennedy Road in the asphalt bike lane 8/3/2023 A number of roots are starting to pop on bike path section.1 Getting very bumpy for riders Photo 1 Photo 2 Near crest of Rec path leading down to Farrell Park 6/7/2023 There is also some erosion just below/west of the fixed pothole where the path appears to being undercut that could cause the breaking off of chucks of the asphalt. 1 A wooden brace on the side fixed with rock and covered in asphalt should fix it, but what do I know? Photo 2 Farrell Park path near ball field 8/3/2023 root damage troughout 2 Photo 1 Rec Path Potholes & Tree Root Damage Other Remarks Severity of problem 1 = Small 2 = Medium 3 = Severe Description of condition Links to images (if you have one) Page 1 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Brush & Tree Overgrowth Location Date Reported Date Fixed Can this be done in winter? Nowland Farm Road rec path at the Vale Drive intersection 08/21/22 Spring 2023 Evergreen bush has grown into path and needs to be trimmed back 0 No Photo 1 Along Rec Path between Deerfield and Szymanski Park 04/12/23 Vines on trees in this area are pulling down trees at a rapid rate. Should the City cut down the vines to save the trees or should this be just considered nature? ? Yes Shared-use path on Dorset Street north of Kennedy Road 08/03/23 Low branches hanging down into the path and sidewalk 3 Yes Photo 1 Photo 2 Farrell Park near ball field 08/03/23 Lots of brush and tree branches encroaching on already narrow path 3 Yes Photo 1 Rec Path Brush & Tree Overgrowth Locations Links to images (if you have one)Other Remarks Severity of problem 1 = Small 2 = Medium 3 = Severe Description of condition Page 2 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Cracking Locations Location Date Reported Date Fixed Rec Path on Dorset Street from Midland Ave. to Saddie Lane 09-12-18 Severe cracking in section in front of 1700 Dorset Street and in the area near the end of path just before the Midland Ave crosswalk 3 Photo 1 Photo 2 Photo 3 Rec Path on hill section between Butler Farms and Park Rd 8/1/2019 2 Rec Path along 189 - cracks intermittently along whole section between Farrell and Spear 8/23/2019 Cracks aren't really wide currently, but many are long. Sealing will slow their widening and keep this path in good shape. 1 Generally this path is in very good shape - let's keep it that way as long as possible Patchen Rd heading south, crack/gouged hole between Williston Rd and grocery entrance 8/23/2019 2 Nowland Farm Road from Pinnacle to Four Sisters 8/23/2019 cracking througout, but not as progressed as the Pinacle to Spear section 2 Lots of horizontal cracks, but not as severe as east end of Nowland Farm Rd. Noland Farm Road from Four Sisters to Dorset 9/27/2019 medium vertical cracks throughout 2 weeds starting to grow through pavement Photo 1 Photo 2 Photo 3 Path between Dorset and Crispen Drive (along Sadie Lane) before and after wooden bridge heading east 9/27/2019 medium vertical cracks throughout 2 Photo 1 Photo 2 Short section of rec path along Old Cross Rd 1/21/2020 major vertical cracks in 30-50 foot section as path winds behind foliage.2 Dorset Street rec path between I-189 bridge and Swift Extension along ball fields 4/20/2020 moderate vertical cracks 2 Photo 1 Photo 2 Dorset Street rec path between Wheeler House and Park Road.4/20/2020 vertical cracks forming 1 Photo 1 Photo 2 Sections of rec path between Butler Farm neighborhood and Golf Course Road 1/21/2020 Major vertical cracks as path flattens out closer to Butler Farm side. Maybe too late for crack filler, so also listed under Re-paving Tab. 3 Cracks wide enough to trap road bike tire resulting in severe injury Photo 1 Photo 2 Photo 3 Rec Path that parrallels Swift Street near intersection with Meadowood Drive 4/12/2023 Moderate cracking on hill 2 Photo 1 Rec Path Cracking Locations Other Remarks Severity of problem 1 = Small 2 = Medium 3 = Severe Description of condition Links to images Page 3 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Re-paving Priorities Path Location Date Reported Date Fixed Rec Path just north of Fairway Drive along 16th hole fairway 8/21/2022 Path is broken up severly from the roots of a Poplar tree 3 Tree roots under path need to be severed and section repaved Photo Nowland Farms Rec Path - Full length 4/12/2023 Entire length may need complete repaving sometime in the 2 to 3 year timeframe due to numerous potholes, major cracking and crumbling asphalt. Needs to be on a watchlist. Resurficing maybe tied to repaving of Nowland Farm Road itself. 2 Photo 1 Photo 2 Photo 3 Photo 4 Sections of rec path between Butler Farm neighborhood and Golf Course Road 1/21/2020 Major vertical cracks as path flattens out closer to Butler Farm side. May be too late to use crack filler as pavement is starting to crumble. 3 Cracks wide enough to trap road bike tire resulting in severe injury. Photo 1 Sidewalk on Hinesburg Road near Awasuwu Trail crossing 4/12/2023 Major sidewalk failure with pothole and extensive cracking in 20 ft. section 3 Photo 1 Rec Path Re-Paving Priority List Links to images (if you have one)Other Remarks Severity of problem 1 = Small 2 = Medium 3 = Severe Description of condition Page 4 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Malfunctioning RRFBs Road Direction Date Reported Date Fixed Report immediately to DPW via "How do I report a Maintenance Issue" on Home Page of City's website. If not repaired within a week, report again to DPW. Malfunctioning RRFB Locations Links to images (if you have one)Other Remarks Severity of problem 1 = Small 2 = Medium 3 = Severe Description of condition Page 5 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Southeast Quadrant Dorset St and Midland Ave 04/12/23 Heavy traffic area - Presently, it observes as a low priority, but the current paint will not make it through the 23/24 winter. 3 Due to high traffic volume, this will most likely need to be painted annually Dorset St and Nowland Farm Rd/Old Cross Road 04/12/23 Done Heavy traffic area 3 Due to high traffic volume, this will most likely need to be painted annually Spear St. at Deerfield/Nowland Farm Rd 04/12/23 Heavy traffic area 3 Due to high traffic volume, this will most likely need to be painted annually Photo 1 Spear St. at Swift Street (location of new crosswalk light)04/12/23 Done Heavy traffic area 3 Due to high traffic volume, this will most likely need to be painted annually Spear St. at Swift Street (east from intersection near Episcopal Church)04/12/23 Done Heavy traffic area 3 Due to high traffic volume, this will most likely need to be painted annually Cider Mill Drive at location of where rec path crosses road near mailboxes 04/12/23 Heavy traffic area 0 Due to high traffic volume on Cider Mill Drive, this will most likely need to be painted annually Cider Mill Drive at Crispin Drive 04/12/23 Crosswalk Visable 0 Due to high traffic volume on Cider Mill Drive, this will most likely need to be painted annually Cider Mill Drive at Royal Drive (where rec path pops out from Dorset Heights)04/12/23 Crosswalk Visable 0 Due to high traffic volume on Cider Mill Drive, this will most likely need to be painted annually Braeburn St. at Crispin 04/12/23 Crosswalk Visable 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Braeburn St. at Royal Dr. 04/12/23 Crosswalk Visable 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Braeburn St. at Winesap Lane 04/12/23 Crosswalk Visable 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Braeburn St. at Summerfield Ave 04/12/23 Crosswalk Visable 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Winesap Lane at Cider Mill Drive as it crosses to rec path 04/12/23 Striping still visable, but fading. Considered a #0 since not a thru street; road ends. 2 Due to no traffic volume at this time, this will most likely need to be painted every 5 years if road is lengthened Windswept Lane & Dorset Street 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Holbrook & Dorset Street 04/12/23 1 Due to low traffic volume, this will most likely need to be painted every three years or so. Foulsham Hollow Rd & Dorset Street 04/12/23 Crosswalk connects Dorset rec path - never been painted 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Medalist Drive & Dorset 04/12/23 Crosswalk connects Dorset rec path - never been painted 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Rec Path crossing at Holbrook & Old Cross 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Page 6 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Rec Path crossing at Golf Course Rd near Old Cross 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Rec Path crossing on Fairway Drive 04/12/23 Well worn as it looks like it has never been painted 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Crosswalk connecting 10th hole to 11th hole across Golf Course Road 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Sidewalk crossing at Fairway Dr & Golf Course Rd. 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Sidewalk crossing east/west at first (north) intersection of Park Rd & Golf Course Rd.04/12/23 1 Due to low traffic volume, this will most likely need to be painted every three years or so. Sidewalk crossing at second (south) entrance to Park Rd. and Golf Course Rd.04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Crosswalk connecting rec path across Park Road on the hill almost to Golf Course Road 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Rec Path Crossing at intersection of Dorset Street and Park Road 04/12/23 0 Due to mid- traffic volume, this will most likely need to be painted biennially. Intersection at Swift & Dorset - both crosswalks 04/12/23 High Traffic Area 3 Due to high traffic volume, these will most likely need to be painted annually Entrance to Veterans Memorial Park off Swift Street Extension 04/12/23 2 Due to mid- traffic volume, this will most likely need to be painted biennially. Swift Street Extension & Brand Farm Dr. 04/12/23 1 Due to mid- traffic volume, this will most likely need to be painted biennially. Brand Farm Drive & Blue Star Lane 04/12/23 well worn 3 Raised crosswalk located here Brand Farm Drive & Lupine Lane 04/12/23 1 Due to low traffic volume, this will most likely need to be painted every three years or so. Swift Street Extension/Brand Farm Drive & Wheeler Hiking Trail Entrance 04/12/23 Appears to have never been painted before 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Economou Farm Rd across to Swift Street Rec Path 04/12/23 Appears to have never been painted before 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Twin Oaks Terrace crosswalk at the Edge Sports building 08/21/22 Hays & Twin Oaks Terrace 08/21/22 Well worn 3 Twin Oaks Terrace crosswalk at Twin Oaks N Road 08/21/22 2 Due to low traffic volume, this will most likely need to be painted every three years or so. Grandview Drive at Dorset Street 08/21/22 2 Pinacle Drive near entrance from Spear Street - north/South crosswalk 04/12/23 Appears to have never been painted before 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Pinacle Drive internally ~100 yards in from Nowland Farm Rd - north/South crosswalk 08/18/22 Appears to have never been painted before 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Page 7 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Pinacle Drive & Nowland Farm Rd 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Vale Drive & Nowland Farm Rd 04/12/23 1 Due to low traffic volume, this will most likely need to be painted every three years or so. Four Sisters & Nowland Farm Rd 04/12/23 2 Due to low traffic volume, this will most likely need to be painted every three years or so. Old Schoolhouse Rd & Nowland Farm Rd 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Midland Ave at the intersection with east entrance to Bower St/Catkin Dr (crosswalk running north/south)04/12/23 1 Due to mid- traffic volume, this will most likely need to be painted biennially. Catkin Dr east entrance & Midland Av (crosswalk running east/west)04/12/23 1 Due to mid- traffic volume, this will most likely need to be painted biennially. Midland Ave at the intersection with west entrance to Bower St (crosswalk running north/south)04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Catkin Dr west entrance & Midland Av (crosswalk running east/west)04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Midland Ave at Stafford - East entrance 04/12/23 1 Midland Ave at RRFB crossing near Stafford 04/12/23 Crosswalk needs painting 3 High Traffic crossing Midland Ave at Stafford - West entrance - 2 crosswalks 04/12/23 Crosswalk needs painting 3 Midland Ave at South Jefferson 04/12/23 Crosswalk needs painting 3 South Jefferson crosswalk at Rec Path along Spear Street 04/12/23 Crosswalk needs painting - may never have been painted in paste 3 South Village internal crosswalks 04/12/23 Generally seem in good condition 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Southwest Quadrant Deerfield Ave. at Summit at Spear Condominium Entrance 04/12/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Harbor Ridge & Pheasant Way at mailboxes 04/07/23 No paint evident. May not have ever been painted before. Will need a "landing pad" on mailbox side of Harbor Ridge. 3 Due to mid- traffic volume, this will most likely need to be painted biennially. Harbor Ridge & Keari Lane 04/07/23 well worn 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Harbor Ridge & Baycrest Dr. 04/07/23 Possibly could go one more year, but the paint should be refreshed while DPW is repainting nearby crosswalks. 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Baycrest & Bay CT 04/07/23 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Bay CT & Baycrest Park Entrance 04/07/23 0 Page 8 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Keari Lane & Bay CT 04/07/23 well worn 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Baycrest at Harbor View Rd 04/07/23 2 Due to low traffic volume, this will most likely need to be painted every three years or so. Baycrest at the entrance to Bay Court Condos 04/07/23 well worn, no longer visable 3 Due to low traffic volume, this will most likely need to be painted every three years or so. Irish Farm and Haymaker 04/07/23 1 Irish Farm and Baycrest 04/07/23 0 Allen Road and Baycrest 3 Harbor View Rd & Harbor Village Senior Community - 3 crosswalks grouped 04/07/23 1 Due to low traffic volume, this will most likely need to be painted every three years or so. Fayette Drive and Real Street - crosses rec path 08/21/22 Looks like it has never been painted before 3 Fayette Drive and Olde Orchard Park - crosses rec path 08/21/22 Looks like it has never been painted before 3 Across Hannaford Dr at Fayette Dr 08/21/22 3 New Hannaford's entrance at Queen City Park Rd 08/21/22 3 Queen City Park Road and entrance to the Humane Society on sidewalk to remind drivers that this is a sidewalk and bike lane entrance 08/21/22 This has never been painted 3 Queen City Park Road and entrance to Burlington Rec Path near Pine Street 08/21/22 3 All the City side road north/south crosswalks along the sides of Shelburne Road including at Laurell Hill Dr, McIntosh, Tumblebrook, Imperial, etc. 08/21/22 If confirmed that the City is responsible for painting these crosswalks, each crosswalk should be broken out separately. Most fine at this point. According to Justin Rabidoux, VTrans is responsible for painting all directions of these intersections; need to confirm. A separate list of VTrans crosswalks should also be built.2 crosswalks at Spear Street and East Terrace intersection 08/21/22 0 Due to mid- traffic volume, this will most likely need to be painted biennially. The furthest north UVM crosswalks on Spear Street 08/21/22 Heavy traffic area 0 Due to high traffic volume, this will most likely need to be painted annually The UVM crosswalk at the rec path and driveway to Gutterson Fieldhouse 08/21/22 Heavy traffic area 0 Due to high traffic volume, this will most likely need to be painted annually Spear Street and Quarry Hill Road 08/21/22 Heavy traffic area 0 Due to high traffic volume, this will most likely need to be painted annually Farrell Street crosswalk just north of the I-189 overpass 08/21/22 0 Farrell Street Crosswalk from rec path to apartments just south of the Eastwood Drive intersection 08/21/22 2 Note: The vehicle stop lines at 3-way stop intersection with Eastwood Drive need to be painted annually to avoid accidents Swift Street and Farrell Street insection crosswalks 04/12/23 Intersection has not been repainted since reconstructed 3 Requires green paint for bike lane and bike boxes Page 9 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos 6 Farrell Street raised-crosswalks west of the insection with Eastwood and before the Shaws Driveway - These crosswalks have never been repainted since they were installed 04/12/23 well worn; crosswalk lines have not been repainted by the City since the crosswalks were first installed 3 Red paint previously used. Farrell Street crosswalk between Shaws shopping center entrance closest to Shelburne Rd crossing to Walgreens 04/12/23 3 Farrell Street and Shelburne Road 04/12/23 well worn 3 Due to high traffic volume, this will most likely need to be painted annually Joy Drive and Eastwood Drive intersection - both directions 08/21/22 0 Due to high traffic volume, this will most likely need to be painted annually Joy Drive and Lund Building entrance 08/21/22 0 Due to low traffic volume, this will most likely need to be painted every three years or so. Crosswalk across Eastwood Drive to sidewalk in front of Hallam Building 08/21/22 well worn or never done in past; curb cuts are present 3 Hadley and Meadows Roads 08/21/22 well worn or never done in past; curb cuts are present 3 Paint on diagonal to connect sidewalks Hadley Rd at Pizzagalli Parking lot 08/21/22 0 Hadley Road and Shelburne Road 08/21/22 well worn 3 Again, not sure if Vtran's responsibility White Place and Shelburne Road 08/21/22 well worn 3 Again, not sure if Vtran's responsibility Bacon Road and Shelburne Road 08/21/22 well worn 3 Again, not sure if Vtran's responsibility Proctor Ave and Shelburne Road 08/21/22 0 Due to high traffic volume, this will most likely need to be painted annually Proctor Ave and Apple Tree CT 08/21/22 well work or perhaps never done before 3 Proctor Ave and Birchwood CT 08/21/22 well work or perhaps never done before 3 Proctor Ave and Orchard Road 08/21/22 well work or perhaps never done before 3 Proctor Ave and Meadow Road 08/21/22 0 Due to high traffic volume, this will most likely need to be painted annually Central District & Northwest Quadrant Hinesberg Road Intersection with: 1060 @ Sphinx Building 06/06/21 2 Business Driveway ? Marking for non road intersection Tilley Drive 08/21/22 0 Unclear if this will be VTrans' responsibilty or South Burlington's O'Brien Farm Road, Hayes Ave 06/06/21 3 RRFB's present, paint faint, heavy traffic, high ped use. Entrance of Country Estates 06/06/21 3 Residental driveway. Has stop sign, no crosswalk. ? Marking for non road intersection Page 10 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Kennedy Drive Intersection 06/06/21 3 Lights at intesection, paint worn off . Deane St 06/06/21 1 Woodcrest Dr 06/06/21 2 Lilac Lane 06/06/21 2 Sunset Ave 06/06/21 1 Simpson Ct 06/06/21 1 Barrett Street 06/06/21 1 Ruth St 06/06/21 0 Unclear if this will be VTrans' responsibilty or South Burlington's St. John Vianny Church 06/06/21 0 Unclear if this will be VTrans' responsibilty or South Burlington's Wright Court 06/06/21 Never painted 3 Will need Vtrans authorization to install crosswalk at this location. May need RRFB. Project to be added to the FY24- FY33 CIP Prouty Parkway 06/06/21 0 Unclear if this will be VTrans' responsibilty or South Burlington's Awasiwi Trail 06/06/21 0 Unclear if this will be VTrans' responsibilty or South Burlington's Iby Street 06/06/21 2 OK Market Street, Intersection with:06/06/21 Entrance of strip mall (Price Chopper, etc) 06/06/21 2 minimal marking, ? Marking for non-road intersection Market Street Intersection with: Paved path/parallell to Hinesburg Rd.06/06/21 1 Dorset Street 06/06/21 1 Crossing over bridge to park. Not named 06/06/21 1 Kennedy Drive Intersection With: CITCO Station, corner of Rt 116 and Kennedy 06/06/21 ? Marking for non-road intersection. 3 Heavy Traffic, Heavy ped use basic but not great markings. Timberlane, condo complex intesection with traffic lights 06/06/21 Hard to see path users when exiting Manor Woods. Path users don't always look up either. 3 High priority, heavy traffic, heavy ped use, paint worn off High School entrance heading west on Kennedy just before Dorset intersection where it crosses rec path 08/21/22 Has not been painted in 4 years - not okay. Assume it will finally be done as part of repaving project. 3 Heavy Traffic. Perhaps green paint. Dorset and Kennedy Drive intersection at South Burlington High School 08/21/22 Has not been painted in 4 years - not okay 3 High priority, heavy traffic, heavy ped use, paint worn off Entrance of 140/150 Kennedy Dr 06/06/21 ? Marking for non-road intersection. Also, Yield sign not at eye level for bike/ped users. Gagne couldn't reach bottom of the sign. If important, should be eye level. 3 Business entrance, not great markings Treetop/Kimball Ave Intersection 06/06/21 3 Heavy Traffic, Heavy ped use basic but not great markings. Entrance 1795 Williston Rd 06/06/21 ? Marking for non-road intersection.3 Page 11 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Eldredge St 06/06/21 entrance to O'Brien Estates, would be good location for cross walk across Kennedy Dr. 0 Dorset Street Intersection with: Hummingbird Lane 06/01/21 Proposed 0 Grandview 06/01/21 3 completley worn off 1 Kennedy Drive 06/01/21 0 Private office complex. ? Marking for non- rad intersection Kennedy Drive Intersection @ HS 06/01/21 High Priority: high traffic, high ped use, near school 3 across 189- fresh paint, across dorset 3, across kennedy dr-3. South of Firestation 06/01/21 worn, given near school, high priority 2 North of Firestation 06/01/21 worn, given near school, high priority 2 MiddleSchool 06/01/21 all very worn, near school 3 San Remo Drive (South)06/01/21 3 Hickory Lane 06/01/21 1 San Remo Drive (North)06/01/21 3 Greenwood Drive (near derm office)06/01/21 ? Mall Entrance South 06/01/21 1 all paint in good shape Blue Mall Entrance 06/01/21 1 paint in good shape Mall Entrance North and Market St 06/01/21 1 some wear noted, will need frequent repainting Barnes & Noble Shopping Entrance 06/01/21 2 Dorset st paint a little faint, entrance to B&N ok Williston Rd 06/01/21 3 YIKES! PAINT GONE! ?Marking at Holiday Inn Entrance. Wiliston Rd Intersection with: Delata Hotel/Moe's Intersection 06/01/21 ?marking across entrance from Moe's to Phone Depot. Sidewalk crosses 4 lanes.3 Signal light for peds, no paint, at all. Mary Street 06/01/21 great short cut from Williston Rd to Market st for peds!3 missing paint Midas Road 06/01/21 intersection needs a re-do 3 Missing paint White Street 06/01/21 intersection needs a re-do 3 side walk present, no crosswalk, etc. Hinesburg Rd 06/01/21 3 YIKES NO PAINT Cottage Grove 06/01/21 2 visible could be better Heath St 06/01/21 3 Pine Tree Terrace 06/01/21 3 Davis Pkway 06/01/21 3 Hayden Pkwy 06/01/21 3 Gilbert Street 06/01/21 3 Elsom Pkwy 06/01/21 3 Victory Drive 06/01/21 3 Victoria Drive 06/01/21 3 Mills Ave 06/01/21 3 Airport Road 06/01/21 3 Intersection with Kennedy Dr 06/01/21 3 YIKES- Lights, no crosswalks at all. Page 12 of 13 Crosswalk Painting and Rec Path Maintenance & Repaving Priority Lists - Updated 23-08-03 Crosswalk Striping Location Last Date Observed Date Painted (City Use) Crosswalk Striping Needed Other Remarks Severity of problem 0 = None 1 = Low 2 = Medium 3 = Severe Description of condition Photos Other Crosswalks in Northwest Quadrant The rest of the Northwest Quadrant not surveyed Northeast Quadrant No survey done as of 8/22/22 Page 13 of 13 City of South BurlingtonFY24 Policy Priorities & StrategiesRole of Council"This is the vision for our community"Committee Strategy DescriptionBike/Ped Provide guidance to City Staff on the development and deployment of the Recreation Path wayfinding package and regulatory signage.Bike/Ped Work with Local Motion to support community events, resources, etc. (e.g., bicycle valet parking at events, community rides)Bike/Ped Participate in scoping studies, planning efforts, and development review applications that impact bike and pedestrian modes of travel and monitor the integration of the preferred alternative or permit condition through to construction.Bike/Ped Coordinate with Local Motion and other state bicycling advocacy organizations to bring about better bike/ped facilities.Bike/Ped Coordinate with the Recreation & Parks Department, Public Works, and appropriate City Committees to ensure City trails and paths are accessible and maintained.  Bike/Ped Support City Staff in conveying the progress of projects funded by the Penny for Paths Initiative with signage and announcements to indicate infrastructure improvements “coming soon” or completed.Bike/Ped Identify partnerships to aid the education of all modes of travel (automobile, e‐assist devices, and non‐motorized) on the rules of the road and use of the South Burlington network.Bike/Ped Increase awareness of South Burlington as a bikeable, walkable city through community outreach, digital/paper maps, signage and community surveys Bike/Ped Communicate with City staff to develop ways of reducing vehicle speeds to promote a safer environment for bicyclists and pedestrians.Bike/Ped Work with City staff and the CCRPC to develop the Walk/Bike Master Plan.Bike/Ped Communicate bike and pedestrian network needs, priorities, successes through announcements, events, meetings, digital/paper maps, and publicity.Bike/Ped Publicly advocate for greater alternative transportation use to reduce use of fossil fuel burning vehicles for local trips.Bike/Ped Engage closely with City Staff on the allocation of the Penny for Paths Fund through the CIP development and grant applications, as well as assist in strategically planning for implementing priority projects. Bike/Ped In coordination with City Staff, monitor the condition of the bike and pedestrian network (paint, signage, surface condition) and report maintenance concerns. Comprehensive Plan UpdateBike/Ped Annually review and provide updates to the mapped data of bike and pedestrian infrastructure (existing and proposed GIS datasets) to maintain an accurate record of the system. Bike/Ped Support City staff in their plans for the I‐89 East‐West Crossing.Bike/Ped Participate in the City’s implementation of the Climate Action Plan through a Committee liaison, cognizant of the important roles micromobility and non‐vehicular travel play in a carbon‐neutral future. Bike/Ped, EnergyPartner with Energy Committee and communicate with South Burlington schools to increase bus, public transit, bicycle and pedestrian commuting for students, staff, and residents (statewide Way to Go School program, Safe Routes to School program and Committee's Neighborhood to Schools Greenway pilot).Green & Clean:  Emphasizing sustainability for long‐term viability of a clean and green South BurlingtonCore Municipal Services and AdministrationCity Center and Tax Increment Financing DistrictClimate Action PlanRole of Committee"This is how our resident committees can inform policy and help implement policy."Affordable and Community Strong:  Creating a robust sense of place and opportunity for our residents and visitors.Opportunity Oriented:  Being a supportive and engaged member of the larger regional and statewide community.Walkable:  Bicycle and pedestrian friendly with safe transportation infrastructure.