HomeMy WebLinkAboutSP-23-022 - Supplemental - 0793 Shelburne Road (14)1
Marla Keene
From:Luke Willey <luke@shrugg.com>
Sent:Friday, July 21, 2023 5:07 PM
To:Marla Keene
Cc:Dave Simendinger; Kurt Simendinger; Jamie L. Simendinger; joeryanvt@gmail.com
Subject:'EXTERNAL'793 Shelburne Road
Attachments:22063 - Simendinger, C-1 Site Plan 07-07-23.pdf
This message has originated from an External Source. Please use proper judgment and caution when opening
attachments, clicking links, or responding to this email.
Marla:
See aƩached revised site plan with the final revised landscaping and breakout of front yard setback by street.
With regards to the wastewater calculaƟons, per the current State regulaƟons the calculated flows would be:
ExisƟng
o (8) pumps x 125/fuel hose = 1000 GPD
o (3) employees x 13/emp = 39 GPD
Total ExisƟng Design Flow = 1039 GPD
Proposed
o (6) pumps x 125/fuel hose = 750 GPD
o (3) employees x 13/emp = 39 GPD
Total ExisƟng Design Flow = 789 GPD
Luke Willey
Ruggiano Engineering
5 Lake Street, St. Albans, VT 05478
tel: 802.524.9300
cell: 802-370-0923
luke@shrugg.com
www.ruggianoengineering.com