Loading...
HomeMy WebLinkAboutSP-23-022 - Supplemental - 0793 Shelburne Road (14)1 Marla Keene From:Luke Willey <luke@shrugg.com> Sent:Friday, July 21, 2023 5:07 PM To:Marla Keene Cc:Dave Simendinger; Kurt Simendinger; Jamie L. Simendinger; joeryanvt@gmail.com Subject:'EXTERNAL'793 Shelburne Road Attachments:22063 - Simendinger, C-1 Site Plan 07-07-23.pdf This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Marla: See aƩached revised site plan with the final revised landscaping and breakout of front yard setback by street. With regards to the wastewater calculaƟons, per the current State regulaƟons the calculated flows would be:  ExisƟng o (8) pumps x 125/fuel hose = 1000 GPD o (3) employees x 13/emp = 39 GPD  Total ExisƟng Design Flow = 1039 GPD  Proposed o (6) pumps x 125/fuel hose = 750 GPD o (3) employees x 13/emp = 39 GPD  Total ExisƟng Design Flow = 789 GPD Luke Willey Ruggiano Engineering 5 Lake Street, St. Albans, VT 05478 tel: 802.524.9300 cell: 802-370-0923 luke@shrugg.com www.ruggianoengineering.com