Marla Keene
From:Monika Ingalls
Sent:Tuesday, March 7, 2023 3:46 PM
To:Andres Torizzo; Marla Keene; dmarshall@cea-vt.com; sleppert@cea-vt.com; Thomas
Adler
Cc:Dave Wheeler
Subject:RE: 'EXTERNAL'Meadowland Lot 7
Hi Andres,
I did email Marla and let her know that my previous comments had been addressed and I gave her the following to
include as conditions of approval:
Update the EPSC plan to include the new layout that has the catch basin along Bowdoin St/adjust plan as
needed
Change the notes for the construction entrances on the EPSC to show that they will need a construction
entrance and they will need to sweep the street as necessary, not either/or
Thanks,
Monika
Monika Ingalls
Stormwater Project Manager
Department of Public Works
City of South Burlington
104 Landfill Road
South Burlington, VT 05403
(802) 658-7961 Ext. 6108
Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning
City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected
by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email.
Thank you for your cooperation.
From: Andres Torizzo <andres@watershedca.com>
Sent: Tuesday, March 7, 2023 3:38 PM
To: Marla Keene <mkeene@southburlingtonvt.gov>; dmarshall@cea-vt.com; sleppert@cea-vt.com; Thomas Adler
<tadler@watershedca.com>
Cc: Monika Ingalls <moingalls@southburlingtonvt.gov>; Dave Wheeler <dwheeler@southburlingtonvt.gov>
Subject: Re: 'EXTERNAL'Meadowland Lot 7
Hi Marla, did you receive any word from Monika on this project by chance? Thank you.
Sent from my iPhone
On Mar 7, 2023, at 9:11 AM, Andres Torizzo <andres@watershedca.com> wrote:
2
Marla,
There is an associated detail sheet. To avoid confusion, we added the same revision date of 3/7/23 and
have attached it here.
From: Marla Keene <mkeene@southburlingtonvt.gov>
Sent: Tuesday, March 7, 2023 8:57 AM
To: Andres Torizzo <andres@watershedca.com>; dmarshall@cea-vt.com; sleppert@cea-vt.com;
'Thomas Adler' <tadler@watershedca.com>
Cc: Monika Ingalls <moingalls@southburlingtonvt.gov>
Subject: RE: 'EXTERNAL'Meadowland Lot 7
Awesome, thanks. If this is the only plan, I’ll just look for confirmation from Monika by the end of the
day on whether the outstanding issues have been addressed.
Marla Keene, PE
Development Review Planner
City of South Burlington
(802) 846-4106
From: Andres Torizzo <andres@watershedca.com>
Sent: Tuesday, March 7, 2023 8:51 AM
To: Marla Keene <mkeene@southburlingtonvt.gov>; dmarshall@cea-vt.com; sleppert@cea-vt.com;
'Thomas Adler' <tadler@watershedca.com>
Cc: Monika Ingalls <moingalls@southburlingtonvt.gov>
Subject: RE: 'EXTERNAL'Meadowland Lot 7
Marla,
Attached is a site plan with revision date of 3/7/23. The only change between this plan and the 3/6/23
version Monika sent you was a change in outlet weir elevation in DMH#2 from 344.0 to 344.7.
thanks
From: Marla Keene <mkeene@southburlingtonvt.gov>
Sent: Tuesday, March 7, 2023 8:35 AM
To: Andres Torizzo <andres@watershedca.com>; dmarshall@cea-vt.com; sleppert@cea-vt.com;
'Thomas Adler' <tadler@watershedca.com>
Cc: Monika Ingalls <moingalls@southburlingtonvt.gov>
Subject: RE: 'EXTERNAL'Meadowland Lot 7
Thanks for keeping me in the loop. If revised plans are proposed, they’ll need to be provided to the
Board before the hearing can be closed. Monika sent me a version of C2.2 this morning with a rev date
of 3/6/2023 on it. Please keep in mind files should be named with the most recently revised date
included in the file name. This is to keep us from screwing up and accidentally including the wrong plan
as the “record,” which could result in your not being permitted to build what you and the Board agreed
upon.
Marla Keene, PE
Development Review Planner
3
City of South Burlington
(802) 846-4106
From: Andres Torizzo <andres@watershedca.com>
Sent: Tuesday, March 7, 2023 8:02 AM
To: dmarshall@cea-vt.com; sleppert@cea-vt.com; 'Thomas Adler' <tadler@watershedca.com>
Cc: Marla Keene <mkeene@southburlingtonvt.gov>; Monika Ingalls <moingalls@southburlingtonvt.gov>
Subject: RE: 'EXTERNAL'Meadowland Lot 7
Will do. I am sending over the model to Monika now and then can be in touch with Marla.
From: David Marshall <dmarshall@cea-vt.com>
Sent: Tuesday, March 7, 2023 7:53 AM
To: sleppert@cea-vt.com; 'Andres Torizzo' <andres@watershedca.com>; 'Thomas Adler'
<tadler@watershedca.com>
Cc: Marla Keene <mkeene@southburlingtonvt.gov>; 'Monika Ingalls'
<moingalls@southburlingtonvt.gov>
Subject: RE: 'EXTERNAL'Meadowland Lot 7
HI Andres-
I have a meeting in Stowe at 9 AM today so can you Shepard this with
Monika, and once we have the Stormwater Utility sign-off, then with
Marla? The City DRB needs to here from us on the suitability of the
stormwater by Noontime today.
Thanks!
David S. Marshall, P.E.
Civil Engineering Associates, Inc.
10 Mansfield View Lane
South Burlington, VT 05403
P 802-864-2323 x310 F 864-2271
From: Steve Leppert <sleppert@cea-vt.com>
Sent: Tuesday, March 7, 2023 6:32 AM
To: 'Andres Torizzo' <andres@watershedca.com>; 'Thomas Adler' <tadler@watershedca.com>;
dmarshall@cea-vt.com
Subject: RE: 'EXTERNAL'Meadowland Lot 7
Updated plan attached
Steve Leppert
Civil Engineering Associates, Inc.
10 Mansfield View Lane
So. Burlington, Vermont 05403
Office 802-864-2323 x303
e-mail: sleppert@cea-vt.com
From: Andres Torizzo <andres@watershedca.com>
Sent: Monday, March 6, 2023 6:06 PM
4
To: 'Thomas Adler' <tadler@watershedca.com>; dmarshall@cea-vt.com
Cc: sleppert@cea-vt.com
Subject: RE: 'EXTERNAL'Meadowland Lot 7
Hi All,
With the added section depth as requested by the City, we can squeak a bit more storage out of the
current 14 row x 10 chamber system. Therefore, there is not a need to add the additional row. The
numbers work if we just raise the weir to 344.7.