Loading...
HomeMy WebLinkAboutSD-23-05 - Supplemental - 0760 Shelburne Road (56)SOUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802) 864-0435 www.sburl.com SBWD Technical Review Comments SP-23-05 760 Shelburne Rd. Date: May 30, 2023 Submitted by: Jay Nadeau, SBWD Superintendent It is the responsibility of the contractor to be familiar with the CWD Specifications beyond what is included in this information. The Champlain Water District Specifications and Detail for the Installation of Water Lines and Appurtenances information can be found at www.champlainwater.org Plan Specific Comments Sheet C3-01. (See sheet C3-01) 1. The proposed eight-inch (8”) tee shall include a main line gate valve on either side of the new tee to be cut-in, secured to the tee with Foster Adapters. The cut-in of this tee shall require a shutdown on the only line supplying the northern part of the City so must be scheduled for night work. At least three weeks’ notice must be provided to the SBWD so all affected customers can be notified in advance of the water service interruption. 2. A six-inch (6”) valve on the line supplying the Multi-family Residential 27DU building shall be secured to the hydrant tee. 3. Install copper between the main and curb stop to the proposed financial institution building. 4. Locate and abandon all three existing water services at the corporations. Close the corporations, disconnect the service lines, and wrap the service taps in V-Bio polyurethane. 5. The services to all of the proposed buildings shall be copper and DI if petroleum infused soils are encountered. See VT Water Supply Rule requirements. 6. See CWD Specifications for tracing wire requirements for all PVC water pipe. 7. The SBWD suggests that FS lines entering a building be DI. Sheet C8-04 1. Water Details must be those found in the CWD Specifications. The Department will not accept any pipe or material that is not in compliance with the CWD Specifications.