Loading...
HomeMy WebLinkAboutAgenda 05_SP-23-031_1250 Spear St_WielengaROADWAYS AND TRANSPORTATION FACILITIES ADAPTED FROM VTRANS TECHNICAL LANDSCAPE MANUAL FOR SECTION 651 FOR SEED (PAY ITEM 651.15) THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH CONSTRUCTION GUIDANCE REVISIONS TURF ESTABLISHMENT WHFJANUARY 12, 2015 7. 6. 5. 4. 3. 2. 1. GROWTH OF GRASS. TO SEPTEMBER 15 AND AFTER APRIL 15 CAN BETTER ENSURE A VIGOROUS TURF ESTABLISHMENT: PLACING SEED, FERTILIZER, LIME AND MULCH PRIOR THE AMOUNTS AND TYPES OF SOIL AMENDMENTS TO BE APPLIED. AND THE TYPE OF HYDROSEED PROPOSED FOR USE WILL ULTIMATELY DICTATE HYDROSEEDING: ALTHOUGH GUIDANCE IS GIVEN ABOVE THE SITE CONDITIONS ACHIEVE 90% GROUND COVER OR AS DIRECTED BY THE ENGINEER. HAY MULCH: TO BE PLACED ON EARTH SLOPES AT THE RATE OF 2 TONS/ACRE, DIRECTED BY THE ENGINEER. FERTILIZER AND LIMESTONE: SHALL FOLLOW RATES SHOWN ON PLAN OR AS WEIGHT AND SHALL BE FREE OF ALL NOXIOUS SEED. ALL SEED MIXTURES: SHALL NOT HAVE A WEED CONTENT EXCEEDING 0.40% BY UPLAND (NON WETLAND) AREAS DISTURBED BY THE CONTRACTOR. SEED MIX: USE AS INDICATED IN THE PLANS AND/OR FOR ALL ESTABLISHED ON WHICH SEED MIX TO USE. SEED MIX: THE CONTRACTOR SHALL COORDINATE WITH THE RESIDENT ENGINEER ROADWAYS AND TRANSPORTATION FACILITIES ADAPTED FROM VTRANS TECHNICAL LANDSCAPE MANUAL FOR SECTION 651 FOR SEED (PAY ITEM 651.15) THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH CONSTRUCTION GUIDANCE REVISIONS TURF ESTABLISHMENT 7. 6. 5. 4. 3. 2. 1. GROWTH OF GRASS. TO SEPTEMBER 15 AND AFTER APRIL 15 CAN BETTER ENSURE A VIGOROUS TURF ESTABLISHMENT: PLACING SEED, FERTILIZER, LIME AND MULCH PRIOR TYPES OF SOIL AMENDMENTS TO BE APPLIED AND THE TYPE OF HYDROSEED WILL ULTIMATELY DICTATE THE AMOUNTS AND HYDROSEEDING: ALTHOUGH GUIDANCE IS GIVEN ABOVE THE SITE CONDITIONS ACHIEVE 90% GROUND COVER OR AS DIRECTED BY THE ENGINEER. HAY MULCH: TO BE PLACED ON EARTH SLOPES AT THE RATE OF 2 TONS/ACRE, DIRECTED BY THE ENGINEER FERTILIZER AND LIMESTONE: SHALL FOLLOW RATES SHOWN ON PLAN OR AS WEIGHT AND SHALL BE FREE OF ALL NOXIOUS SEED. SEED MIX: SHALL NOT HAVE A WEED CONTENT EXCEEDING 0.40% BY SEED MIX: USE ONLY AS INDICATED IN THE PLANS. WATERS OF THE STATE OF VERMONT. SEED MIX: THE URBAN AREA MIX SHALL NOT BE USED IN WETLANDS OR ANY WHFJANUARY 22, 2015 SYMBOL CONSTRUCTION SPECIFICATIONS GUIDANCE. THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR NOTES: VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION ORIGINALLY DEVELOPED BY USDA-NRCS ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC NOT TO SCALESTAPLESTAPLE 3 3 3 1 5 2 JUTE MESH 4 EROSION CONTROL MATTING EXCELSIOR BLANKET FIRMLY TAMP SOIL V H 4"MIN DETAIL 1 TERMINAL FOLD 3"MIN 1"MIN STAPLE DETAIL SHALL BE PLACED LOOSELY OVER GROUND SURFACE. DO NOT STRETCH. DISTURBED AREAS SHALL BE SMOOTHLY GRADED. EROSION CONTROL MATERIAL APPROXIMATELY 12" INTERVALS. ALL TERMINAL ENDS AND TRANSVERSE LAPS SHALL BE STAPLED AT REQUIRED PER 4'X150' ROLL OF MATERIAL. ARE REQUIRED PER 4'X225' ROLL OF MATERIAL AND 125 STAPLES ARE APART AND IN ROWS APPROXIMATELY 3' APART. APPROXIMATELY 175 STAPLES STAPLES ARE TO BE PLACED ALTERNATELY, IN COLUMNS APPROXIMATELY 2' APPLY FERTILIZER, LIME SEED PRIOR TO PLACING MATTING. OCCURS WITHIN EACH 25'. THAN 6%. ON SLOPES OF 6% OR MORE, THEY SHALL BE SPACED SO THAT ONE THAT ONE OCCURS WITHIN EACH 50' ON SLOPES OF MORE THAN 4% AND LESS EROSION MATTING, CHECK SLOTS, SHALL BE SPACED IN DITCH CHANNEL SO 5. 4. 3. 2. 1. (RECP) DITCH CONTROL PRODUCT ROLLED EROSION REVISIONS MARCH 8, 2007 JMF APRIL 16, 2007 WHF DETAIL 2 JUNCTION SLOT 6" 12"12" EXCELSIOR BLANKET EROSION CONROL MATTING JUTE MESH STAPLESSTAPLES DETAIL 3 ANCHOR SLOT DETAIL 4 CHECK SLOT DETAIL 5 LAP JOINT EROSION CONTROL MATTING EXCELSIOR BLANKET JUTE MESH EROSION CONTROL MATTING STAPLESTAPLES 12" FIRMLY TAMP SOIL FIRMLY TAMP SOIL STAPLE 4" MIN 6"-12" 6"-12" 6"-12"6"-12" BE BUTTED TOGETHER EXCELSIOR BLANKET SHALL EROSION CONTROL MATTING JUTE MESH JANUARY 13, 2009 WHF (PAY ITEM 653.21). MATTING (PAY ITEM 653.20) OR PERMANENT EROSION MATTING 653 AND AS SHOWN IN THE PLANS FOR TEMPORARY EROSION THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH SECTION SYMBOL NOT TO SCALE GUIDANCE. THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR NOTES: VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION ORIGINALLY DEVELOPED BY USDA-NRCS ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC FR OR OTHER PLANTINGS VEGETATIVE 2" DIAMETER LAYER •" TO WILLOW BRUSH 2"X2'X3' HARDWOOD POST WIRE GALVANIZED 9 GAUGE BASEFLOW SPECIFIED PLUGS AS HERBACEOUS FIBER ROLL CONSTRUCTION SPECIFICATIONS (EROSION LOG) FIBER ROLL REVISIONS MARCH 21, 2008 WHF JANUARY 13, 2009 WHF SLOPE CONTOURS EXCAVATE A SHALLOW TRENCH SLIGHTLY BELOW BASEFLOW OR A 4" TRENCH ON NECESSARY. TRIM THE TOP OF THE POSTS EVEN WITH THE EDGE OF THE ROLL, IF BOTH SIDES FO THE ROLL AND SPACED LATERALLY ON 2' TO 4' CENTERS. PLACE THE ROLL IN THE TRENCH AND ANCHOR WITH 2"X2" POSTS PLACED ON GALVANIZED WIRE OR „" DIAMETER BRAIDED NYLON ROPE. NOTCH THE POSTS AND TIE TOGETHER, ACROSS THE ROLL, WITH 9 GAUGE 4. 3. 2. 1. THE FIBER ROLL. FIBER. HERBACEOUS VEGETATION, IF SPECIFIED, SHALL BE PLANTED INTO IMMEDIATELY ADJACENT TO THE ROLL TO PROMOTE ROOT GROWTH INTO THE ELSEWHERE IN THE CONTRACT DOCUMENTS. VEGETATION SHALL BE PLACED PLANT WITH SUITABLE HERBACEOUS OR WOODY VEGETATION AS SPECIFIED PLACE SOIL EXCAVATED FROM THE TRENCH BEHIND THE ROLL AND HAND TAMP. SECTION 653 FOR EROSION LOG (PAY ITEM 653.60) THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH NOT TO SCALE SILT FENCE SYMBOL CONSTRUCTION SPECIFICATIONS VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION ORIGINALLY DEVELOPED BY USDA-NRCS ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC SEE NOTE #3 FOR POST SPACING (SEE NOTE #1) WOVEN WIRE FENCE 16" MIN FILTER CLOTH EMBED 6"MIN FLOW FLOW WOVEN WIRE AND POST) (UPSLOPE OF WIRE FILTER CLOTH CLOTH 6" MIN EMBED FILTER 4" SEDIMENT REACHES HALF OF FABRIC HEIGHT. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN SILT FENCE REVISIONS MARCH 21, 2008 WHF FLOW POST DETAIL OVER-LAPPED BY 6" AND FOLDED. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE DECEMBER 11, 2008 WHF JANUARY 13, 2009 WHF GUIDANCE. THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR NOTES: SILT FENCE, WOVEN WIRE REINFORCED (PAY ITEM 649.515). FOR SILT FENCE (PAY ITEM 649.51) OR GEOTEXTILE FOR SECTION 649 AND AS SHOWN IN THE PLANS FOR GEOTEXTILE THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH MAX. MESH OPENING. STORMWATER PERMIT. WOVEN WIRE SHALL BE A MIN. 14 GAUGE WITH A 6" RECEIVING WATERS WHEN THE PROJECT FALLS UNDER A CONSTRUCTION WOVEN WIRE REINFORCED FENCE IS REQUIRED WITHIN 100' UPSLOPE OF OR APPROVED EQUIVALENT. FILTER CLOTH SHALL BE EITHER FILTER X, MIRAF1100X, STABILINKA T140N 6'. EXCEED 4' AND WHEN ELONGATION IS <50%, POST SPACING SHALL NOT EXCEED FILTER-CLOTH FENCE, WHEN ELONGATION IS >50%, POST SPACING SHALL NOT POST SPACING FOR WIRE-BACKED FENCE SHALL BE 10' MAXIMUM. FOR WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION. TIES. FILTER CLOTH IS TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WOVEN WIRE FENCE IS TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE 6. 5. 4. 3. 2. 1. WOVEN WIRE SILT FENCE SWALETREESDOWN SPOUTDOOR 354.8'EXISTING DRAINPIPEPARKING LOT CHURCHELEVATION 361'ELEVATION363'OUTLETELEVATION 352.67'ELEVATION 356.4'EXISTINGGRADING PLANALL SAINTS CHURCHDOOR 354.8'10 25 40IN FEETDesign by: Craig WielengaDate: June 14, 2023Revised by: CWDate: June 19, 2023, July 27, 2023EL E V AT I ON 3 5 9'ELEVATION 357'ELEVATI ON 355'ELEVATI ON 353'EL EVATI ON 3 5 7' E L E V A T I ON 3 5 9' E L E V A T I O N 3 6 1' E L E V A T I O N 3 6 3'FOOTBRIDGENOTES:1. EXISTING DRAIN PIPES SHALL BERETAINED AND PROTECTED Design by: Craig WielengaSWALEEXCAVATIONLIMITSPROPOSEDWASTE SITETREESDOWN SPOUTEXISTING DRAINPIPENEWSIDEWALK5% SLOPE1-2% SLOPEDRAINFIELDNEW STEPSDRAINPIPENEW 8"RETAININGWALLNEW 8"RETAININGWALLPARKING LOT CHURCHDRAINELEVATION354.7'ELEVATION 361'ELEVATION363'ELEVATI ON 353'PROPOSEDGRADING PLANALL SAINTS CHURCHDRAINELEVATION354.7'EQUIPMENTAND MATERIALSTORAGE10 25 40IN FEETDate: June 14, 2023Revised by: CWDate: June 20, 2023ELEVATION 357'ELEVATION 355' ELEVATION 357'ELEVATI ON 359' ELEVATIO N 361' ELEV ATIO N 363'ELEVATI ON 351'DOOR 354.8'ELEVATION 356.4'DOOR 354.8'EL EVATI ON 3 59'355'356.6'357.3'FOOTBRIDGE4'31SWALE DETAIL SYMBOL CONSTRUCTION SPECIFICATIONS GUIDANCE. THE VT AGENCY OF NATURAL RESOURCES FOR ADDITIONAL EROSION PREVENTION & SEDIMENT CONTROL -2006- " FROM REFER TO "THE VERMONT STANDARDS & SPECIFICATIONS FOR NOTES: VERMONT DEPARTMENT OF ENVIRONMENTAL CONSERVATION ORIGINALLY DEVELOPED BY USDA-NRCS ADAPTED FROM DETAILS PROVIDED BY: NEW YORK STATE DEC TRENCH CUTOFF PROFILE A A NOT TO SCALE @ CENTERLINE CREST HEIGHT (H) 1.5'MIN B B FABRIC FILTER STONE 2"-9" TRENCH CUTOFF 1 11 1 6" 24" MAX FABRIC FILTER 18" TOE 2 2 1 SECTION A-A MIN 9" SECTION B-B 1 SLOPE(ft/ft)X=H(ft) VARIES WITH SLOPE SPACING (X) CHECK DAM BOTTOM DITCH SLOPE AS NECESSARY 3/4" STONE REVISIONS MARCH 21, 2008 WHF JANUARY 8, 2009 WHF ITEM 653.25) SECTION 653 FOR TEMPORARY STONE CHECK DAM, TYPE I (PAY THIS WORK SHALL BE PERFORMED IN ACCORDANCE WITH STONE WILL BE PLACED ON A FILTER FABRIC FOUNDATION. DAM. DOWNSTREAM DAM IS AT THE SAME ELEVATION AS THE TOE OF THE UPSTREAM CHECK DAMS SHALL BE SPACED SO THAT THE ELEVATION OF THE CREST OFTHE NECESSARY. 3/4" FILTERING STONE MAY BE ADDED TO THE FACE OF THE CHECK DAM AS EROSION WITH STONE OR LINER AS APPROPRIATE. PROTECT CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND STONE. CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES BELOW MAXIMUM DRAINAGE AREA 2 ACRES.7. 6. 5. 4. 3. 2. 1. CUTTING AROUND THE DAM. EXTEND THE STONE A MINIMUM OF 1.5' BEYOND THE DITCH BANKS TO PREVENT SWALEEXCAVATIONLIMITSPROPOSEDWASTE SITETREESDOWN SPOUTDOOREXISTING DRAINPIPENEWSIDEWALK4-5%SLOPE1-2% SLOPEDRAINFIELDNEW STEPSDRAINPIPENEW 8"RETAININGWALLNEW 8"RETAININGWALLPARKING LOT CHURCHDRAINELEVATION355'ELEVATION 361'ELEVATION363'ELEVATION 353'ELEVATION 357'EROSION PLANALL SAINTS CHURCHDOORDRAINELEVATION355'EQUIPMENTAND MATERIALSTORAGE10 25 40IN FEETNDesign by: Craig WielengaDate: June 15, 2023Revised by: CWDate: June 17, 2023 - July 27, 2023FIBER WATTLESILT FENCENOTES:1. ALL EXCAVATED AREAS WILL HAVE4" OF TOPSOIL AND WILL BE SEEDEDAND MULCHED.2. ANY SLOPE GREATER THAN A 3:1WILL HAVE EROSION CONTROL MAT.3.EROSION CONTROL MAT WILL BEUSED IN THE SWALE.4. ALL EQUIPMENT WILL BE PARKEDEVERY NIGHT IN THE PARKING LOT.5. ALL MATERIALS WILL BE STORED INTHE AREA MARKED OUT IN THEPARKING LOT.6. NO WELLS OR SEPTIC TANKS ARELOCATED ON THE PROPERTY.7. ALL EPSC MEASURES WILL BE DONEIN ACCORDANCE WITH THE "LOWRISK SITE HANDBOOK".FOOTBRIDGEFIBER WATTLEEROSION MATCHECK DAM