HomeMy WebLinkAboutSP-23-11 - Supplemental - 0113 Garden Street (12)STORMWATER MANAGEMENT SUMMARY
City Center
March 17, 2023
PERMIT STATUS:
An individual stormwater discharge permit (7736-INDS.A) was obtained for the
lands owned by South Burlington City Center, LLC. The Permit approved a
comprehensive approach to the stormwater management system for the future site
development along Market Street, as well as the future construction of Garden
Street and the associated site development. The stormwater collection system along
Market Street is subject to a separate permit associated with the City’s
reconstruction of the street and utilities. The proposed permitted stormwater
treatment practices for City Center consist of a wet pond, five constructed wetlands,
two bioretention areas, an infiltration trench/chamber system, and simple
disconnection. Note that the simple disconnection applies to the path leading to
Dumont Park.
The Permit approved a total impervious surface of 18.5 acres. The stormwater
management system provides water quality treatment for 9.65 acres of offsite
impervious surface (included in the 18.5 acres total).
CONSTRUCTION STATUS:
Site Development
146 Market Street (Allard Square)CONSTRUCTED
180 Market Street (City Hall)CONSTRUCTED
310 Market Street (Garden Apartments) CONSTRUCTED
303 Market Street (Union Place)CONSTRUCTED
112 Garden Street (Prospect Place)UNDER CONSTRUCTION
324 Garden Street (Dover Place)CONSTRUCTED
224 Market St (Catamount Run-Block B) UNDER CONSTRUCTION
268 Market St (Catamount Run-Block B) UNDER CONSTRUCTION
339 Garden St (Catamount Run-Block B) not constructed
Catamount Run – Block A (Lot N)PROPOSED
Market Street Commons (Black Bay)CONSTRUCTED
Garden Street – north & south segments PARTIALLY CONSTRUCTED
Stormwater Practices
Gravel wetland #1 (GW#1)CONSTRUCTED
Gravel wetland #2 (GW#2)CONSTRUCTED
Gravel wetland #3 (GW#3)CONSTRUCTED
Gravel wetland #4 (GW#4)not constructed
Gravel wetland #5 (GW#5)CONSTRUCTED
Storm pond #1 (pond #1)CONSTRUCTED
Infiltration system UNDER CONSTRUCTION
Bio-retention area #1 (BR#1)UNDER CONSTRUCTION
Bio-retention area #2 (BR#2)PROPOSED
Note that not all of the site development areas listed contribute fully to the listed
stormwater practices.
Gravel Wetland 1 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
303 Market Street (Union Place) 0.96 acre 0.70 acre
Block A (portion Bldg A1 rooftop) 0.34 acre 0.34 acre
112 Garden St (portion rooftop)0.32 acre 0.32 acre
Future development 0.56 acre 0.60 acre*
Approved TOTAL 2.18 acres 1.96 acres
* Note that the impervious surface exceeds the drainage area
Gravel Wetland 2 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
310 Market Street (Garden Apts) 1.07 acres 0.87 acre
324 Garden Street (Dover Place) 0.63 acre 0.53 acre
Garden Street (north of Market St) 0.66 acres 0.55 acre
Partial Lot B **1.99 acres 1.67 acres
Future development 0.23 acres 0.84 acres*
Approved TOTAL 4.58 acres 4.46 acres
* Note that the impervious surface exceeds the drainage area
** Lot B includes bioretention area #1
Gravel Wetland 3 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
Market St. Commons (Black Bay) 0.62 acres 0.60 acres
Approved TOTAL 0.62 acres 0.60 acres
Gravel Wetland 4 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
Future development 0.43 acres 0.41 acres
Approved TOTAL 0.43 acres 0.41 acres
Gravel Wetland 5 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
112 Garden St (Prospect Place)2.08 acres 1.98 acres
303 Market St (Union Place)0.37 acre 0.37 acre
Garden Street ROW (south of
Market St)1.35 acres 1.11 acres
Block A (portion Bldg A1 rooftop) 0.52 acre 0.41 acre
Future development 0.90 acre 1.23 acres*
Approved TOTAL 5.22 acres 5.10 acres
* Note that the impervious surface exceeds the drainage area
Storm Pond #1 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
Offsite 13.95 acres 9.65 acres
146 Market St. (Allard Sq. rooftop) 0.21 acres 0.21 acres
City Hall/School driveway 0.43 acres 0.27 acres
Partial Lot B 1.02 acres 0.90 acre
Block A (partial Lot N)4.26 acres 2.38 acres
Future development 0.43 acres 1.13 acres
Approved TOTAL 20.30 acres 14.54 acres
Notes:
-Allard Sq. rooftop area taken from Permit 7736-INDS application
-City Hall/School driveway taken from Operational Stormwater Permit
Application prepared by Engineering Ventures, PC
-Lot N includes bioretention area #2
-Note that the impervious surface exceeds the drainage area
Rooftop Infiltration System Drainage Data
Subwatershed description Drainage
area
Impervious
surface
112 Garden St (portion rooftop)0.32 acres 0.32 acres
Block A (portion Bldg A1 rooftop) 0.34 acre 0.34 acre
Future development 0.52 acres 0.52 acres
Approved TOTAL 1.18 acres 1.18 acres
Bioretention Area #1 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
Partial Lot B 0.60 acres 0.45 acres
Future development 0.38 acres 0.50 acres
Approved TOTAL 0.98 acres 0.95 acres
-Bioretention area #1 flows to gravel wetland #2 for storm events > WQv
Bioretention Area #2 Drainage Data
Subwatershed description Drainage
area
Impervious
surface
Block A (partial Lot N -Bldg A3
rooftop & garage ramp)0.55 acre 0.42 acre
Future development 0.37 acre 0.46 acre
Approved TOTAL 0.92 acre 0.88 acre
-Bioretention area #2 flows to Storm Pond #1 for storm events > WQv
Note that some stormwater practices are in series. For larger storm events, the
rooftop infiltration system discharges to GW#1, bioretention area #1 discharges to
GW#2, and bioretention area #2 discharges to storm pond #1.
302.5302.5
302.5302.5 302.5
LLLL
L
LL
FM
FMFMFMFM3103093093103113113103053123123143153143123
1
1
3113113113103103123123
1
2
31
2 298308 308305305308305300 300
300305308298
299305310
3
1
0
31031
0
309311310308309307309312314314DDDRDRDRDRDRD
FM 305307UUUUUU312311311311310310 3
1
0
3
10
311312MARKET STLOT M410' WIDE SHARED USE PAVED PATH6' WIDE CONCRETE SIDEWALKEX. SIDEWALKEXISTING BOXSEE PLANS BY WAGNERHODGSON FOR LAYOUT ANDLANDSCAPING IN MINI PARKGARDEN STREETLOT M5110.2'
1
0
0
.0
'209.1'NEW CONCRETE SIDEWALK6'
C
ON
CR
E
TE
S
I
D
EW
A
LKPROPOSED 61 UNITRESIDENTIAL BUILDINGBIKE RACKS(4 HOOPS)5'
CONCRE
T
E
S
I
D
EW
A
L
K20' R.30' R.10' R.20' R.22'20'20' R.CONCRETE CURBCONC
R
E
T
E
CU
R
B RAMPTRASH & RECYCLING CONTAINERSTO BE LOCATED IN PARKING GARAGEBLDG B1MARKET STREETCI
T
Y
H
A
L
L
/
SCHOO
L
DR
I
V
EWAY
FU
TURE
PUB
L
IC
S
TREE
T
3
2
4
'LOT B-B2LOT B-B1TRANSECT T-4TRANSECT T-5TRANSECT T-4TRANSECT T-5BUILDING A2BUILDING A1BUILDING A3FU
TUR
E
PUB
L
IC
S
TREE
TBIOERETENTION AREAPOCKET PLAZAEXISTING PAVED DRIVECLASS 2 WETLANDEXISTING PAVED PARKINGEXISTINGPAVEDPARKINGEL
E
CELEC ELECSOUTH BURLINGTON CITY CENTERCATAMOUNT RUN - PH.IIMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing01-25-23KBABRB>HE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWNSTORM POND 1STLOT N (BLOCK A)STORMWATER EXHIBITGRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.#155 MARKET STREETMIXED USE BUILDINGLOT BBUILDING B2LOT BBUILDING B1#112 GARDEN STREET#303 MARKETSTREETBIO-RETENTION AREAOVERFLOWS TO STORM PONDTO GW#5
TO INFILTRATIONSYSTEM (OVERFLOWTO GW#1)FROM CITY HALL / SCHOOLDRIVEWAY & BLOCK B (TOSTORM POND)FROM OFFSITETO STORM PONDTO GW#5
PORTION BUILDING A1ROOFTOP TO GW#5PORTION BUILDING A1 ROOFTOPTO INFILTRATION SYSTEMBUILDING A1 ROOFTOPTO BIORETENTION AREARAMP TOBIORETENTION AREA(VIA PUMP STATION)LOT N DRAINAGE AREATO STORM PONDPRETREATMENT UNITFOR OFFSITE RUNOFFPRETREATMENT UNITFOR SITE DEVELOPMENTRUNOFF03-17-23MAINTENANCE PLANGENERALINSPECT SYSTEM ANNUALLY IN ACCORDANCE WITH DEC PERMIT REQUIREMENTS. SUBMITCOMPLETED ANNUAL INSPECTION FORM TO DEC STORMWATER MANAGEMENT PROGRAM BYJULY 1 5TH OF EACH YEAR.BIORETENTION-INSPECT SEASONALLY TO ENSURE THAT VEGETATION IS WELL ESTABLISHED AND REMOVEWEEDS AND INVASIVE SPECIES. ENSURE THAT NO VEGETATION IS RESTRICTING ORCONCENTRATING THE FLOW PATH THROUGH THE SYSTEM.-ANNUALLY INSPECT FOREBAY SEDIMENT DEPTH AND REMOVE AND PROPERLY DISPOSEWHEN SEDIMENT ACCUMULATION EXCEEDS 12" AS MEASURED ON THE FIXED VERTICALSEDIMENT MARKER.-IF STANDING WATER REMAINS FOR GREATER THAN 72 HOURS AFTER A PERIOD OF HEAVYRAINFALL INSPECT RISERS AND CLEANOUTS FOR BLOCKAGES, AND REMOVE ANYBLOCKAGE DISCOVERED.-ANNUALLY INSPECT INLETS, OUTLETS, AND SURFACE AREA TO ENSURE THAT NOVEGETATION IS RESTRICTING OR CONCENTRATING THE FLOW PATH THROUGH THESYSTEM.-DURING WINTER MONTHS SNOW SHALL NOT BE PUSHED INTO THE BIORETENTION SYSTEM.GRAVEL WETLAND-INSPECT SEASONALLY TO ENSURE THAT VEGETATION IS WELL ESTABLISHED AND REMOVEWEEDS, INVASIVE SPECIES, DECAYING VEGETATION, LITTER AND DEBRY. ENSURE THAT NOVEGETATION IS RESTRICTING OR CONCENTRATING THE FLOW PATH THROUGH THESYSTEM.-IF STANDING WATER REMAINS FOR GREATER THAN 72 HOURS AFTER A PERIOD OF HEAVYRAINFALL INSPECT RISERS AND CLEANOUTS FOR BLOCKAGES, AND REMOVE ANYBLOCKAGE DISCOVERED.-DURING WINTER MONTHS SNOW SHALL NOT BE PUSHED INTO THE BIORETENTION SYSTEM.WET POND-ANNUALLY INSPECT INLETS AND OUTLET FOR VEGETATION THAT IS RESTRICTING ORCONCENTRATING FLOW PATH THROUGH THE SYSTEM. REMOVE ANY VEGETATIONOBSTRUCTING FLOW.CATCHBASINS/MANHOLES /SWIRL SEPARATORS-INSPECT ANNUALLY. REMOVE SEDIMENT WHEN SEDIMENT ACCUMULATION REACHES 50%OF STORAGE CAPACITY OF THE SUMP.-ANNUALLY INSPECT FRAME, GRATE, AND RISERS FOR DETERIORATION.