INTRODUCTION:
This application proposes the phased construction of the following three buildings
on Block A (Lot N):
Building A1 – a mixed use building with a parking garage in the basement,
13,500 square feet of commercial tenant space and amenity/support space
on the first (street) floor, and 101 dwelling units.
Building A2 – a mixed use building with a parking garage in the basement,
13,500 square feet of commercial tenant space and amenity/support space
on the first (street) floor, and 62 dwelling units.
Building A3 – a multi-family building with 50 dwelling units and a parking
garage in the basement.
The uses within the commercial spaces will be determined by market demand.
Potential uses include a mix of restaurants, retail, and professional services. The
interior layout, size, and exact footprints of the commercial tenant spaces will also
be determined by the market, while meeting the requirements of the form based
code.
Construction will begin with Building A1, followed by Building A2, and lastly
Building A3.
SITE:
The buildings will be constructed on Block A (Lot N) within South Burlington’s form
based code City Center zoning district. Block A (Lot N) is bisected by the T-4 & T-5
transects. The site is located west of Market Street, north of Garden Street, and
south of the future public street adjacent to #155 Market Street.
Apartment buildings under construction are located across Garden Street to the
south. Mixed use buildings are under construction across Market Street. An existing
mixed use building is located to the north at #155 Market Street. City Hall, the
library, and senior center are located to the northeast.
CONSTRUCTION PHASING:
Construction of the three buildings will be staggered over about 20 months. The
following outlines the proposed approximate start of construction and occupancy
dates:
Catamount Run – Block A (Lot N)
Proposed Commencement of Construction & Occupancy
Building Construction Occupancy
A1 November 2023 June 2025
A2 November 2023 June 2025
A3 March 2024 March 2025
PARKING:
Shared surface parking for the three buildings will be provided within the interior of
the block. Parking spaces in each of the garages will likely be assigned to residents.
In addition, on-street parking will be available along Market Street and Garden
Street.
A total of 254 parking spaces are proposed for 213 dwelling units and
approximately 27,000 square feet of commercial tenant space. The proposed
parking is less than the maximum of 2 spaces per dwelling unit. There is no
minimum parking demand for the commercial uses. The commercial uses will likely
be focused on serving City Center residents, reducing their parking demand.
Short term bike parking is provided along Market Street and at the rear of each
building near the lobby entrances. Long term bike parking is provided in the
parking garage for each building. Bike parking will be located at the front of the
garage parking spaces, as well as in common areas within the garage. A vertical bike
rack will be wall mounted, staggered between vehicle parking spaces (the vehicle
space and bike space will be assigned to the same resident). The balance of the long
term bike spaces will be provided in common areas using vertical wall mounted
racks.
OPEN SPACE:
The open space requirement will be met using a combination of onsite and offsite
open space elements. The Large Development Area open space credit utilizing the
City Stormwater Park located off Market Street will be used to meet 50% of the open
space requirement. The balance of the required open space will be met with a rain
garden, pocket plaza, and multiple snippet/parklet spaces (see the Open Space
narrative for additional details).
INCLUSIONARY / AFFORDABLE HOUSING:
Miscellaneous Application #MS 18-05 established compliance with inclusionary
zoning requirements for current and future residential development within the
Covered Development, which includes Block A (Lot N). The proposed buildings
involve construction of 213 market rate dwelling units. Inclusionary housing units
are not required for this application, based upon the findings for the Covered
Development in the Miscellaneous Application approval. As required by conditions
10, 11, & 13 of the approval, an updated summary of the inclusionary and market
rate units including this application is attached.
WATER & WASTEWATER FLOWS:
The following summarizes the water and wastewater design flows for the
residential portion of the project. The design flows for the commercial uses will be
determined once the uses are known.
Catamount Run – Block A (Lot N)
Residential Water Design Flow
Building Dwelling Units Unit Design Flow Total Design
Flow
A1 42 140 GPD/bedroom 22,400 GPD59280 GPD/bedroom
A2 30 140 GPD/bedroom 13,160 GPD32280 GPD/bedroom
A3 11 140 GPD/bedroom 12,460 GPD39280 GPD/bedroom
Catamount Run –Block A (Lot N)
Residential Wastewater Design Flow
Building Dwelling Units Unit Design Flow Total Design
Flow
A1 42 140 GPD/bedroom 18,270 GPD59210 GPD/bedroom
A2 30 140 GPD/bedroom 10,920 GPD32210 GPD/bedroom
A3 11 140 GPD/bedroom 9,730 GPD39210 GPD/bedroom
STORMWATER:
See the attached Stormwater Management Narrative.
TRAFFIC IMPACT FEES:
The Applicant requests that the approval of this application include a
recommendation that the City Council approve a credit against the traffic impact fee
for the value of the ‘in-kind’ contribution associated with the construction of the
south segment of Garden Street.
Final Plat application #SD-19-24 estimated the construction cost of the southerly
segment of Garden Street to be $1,520,000.00. A portion of this ‘in-kind’