Loading...
HomeMy WebLinkAboutSP-23-11 - Supplemental - 0225 0267 Market Street (7)Construction Phasing PlanMarch 17, 2023, Revised June 15,2023NOTES:1.THIS PLAN IS INTENDED ONLY TO SHOW THE SEQUENCING ASSOCIATEDWITH THE PHASED CONSTRUCTION OF THE THREE BUILDINGS, SITEIMPROVEMENTS, AND LANDSCAPING. REFER TO THE LANDSCAPE PLANSAND CIVIL PLANS FOR DESIGN INFORMATION RELATED TO UTILITIES,GRADING, PLANTINGS, SITE FURNITURE AND AMENITIES.2.ALTHOUGH A PORTION OF THE RAIN GARDEN IMPROVEMENTS (PLAZASHADE STRUCTURE) WILL BE CONSTRUCTED WITH BUILDING A2, THE RAINGARDEN WILL BE COMPLETED WITH BUILDING A3.BUILDING CONSTRUCTION & OPEN SPACE SEQUENCING:(1)BUILDING A1REQUIRED OPEN SPACE = 6,735 SF-LDA O/S CREDITOPEN SPACE AREA = 3367.5 SF-SNIPPETOPEN SPACE AREA = 990 SF-SNIPPETOPEN SPACE AREA = 1,300 SF-POCKET PLAZAOPEN SPACE AREA = 2,400 SFOPEN SPACE PROVIDED = 8,057.5 SF(2)BUILDING A2CUMULATIVE REQUIRED OPEN SPACE = 11,130 SF-LDA O/S CREDITOPEN SPACE AREA = 2,197.5 SF-SNIPPETOPEN SPACE AREA = 1,175 SFCUMULATIVE OPEN SPACE PROVIDED = 11,430 SF(3) BUILDING A3CUMULATIVE REQUIRED OPEN SPACE = 14,130 SF-LDA O/S CREDITOPEN SPACE AREA = 1,500 SF-RAIN GARDENOPEN SPACE AREA = 3,500 SFCUMULATIVE OPEN SPACE PROVIDED = 16,430 SFA3A1A2COMPLETION OF THE RAIN GARDEN ANDPLANTINGS WILL BE WITH BUILDING A3POCKET PLAZA TO BE COMPLETEDWITH OCCUPANCY OF BUILDING A1SNIPPETSNIPPETSNIPPETINSTALLATION OF THE PLAZA SHADESTRUCTURE AND ADJACENT RETAININGWALL WILL BE WITH BUILDING A2