Loading...
HomeMy WebLinkAboutSP-23-11 - Plans - Record - 0113 Garden StreetSpace Recommendations: Distance from ground to boom of rack: 42” Ceiling height: Minimum 92” Side wall to rack center: Minimum 20”, recommended 24” Distance between racks center to center: Minimum 28”, recommended 31” 11 gauge steel ¼” x 2” flat steel hook mounts 3/4” solid steel locking bar 7/16” holes to accommodate 3/8” bolt Top view Product Materials and Benefits: Mount Options: Color Options: Wall Mount Standard Color Black DoubleUp Rack (w/locking bar) Model: 543-4002 Side View Front View 38.05 30.22 8.88 0.125 0.38 0.25 19.16 23.52 23.09 26.59 45° 220 Congress Park Dr. #215 Delray Beach, FL 33445www.theparkcatalog.com Ph: 800-695-3503 C ATA L O G Finishes: Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1. Sanded Down 2. Washed and Dried 3. Zinc Primer 4. Powder Coat 5. UV Clear Topcoat WALL MOUNT RACK AT FRONT OF EACH GARAGE PARKING SPACE Space Recommendations: Ceiling height: Minimum 95” Side wall to rack center:Minimum 20”, recommended 24” Distance between racks center to center: Minimum 28”, recommended 31” 11 gauge steel¼” x 2” flat steel hook mounts3/4” solid steel locking bar7/16” holes to accommodate 3/8” bolt 2” x 2” square support bars Product Materials and Benefits: Finishes: Mount Options: Color Options: Free Standing Standard Color Black Size Options: 2 Rack / 4 Bike (41” Span, Approx 55” w/bikes) 3 Rack / 6 Bike (67” Span, Approx 81” w/bikes) 4 Rack / 8 Bike (93” Span, Approx 108” w/bikes) 5 Rack / 10 Bike (119” Span, Approx 134” w/bikes) DoubleUp Single Sided Rack Model: 543-4010 3350 NW Boca Raton Blvd., Boca Raton, FL 33431 1-866-280-9894 | sales@theparkcatalog.com C A T A L O G 36" Depth 36" Depth 36" Depth 41" Length Span 43.5" Average Depth w/bikes 43.5" Average Depth w/bikes 43.5" Average Depth w/bikes 36" Depth 43.5" Average Depth w/bikes 67" Length Span 93" Length Span 119" Length Span 2 Rack / 4 Bike 3 Rack / 6 Bike 4 Rack / 8 Bike 5 Rack / 10 Bike Powder Coat Our powder coat finish assures a high level of adhesion and durability by following these steps: 1.Sanded Down 2.Washed and Dried 3.Zinc Primer 4.Powder Coat 5.UV Clear Topcoat 80”95”MinimumHeightClearance WALL MOUNT RACK FOR COMMON BIKE STORAGE (TO BE MOUNTED FLUSH AGAINST PARKING GARAGE WALL) + 303.50 302.10 + E ET +313.2015'R25'RE T + 315.02 315.34 + + +314.22 314.50 + 314.25 314.90 +314.10 ++ 314.85+ 314.13313.95 + 313.90 +313.60 ++ 313.88+314.58 +314.13 +313.84 +313.51 + 313.41 + 31 4.75 + 314.34 + 313.64+ 315.28 + 314.95 +314.50 +++++ 313.30 + 314.40 313.50 + +312.70 315.40 + + 313.70 311.30+ 313.60 + + 313.50+ 313.85 +315 315 315315 WWS GGGGGGGUD UD UD UD UD UD UD UD UD UD YDHHDY 3133103 10 310310 310 311 308309314 314 GGGGGGG G G G G G G TTTTTTTETL LLL L L L L L L L EEWW WWWWWWWW W W W W W WWS SSSSSSSSSSSSS SSS S S S RD RDD D S S HYD CC S S 5'-0'' HIGH RTU ON 24'' HIGH BASE 5'-0'' HIGH RTU ON 24'' HIGH BASE ROOF EQUIPMENT SCREEN AA 26 38 38 U U 25 1 1V Z Z V1 Z1 15 6 15.2 15.4 24.6 H 5' - 0"5' - 0" 6' - 1"9' - 1"7' - 6"5' - 0"PROJECT : REVISION/DATE : 1" = 40'-0" SOLAR-READY ZONE 22-374 06-20-2023 A - 01.1 CATAMOUNT RUN - BLOCK A - BUILDING A1 SOLAR-READY ZONE Total rooftop area = 29, 530 SF Minimum solar-ready zone = 11, 812 SF 40% X 29,530 SF = 11,812 SF Total solar-ready zone available = 11,911 SF (solar-ready zone areas shown subject to adjustment with final design of mechanical equipment) The solar-ready zone shall comply with 2015 NFPA 1, 11.12 Photovoltaic Systems. The solar-ready zone shall include a collateral dead load of not less than 5 psf in gravity and lateral design calculations. Interconnection pathways shall be provided for routing of conduit or piping from the solar- ready zone to the electrical service panel or service hot water system. The main electrical service panel shall have a reserved space to allow installation of a dual pole circuit breaker for future solar electric installation and labeled ''FOR FUTURE SOLAR ELECTRIC''. The reserved space shall be positioned at the end of the panel that is opposite from panel supply conductor connection. A permanent certificate, indicating the solar- ready zone and other requirements, shall be posted near the electric distribution panel, water heater, or other conspicuous location. 5 4 2 1 3 PROJECT : REVISION/DATE : VIEW 1 22-374 05-24-2023 A - 01.2 CATAMOUNT RUN - BLOCK A - BUILDING A1 PROJECT : REVISION/DATE : VIEW 2 22-374 05-24-2023 A - 01.3 CATAMOUNT RUN - BLOCK A - BUILDING A1 PROJECT : REVISION/DATE : VIEW 3 22-374 05-24-2023 A - 01.4 CATAMOUNT RUN - BLOCK A - BUILDING A1 PROJECT : REVISION/DATE : VIEW 4 22-374 05-24-2023 A - 01.5 CATAMOUNT RUN - BLOCK A - BUILDING A1 PROJECT : REVISION/DATE : VIEW 5 22-374 05-24-2023 A -01.6 CATAMOUNT RUN - BLOCK A - BUILDING A1 PROJECT : REVISION/DATE : RENDERING 22-374 03-22-2023 A00 CATAMOUNT RUN - BLOCK A - BUILDING A1 ARTIST'S RENDITION - FOR DISCUSSION PURPOSES ONLY. SEE DESIGN PLANS FOR DETAILS. 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE 315.10 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - UNITS 99' - 0" LEVEL 1 - MARKET STREET COMMERCIAL 152' - 8 1/2" TOP OF PARAPET 3 154' - 2 1/2" TOP OF PARAPET 4 BRICK GLEN-GERYEASTLINE HARDIEPLANK - LAP SIDINGCOLOR ARTIC WHITEBRICK WATSON BRICK CO.BERGEN KT COMPOSITE WOOD SIDING 5' - 0"12' - 8 1/2"10' - 9"10' - 9"14' - 0"1' - 0"1' - 0"2' - 8"3' - 1" 3' - 2" BRICK GLEN-GERYEASTLINE 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - UNITS 154' - 2 1/2" TOP OF PARAPET 4 JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST 14' - 0"10' - 9"10' - 9"12' - 8 1/2" 2' - 0"3' - 0"HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE COMPOSITE WOOD SIDING 3' - 1" PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A01 CATAMOUNT RUN - BLOCK A - BUILDING A1 MARKET STREET ELEVATION PATIO ELEVATION - FACING A2 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 2 1/2" TOP OF PARAPET 1 101' - 0" LEVEL 1 - UNITS 152' - 8 1/2" TOP OF PARAPET 3HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE BRICK WATSON BRICK CO. BERGEN KT COMPOSITE WOOD SIDING JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE 3' - 1" HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE BRICK WATSON BRICK CO. BERGEN KT JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST BRICK GLEN-GERY EASTLINE COMPOSITE WOOD SIDING 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 2 1/2" TOP OF PARAPET 1 101' - 0" LEVEL 1 - UNITS 152' - 8 1/2" TOP OF PARAPET 3 154' - 2 1/2" TOP OF PARAPET 4 BRICK WATSON BRICK CO. BERGEN KT BRICK GLEN-GERY EASTLINE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7069 IRON ORE 2' - 7" PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A02 CATAMOUNT RUN - BLOCK A - BUILDING A1 GARDEN STREET ELEVATION - SECTION A GARDEN STREET ELEVATION - SECTION CGARDEN STREET ELEVATION - SECTION B COMPOSITE WOOD SIDINGJAMES HARDIECEMENT BOARD PANEL COLOR LIGHT MIST HARDIEPLANK - LAP SIDING COLOR ARTIC WHITEJAMES HARDIECEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIECEMENT BOARD PANEL COLOR RICH ESPRESSO 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - UNITS 99' - 0" LEVEL 1 - MARKET STREET COMMERCIAL 152' - 8 1/2" TOP OF PARAPET 3 154' - 2 1/2" TOP OF PARAPET 4 COMPOSITE WOOD SIDINGJAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE 99' - 0" LEVEL 1 - MARKET STREET COMMERCIAL JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIE CEMENT BOARD PANEL COLOR RICH ESPRESSO JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7069 IRON ORE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W.6150 UNIVERSAL KHAKI 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 101' - 0" LEVEL 1 - UNITS 152' - 8 1/2" TOP OF PARAPET 3 154' - 2 1/2" TOP OF PARAPET 4 COMPOSITE WOOD SIDINGHARDIEPLANK - LAP SIDING COLOR ARTIC WHITE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A03 CATAMOUNT RUN - BLOCK A - BUILDING A1 BACK ELEVATION - SECTION A BACK ELEVATION - SECTION B BACK ELEVATION - SECTION C LATERAL ELEVATION 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - UNITS 99' - 0" LEVEL 1 - MARKET STREET COMMERCIAL 152' - 8 1/2" TOP OF PARAPET 3 10' - 9"10' - 9"15' - 0"B1C1 A2 A1 A3 A2 A1 A2 A1 A2 A1 A2 A1 B1 B1 B1B1 B1 B1 B1 B1 B1B1 B1 B2B2B2 B1B1 B1B1 C1 C1C1 C1 C1C1 C1 C1 C1 C1 C1 A2 A1A2A1 A2A1 A2A1 D1 D1 D1 D1 D1 D1 31' - 8"7' - 0"14' - 6"8' - 9"32' - 10"18' - 3"16' - 3"8' - 3"27' - 3"20' - 11" 185' - 8" 4' - 0"4' - 1" 154' - 2 1/2" TOP OF PARAPET 4 11' - 3"8' - 6"8' - 5"GLAZING BUILDING BREAKS BUILDING FRONTAGE14' - 6"32' - 4"16' - 5"48' - 1" B1A2 A1 B1A2 A1 3' - 1" 16' - 11"7' - 3"18' - 6"9' - 5"9' - 5"9' - 5"19' - 10"24' - 8"12' - 9"31' - 8" PROJECT : REVISION/DATE : 1/16" = 1'-0" BUILDING REQUIREMENTS - PRIMARY FAÇADE 22-374 03-22-2023 A04 CATAMOUNT RUN - BLOCK A - BUILDING A1 WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF UPPER FACADE GLAZING TOTAL UPPER FACADE AREA: 6323 SF GLAZING REQUIRED (30%): 1896 SF GLAZING PROVIDED (31%): 1972 SF QTY.TOTAL AREA 407 SF 1972 SF BUILDING FRONTAGE TOTAL FACADE LENGTH: 185'-8'' FRONTAGE BUILDOUT PRIMARY BUILD TO ZONE: 143'-0'' (77%) FIRST STORY GLAZING FACADE LENGHT: 185'-8'' GLAZING REQUIRED (80% OF THE LENGHT): 148'-5'' GLAZING PROVIDED (83% OF THE LENGHT): 151'-4'' TRANSPARENT REQUIRED (75%): 111'-3'' TRANSPARENT PROVIDED (100%): 151'-4'' 11 A2 7' - 0''2' - 8''19 SF 209 SF11 A3 9' - 0''8' - 0''72 SF 72 SF1 B1 7' - 0''4' - 0''28 SF 504 SF18 C1 5' - 6''4' - 0''22 SF 264 SF12 D1 8' - 6''8' - 0''68 SF 408 SF6 B2 9' - 0''4' - 0''36 SF 108 SF3 MARKET STREET ELEVATION UPPER FACADE GLAZING +312.57314.50+ GGGG WET15'R 25'R+ 313.41 + 314.75 + 314.34 + 313.64 + 315.28 315 HD YGG L L L L W SS 119 VEST. 39' - 5"27' - 5"35' - 7"19' - 8"21' - 8"3' - 6"3' - 0" C0MMERCIAL T5T4 COMMERCIAL RESIDENTIAL 2 8 ' - 0 " 1 6 ' - 6 " 55' - 7" 2' - 10" 43' - 11" 31' - 10" 30' - 8" 34' - 4" 13' - 3" 1 8 ' - 4 " 54' - 4"4 ' - 1 " PROJECT : REVISION/DATE : Comme indiqué BUILDING REQUIREMENTS - ENTRANCES 22-374 03-22-2023 A05 CATAMOUNT RUN - BLOCK A - BUILDING A1 ENTRANCES MAX. DISTANCE BETWEEN PUBLIC ENTRANCES: 40'-0'' PROVIDED: 39'-5'' MAX. AVERAGE BETWEEN PUBLIC ENTRANCES: 30'-0'' PROVIDED: 21'-5'' PRIMARY FAÇADE - MARKET STREET SECONDARY FAÇADE - GARDEN STREET NNENTRANCES MAX. DISTANCE BETWEEN OPERABLE ENTRANCES: RESIDENTIAL FIRST STORY: 72'-0''(T4) - PROVIDED: 57'-7'' PUBLIC NON RESIDENTIAL FIRST STORY: 60'-0''(T5) - PROVIDED: 58'-5' MAX. AVERAGE BETWEEN OPERABLE ENTRANCES: RESIDENTIAL FIRST STORY: 54'-0''(T4) - PROVIDED: 34'-5'' PUBLIC NON RESIDENTIAL FIRST STORY: 45'-0''(T5) - PROVIDED: 30'-4' 60 x 3560 x 3560 x 3560 x 3560 x 35ET + 313.27 +312.57 +314.13 +313.84 +313.51 + 313.41 + 314.75 + 314.34 + 313.64 + 315.28 313.50 + +309.60 314. 4+313. 9 0 + + 314.40 314.40 + 314.05 + +311.60 313.50 + +312.70 315.50 + 315.40 + 313.50 + 313.00+ + 313.70 313.60 + + 313.50 314. 50 + 315 315 YDH 310 309 GGGGL L L LLW W W W W W SSSECTION A SECTION B SECTION CT4T5 6' - 0"MARKET STREETG A R D E N S T R E E T T5T418' - 0"9' - 0"79' - 5'' 74' - 11'' 155' - 2'' 52'- 3'' 66' - 10" 7' - 11" P RIM A R Y B UIL D-T O-Z O N E PRIMARY BUILD-TO-ZONE PROJECT : REVISION/DATE : Comme indiqué BUILDING REQUIREMENTS - SECONDARY FAÇADE 22-374 06-20-2023 A06 CATAMOUNT RUN - BLOCK A - BUILDING A1 UPPER FACADE GLAZING (T4) TOTAL UPPER FACADE AREA: 6932 SF GLAZING REQUIRED (20%): 1387 SF GLAZING PROVIDED (30%): 2082 SF (100% TRANSPARENT) BUILDING FRONTAGE TOTAL FACADE LENGTH: 361'-9'' FRONTAGE BUILDOUT PRIMARY BUILD-TO-ZONE: 293'-1' (80%) FIRST STORY GLAZING (T4) - FACADE LENGHT: 207'-5'' GLAZING REQUIRED (20%): 41'-5'' GLAZING PROVIDED (49%): 102'-0'' TRANSPARENT REQUIRED (75%): 76'-6'' TRANSPARENT PROVIDED (85%): 87'-0'' (T5) - FACADE LENGHT: 153"-3'' GLAZING REQUIRED (40%): 61'-3'' GLAZING PROVIDED (73%): 112' TRANSPARENT REQUIRED (75%): 84'-0'' TRANSPARENT PROVIDED (93%): 105'-4'' WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF QTY.TOTAL AREA 333 SF 2082 SF 09 A2 7' - 0''2' - 8''19 SF 171 SF B1 7' - 0''4' - 0''28 SF 504 SF18 B2 9' - 6''4' - 0''38 SF 00 C1 5' - 6''4' - 0''22 SF 462 SF21 D1 8' - 6''8' - 0''68 SF 612 SF09 09 A3 9' - 6''8' - 0''76 SF -00 NOTE: SEE SHEET A-06 FOR DETAILS OF EACH SECTION GARDEN STREET ELEVATION (T5) TOTAL UPPER FACADE AREA: 5425 SF GLAZING REQUIRED (20%): 1085 SF GLAZING PROVIDED (29%): 1570 SF (100% TRANSPARENT) WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF QTY.TOTAL AREA 296 SF 1570 SF 08 A2 7' - 0''2' - 8''19 SF 152 SF B1 7' - 0''4' - 0''28 SF 700 SF25 B2 9' - 6''4' - 0''38 SF 76 SF2 C1 5' - 6''4' - 0''22 SF 66 SF03 D1 8' - 6''8' - 0''68 SF 204 SF03 08 A3 9' - 6''8' - 0''76 SF 76 SF1 T4 T5 - NO SCALE 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 3" TOP OF PARAPET 1 101' - 0" LEVEL 1 - UNITS 152' - 9" TOP OF PARAPET 3 9' - 0"6' - 0"20' - 9"28' - 2"10' - 4"23' - 9"10' - 7"23' - 1"10' - 7"22' - 1"5' - 10" 9' - 0" 4' - 0"4' - 0"4' - 0"4' - 0" 9' - 0" 4' - 0"4' - 0" 8' - 0" 4' - 0"4' - 0" 8' - 0" 4' - 0"4' - 0"4' - 0" 155' - 2"3' - 6"12' - 9"10' - 9"10' - 9"14' - 0"1' - 0"52' - 9"A2A1 A2A1 A2A1 B1 B1 B1 B1 B1 B1 B1 B1 C1 C1 C1 C1 C1 C1C1 C1 C1 C1 C1 C1C1 C1 C1 C1 C1 C1 C1 C1 C1 B1 D1 D1 D1 D1 D1 D1 D1 D1 D1 B1 B1 B137' - 9"34' - 3"28' - 4"9' - 10"23' - 11"20' - 8"16' - 4"5' - 11"22' - 1" 52' - 3"74' - 11" 8' - 0" 4' - 0"8' - 0"4' - 0"4' - 0"6' - 2"15' - 7" A2A1 A2A1 A2A1 A2 A1 A2 A1 A2 A1 A2A1 A2A1 A2A1 A2 A1 A2 A1 A2 A1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 T4 T5 9' - 3" 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 3" TOP OF PARAPET 1 101' - 0" LEVEL 1 - UNITS 152' - 9" TOP OF PARAPET 3 154' - 3" TOP OF PARAPET 4 26' - 0"7' - 9"12' - 5"10' - 0"12' - 10"10' - 5" 79' - 5"1' - 6"3' - 6"12' - 9"10' - 9"10' - 9"14' - 0"10' - 1"4' - 0"24' - 7" B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 A2 A1 A2 A1 C1 C1 C1 D1 D1 D1 B2 B2 A3 6' - 2"10' - 3"8' - 1"34' - 3"PROJECT : REVISION/DATE : 1/16" = 1'-0" BUILDING REQUIREMENTS - SECONDARY FAÇADE 22-374 06-20-2023 A07 CATAMOUNT RUN - BLOCK A - BUILDING A1 SECTION A SECTION B SECTION C TOWARDS A2 6 6 2 1 12 15 18 10 7 2 005 ELEVATOR MECH. 007 ELEVATORS 006 LOBBY 002 STAIR 1 008 STAIR 2 004 MECH.24' - 7"25' - 4" 001 ELEC. 009 ELEC. 010 MECH. PROJECT : REVISION/DATE : 1/32" = 1'-0" BUILDING REQUIREMENTS - PARKING 22-374 06-20-2023 A08 CATAMOUNT RUN - BLOCK A - BUILDING A1 PARKING VEHICULES: 79 SPACES BIKES: 104 SPACES N TOWARDS A2 6 6 2 1 12 15 18 10 7 2 005 ELEVATOR MECH. 007 ELEVATORS 006 LOBBY 002 STAIR 1 008 STAIR 2 004 MECH.24' - 7"25' - 4" 001 ELEC. 009 ELEC. 010 MECH. PROJECT : REVISION/DATE : 1/32" = 1'-0" BUILDING REQUIREMENTS - PARKING 22-374 07-04-2023 A08 CATAMOUNT RUN - BLOCK A - BUILDING A1 PARKING VEHICULES: 79 SPACES BIKES: 104 SPACES N 60 x 3560 x 3560 x 3560 x 3560 x 35ET +312.57 +314.13 +313.84 +313.51 + 313.41+ 314.75 + 314.34+ 313.64 + 315.28 ++ 314.40 +312.70 315.40 + + 313.70 315315 YDH 310309GGGGL L L L L W MARKET STREETGARDEN STREET 111 TYPE B3 101 TYPE B2 102 TYPE B4 103 TYPE C1 104 TYPE C1 105 TYPE D3 106 TYPE D4 107 TYPE C1 108 TYPE C1 109 TYPE C1 110 TYPE C3 126 STAIR 2 100' - 0" 99' - 0" 101' - 0" 101' - 0" 115 GYM 113 PACKAGE ROOM 112 MAIL ROOM 114 VEST. 121 VEST. 124 PET WASH 122 LAUNDRY 117 TOILET 116 TOILET (13801 ft²) 118 COMMERCIAL 119 VEST. 125 STAIR 1 120 LOBBY 127 ELEVATORS T5 T4 123 JANITOR PROJECT : REVISION/DATE : 1" = 30'-0" PLAN - LEVEL 1 22-374 05-24-2023 A09 CATAMOUNT RUN - BLOCK A - BUILDING A1 N 221 TYPE B1 224 TYPE D2 226 TYPE A1 215 TYPE C1 216 TYPE C4 217 TYPE C1 214 TYPE C1 218 TYPE D5 227 TYPE A1 234 STAIR 2 223 TYPE D6 220 TYPE A1 219 TYPE C2 200 CORRIDOR 202 TYPE A1203 TYPE A1204 TYPE A4 206 TYPE C1 207 TYPE C1 208 TYPE D1 209 TYPE D1 210 TYPE C1 211 TYPE C1 212 TYPE C1 213 TYPE C3 222 TYPE C2 225 TYPE B1 205 TYPE A1 201 TYPE A5 230 TYPE A1 235 ELEVATORS 233 STAIR 1 228 TYPE A3 229 TYPE A2 232 LAUNDRY 231 JANITOR PROJECT : REVISION/DATE : 1" = 30'-0" PLAN - LEVEL 2-3-4 22-374 03-22-2023 A10 CATAMOUNT RUN - BLOCK A - BUILDING A1 N 302.10 + E E EEE +314.58 +314.13 ++ +314.65 ++ ++314.72 313.50 ++312.70 315.50 +315.40 +311.85 +311.30+313.60 + +314.40 + + 313 312 313312 315 312 314 310310 310309 308 309 G GGGG GGGGG GGTTTTTTUEUE UEUE UEUEUEUEUEWWWWW SSSSSSS SSSS HY D S S5'-0'' HIGH RTU ON 24'' HIGH BASE 5'-0'' HIGH RTU ON 24'' HIGH BASE ROOF EQUIPMENT SCREEN 24 24 AA 1 1 13 M 10 X X 7' - 1"5' - 6"5' - 0"PROJECT : REVISION/DATE : 1" = 40'-0" SOLAR-READY ZONE 22-374 05-24-2023 A - 01.1 CATAMOUNT RUN - BLOCK A - BUILDING A2 SOLAR-READY ZONE Total rooftop area = 19, 366 SF Minimum solar-ready zone = 7, 746 SF 40% X 19,366 SF = 7,746 SF Total solar-ready zone available = 7,750 SF (solar-ready zone areas shown subject to adjustment with final design of mechanical equipment) The solar-ready zone shall comply with 2015 NFPA 1, 11.12 Photovoltaic Systems. The solar-ready zone shall include a collateral dead load of not less than 5 psf in gravity and lateral design calculations. Interconnection pathways shall be provided for routing of conduit or piping from the solar- ready zone to the electrical service panel or service hot water system. The main electrical service panel shall have a reserved space to allow installation of a dual pole circuit breaker for future solar electric installation and labeled ''FOR FUTURE SOLAR ELECTRIC''. The reserved space shall be positioned at the end of the panel that is opposite from panel supply conductor connection. A permanent certificate, indicating the solar- ready zone and other requirements, shall be posted near the electric distribution panel, water heater, or other conspicuous location. 1 2 3 4 5 PROJECT : REVISION/DATE : VIEW 1 22-374 05-24-2023 A - 01.2 CATAMOUNT RUN - BLOCK A - BUILDING A2 PROJECT : REVISION/DATE : VIEW 2 22-374 05-24-2023 A - 01.3 CATAMOUNT RUN - BLOCK A - BUILDING A2 PROJECT : REVISION/DATE : VIEW 3 22-374 05-24-2023 A - 01.4 CATAMOUNT RUN - BLOCK A - BUILDING A2 PROJECT : REVISION/DATE : VIEW 4 22-374 05-24-2023 A - 01.5 CATAMOUNT RUN - BLOCK A - BUILDING A2 PROJECT : REVISION/DATE : VIEW 5 22-374 05-24-2023 A -01.6 CATAMOUNT RUN - BLOCK A - BUILDING A2 PROJECT : REVISION/DATE : RENDERING 22-374 03-22-2023 A00 CATAMOUNT RUN - BLOCK A - BUILDING A2 ARTIST'S RENDITION - FOR DISCUSSION PURPOSES ONLY. SEE DESIGN PLANS FOR DETAILS. 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 89' - 0" PARKING LEVEL 136' - 6" LEVEL 4 315.10 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - STREET / UNITS2' - 0"12' - 8 1/2"10' - 9"10' - 9"14' - 0"1' - 0"51' - 2 1/2"BRICK WATSON BRICK CO. BERGEN KTHARDIEPLANK - LAP SIDING COLOR ARTIC WHITE COMPOSITE WOOD SIDINGJAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE 3' - 3" JAMES HARDIE CEMENT BOARD PANEL COLOR S.W.6150 UNIVERSAL KHAKI 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 1' - 0"14' - 0"10' - 9"10' - 9"315.10 149' - 2 1/2" TOP OF PARAPET 1 101' - 0" LEVEL 1 - STREET / UNITS 154' - 2 1/2" TOP OF PARAPET 4 12' - 8 1/2"5' - 0"54' - 2 1/2"BRICK GLEN-GERY EASTLINEHARDIEPLANK - LAP SIDING COLOR ARTIC WHITE BRICK WATSON BRICK CO. BERGEN KT COMPOSITE WOOD SIDING JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE HARDIEPLANK - LAP SIDING COLOR S.W. 7069 IRON ORE 3' - 3" 3' - 3" BRICK GLEN-GERY EASTLINE 3' - 11" PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A01 CATAMOUNT RUN - BLOCK A - BUILDING A2 PATIO ELEVATION MARKET STREET ELEVATION 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 10' - 9"10' - 9"14' - 0"1' - 0"315.10 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - STREET / UNITS 152' - 8 1/2" TOP OF PARAPET 3 1' - 6"2' - 0"12' - 8 1/2"52' - 8 1/2"HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE COMPOSITE WOOD JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7069 IRON ORE JAMES HARDIE CEMENT BOARD PANEL COLOR RICH ESPRESSO JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIE CEMENT BOARD PANEL COLOR S.W.6150 UNIVERSAL KHAKI 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 10' - 9"10' - 9"14' - 0"1' - 0"315.10 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - STREET / UNITS 152' - 8 1/2" TOP OF PARAPET 3 154' - 2 1/2" TOP OF PARAPET 4 3' - 0"2' - 0"12' - 8 1/2"54' - 2 1/2"BRICK GLEN-GERY EASTLINE HARDIEPLANK - LAP SIDING COLOR ARTIC WHITEBRICK WATSON BRICK CO. BERGEN KT COMPOSITE WOOD SIDING JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE HARDIEPLANK - LAP SIDINGCOLOR S.W. 7069 IRON ORE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7069 IRON ORE 3' - 6"3' - 3" 3' - 8" PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A02 CATAMOUNT RUN - BLOCK A - BUILDING A2 BACK ELEVATION PUBLIC STREET ELEVATION 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 149' - 2 1/2" TOP OF PARAPET 1 151' - 2 1/2" TOP OF PARAPET 2 101' - 0" LEVEL 1 - STREET / UNITS 154' - 2 1/2" TOP OF PARAPET 4 1' - 0"14' - 0"10' - 9"10' - 9"315.10 D3D2C1D1 9' - 0"20' - 2"7' - 3"15' - 1"8' - 3"33' - 9"17' - 3"16' - 9"8' - 3"28' - 9"18' - 11" FIRST STORY LENGHT 185' - 6" A1 B1 B1 B1 A1 A1 C1 C1 C1 C1 C1 C1 C1 C1 C1 D1 D1 B1 B1 B1 B1 B1 B1 B1 C1 B1 B1 B1 B1 B1 B1 B1 D1 D1 A1 A1 A1 A1 A1 A1 D1 D1 D1 D2 D2 17' - 8 1/2"54' - 2 1/2"8' - 6"4' - 6".14' - 3"4' - 6".7' - 6"9' - 8" A2 A2 A2 A2 A2 A2 A2 A2 A2 BUILDING BREAKS C1 C1 47' - 9"16' - 9"36' - 7"15' - 1"BUILDING FRONTAGE GLAZING9' - 6"12' - 1"12' - 1"8' - 3"9' - 11"9' - 8"8' - 6"10' - 3"17' - 7" 31' - 6" PROJECT : REVISION/DATE : 1/16" = 1'-0" BUILDING REQUIREMENTS - PRIMARY FAÇADE 22-374 03-22-2023 A03 CATAMOUNT RUN - BLOCK A - BUILDING A2 WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF UPPER FACADE GLAZING TOTAL UPPER FACADE AREA: 6360 SF GLAZING REQUIRED (30%): 1908 SF GLAZING PROVIDED (32%): 2056SF QTY.TOTAL AREA 333 SF BUILDING FRONTAGE TOTAL FACADE LENGTH: 185'-6'' FRONTAGE BUILDOUT PRIMARY BUILD TO ZONE: 147'-6'' (80%) FIRST STORY GLAZING FACADE LENGHT: 185'-6'' GLAZING REQUIRED (80%): 146'-8'' GLAZING PROVIDED (80%): 147'-0'' TRANSPARENT REQUIRED (75%): 110'-0'' TRANSPARENT PROVIDED (100%): 146'-0'' 9 A2 7' - 0''2' - 8''19 SF 171 SF9 B1 7' - 0''4' - 0''28 SF 476 SF17 C1 5' - 6''4' - 0''22 SF 286 SF13 D1 8' - 6''8' - 0''68 SF 544 SF8 D2 8' - 6''6' - 0''51 SF 153 SF3 2056 SF D3 8' - 6''11' - 0''93 SF 93 SF1 E+314.72+314.40315 GGGG 72 x 36EE311.85 +313 312 315312G3' - 0"23' - 11"18' - 3"37' - 10"26' - 11"38' - 0" 114 STAIR 2 T5T4 RESIDENTIALCOMMERCIAL 35' - 7"32' - 0"38' - 4"25' - 1"40' - 1"8' - 3" PROJECT : REVISION/DATE : 3/64" = 1'-0" BUILDING REQUIREMENTS - ENTRANCES 22-374 03-22-2023 A04 CATAMOUNT RUN - BLOCK A - BUILDING A2 ENTRANCES MAX. DISTANCE BETWEEN PUBLIC ENTRANCES: 40'-0'' PROVIDED: 38'-0" MAX. AVERAGE BETWEEN PUBLIC ENTRANCES: 30'-0'' PROVIDED: 21' - 7'' PRIMARY FAÇADE - MARKET STREET SECONDARY FAÇADE - PUBLIC STREET NN ENTRANCES MAX. DISTANCE BETWEEN OPERABLE ENTRANCES: RESIDENTIAL FIRST STORY: 72'-0''(T4) - PROVIDED: 38'-4''PUBLIC NON RESIDENTIAL FIRST STORY: 60'-0''(T5) - PROVIDED: 40'-1'' MAX. AVERAGE BETWEEN OPERABLE ENTRANCES: RESIDENTIAL FIRST STORY: 54'-0''(T4) - PROVIDED: 32'-7'' PUBLIC NON RESIDENTIAL FIRST STORY: 45'-0''(T5) - PROVIDED: 24'-2'' T4T5 PUBLIC NON RESIDENTIAL FIRST STORY: 45'-0"(T5) - PROVIDED: 32'-7"RESIDENTIAL FIRST STORY: 54'-0"(T4) - PROVIDED: 24'-2" PUBLIC NON RESIDENTIAL FIRST STORY: 60'-0"(T5) - PROVIDED: 38'-4" RESIDENTIAL FIRST STORY: 72'-0"(T4) - PROVIDED: 40'-1" 100' - 0" LEVEL 1 - STREET / COMMERCIAL 115' - 0" LEVEL 2 125' - 9" LEVEL 3 136' - 6" LEVEL 4 BUILDING BREAKS 149' - 3" TOP OF PARAPET 1 151' - 3" TOP OF PARAPET 2 101' - 0" LEVEL 1 - STREET / UNITS 154' - 3" TOP OF PARAPET 4 T4T5 8' - 0"9' - 3"17' - 5"10' - 10"22' - 6"16' - 3"34' - 11"19' - 6"14' - 0" 5' - 7"21' - 1"18' - 3" A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 A2A1 B1 B1 B1B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 B1 C1 C1 C1 C1 C1 C1 C1 C1 B1 B1 C1 C1 C1C1 E1 E1 A2A1 A2A1 A3 10' - 2"8' - 0"16' - 10"8' - 0"3' - 6"4' - 0"9' - 0" GLAZING3' - 0"2' - 0"12' - 9"10' - 9"10' - 9"14' - 0"1' - 0"54' - 3"3' - 4"4' - 0"4' - 0" 191' - 5" 149' - 8"41' - 9" 11' - 6"14' - 6"9' - 10"9' - 10"9' - 10"34' - 3"39' - 3"PROJECT : REVISION/DATE : 1/16" = 1'-0" BUILDING REQUIREMENTS - SECONDARY FAÇADE 22-374 06-20-2023 A05 CATAMOUNT RUN - BLOCK A - BUILDING A2 UPPER FACADE GLAZING (T5) TOTAL UPPER FACADE AREA: 5187 SF GLAZING REQUIRED (20%): 1038 SF GLAZING PROVIDED (33%): 1756 SF (100% TRANSPARENT) BUILDING FRONTAGE TOTAL FACADE LENGTH: 191'-5'' FRONTAGE BUILDOUT PRIMARY BUILD TO ZONE: 191'-5'' (100%) FIRST STORY GLAZING (T4) - FACADE LENGHT: 41'-9'' GLAZING REQUIRED (20%): 8'-3'' GLAZING PROVIDED (50%): 21'-0'' TRANSPARENT REQUIRED (75%): 6'-2'' TRANSPARENT PROVIDED (100%): 21'-0'' (T5) - FACADE LENGHT: 149"-8'' GLAZING REQUIRED (40%): 59'-10'' GLAZING PROVIDED (63%): 95'-9'' TRANSPARENT REQUIRED (75%): 44'-1'' TRANSPARENT PROVIDED (100%): 95'-9''1756 SF WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF QTY.TOTAL AREA 518 SF14 A2 7' - 0''2' - 8''19 SF 266 SF14 B1 7' - 0''4' - 0''28 SF 532 SF19 C1 5' - 6''4' - 0''22 SF 176 SF08 A3 9' - 6''8' - 0''76 SF 76 SF01 E1 5' - 9''2' - 9''94 SF 02 T5 (T4) TOTAL UPPER FACADE AREA: 1405 SF GLAZING REQUIRED (20%): 281 SF GLAZING PROVIDED (28%): 396 SF (100% TRANSPARENT) 584 SF WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF QTY.TOTAL AREA 111 SF03 A2 7' - 0''2' - 8''19 SF 57 SF03 B1 7' - 0''4' - 0''28 SF 140 SF05 C1 5' - 6''4' - 0''22 SF 88 SF04 A3 9' - 6''8' - 0''76 SF -00 E1 5' - 9''2' - 9''94 SF 00 T4 188 SF - 006 WATER 000 PARKING 001 MECH. 002 STAIR 1 003 LOBBY 004 ELEVATOR 005 ELEVATOR MECH. 007 STAIR 2 25' - 6"25' - 6" 2 13 11 1 2 10 2 5 2 008 ELEC. PROJECT : REVISION/DATE : 1/32" = 1'-0" BUILDING REQUIREMENTS - PARKING 22-374 06-20-2023 A06 CATAMOUNT RUN - BLOCK A - BUILDING A2 PARKING VEHICULES: 48 SPACES BIKES: 64 SPACES N 006 WATER 000 PARKING 001 MECH. 002 STAIR 1 003 LOBBY 004 ELEVATOR 005 ELEVATOR MECH. 007 STAIR 2 25' - 6"25' - 6" 2 13 11 1 2 10 2 5 2 008 ELEC. PROJECT : REVISION/DATE : 1/32" = 1'-0" BUILDING REQUIREMENTS - PARKING 22-374 07-04-2023 A06 CATAMOUNT RUN - BLOCK A - BUILDING A2 PARKING VEHICULES: 48 SPACES BIKES: 64 SPACES N 60 x 35 60 x 35 72 x 36 72 x 36+ 303.50 EE+314.50 +314.65 +++314.72 311.85 +311.75 +311.75 ++ 313 312 310 315 312 310309 308 GGGG TUE109 VEST. 115 ELEVATOR 114 STAIR 2 MARKET STREET 113 STAIR 1 111 JANITOR (3246 ft²) 105 COMMERCIAL (10503 ft²) 103 COMMERCIAL 102 TYPE D5 101 TYPE D4 107 WC ADA 108 WC ADA 106 GYM 104 VEST. 110 MAIL ROOM PUBLIC STREET117 LOBBY A 009 LOBBY B 112 PET WASH PROJECT : REVISION/DATE : 1" = 30'-0" PLAN - LEVEL 1 22-374 05-24-2023 A07 CATAMOUNT RUN - BLOCK A - BUILDING A2 N 218 TYPE D1 217 TYPE D5216 TYPE C2 215 TYPE B1 214 TYPE A3 213 TYPE C2 212 TYPE D2 211 TYPE C3 210 TYPE C2 209 TYPE A3 208 TYPE B1 207 TYPE D 206 TYPE D 225 STAIR 2 205 TYPE B3 204 TYPE A1 203 TYPE A1 202 TYPE A1 201 TYPE B2 220 TYPE C1 219 TYPE A2 221 LAUNDRY 222 MECH. 226 ELEVATOR 200 CORRIDOR 223 JANITOR 224 STAIR 1 PROJECT : REVISION/DATE : 1" = 30'-0" PLAN - LEVEL 2-3-4 22-374 03-22-2023 A08 CATAMOUNT RUN - BLOCK A - BUILDING A2 N EE ETT15'R 25'R 25'R3 1 4 E TET302.5302.5308306305300 305 315.02 +++314.22 314.50 + 314.62 + 314.16+ 313.47 + 313.15 + 314.95+ 313.30 + 312.3+ 312.3 313.25++312.30 316.50 + + 313.50 + 31 2.3314.00 + + 313.85 + 313.65 +311.70 313.15++311.82 315.03++314.11 314 311 310 312 312 311 310 310 315 315 314 315 313 310 312 311312315308FM GGGGU D UD UDUD UD UD H DY HDY3 1 0 310305300 305 310 311 312308 312 314 G G G LL L LL L LL W WW W W W WWSSSSS S SSS D S S 1 1 9 9 A A E E 5'-0'' HIGH RTU ON 24'' HIGH BASE ROOF EQUIPMENT SCREEN PROJECT : REVISION/DATE : 1/32" = 1'-0" SOLAR-READY ZONE 22-374 02-24-2023 A-01.1 CATAMOUNT RUN - BLOCK A - BUILDING A3 SOLAR-READY ZONE Total rooftop area = 13, 360 SF Minimum solar-ready zone = 5, 344 SF 40% X 13,360 SF = 5,344 SF Total solar-ready zone available = 5,407 SF (solar-ready zone areas shown subject to adjustment with final design of mechanical equipment) The solar-ready zone shall include a collateral dead load of not less than 5 psf in gravity and lateral design calculations. Interconnection pathways shall be provided for routing of conduit or piping from the solar- ready zone to the electrical service panel or service hot water system. The main electrical service panel shall have a reserved space to allow installation of a dual pole circuit breaker for future solar electric installation and labeled ''FOR FUTURE SOLAR ELECTRIC''. The reserved space shall be positioned at the end of the panel that is opposite from panel supply conductor connection. A permanent certificate, indicating the solar- ready zone and other requirements, shall be posted near the electric distribution panel, water heater, or other conspicuous location. 2 3 1 4 PROJECT : REVISION/DATE : VIEW 1 22-374 02-24-2023 A-01.2 CATAMOUNT RUN - BLOCK A - BUILDING A3 PROJECT : REVISION/DATE : VIEW 2 22-374 02-24-2023 A-01.3 CATAMOUNT RUN - BLOCK A - BUILDING A3 PROJECT : REVISION/DATE : VIEW 3 22-374 02-24-2023 A-01.4 CATAMOUNT RUN - BLOCK A - BUILDING A3 PROJECT : REVISION/DATE : VIEW 4 22-374 02-24-2023 A-01.5 CATAMOUNT RUN - BLOCK A - BUILDING A3 PROJECT : REVISION/DATE : RENDERING 22-374 03-22-2023 A00 CATAMOUNT RUN - BLOCK A - BUILDING A3 ARTIST'S RENDITION - FOR DISCUSSION PURPOSES ONLY. SEE DESIGN PLANS FOR DETAILS. 100' - 0" STREET LEVEL 112' - 9" LEVEL 2 123' - 6" LEVEL 3 134' - 3" LEVEL 4 102' - 0" LEVEL 1 147' - 5" TOP OF PARAPET 150' - 5" TOP OF HIGH PARAPET 3' - 0"13' - 2"10' - 9"10' - 9"10' - 9"2' - 0"50' - 5"HARDIEPLANK - LAP SIDINGCOLOR ARTIC WHITEBRICK WATSON BRICK CO. BERGEN KT COMPOSITE WOOD SIDING JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST HARDIEPLANK - LAP SIDINGCOLOR S.W. 7069 IRON ORE JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE2' - 6"2' - 6" 100' - 0" STREET LEVEL 112' - 9" LEVEL 2 123' - 6" LEVEL 3 134' - 3" LEVEL 4 102' - 0" LEVEL 1 147' - 5" TOP OF PARAPET 150' - 5" TOP OF HIGH PARAPET 2' - 0"10' - 9"10' - 9"10' - 9"13' - 2"3' - 0"50' - 5"HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W.6150 UNIVERSAL KHAKI COMPOSITE WOOD SIDING JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY JAMES HARDIE CEMENT BOARD PANEL COLOR LIGHT MIST JAMES HARDIE CEMENT BOARD PANEL COLOR RICH ESPRESSO JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A01 CATAMOUNT RUN - BLOCK A - BUILDING A3 GARDEN STREET ELEVATION BACK ELEVATION 100' - 0" STREET LEVEL 112' - 9" LEVEL 2 123' - 6" LEVEL 3 134' - 3" LEVEL 4 102' - 0" LEVEL 1 147' - 5" TOP OF PARAPET 150' - 5" TOP OF HIGH PARAPET 3' - 0"13' - 2"10' - 9"10' - 9"10' - 9"2' - 0"50' - 5"HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W.6150 UNIVERSAL KHAKI JAMES HARDIECEMENT BOARD PANEL COLOR ARTIC WHITE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY COMPOSITE WOOD SIDING HARDIEPLANK - LAP SIDING COLOR S.W. 7069 IRON ORE 2' - 6" 100' - 0" STREET LEVEL 112' - 9" LEVEL 2 123' - 6" LEVEL 3 134' - 3" LEVEL 4 102' - 0" LEVEL 1 147' - 5" TOP OF PARAPET 150' - 5" TOP OF HIGH PARAPET 3' - 0"13' - 2"10' - 9"10' - 9"10' - 9"2' - 0"50' - 5"HARDIEPLANK - LAP SIDING COLOR ARTIC WHITE BRICK WATSON BRICK CO. BERGEN KT JAMES HARDIE CEMENT BOARD PANEL COLOR ARTIC WHITE JAMES HARDIE CEMENT BOARD PANEL COLOR S.W 7068 GRIZZLE GRAY COMPOSITE WOOD SIDING HARDIEPLANK - LAP SIDING COLOR S.W. 7069 IRON ORE 2' - 6" PROJECT : REVISION/DATE : 1/16" = 1'-0" ELEVATIONS 22-374 03-22-2023 A02 CATAMOUNT RUN - BLOCK A - BUILDING A3 LEFT ELEVATION RIGHT ELEVATION 100' - 0" STREET LEVEL 112' - 9" LEVEL 2 123' - 6" LEVEL 3 134' - 3" LEVEL 4 102' - 0" LEVEL 1 147' - 6" TOP OF PARAPET 148' - 6" TOP OF HIGH ROOF DECK 10' - 9"10' - 9"10' - 9"2' - 0"A3 E1 E1 C1 C1 C1C1 C1 C1 C1C1 C1 C1 C1C1 C1 C1 E1 B1 B1 A1 A2 A1 A2 A1 A2 B1 B1 B1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 D1 B2D3 1' - 0"13' - 3"20' - 3"26' - 1 1/2"10' - 7"23' - 5 1/2"10' - 3 1/2"24' - 1"10' - 3 1/2"24' - 0 1/2"10' - 7"13' - 0 1/2"5' - 9 1/2"28' - 8"13' - 1 1/2" 220' - 2" 8' - 0"4' - 0"3' - 4"4' - 0"8' - 0"4' - 0"4' - 0"8' - 0"8' - 0"4' - 0"8' - 0"4' - 0"4' - 0"8' - 0"4' - 0"4' - 0"4' - 0"8' - 0" B1 B1B1 B1B1 B1 B1B1B1B1B1B1B1B1 46' - 6"3' - 0"143' - 5 1/2" BASE OF TRUSS PROJECT : REVISION/DATE : 1/16" = 1'-0" BUILDING REQUIREMENTS - PRIMARY FAÇADE 22-374 05-24-2023 A03 CATAMOUNT RUN - BLOCK A - BUILDING A3 BUILDING BREAKS WINDOW TYPE A1 HEIGHT WIDTH AREA 7' - 0''5' - 4''37 SF UPPER FACADE GLAZING TOTAL UPPER FACADE AREA: 7627 SF GLAZING REQUIRED (30%): 2288 SF (100% TRANSPARENT) GLAZING PROVIDED (31%): 2398 SF (100% TRANSPARENT) QTY.TOTAL AREA 111 SF BUILDING FRONTAGE TOTAL FACADE LENGTH: 220'-2'' FRONTAGE BUILDOUT PRIMARY BUILD TO ZONE: 220'-2'' (100%) FIRST STORY GLAZING FACADE LENGHT: 220'-2'' GLAZING REQUIRED (40%): 88'-0'' GLAZING PROVIDED (80%): 103'-4'' 3 A2 7' - 0''2' - 8''19 SF 57 SF3 B1 7' - 0''4' - 0''28 SF 532 SF19 C1 5' - 6''4' - 0''22 SF 308 SF14 D1 8' -6''8' -0''68 SF 1156 SF17 2398 SF D3 10' - 6''8' -0''84 SF 84 SF1 A3 8' -6''8' -0''68 SF 68 SF1 TRANSPARENT REQUIRED (75%): 66'-0'' TRANSPARENT PROVIDED (100%): 103'-4'' B2 8' -6''4' - 0''34 SF 34 SF1 E1 5' - 9''2' - 9''16 SF 48 SF3 36"BAS 7' - 6"24' - 11"23' - 2"31' - 7"9' - 7"23' - 3"26' - 0"42' - 2"7' - 6" PROJECT : REVISION/DATE : 1/16" = 1'-0" BUILDING REQUIREMENTS - ENTRANCES 22-374 03-22-2023 A04 CATAMOUNT RUN - BLOCK A - BUILDING A3 PRIMARY FAÇADE - GARDEN STREET NENTRANCES MAX. DISTANCE BETWEEN OPERABLE ENTRANCES (RESIDENTIAL 1ST STORY) : 46'-0'' PROVIDED: 42'-0" MAX. AVERAGE BETWEEN OPERABLE ENTRANCES (RESIDENTIAL 1ST STORY) : 36'-0'' PROVIDED: 21'-3" UP UP 000 PARKING 003 STAIR 2 006 MECH. 005 ELEVATOR 004 VEST. 007 STAIR 1 001 MECH.25' - 5"VEHICULES : 33 SPACES BIKES : 54 SPACES 002 ELEC. 3 4 5 2 3 16 PROJECT : REVISION/DATE : 1" = 20'-0" PLAN - BASEMENT 22-374 06-20-2023 A05 CATAMOUNT RUN - BLOCK A - BUILDING A3 N UP UP 000 PARKING 003 STAIR 2 006 MECH. 005 ELEVATOR 004 VEST. 007 STAIR 1 001 MECH. VEHICULES : 33 SPACES BIKES : 54 SPACES 002 ELEC. 3 4 5 2 3 16 PARKING VEHICULES: 33 SPACES BIKES: 62 SPACES 25' - 5"PROJECT : REVISION/DATE : 1" = 20'-0" PLAN - BASEMENT 22-374 07-04-2023 A05 CATAMOUNT RUN - BLOCK A - BUILDING A3 N 60 x 35 60 x 35 36"GARDEN STREET 117 VEST. 123 ELEVATOR 113 GYM 116 MAIL & PACKAGE 112 JANITOR 122 STAIRS 2 120 VEST.119 MECH. 121 STAIRS 1 103 TYPE D1 102 TYPE C1 101 TYPE B1 111 TYPE A1 110 TYPE D1 109 TYPE D2 108 TYPE C1 107 TYPE C1 106 TYPE B2 (ADA) 105 TYPE C1104 TYPE D5 115 TOILET 114 TOILET 118 LAUNDRY PROJECT : REVISION/DATE : 1" = 20'-0" PLAN - LEVEL 1 22-374 03-22-2023 A06 CATAMOUNT RUN - BLOCK A - BUILDING A3 N BASUP 218 ELEVATOR 216 STAIRS 1 217 STAIRS 2 214 JANITOR 200 CORRIDOR 203 TYPE D1 204 TYPE D4 205 TYPE C1 202 TYPE C1 201 TYPE B1 213 TYPE B1 212 TYPE A1 211 TYPE A1 210 TYPE D3 209 TYPE D2 208 TYPE C1 206 TYPE C1 207 TYPE C1 215 LAUNDRY PROJECT : REVISION/DATE : 1" = 20'-0" PLAN - LEVEL 2-3-4 22-374 03-22-2023 A07 CATAMOUNT RUN - BLOCK A - BUILDING A3 N 34"FL SL CJ 4545 6060 9090 120120 150150 180180 AL 5.7 7.4 V.3 RETURNSUPPLYA473 4 GALVANISED 4'' X 4'' HSS (SEE STRUCTURE) TYP. CONTINUOUS GALVANISED 4'' C CHANNEL (SEE STRUCTURE) TYP.EQEQEQEQ EQ EQ EQ 23' - 4 5/8"13' - 9 1/4"2' - 6 3/4"16' - 4"EQEQEQ16' - 4"EQEQEQEQ 5' - 0 11/32"9' - 2"9' - 2 9/32" 23' - 4 5/8" TOP OF COLUMN 1' - 1"TYP.1' - 0"1' - 1"GALVANISED 2'' C CHANNEL TYP. PAINTED CONTINUOUS GALVANISED 2'' X 4'' HSS COLUMN (SEE STRUCTURE) TYP. 75.30 75.31 75.30 75.30 8"THERMAL BREAK TOP OF COLUMN METAL PANEL A: FLOOR TO DECK B: FLOOR TO GWB CEILING C: AS INDICATED WALL HEIGHT: 1. ALL PLAN DIMENSIONS OF INTERIOR WALLS ARE TAKEN FROM THE CENTER OF THE PARTITION AND ALL PLANS DIMENSIONS OF EXTERIOR WALLS ARE TAKEN FROM THE FACE OF THE STUDS, UNLESS OTHERWISE NOTED . NOTES: ± 100' = 315.00' (SEE CIVIL) GEODESIC GROUND LEVEL: D: FLOOR TO CONCRETE SLAB/CEILLING LEVEL DOOR NUMBER WALL TYPE WINDOW NUMBER CONSTRUCTION NOTE 00 ROOM NUMBER ALL FACES ALIGN LEVEL INDICATES REVISION PB PANIC BAR JOIST DIRECTION FD FLOOR DRAIN RD ROOF DRAIN 00 F.R. 45min. F.R. 120 min. (2h) F.R. 150 min. (2.5h) F.R. 180 min. (3h) F.R. 60min. (1h) F.R. 90min. (1.5h) GALVANIZED STEEL FREE LINTEL STRUCTURAL LINTEL (SEE STRUCTURE) CONTROL JOINT 01 X X XXX ROOM NAME A 500 1 SECTION NUMBER DRAWING NUMBER DETAIL NUMBER DRAWING NUMBER 1 120 1t 4.5 REF 1 A0-500 1 A0-500 REF ELEVATION NUMBER DRAWING NUMBER WALL HEIGHT FIRE RATING 146' - 8" TOP OF ROOF DECK 5.7 7.4 148' - 8" TOP OF PARAPET 152' - 2" TOP OF HIGH PARAPET 3' - 6"2' - 0"23' - 4 5/8" EQ EQ EQ EQ EQEQ1' - 2"1' - 2"EQEQEQ2' - 0"2' - 0"1' - 6"T 450-443-4434 www.jutrasarchitecture.com DATE / PROJECT NUMBER ARCH E SIZE KEY PLAN N O T F O R C O N S T R U C T IO N © JUTRAS ARCHITECTURE PLC . DRAWING TITLE DRAWN BY / VERIFY BY ADDRESS PROJECT'S NAME CLIENT NOTES AND LEGENDN SCALE / SHEET G A RD EN STREETMA R K E T S T R E E T AS INDICATED A473 ROOF SCREEN CATAMOUNT RUN - BLOCK B - BUILDING B1 SOUTH BURLINGTON, VT 11-07-2022 J.B. SNYDER-BRAVERMAN DEVELOPMENT LLC 22-374 E.J. 1/4" = 1'-0"A473a01 1 ROOF SCREEN PLAN 1 1/2" = 1'-0"A473 2 ROOF SCREEN SECTION DETAIL A473 3 ROOF SCREEN 3D 1/4" = 1'-0"A473A473 4 ROOF SCREEN ELEVATION BUILDING ENVELOPE NOTES LEGEND 61.2 5/8" CONTINUOUS PLYWOOD 61.3 3/4" CONTINUOUS PLYWOOD 61.6 WOOD STRUCTURE 61.10 2"X6" WOOD STUD 61.10.1 2"X6'' TREATED WOOD 72.5 MINERAL WOOL WATER REPELLENT SEMI-REGID INSULATION 72.6 CONTINUOUS 6mm ETHAFOAM SHEET 73.3 CONTINUOUS SELF-ADHERE AIR AND VAPOR BARRIER AROUND OPENING (TYP.) 75.18.1 ROOF MEMBRANE ( SEE ROOF TYPES) 75.30 CHEMCURB ON SEALANT (SEE MANUFACTURER) 75.31 SEALANT (SEE MANUFACTURER) 76.2 GALVANIZED PREPAINTED CONTINUOUS CAGE 24 METAL FLASHING NO.DATE DESCRIPTION BY B 12-23-2022 ISSUED FOR PERMIT J.B. TOP OF SCREEN TO EXTEND A MINIMUM OF 6" ABOVE TOP OF RTU 8"1'-2"1'-2"TOP OF SCREEN TO EXTEND A MIN. OF 6" ABOVE TOP OF RTU 03-22-2023 ROOFTOP MECHANICAL SCREENING REQUIREMENTS 1. AS SHOWN ON THIS PLAN, THE 7 FEET HIGH SCREEN SHALL BE INSTALLED AROUND THE LARGE RTU. 2. A SCREEN SHALL ALSO BE INSTALLED FOR SMALLER RTU LOCATED WITHIN 15 FEET OF THE PERIMETER OF THE ROOFTOP. THE HEIGHT OF THE SCREEN SHALL BE AT LEAST EQUAL TO THE HEIGHT OF THE RTU. 1 06-15-23 ADD ROOFTOP MECH SCREEN REQ SBD 310 MARKET STREET SOUTH BURLINGTON, VT SOUTH BURLINGTON CITY CENTER CATAMOUNT RUN TRASH/RECYCLING/COMPOST STRUCTURE11-07-22 X W-3 EXT. INT.1"3 5/8''X W-1 EXT. INT.1"8 3/8"PROJECT : REVISION/DATE : 3" = 1'-0" WINDOW JAMB 22-374 11-14-2022 A21 CATAMOUNT RUN RESIDENCE - BUILDING B2 A213" = 1'-0" 1 WINDOW JAMB - HARDIE PANEL A213" = 1'-0" 2 WINDOW JAMB - BRICK BLOCK A A00