Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation Supplemental Info (4) State of Vermont Agency of Natural Resources Department of Environmental Conservation Drinking Water and Groundwater Protection Division WASTEWATER SYSTEM AND POTABLE WATER SUPPLY PERMIT LAWS/REGULATIONS INVOLVED 10 V.S.A. Chapter 64, Potable Water Supply and Wastewater System Permit Wastewater System and Potable Water Supply Rules, Effective April 12, 2019 Regional Offices – Montpelier/Essex Jct./Rutland/Springfield/St. Johnsbury Permittee(s): South Burlington School District 577 Dorset Street South Burlington, VT 05403 Permit Number: WW-4-0847-1 This permit affects the following property/properties in the City of South Burlington, Vermont: Lot Parcel SPAN Acres Book(s)/Page(s)# 0 0450-00010 600-188-15838 11.20 Book:697 Page(s):402 This application, consisting of the installation of temporary classrooms at an existing elementary school (Rick Marcotte Central School) utilizing a proposed municipal sewer service connection and an existing municipal water service connection located at 200 Market Street in the City of South Burlington, Vermont, is hereby approved under the requirements of the regulations named above subject to the following conditions. Any person aggrieved by this permit may appeal to the Environmental Court within 30 days of the date of issuance of this permit in accordance with 10 V.S.A. Chapter 220 and the Vermont Rules of Environmental Court Proceedings. 1. GENERAL 1.1 The permittee is responsible to record this permit in the City of South Burlington Land Records within 30 days of issuance of this permit and prior to the conveyance of any lot subject to the jurisdiction of this permit. 1.2 The permittee is responsible to record the design and installation certifications and other documents that are required to be filed under these Rules or under a permit condition in the City of South Burlington Land Records. 1.3 Each assign or successor in interest shall be shown a copy of the Wastewater System and Potable Water Supply Permit and the stamped plan(s) prior to the conveyance of a lot. 1.4 By acceptance of this permit, the permittee agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with the Vermont environmental and health statutes and regulations, and permit conditions. 1.5 This permit does not relieve the landowner from obtaining all other approvals and permits from other State Agencies or Departments, or local officials prior to construction. 1.6 All conditions set forth in WW-4-0847-1 shall remain in effect except as amended or modified herein. 2. CONSTRUCTION 2.1 Construction shall be completed as shown on the plans and/or documents prepared by Engineering Ventures, PC (Julia Ginorio, P.E.) with the stamped plans listed as follows: Title Sheet # Plan Date Revision Site Plan C201 12/23/2022 N/A Site Details C301 12/23/2022 03/24/2023 2.2 Construction of wastewater systems or potable water supplies, or buildings or structures (as defined by the Wastewater System and Potable Water Supply Rules), or campgrounds, not depicted on the stamped Wastewater System and Potable Water Supply Permit WW-4-0847-1 Page 2 of 2 plans, or identified in this permit, is not allowed without prior approval by the Drinking Water and Groundwater Protection Division. 3. INSPECTIONS 3.1 No permit issued by the Secretary shall be valid for a substantially completed potable water supply and wastewater system until the Secretary receives a signed and dated certification from a qualified Vermont Licensed Designer (or where allowed, the installer) on a Secretary-approved form that states: “I hereby certify that, in the exercise of my reasonable professional judgment, the installation-related information submitted is true and correct and the wastewater system was installed in accordance with the permitted design and all permit conditions, was inspected, was properly tested, and has successfully met those performance tests” or which satisfies the requirements of §1-311 of the referenced rules. 4. DESIGN FLOW 4.1 Lot use and design flows (gpd) shall correspond to the following: Lot Building Building Use / Design Flow Basis Wastewater Water 0 Proposed Temporary classroom addition to an existing elementary school with a cafeteria and without showers 592 students/staff @ 8gpd per student/staff 4,736 4,736 0 N/A Permitted reserve capacity 5,259 5,259 5. WASTEWATER SYSTEM 5.1 This project is approved for connection to the municipal wastewater treatment facility as depicted on the plan(s) stamped by the Drinking Water and Groundwater Protection Division. 5.2 This permit is based, in part, on a determination by the municipality that sufficient capacity exists in the wastewater treatment facility and associated sanitary sewer collection line to accommodate the design flow of this project. This permit does not imply the municipality will grant allocation to the building. 6. POTABLE WATER SUPPLY 6.1 This project is approved with the existing connection to a municipal water supply system. 6.2 This permit is based, in part, on a determination by the municipality that sufficient capacity exists in the municipal public water system to accommodate the design flow approved by this permit. This permit does not imply that the municipality will grant allocation for the building. Julia S. Moore, Secretary Agency of Natural Resources Dated March 24, 2023 By ________________________________ Allison Lowry, Environmental Analyst VI Essex Junction Regional Office Drinking Water and Groundwater Protection Division cc: Engineering Ventures, PC