Craig Wielenga, hereinafter referred to as the applicant, is seeking to amend a previously
approved plan for a 5,620 sf place of worship. The amendment consists of fill removal exceeding
20 cubic yards and associated regrading for the purpose of stormwater management in the rear
of the property, and minor site improvements, 1250 Spear Street.
The Development Review Board held a public hearing on August 1, 2023. ___ represented the
applicant.
Based on testimony provided at the above-mentioned public hearings and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a previously approved plan for a 5,620 sf place of
worship. The amendment consists of fill removal exceeding 20 cubic yards and associated
regrading for the purpose of stormwater management in the rear of the property, and
minor site improvements, 1250 Spear Street.
2. The owner of record of the subject property is All Saints Episcopal Church.
3. The subject property is located in the Residential – 2 Zoning District.
4. The application was received on 7/18/2023.
5. The plans submitted consist of:
Sheet No. & Title Prepared by Plan Last Revised on:
Location Plan Craig Wielenga 6/13/2023
Existing Grading Craig Wielenga 6/19/2023
Proposed Grading Craig Wielenga 6/20/2023
Proposed Layout Craig Wielenga 6/17/2023
ESPC Plan Craig Wielenga 6/17/2023
ZONING DISTRCIT & DIMENSIONAL REQUIREMENTS
Setbacks, Coverages & Lot Dimensions
The applicant is proposing to pour a concrete walkway as part of this project and thereby
increase the impervious surface of the lot.
R2 Zoning District Required Proposed
Min. Lot Size, non-residential use 22,000 sf No change
Max. Building Height Pitched Roof 28 ft No change
#SP-23-031
- 2 -
Max. Building Coverage 20% No change
@Max. Overall Coverage 40% 14.7%
Min. Front Setback 3,000% No change
Min. Side Setback 10 ft No change
Min. Rear Setback 30 ft No change
= Zoning Compliance
@ = This calculation must be updated to reflect any additional impervious surface required for the
provision of a stabilized surface for bicycle parking, as required by 13.03 below, prior to issuance of
a Zoning Permit.
SITE PLAN REVIEW STANDARDS
14.06 General Review Standards
A. Relationship of Proposed Structures to the Site.
(1) The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian movement,
and adequate parking areas.
The applicant is proposing to construct a concrete walkway at 5% grade between the existing
parking area and the existing entrance to the walkout basement. The proposed concrete walkway
will offer a more stable option for movement between the structure and the site.
(2) Parking
No changes to parking are proposed.
B. Relationship of Structures and Site to Adjoining Area.
(1) The Development Review Board shall encourage the use of a combination of common
materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing),
landscaping, buffers, screens and visual interruptions to create attractive transitions
between buildings of different architectural styles.
(2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing
buildings and roads in the vicinity that have a visual relationship to the proposed structures.
No changes to buildings or structures are proposed.
14.07 Specific Review Standards
A. Environmental Protection Standards. All proposed development shall be subject to the
applicable requirements of Article 12, Environmental Protection Standards.
There are no identified Natural Resources or Environmental Hazards on the property – as such,
the proposed re-grading does not affect compliance with the requirements of Article 12.
B. Site Design Features. All proposed development shall comply with standards for the
placement of buildings, parking and loading areas, landscaping and screening, open space,
stormwater, lighting, and other applicable standards related to site design pursuant to these
Land Development Regulations.
The purpose of this application is to re-grade the site to improve stormwater management. The
standards mentioned in this criterion are included in Article 14.11 and are discussed below.
#SP-23-031
- 3 -
C. Access and Circulation. All proposed development shall comply with site access and
circulation standards of Section 15.A.14.
No changes to access or circulation are proposed.
D. Transportation Demand Management (TDM) [reserved]
E. Building Form. Development within the City Center Form Based Code District, the Urban
Design Overlay District, and other districts with supplemental building form standards shall
adhere to the standards contained therein.
Building form standards do not apply to this zoning district.
F. Streetscape Improvements. A proposed new construction or extension/expansion of an
existing structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section
8.11(D) within the City Center Form Based Code, or Section 3.11(D) in all other zoning districts,
shall be required to upgrade adjacent sidewalks, greenbelts, and related street furniture (trees,
benches, etc.) to the standards contained within the applicable Street Type and Building
Envelope Standard. Nothing in this subsection shall be construed to limit requirements for
additional upgrades as necessary to meet the requirements of these Regulations.
No modifications to a structure are proposed.
G. Access to Abutting Properties. The reservation of land may be required on any lot for
provision of access to abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial or collector street, to provide additional access for emergency or other
purposes, or to improve general access and circulation in the area.
No changes affecting compliance with this criterion are proposed.
H. Utility Services. Electric, telephone and other wire-served utility lines and service
connections shall be underground insofar as feasible and subject to state public utilities
regulations. Any utility installations remaining above ground shall be located so as to have a
harmonious relation to neighboring properties and to the site. Standards of Section 15.A.18,
Infrastructure, Utilities, and Services, shall also be met.
No changes affecting compliance with this criterion are proposed.
I. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including
compliance with any recycling, composting, or other requirements, shall be accessible, secure
and properly screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s). Small receptacles intended for use by households or the public (ie, non-dumpster,
non-large drum) shall not be required to be fenced or screened.
No changes affecting compliance with this criterion are proposed.
OTHER APPLICABLE STANDARDS
13.03 Bicycle Parking and Storage
As per Table 13-3, the use has a short-term bicycle parking requirement of one space per
5,000 sf GFA and a minimum requirement of four (4) spaces. The property currently has
three ‘inverted U’ bike racks which provide six (6) short-term bike parking spaces located
north of the proposed and existing concrete walkways that serve the primary entrances to
the building. However, existing & previously-approved bike racks may be permitted to
#SP-23-031
- 4 -
count towards the minimum requirements provided that they are compliant with
13.03.B(2)(d)(i), which requires bike racks to be “securely anchored to the ground and on a
hard, stabilized surface of at least six feet in length and a width sufficient to satisfy the
remainder of these regulations”. The existing bike rack is located on grass. The applicant
must amend the site plan to show the location and dimensions of the stabilized surface
for the bike racks, and indicate that the bike racks will be anchored to this surface, prior to
the issuance of a Zoning Permit.
13.04 Snow Storage
Per Section 13.04(B)(7), “snow storage areas must be specified and located in an area that
minimizes the potential for erosion and contaminated runoff into any adjacent or nearby
surface water.” The snow storage areas were indicated on the initially submitted site plan
but are not reflected on the most recent version of the site plan submitted by the
applicant. The applicant must amend the site plan to show snow storage areas prior to
issuance of a Zoning Permit.
13.07 Exterior Lighting
Per Section 13.07.A, exterior lighting “shall have such shielding as will direct the light
downward and will prevent the source of light from being visible from any adjacent
residential property or street.” The applicant is not proposing to add or replace exterior
lighting fixtures; no exterior lighting impacts are proposed as part of this application.
14.07 Disposal of Wastes
Per Section 14.07.I, dumpsters “shall be accessible, secure and properly screened with
opaque fencing to ensure that trash and debris do not escape the enclosure(s)”. There is
not an existing dumpster on the property and the applicant is not proposing to install one
as part of this application. As such, this criterion is not applicable to this application.
14.11 Alteration of Existing Grade
Per Section 14.11.F, the “removal from land or the placing on land of fill, gravel, sand,
loam, topsoil, or other similar material in an amount equal to or greater than twenty (20)
cubic yards, except when incidental to or in connection with the construction of a structure
on the same lot, shall require the approval of the Development Review Board”.
The applicant is proposing to remove approximately 183 cubic yards of fill from the
existing stormwater conveyance swale for the purpose of better conveying stormwater
through the swale and is proposing to add approximately 40 cubic yards of ¾” gravel and
15 cubic yards of ¾” drain rock to the rear of the site for the purpose of funneling
stormwater away from the existing walkout basement entrance and towards the swale.
(2) Standards and Conditions for Approval.
(b) The Development Review Board, in granting approval may impose any conditions it
deems necessary, including, but not limited to, the following:
(i) Duration or phasing of the permit for any length of time.
The applicant has proposed for the fill to be in place permanently, as the
purpose of this re-grading effort is to permanently improve stormwater
drainage in the rear of this site. As such, the Board does not deem it necessary
to impose a condition regarding the duration of this approval.
#SP-23-031
- 5 -
(ii) Submission of an acceptable plan for the rehabilitation of the site at the
conclusion of the operations, including grading, seeding and planting, fencing,
drainage, and other appropriate measures.
The South Burlington Stormwater Superintendent reviewed these plans for
compliance with this criterion and others on 7/21/2023, and offered the
following comments:
1. Proposed Grading Plan:
a. Proposed grading difficult to read. Please use different line types and
consistently label contours.
b. Please provide proposed grading contours for entirety of project area
c. Please provide detail of proposed swale.
2. Existing Grading Plan:
a. Grading difficult to read. Please use different line types and consistently
label contours.
b. Please provide existing grading contours for entirety of project area.
3. EPSC Plan:
a. Please correct title of plan to read “EPSC”.
b. Please use different line type for silt fence.
c. Please provide EPSC measures for the proposed waste site.
d. Please provide EPSC measures for area around retaining walls and back of
building.
e. Please provide detail of proposed EPSC measures
f. Silt fence is not appropriate for use in an area with concentrated flow, i.e. a
swale. Please propose an appropriate EPSC measure.
g. Please ensure that EPSC measures conform with Article 16 – Construction
and Erosion Control Standards in the Land Development Regulations.
Staff considers that the provided comments of the Stormwater Superintendent
address issues that the Board may find to be minor modifications of the
provided site plan. However, Section 14.05.E(1)(a) defines a minor modification
as a change that “leaves no part of its implementation to the discretion of the
Applicant”. Staff further considers that the comments of the Stormwater
Superintendent could be interpreted to leave part of their implementation to
the discretion of the applicant.
Staff considers that these comments and any subsequent condition of approval
can be updated and presented for consideration to the Board if the applicant
and Stormwater Superintendent can agree on more specific language after the
publication of this report but prior to the date of the hearing.
If the applicant and Stormwater Superintendent cannot agree on more specific
language prior to the date of the hearing, Staff considers that the Board can
either continue this application until the applicant and Stormwater
Superintendent can reach an understanding, or close this application with only
the provided information and include a condition that the Stormwater
Superintendent review & approve any applicant response to the provided
comments.
#SP-23-031
- 6 -
(iii) Provision of a suitable bond or other security in accordance with Section
17.15 adequate to assure compliance with the provisions of these Regulations.
The Board finds this step to be unnecessary and does not require the provision
of a bond.
(iv) Determination of what shall constitute pre-construction grade under
Section 3.07, Height of Structures.
The applicant has not requested a modification of what shall constitute pre-
construction grade. The Board finds that the purpose of the fill is to create
elevation changes to facilitate stormwater drainage. If the fill is later removed
and the elevation of the area returned to its pre-altered state for the purposes
of building construction, the Board finds that the pre-alteration grade may be
considered the preconstruction grade.
16.04 Excavation and Grading
16.04 pertains to excavation and grading and specifies that “all excavation and filling required
for construction of improvements shall be as specified within this Section”, including that
stabilization must occur within 48 hours of final grading, that embankments must be
constructed in lifts of no more than 6-inches, and that embankments shall have a side slope of
no greater than 2 horizontal to 1 vertical. The applicant has testified that this project will comply
with the requirements of 16.04.
DECISION
Motion by ____, seconded by ____, to approve site plan application #SP-23-031 of Craig
Wielenga, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect except as amended
herein.
2. This project shall be completed as shown on the plan submitted by the applicant and on
file in the South Burlington Department of Planning and Zoning as conditioned herein.
3. Prior to issuance of a Zoning Permit, the plans must be revised to show the changes
below and shall require approval of the Administrative Officer.
a. Amend the plans to reflect the existence & location of the stabilized surface on
which the existing bike racks will be mounted, and include language specifying
how the racks will be securely anchored to the ground.
b. Amend the plans to reflect the existence of snow storage areas.
c. [Placeholder condition pending the resolution of the red Staff comment under
14.11(2)(B)(ii) above].
4. A digital PDF version of the full set of approved final plans as amended must be
delivered to the Administrative Officer prior to issuance of a Zoning Permit.
5. The zoning permit must be obtained within six (6) months of this decision with the
option for requesting a one (1) year extension as allowed in LDR 17.04.
6. The applicant must address the comments of the Stormwater Superintendent.
#SP-23-031
- 7 -
7. The applicant must regularly maintain all stormwater treatment and conveyance
infrastructure.
8. Bicycle racks must meet the minimum requirements of 13.14 and Appendix G.
9. All exterior lighting must be installed or shielded in such a manner as to conceal light
sources and reflector surfaces from view beyond the perimeter of the area to be
illuminated.
10. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications must be underground.
11. The proposed project must adhere to standards for erosion control as set forth in
Section 16.03 of the South Burlington Land Development Regulations. In addition, the
grading plan must meet the standards set forth in Section 16.04 of the South Burlington
Land Development Regulations.
12. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to occupancy and/or use of the approved modifications.
13. The applicant must regularly maintain all stormwater treatment and conveyance
infrastructure.
14. Any change to the site plan shall require approval by the South Burlington Development
Review Board or the Administrative Officer as allowed by the Land Development
Regulations.
John Moscatelli Yea Nay Abstain Not Present
Mark Behr Yea Nay Abstain Not Present
Frank Kochman Yea Nay Abstain Not Present
Quin Mann Yea Nay Abstain Not Present
Dawn Philibert Yea Nay Abstain Not Present
Stephanie Wyman Yea Nay Abstain Not Present
Motion carried by a vote of _ - _ - _.
Signed this ____ day of August, 2023, by
_____________________________________
Dawn Philibert, Chair
Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this
decision, a notice of appeal and the required fee by certified mail to the Superior Court,
Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed
#SP-23-031
- 8 -
to the City of South Burlington Planning and Zoning Department at 180 Market Street, South
Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at
802-828-1660 or http://vermontjudiciary.org/GTC/environmental/default.aspx for more
information on filing requirements, deadlines, fees and mailing address.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant
state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.