Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SD-23-10 - Supplemental - 0255 Kennedy Drive (44)
O’Brien Farm Road, LLC Final Plat Application May 12, 2023 Exhibit Table of Contents Exhibit Name Exhibit Description Document Dated Exhibit 000 Application Narrative 05/17/23 Exhibit 001 Abutter List 04/28/23 Exhibit 002 City Final Plat Application, Executed 05/12/23 Exhibit 003 Combined Lighting Plan 05/03/22 Exhibit 004 Coverage Chart 12/07/21 Exhibit 005 Hillside Traffic Impact Analysis Updated 08/30/21 Exhibit 006 Hillside Traffic Impact Analysis Appendices Update 08/30/21 Exhibit 007 Issued Preliminary Plat Permit for Project Lots 11/12/2020 Exhibit 008 Landscape Improvement Estimate 06/03/22 Exhibit 009 Landscape Improvement Estimate, On Structure 11/03/21 Exhibit 010 Digital Renderings of Project Site 05/12/23 Exhibit 011 Project Lighting Plan 04/19/22 Exhibit 012 Parking Lot Island Area Calculation 06/01/22 Exhibit 013 Master Plan Amendment Allowing Limited Commercial Use 04/07/22 Exhibit 014 Issued Conditional Use Permit For Necessary Parking Area 07/11/22 Exhibit 015 On Building Exterior Lighting Cut Sheets 05/03/22 Exhibit 016 Preliminary Wastewater Allocation 11/10/21 Exhibit 017 Preliminary Water Allocation 02/26/20 Exhibit 018 Proposed Parking Lot Light Fixture 12/07/21 Exhibit 019 Proposed Parking Lot Light Pole 12/07/21 Exhibit 020 Sheet C2-A Hillside Electrical Distribution Plan 12/01/21 Exhibit 021 Original Project Narrative Submitted December 15, 2021 12/15/21 Exhibit 022 Project Narrative Additional Information Submitted In Response to Incomplete Items Identified in Original Submission 01/21/22 Exhibit 023 Project Narrative Update to Include Changes Requested by Board and City and Additional Information Needed 04/19/22 Exhibit 024 Architectural Comparison PowerPoint Presentation for Lot 13 and Lot 15 03/15/22 Exhibit 025 Traffic Report Trip Clarification Memo 11/22/21 Exhibit 026 C1.1 Open Space Area Plan Exhibit Hillside Master Plan 05/03/22 Exhibit 027 C2 Amenity Area Plan Multi-Family Zone of Hillside Master Plan 05/03/22 Exhibit 028 Existing and Planned Open Space PPT 05/03/22 Exhibit 029 Overview of Exterior Architecture and Amenities Presentation to Board 05/03/22 Exhibit 030 Exterior Architecture and Pedestrian Experience Presentation to Board 05/03/22 Exhibit 031 Food Truck and Amenity Area Comparison Sheet 05/03/22 Exhibit 032 Interior Amenity Spaces Overview 05/03/22 Exhibit 033 Landscape Budget With PC Construction Comment 05/03/22 Exhibit 034 Additional Project Narrative Responsive to City Feedback 05/03/22 Exhibit 035 Additional Project Narrative Responsive to City Feedback 06/07/22 Exhibit 036 Issued Final Plat Permit Lot 13 and Lot 15 07/11/22 Exhibit 037 C1 Overall Site Plan 06/01/22 Exhibit 038 C2 Site Plan 06/01/22 Exhibit 039 C3.1 Lot 13 Utility Plan 06/01/22 Exhibit 040 C3.2 Lot 13 Grading Plan 06/01/22 Exhibit 041 C3 Lot 13 Materials Plan 06/01/22 Exhibit 042 C4.1 Lot 15 Utility Plan 06/01/22 Exhibit 043 C4.2 Lot 15 Grading Plan 06/01/22 Exhibit 044 C4 Lot 15 Materials Plan 06/01/22 Exhibit 045 C5 Watershed Plan 06/01/22 Exhibit 046 C6 Soils Restoration Plan 06/01/22 Exhibit 047 D1 Civil Details 12/01/21 Exhibit 048 D2 Civil Details 12/01/21 Exhibit 049 D3 Civil and Water Details 12/01/21 Exhibit 050 D4 Civil and Water Details 12/01/21 Exhibit 051 D5 Civil and Water Details 12/01/21 Exhibit 052 D6 Civil and Sanitary Details 06/01/22 Exhibit 053 D7 Civil and Storm Details 06/01/22 Exhibit 054 D8 Erosion Control and Sediment Details 12/01/21 Exhibit 055 D9 Erosion Control and Sediment Details 12/01/21 Exhibit 056 D10 Site Electrical Details 12/01/21 Exhibit 057 EPSC1 Preconstruction 12/01/21 Exhibit 058 EPSC2 Preconstruction 12/01/21 Exhibit 059 EPSC3 Construction Plan 06/01/22 Exhibit 060 EPSC4 Construction Plan 06/01/22 Exhibit 061 EPSC5 Construction Plan 06/01/22 Exhibit 062 EPSC 6 Stabilization Plan 06/01/22 Exhibit 063 L100 Landscape Plan 06/03/22 Exhibit 064 L100.1 Overall Landscape Plan 06/03/22 Exhibit 065 L101 Landscape Plan Lot 13 and Lot 15 06/03/22 Exhibit 066 L102 Rooftop Amenity Deck Conceptual Site Plan 04/15/22 Exhibit 067 L200 Amenity Deck Details 04/15/22 Exhibit 068 L201 Landscape Details Building 13 and 15 12/07/21 Exhibit 069 A0-0 Cover Sheet Architecture Plans 11/23/21 Exhibit 070 A1-01 Basement Plan 11/23/21 Exhibit 071 A1-02 Level 1 Plan 11/23/21 Exhibit 072 A1-03 Level 2 Plan 11/23/21 Exhibit 073 A1-04 Level 3 Plan 11/23/21 Exhibit 074 A1-05 Level 4 Plan 11/23/21 Exhibit 075 A1-06 Roof Plan 11/23/21 Exhibit 076 A1-21 Basement Plan 11/23/21 Exhibit 077 A1-22 Level 1 Plan 11/23/21 Exhibit 078 A1-23 Level 2 Plan 11/23/21 Exhibit 079 A1-24 Level 2 Plan 11/23/21 Exhibit 080 A1-25 Level 4 Plan 11/23/21 Exhibit 081 A1-26 Roof Plan 11/23/21 Exhibit 082 A2-01 Elevation 04/11/22 Exhibit 083 A2-02 Elevation 11/23/21 Exhibit 084 A2-03 Elevation 11/23/21 Exhibit 085 A2-21 Elevation 11/23/21 Exhibit 086 A2-22 Elevation 11/23/21 Exhibit 087 A2-23 Elevation 04/11/22 Exhibit 088 A5-01 Studio and A unit Plan 11/23/21 Exhibit 089 A5-02 B and C Unit Plans 11/23/21 Exhibit 090 A5-03 D Unit Plans 11/23/21 Exhibit 091 A-TE-1-01 Trash Collection Plan 11/23/21 Exhibit 092 City of SB Site Plan Application 05/23/23 Exhibit 093 Stormwater Workbooks 09/24/21 Exhibit 094 Stormwater Narrative 09/24/21 Exhibit 095 Stormwater Modeling 09/24/21 Exhibit 096 Stormwater Worksheets 09/24/21