PROJECT DESCRIPTION
Preliminary and final plat application #SD-23-05 of Gary Bourne to create a General Planned Unit
Development by re-subdividing three existing lots into three new lots of 0.18 acres (Lot 1), 0.14 acres
(Lot 2), and 1.06 acres (Lot 3), and constructing a 3,350 sf financial institution on Lot 1, a 6,480 sf 2-story
mixed commercial and residential building on Lot 2, and a 3-story 27-unit multifamily building on Lot 3,
760 Shelburne Road.
COMMENTS
The Board reviewed this application on March 7, April 4, and June 6, 2023. The Board continued the
hearing for the purpose of allowing the applicant to address Board feedback, particularly on the
architecture of the proposed financial institution on Lot 1. The applicant provided supplemental
materials to resolve some issues discussed on June 6. Staff has included in this memo a review of
subject areas for which the applicant has submitted revised materials, as well as areas where Staff
expected revised materials but none were submitted.
As noted in previous staff reports, the applicant has requested modification or waiver for each
dimensional standard as well as a number of other modifications. The Board must only grant a
modification for cause, and the modification must result in better compliance with the objectives of the
LDR, both those specific to the standard requested to be modified and to the overall LDR objectives.
A) ZONING DISTRICT AND DIMENSIONAL REQUIREMENTS
The project is located in the Commercial 1 zoning district, which is intended to be a “higher-intensity
residential, retail, office, and vertically mixed uses in a manner that serves as or enhances a compact
central business area.” It is also located within an urban design overlay node, whose purpose statement
includes that it “will serve as important connections, gateways, or areas of activity. As such, a more
urban form is desired and, where noted, required and permitted.“ At the June 6 meeting, the applicant
presented updates to a few dimensional standards, which are now included in the updated table below.
2
Commercial 1-R15
Zoning District
Required Proposed
Lot 1
Proposed
Lot 2
Proposed
Lot 3
Proposed
Overall
@ Min. Lot Size 40,000 sq.
ft.
8,054 sq. ft. 6,287 sq. ft. 46,359 sq.
ft.
60,700 sq.
ft
@ Max. Building
Coverage
40 % 41.6% 51.5% 22.9% 28.4%
@ Max. Overall
Coverage
70 % 63.2% 77.6% 76.8% 75.1%
@ Min. Front
Setback, Urban
Design Overlay
20 ft. 10 ft. 13 ft. 73 ft. N/A
@ Min. Side Setback 10 ft. 7.4 ft. 9.9 ft. 10.7 ft N/A
@ Min. Rear Setback 30 ft. N/A 10 ft. N/A N/A
@ Max. Front
Setback Coverage,
Shelburne Road
30% 0% 4% 44% 40.3%
@ Max. Front
Setback Coverage,
Swift St
30% 0% N/A 37.6% 53.1%
@ Max. Height 5 stories
max,
Appearance
of 2 stories
min
1 story 2 stories 3 stories N/A
√ Zoning Compliance
@ Modification or Waiver Requested
Updated information from the last time this table was presented include lot coverage and front setback
coverage. The applicant is proposing to increase lot coverage above the maximum allowable in the zoning
district through the use of additional on-site open/civic space in 10.05E.
10.05 Urban Design Overlay District (UDO)
(2) Glazing. Windows are key to the overall design of a building and the relationship between its
exterior and interior.
(a) For all properties in the Urban Overlay District, a minimum of 75% of glazing shall be
transparent.
On June 6, the applicant presented a design for the building on Lot 1 in which 60% of the glazing
facing Shelburne Road was transparent. The Board’s feedback was that the spandrel glass
detracted from the appearance of the building. The applicant appears to have removed the
spandrel (opaque) glass from the façade, though they have not submitted revised floor plans
and the current elevations are not consistent with the previously-submitted floor plans. Staff
recommends, if the Board approves the project, the Board require the applicant to submit
revised floor plans consistent with the elevations dated 6/29/2023.
3
(3) Dimensional Standards
Height Minimum
(Maximums per
underlying zoning
district)
Glazing Features Setback
from ROW
Designated
Secondary
Node
Appearance of two
stories. Buildings
with a GFA of less
than 6,000 SF may
be one story.
First stories shall have a minimum
of 60% glazing across the width of
the building facade on primary
street; 40% minimum glazing across
width of the façade facing the
secondary street.
Must have
significant
architectural
feature at corner
of corner building.
Minimum
20 feet
1. On June 6, the Board directed the applicant to modify the building on Lot 1 to have the appearance
of two stories. The applicant has made modifications. Staff recommends the Board review the
revised elevations and the site as a whole and provide feedback on whether they consider the
dimensional requirements of the Urban Design Overlay to have been met.
Phasing
The project is proposed to be constructed in three phases. The first phase includes the buildings along
Shelburne Road and the base course of the site drive including the connection to Swift Street. The
multifamily building is the second phase. The third and final proposed phase includes the finish coat of
pavement on the driveway.
In a phased project in general, the applicant must obtain a certificate of occupancy for each phase prior
to use of that phase. Since there is nothing to “occupy” with the applicant’s proposed phase three, Staff
considers there would be no incentive for the applicant to complete it. Staff recommends the Board
either require the applicant to reduce the project to two phases, thus requiring completion of the final
coat of pavement before occupancy of the second building, or require provision of a bond of the cost of
phase 3 prior to issuance of a zoning permit for phase 2. Staff considers the option where phases 2 and
3 are combined to be preferred since the City does not have established protocols for constructing on
private property when an applicant fails to complete their obligations.
On June 6, the Board asked the applicant to demonstrate that site amenity, bike parking, and
landscaping requirements are met on a phase by phase basis.
Site Amenity
The required site amenity is calculated as follows.
Required Provided
Phase 1 6,590 sf non-residential x 6% = 396 sf
3 units x 100 sf / unit = 300 sf
890 sf snippet
Phase 2 27 units x 60 sf / unit = 1,620 sf
3,110 additional sf lot coverage in
Urban Design Overlay = 933 sf
1,840 sf snippet
1,900 sf snippet
Total 3,249 sf 4,630 sf
4
Landscaping
The required landscaping is calculated as follows.
Required Provided
Phase 1 $51,500 $60,099
Phase 1 + 2 $123, 500 $184,720
Provided landscaping includes hardscape elements of benches and sculptures.
Bicycle Parking
The required bicycle parking is calculated as follows.
Required Long-
Term Parking
Provided Long-Term
Parking
Required Short-Term
Parking
Provided Short-Term
Parking
Phase 1 4 42 8 43
Phase 2 27 27 4 8
Total 31 31 12 12
2. Two of the long-term bicycle parking spaces in Phase 1 are located within an interior room within
the proposed bank building. Users of the racks would have to pass through what appears to be
the employee break room with their bicycles in order to use the racks. While the LDRs provide
limited detail on the location of long-term bicycle parking, Staff considers the location to be less
than ideal and considers a more accessible location would be one way the applicant could improve
the project in light of the modifications they are requesting as a PUD.
3. Bicycle racks serving lots 1 and 2 are located just beyond the Lots 1 and 2 property lines on Lot 3.
Since the project is proposed as a PUD, Staff recommends that the Board allow off-site bicycle
racks to count towards the required minimum. However, the bike racks serving Lots 1 and 2 do
not provide the minimum for those lots (8 spaces required, 4 provided). Staff recommends the
Board require the Phase 1 bicycle parking areas to be expanded to permit parking of four bicycles
each (two racks each) so that bicycle parking requirements are met on a phase by phase basis.
Staff considers this can be addressed as a condition of approval.
Residential Density and 18.01 Inclusionary Zoning
The Board has provided feedback to the applicant that in order to construct 30 units total (10 over the
base zoning density unit-maximum), the applicant must provide for 10 of their base zoning density unit-
maximum to be inclusionary. Based on the most current versions of application materials, the applicant
is only proposing five (5) inclusionary units, though they have stated they consider the LDR to require
seven (7) inclusionary units.
As noted at previous meetings, the applicant may also use Transferable Development Rights for one or
more units. The applicant also has the option to make some of the inclusionary units 3 or 4 bedroom units,
which count towards more than 1 of the required inclusionary in order to attain the desired bonus.
The applicant has submitted a second letter arguing that the Board’s interpretation is incorrect, included
in the packet for the Board. The Board may deliberate and issue its decision which may include conditions
pertaining to required inclusionary covenants and documentation.
5
B) SITE PLAN REVIEW
14.07 Specific Review Standards
In all Zoning Districts and the City Center Form Based Codes District, the following standards shall apply:
H. Utility Services. Electric, telephone and other wire-served utility lines and service connections
shall be underground insofar as feasible and subject to state public utilities regulations. Any utility
installations remaining above ground shall be located so as to have a harmonious relation to
neighboring properties and to the site. Standards of Section 15.A.18, Infrastructure, Utilities, and
Services, shall also be met.
Staff provided the plans updated 6/26/2023 to the South Burlington Water District, which indicated on
7/3/2023 the following comments still need to be addressed. Many of these comments are unchanged
from previously rounds of comments provided by the Water District. While these comments are
extensive, Staff considers they do not affect the appearance of the project and are sufficiently specific
that they can be included as conditions of approval.
It is the responsibility of the contractor to be familiar with the CWD Specifications beyond what is included
in this information. The Champlain Water District Specifications and Detail for the Installation of Water
Lines and Appurtenances information can be found at www.champlainwater.org
Plan Specific Comments
Sheet C3-01. (See sheet C3-01)
1. The proposed eight-inch (8”) tee shall include a main line gate valve on either side of the new tee
to be cut-in, secured to the tee with Foster Adapters; total three (3) eight-inch gate valves. This
must be shown on the plans. The cut-in of this tee shall require a shutdown on the only line
supplying the northern part of the City so must be scheduled for night work. At least three
weeks’ notice must be provided to the SBWD so all affected customers can be notified in advance
of the water service interruption.
2. Include a tracing wire box near tee per CWD Specifications.
3. A six-inch (6”) valve on the line supplying the Multi-family Residential 27DU building shall be
secured to the hydrant tee. Add a tracing wire box to this tee, per CWD Specifications.
4. Place the 1.5” curb box inside a gate valve box top when located in concrete or asphalt surface
areas. Include a minimum 1” paving riser.
5. Locate and abandon all three existing water services at the corporations. Close the corporations,
disconnect the service lines, and wrap the service taps in V-Bio polyurethane.
6. The services to all of the proposed buildings shall be copper and DI if petroleum infused soils are
encountered. See VT Water Supply Rule requirements.
7. Install 6” gate valve on FS line to 27 DU Multifamily Residential building. Add tracing wire box
per CWD Specifications.
8. See CWD Specifications for tracing wire requirements for all PVC water pipe.
Sheet C8-04
1. Water Details must be those found in the CWD Specifications. The Department will not accept
any pipe or material that is not in compliance with the CWD Specifications. There are too many
discrepancies to list here between Sheet C8-04 Water Details and the CWD Specifications.
6
C) SUPPLEMENTAL REGULATIONS
13.05 Stormwater Management
Stormwater standards apply when one-half acre or more of impervious surface exists or is proposed to
exist, and where 5,000 sf of impervious is created or reconstructed. The City Stormwater Section
reviewed the plans and provided comments on 3/2/2023. The City Stormwater Section offers the
following comments on the revised plans received 5/23/2023.
1. The swale conveying water to Bioretention 7 terminates in a 9-foot vertical drop over the top of
the retaining wall into the bioretention. Please provide an appropriate inlet for water conveyed
to the bioretention from the swale.
On June 6, the Board asked the applicant to address this comment. The applicant indicated they would
add a yard drain. The plans have not been revised. Staff considers stormwater to be an area for which
the applicant has not sufficiently addressed the comments of the Board.
4. Staff recommends the Board confirm the applicant does not propose to make any changes to this
aspect of the plans.
13.07 Exterior Lighting
Specific requirements for maximum illumination levels are included in Appendix A and are limited to 3
footcandles average at ground level and 0.3 footcandles at the property line.
The June 6 Staff report recommended reducing lighting on the southern side of the property to reduce
excess spillover to 0.3 footcandles maximum, and reducing peak illumination levels to a more
reasonable level, on the order of 8 to 10 footcandles. The applicant testified on June 6 that the parking
lot lighting on the southern side of the site also illuminates the adjacent property. Staff considers
without a joint application, there is no nexus for this project to illuminate an adjacent property.
Illumination levels beyond the southern property line are up to 1 footcandle. However, the more
concerning area of illumination is the rear (east) entrance to the bank building, which is proposed to
have illumination levels in excess of 19 footcandles. Staff considers lighting to be an area for which the
applicant has not sufficiently addressed the comments of the Board.
5. Staff recommends the Board confirm the applicant does not propose to make any changes to this
aspect of the plans.
RECOMMENDATION
Staff recommends that the Board discuss the remaining issues with the applicant and close the hearing.
Nichiha Panel
(Ash)Nichiha Panel (Bark)Black Anodized Mullions
ACM Panels Chase SilverChiseled Limestone
(Cream)
760 & 764 SHELBURNE RD. & 31 SWIFT ST.
SOUTH BURLINGTON, VT
SHELBURNE & SWIFT
Engineer & Landscape Architect:
TRUDELL CONSULTING ENGINEERS (TCE)
478 BLAIR PARK ROAD
WILLISTON, VT 05495
(802) 879-6331
Owner/Applicant:
GARY BOURNE
414 WEST GROVE
MIDDLEBORO, MA 02346
(508) 735-4970
DRAWING INDEX
Architect:
RABIDEAU ARCHITECTS
550 HINESBURG ROAD
SUITE 101
SOUTH BURLINGTON, VT 05403
PROJECT DESCRIPTION:
THE PURPOSE OF THIS PROJECT IS TO REDEVELOP THE FORMER GAS STATION
AND RESTAURANT SITE AND CONSTRUCT A MULTI-UNIT RESIDENTIAL
BUILDING, COMMERCIAL AND FINANCIAL INSTITUTION SPACES. THE
PROJECT WILL UTILIZE MUNICIPAL WATER AND SEWER.
" LOCAL PERMITTING" SUBMISSION SET
(NOT FOR CONSTRUCTION)
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
TRUDELL CONSULTING ENGINEERS
TCE PROJECT NO: 22-523
06/26/2023 ISSUED FOR PERMITTINGLAST REVISED:
USE AND INTERPRETATION OF THE DRAWINGS
BEFORE USING THESE PLANS ENSURE THAT YOU HAVE THE LATEST REVISION
1. Unless otherwise noted, these Drawings are intended for preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities. They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project, the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits, and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect, to insure these plans are properly coordinated including,
but not limited to, contract documents, specifications, owner/contractor agreements, building and mechanical plans,
private and public utilities, and other pertinent permits for construction.
3. Owner and Architect are responsible for final design and location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property. Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains the most current revisions. If unsure, please contact TCE.
PERMIT DESCRIPTION: FINAL PLAT
TAX ID:
PARCEL ID: 1540-00760
SPAN: 600-188-10694
PROJECT
LOCATION
C0-00 Cover
C1-00 Legend & Notes
C1-01 Existing Conditions Plan
C1-02 Demolition & EPSC Plan
C2-00 Overall Site Plan
C2-01 Layout & Materials
C2-02 Grading Plan
C3-01 Utility Plan
C4-01 Existing Stormwater Plan
C4-02 Proposed Stormwater Plan
C8-01 Site Details
C8-02 Site Details
C8-03 Site Details
C8-04 Water Details
C8-05 Sanitary Details
C8-06 Storm Details
C8-07 Storm Details
C8-08 EPSC Details
C8-09 EPSC Handbook Page 1
C8-10 EPSC Handbook Page 2
C8-11 ATM Details
C8-12 ATM Details
C8-13 ATM Details
LA-1.0 Landscape Plan
LA-2.0 Landscape Details
LA-2.1 Site Details
S1-01 Plat
LI-01 Lighting Plan
No. 8917
CIVILJENNIFER ANN DESA
UT
E
LSSTA TE O F VER
M
ONT
PROF
ESSIONAL E N G INEERLICEN S E D
C2-03 Phasing Plan
DDDDDDOH
OH
OH
21
3
214
2
1
6 217213214212211215216214
2
1
2
213
21
1
216217213215212210214213211212210210212211213215217216214208209218219210211213212216214218217210209209210211212208SBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSB SB SB SB SB SB SB SB SB SB SBSBSBSB SBSBSBSBSBSBSBSBSBSB10
'
1-STORY
BUILDING
1-STORY
BUILDING
SHELBURNE ROAD (U.S. ROUTE 7)SWIFT STREET
D
D D
D D
D D D
DDD
D
D
D
D
1-STORY
BUILDINGWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
CROSSWALK SIGNAL
POLE
LEGAL LOAD
LIMIT SIGN
GUPUPUPUPUPUGUGUGUG
FINANCIAL
INSTITUTION
±3,350 SF
14
7
S
P
E
E
D
TA
B
L
E
ATM LANE
13
MULTIFAMILY
RESIDENTIAL
27 DU
FFE 217.0
BFE 207.0
GARAGE
ENTRANCE
D D
MIXED USE ± 3,240 SF
1ST FLOOR: COMMERCIAL
2ND FLOOR: 3 DU
FFE 212.0
FFE 212.0 1,840 SF SITE
AMENITY SPACE
(SNIPPET PARK)
890 SF SITE
AMENITY SPACE
(SNIPPET PARK)210209211212211210209208213214216
21
5213
2
1
1 212209
210
211211
210212213213215
216
215216216.5
21721521621
4
21821821721
5209206205.521221
3
DEDICATED
PARKING FOR
COMMERCIAL USES
ONLY DURING
BUSINESS HOURS 2162102112091,900 SF SITE
AMENITY SPACE
Sheet Title
Project Title
Use of These Drawings
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date By
Revisions
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
E N G I N E E R I N G S U R V E Y
No. 8917
CIVILP
ROF
E
SSIONAL E N G INEERLICEN S E DJENNIFER ANN DESA
U
T
E
LSSTA TE O F VER
M
ONTField Book:
For Local Permitting Only
1. Unless otherwise noted, these Drawings are intended for
preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities.
They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,
the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits,
and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect,
to insure these plans are properly coordinated including, but
not limited to, contract documents, specifications,
owner/contractor agreements, building and mechanical
plans, private and public utilities, and other pertinent permits
for construction.
3. Owner and Architect, are responsible for final design and
location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating
final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user
shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not
transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property.
Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to
the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains
the most current revisions.
PLANNIN G ENVIRON MENTAL
1 02/09/2023 JADPlan RevisionsPROJECT LOCATION
0
Feet
Graphic Scale
20 40 60
15°±VT GridMagnetic
PARCEL ID: 1540-00760 SPAN: 600-188-10694
Overall Site Plan
C2-00
01/20/2023
1" = 20'
22-523
PJM
CMJ
JAD
Shelburne & Swift
760 & 764 Shelburne Rd. &
31 Swift St.
South Burlington, VT
ZONING DISTRICT INFORMATION:
ZONING DISTRICT:C1 R15
OVERLAY DISTRICT:URBAN DESIGN (UDO)/PRIMARY NODE
TRANSIT DISTRICT
TRAFFIC DISTRICT / ZONE 1
SETBACKS
FRONT YARD:30 FT (COMMERCIAL 1)
FRONT YARD:10 FT (PROPOSED PUD)
SIDE YARD:10 FT
REAR YARD:30 FT - N/A - CORNER LOT
LOT COVERAGE:70% MAX.
BLDG COVERAGE:40% MAX.
LOT SIZE:40,000 SF MIN.
HEIGHT REQ'S:2 STORIES MIN.
PLAN INFORMATION:
EXISTING
760 SHELBURNE ROAD
LOT SIZE: 17,553 SF / 0.4 AC
BUILDING COVERAGE: 4,229 SF / 0.1 AC OR 24.1%
TOTAL LOT COVERAGE: 14,901 SF / 0.34 AC OR 84.9%
FRONT YARD:
SHELBURNE RD: 1,113 SF / 0.03 AC OR 90.3%
SWIFT ST: 1,127 SF/ 0.03 AC OR 88.0%
764 SHELBURNE ROAD
LOT SIZE: 26,572 SF / 0.61 AC
BUILDING COVERAGE: 2,812 SF / 0.06 AC OR 10.6%
TOTAL LOT COVERAGE: 19,914 SF / 0.46 AC OR 74.9%
FRONT YARD (SHELBURNE): 431 SF / 0.01 AC OR 43.3%
31 SWIFT STREET
LOT SIZE: 16,575 SF / 0.38 AC
BUILDING COVERAGE: 6,157 SF / 0.14 AC OR
TOTAL LOT COVERAGE: 14,118 SF / 0.32 AC OR 85.2%
FRONT YARD (SWIFT): 948 SF / 0.02 AC OR 77.3%
LOT INFORMATION:
TAX MAP NO. 1540-00760
BOURNE GARY J,
V. 188 P 137-8
17,553 SF / 0.42 AC
TAX MAP NO. 0700-00031
BOURNE GARY
V. 326 P 50-2
16,575 SF / 0.40 AC
TAX MAP NO. 1540-00764
764 SHELBURNE RD LLC,
C/O GARY BOURNE
V. 1035 P 233-4
26,572 SF / 0.61 AC
PROPOSED - INDIVIDUAL LOTS
760 SHELBURNE ROAD
LOT SIZE: 8,054 SF / 0.18 AC
BUILDING COVERAGE: 3,350 SF / 0.08 AC OR 41.6%
TOTAL LOT COVERAGE: 5,095 SF / 0.12 AC OR 63.2%
764 SHELBURNE ROAD
LOT SIZE: 6,287 SF / 0.14 AC
BUILDING COVERAGE: 3,240 SF / 0.07 AC OR 51.5%
TOTAL LOT COVERAGE: 4,880 SF / 0.11 AC OR 77.6%
FRONT YARD (SHELBURNE): 67 SF / 0.001 AC OR 4%
31 SWIFT STREET
LOT SIZE: 46,359 SF / 1.06 AC
BUILDING COVERAGE: 10,620 SF / 0.24 AC OR 22.9%
TOTAL LOT COVERAGE: 35,625 SF / 0.82 AC OR 76.8%
FRONT YARD:
SHELBURNE RD: 381 SF / 0.008 AC OR 44%
SWIFT ST: 1,311 SF / 0.03 AC OR 37.6%
PARKING:35 SURFACE SPACES
27 GARAGE SPACES
TOTAL:62 SPACES
PROPOSED - OVERALL PUD
760 SHELBURNE ROAD
PUD AREA: 60,700 S.F.SF / 1.39 AC
BUILDING COVERAGE: ±17,210 SF / 0.40 AC OR 28.4%
OVERALL COVERAGE: ±45,600 SF / 1.05 AC OR 75.1%
FRONT YARD:
SHELBURNE RD: ±903 SF / 0.02 AC OR 40.3%
SWIFT ST: ±1,355 SF / 0.03 AC OR 53.1%
2 02/16/2023 CMJUtilities
SNOW STORAGE NOTE:
SNOW WILL BE STORED ONSITE IN LANDSCAPE BEDS AND GREEN
SPACES WHERE FEASIBLE. SNOW THAT CANNOT BE STORED ONSITE
WILL BE REMOVED FROM THE SITE.
3 05/15/2023 LETStaff Comments
LOT 1:
LOT 2:
LOT 3:
4 06/26/2023 LETStaff Comments
DDDDDDOH
OH
OH
21
3
214
2
1
6 217213214212211215216214
21
2
213
2
11
216217213215212210214213211212210210212211213215217216214208209218219210211213212216214218217210209209210211212208SBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSB SB SB SB SB SB SB SB SB SB SBSBSBSB SBSBSBSBSBSBSBSBSBSB10
'
1-STORY
BUILDING
1-STORY
BUILDING
SHELBURNE ROAD (U.S. ROUTE 7)SWIFT STREET
D
D D D D D D D DDD
D
D
D
D
1-STORY
BUILDINGWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
CROSSWALK SIGNAL
POLE
LEGAL LOAD
LIMIT SIGN
UTILITY
COVER
CONCRETE FOOTING
FOR ROUTE 7
OVERHEAD LANE
ASSIGNMENT SIGN GUPUPUPUPUPUGUGUGUGSOL. #3 - 75"BUILT-IN TPCONTROLS
FINANCIAL
INSTITUTION
±3,350 SF
ATM
(8) BIKE SPACES
ENCLOSED DUMPSTER
S
P
E
ED
TA
B
L
E
PROPOSED 12' WIDE
CROSS LOT
CONNECTION
MULTIFAMILY
RESIDENTIAL
27 DU
FFE 217.0
BFE 207.0FDFDFDFD
FDFDFD
FD
FDFDFDFDFDFDFDFDFDFDFDFDRDD
D D
MIXED USE ± 3,240 SF
1ST FLOOR: COMMERCIAL
2ND FLOOR: 3 DU
FFE 212.0
FFE 212.0
DROP OFF AREA
w/VEHICULAR PAVERS
DDDDDDDDD D D
D
D
D
DDDD
D
MODULAR BLOCK RETAINING
WALL w/42" HIGH GUARDRAIL
STORMWATER TREATMENT
STRUCTURE (TYP.)
CONCRETE STAIRS
w/STAINLESS STEEL
HANDRAILS (TYP.)
MODULAR BLOCK
WALL (TYP.)
FLUSH CURB
(TYP.)
WOODEN CURVED
BACKLESS BENCH
(TYP.)
STAMPED CONCRETE
PAVEMENT
2' BRICK
PAVING
CONCRETE STAIRS
w/STAINLESS STEEL
HANDRAILS (TYP.)
FLUSH CURB
(TYP.)
ADA SPACE
w/VEHICULAR
PAVERS
DETECTABLE
WARNING
MODULAR BLOCK
RETAINING WALL
(TYP.)
4' WOOD PRIVACY FENCE
RAISED PLANTER w/MODULAR BLOCK WALL
STAMPED CONCRETE PAVEMENT
WOODEN CURVED
BACKLESS BENCH
(TYP.)
STORMWATER TREATMENT
AREA (TYP.)
STAMPED CONCRETE
PAVEMENT
WOODEN CURVED
BACKLESS BENCH
(TYP.)
CONCRETE STAIRS
w/STAINLESS STEEL
HANDRAILS (TYP.)
MODULAR BLOCK
RETAINING WALL
(TYP.)D210209211212211210209208213214216
21
5213
2
1
1 212209
210
211211
210212213213215
216
215216216.5
21721521621
4
218218217215209206205.521221
3
W
W
W W WWWWWWWWSSSSSSSSSSSFD
FD DD
D
MODULAR BLOCK RETAINING
WALL w/42" HIGH GUARDRAIL
(2) BIKE SPACES
CONCRETE
SIDEWALK
±18"-36" MODULAR BLOCK
FREESTANDING WALL
(TYP.)
WOODEN CURVED BACKLESS WALL CAP BENCH (TYP.)
EXISTING LIGHT
FIXTURE TO
REMAIN 216210211209"HEAD ACHE BAR"
COORD. w/SHOP
DRAWINGS
CANOPY
LIMITS
POTENTIAL FUTURE
10' x 6' GENERATOR
LOCATION
UP UP UPUPPAVED BIKE PATH
SCULPTURE (TYP.)
APPROX. LOCATION
FOR REFERENCE ONLYFLUSH CURB
(TYP.)
10' x 12' TRANSFORMER
w/SCREEN FENCE IF REQ'D
BY GMP
SIGN
(2) BIKE
SPACES
21
3
214
2
1
6 217SB SB SB SB SB SB SB SB SBSBSBSBSB7
ENCLOSED DUMPSTER
PROPOSED 12' WIDE
CONNECTION FDFDFDFD
FD
FDFDFDFDFDGARAGE
ENTRANCE
D DDDD
D
MODULAR BLOCK RETAINING
WALL w/42" HIGH GUARDRAIL
CONCRETE STAIRS
w/STAINLESS STEEL
HANDRAILS (TYP.)
4' WOOD PRIVACY FENCE
21221121020920821821721
5209206205.5212FD
FD
MODULAR BLOCK RETAINING
WALL w/42" HIGH GUARDRAIL
(2) BIKE SPACES
POTENTIAL FUTURE
10' x 6' GENERATOR
LOCATION
Sheet Title
Project Title
Use of These Drawings
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date By
Revisions
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
E N G I N E E R I N G S U R V E Y
No. 8917
CIVILP
ROF
E
SSIONAL E N G INEERLICEN S E DJENNIFER ANN DESA
U
T
E
LSSTA TE O F VER
M
ONTField Book:
For Local Permitting Only
1. Unless otherwise noted, these Drawings are intended for
preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities.
They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,
the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits,
and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect,
to insure these plans are properly coordinated including, but
not limited to, contract documents, specifications,
owner/contractor agreements, building and mechanical
plans, private and public utilities, and other pertinent permits
for construction.
3. Owner and Architect, are responsible for final design and
location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating
final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user
shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not
transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property.
Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to
the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains
the most current revisions.
PLANNIN G ENVIRON MENTAL
1
15°±VT GridMagnetic
PARCEL ID: 1540-00760 SPAN: 600-188-10694
Layout & Materials
C2-01
01/20/2023
1" = 20'
22-523
PJM
CMJ
JAD
Shelburne & Swift
760 & 764 Shelburne Rd. &
31 Swift St.
South Burlington, VT
GARAGE LEVEL ENTRANCE
SCALE: 1" = 20'
SEE ARCHITECTURAL
PLANS FOR
UNDERGROUND
PARKING LAYOUT
LAYOUT AND MATERIALS NOTES
1.THE DIMENSIONS SHOWN ON THE DRAWINGS SHOW DESIGN INTENT AND MUST
BE FIELD VERIFIED PRIOR TO PREPARATION OF SHOP DRAWINGS.
2.ALL LINES ARE PARALLEL, PERPENDICULAR, OR 45 DEGREES TO THE LINES FROM
WHICH THEY ARE MEASURED UNLESS OTHERWISE NOTED.
3.THE DIMENSIONS OF PAVEMENT AS SHOWN ON THE DRAWINGS ARE TO THE
CENTER LINE OF EACH TYPE OF JOINT EXCEPT WHERE PAVEMENT MEETS A
VERTICAL FACE; AT THIS LOCATION DIMENSIONS ARE TO THE VERTICAL FACE.
4.DIMENSIONS TO SITE OR BUILDING WALLS ARE TO THE OUTSIDE (OR EXPOSED)
FACE OF WALL UNLESS OTHERWISE NOTED.
5.EXPANSION JOINT FILLER AND SEALANT SHALL BE PLACED WHERE CONCRETE
PAVEMENT MEETS CURBING, WALLS OR OTHER VERTICAL ELEMENTS, INCLUDING
LIGHT BASES, HYDRANTS, BUILDINGS AND BUILDING COLUMNS, WALLS, STAIRS
AND AT OTHER CONDITIONS AS SHOWN ON THE DRAWINGS. CONTRACTOR
SHALL REQUEST THE PRESENCE OF THE LANDSCAPE ARCHITECT TO REVIEW THE
LAYOUT OF EXPANSION JOINTS PRIOR TO PLACING FINISHED WORK.
6.EXPANSION JOINTS SHALL BE LOCATED 25' - 30' O/C, MAX.
7.WHERE NEW PAVING OR EARTHWORK MEETS EXISTING PAVING OR EARTHWORK,
SMOOTHLY BLEND LINE OF EXISTING WITH NEW.
8.RESTORE EXISTING CONDITIONS AS NECESSARY IN ALL AREAS DISTURBED BY
THE CONSTRUCTION OF THIS PROJECT, INCLUDING, BUT NOT LIMITED TO,
RESETTING SITE IMPROVEMENTS, REPAVING AND SEEDING.
15°±VT GridMagnetic0
Feet
Graphic Scale
20 40 60
02/09/2023 JADPlan Revisions
2 02/16/2023 CMJUtilities
3 05/15/2023 LETCity Comments
4 06/26/2023 LETStaff Comments
DDDDDDOH
OH
OH
21
3
214
2
1
6 217213214212211215216214
2
1
2
213
21
1
216217213215212210214213211212210210212211213215217216214208209218219210211213212216214218217210209209210211212208SBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSB SB SB SB SB SB SB SB SB SB SBSBSBSB SBSBSBSBSBSBSBSBSBSB10
'
1-STORY
BUILDING
1-STORY
BUILDING
SHELBURNE ROAD (U.S. ROUTE 7)SWIFT STREET
D
D D
D D
D D D
DDD
D
D
D
D
1-STORY
BUILDINGWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
CROSSWALK SIGNAL
POLE
LEGAL LOAD
LIMIT SIGN
UTILITY
COVER
GUPUPUPUPUPUGUGUGUG
FINANCIAL
INSTITUTION
±3,350 SF
S
P
E
E
D
TA
B
L
E
MULTIFAMILY
RESIDENTIAL
27 DU
FFE 217.0
BFE 207.0
D D
MIXED USE ± 3,240 SF
1ST FLOOR: COMMERCIAL
2ND FLOOR: 3 DU
FFE 212.0
FFE 212.0
210209211212211210209208213214216
21
5213
2
1
1 212209
210
211211
210212213213215
216
215216216.5
21721521621
4
21821821721
5209206205.521221
3 216210211209PHASE IIPHASE I
Sheet Title
Project Title
Use of These Drawings
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date By
Revisions
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
E N G I N E E R I N G S U R V E Y
No. 8917
CIVILP
ROF
E
SSIONAL E N G INEERLICEN S E DJENNIFER ANN DESA
U
T
E
LSSTA TE O F VER
M
ONTField Book:
For Local Permitting Only
1. Unless otherwise noted, these Drawings are intended for
preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities.
They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,
the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits,
and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect,
to insure these plans are properly coordinated including, but
not limited to, contract documents, specifications,
owner/contractor agreements, building and mechanical
plans, private and public utilities, and other pertinent permits
for construction.
3. Owner and Architect, are responsible for final design and
location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating
final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user
shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not
transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property.
Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to
the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains
the most current revisions.
PLANNIN G ENVIRON MENTAL
PROJECT LOCATION
0
Feet
Graphic Scale
20 40 60
15°±VT GridMagnetic
PARCEL ID: 1540-00760 SPAN: 600-188-10694
Phasing Plan
C2-03
5/15/2023
1" = 20'
22-523
PJM
CMJ
JAD
Shelburne & Swift
760 & 764 Shelburne Rd. &
31 Swift St.
South Burlington, VT
PHASING NOTES:
CONSTRUCTION SHALL OCCUR IN ACCORDANCE WITH THE FOLLOWING
PHASES:
1.PHASE 1: CONSTRUCTION OF TWO BUILDINGS ALONG SHELBURNE
ROAD, CURB CUTS, CURBING, SIDEWALKS, SWIFT STREET REC PATH,
UTILITIES, PARKING LOT AND DRIVE BASE CONSTRUCTION AND BASE
PAVEMENT COARSE, LANDSCAPING AND STORMWATER INSTALLATION IN
PHASE 1 AREA
2.PHASE 2: CONSTRUCTION OF MULTIFAMILY RESIDENTIAL BUILDING,
CURBING, SIDEWALKS, UTILITIES, AND STORMWATER INSTALLATION IN
PHASE 2 AREA
3.PHASE 3: CONSTRUCTION OF TOP PAVEMENT COARSE THROUGHOUT
SITE, REMAINING LANDSCAPING, SITE AMENITIES, REMAINING FEATURES,
AND FINAL STABILIZATION
PHASING LEGEND:
PHASE 1
PHASE 2
PHASE 3
NOTE:
EROSION CONTROL MEASURES SHALL REMAIN IN PLACE FOR THE PROJECT
DURATION UNLESS FINAL STABILIZATION IS INSTALLED BETWEEN PHASES. THE
CONTRACTOR SHALL STABILIZE AND PROVIDE SAFETY MEASURES FOR ACTIVE
CONSTRUCTION AREAS ADJACENT TO COMPLETED PHASES IN ACCORDANCE
WITH OSHA REQUIREMENTS.
OPEN SPACE PHASING:
PHASE 1:
PHASE 1 OPEN SPACE REQUIREMENTS:
COMMERCIAL: 6,590 SF x 6% = 396 SF
RESIDENTIAL: 3 UNITS x 60 SF/UNIT = 180 SF
REQUIRED OPEN SPACE: 576 SF
PROVIDED: 890 SF
PHASE 2: REMAINING OPEN SPACE
4 06/26/2023 LETStaff Comments
DDDDDDOH
OH
OH
21
3
214
2
1
6 217213214212211215216214
2
1
2
213
21
1
216217213215212210214213211212210210212211213215217216214208209218219210211213212216214218217210209209210211212208SBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSBSB SB SB SB SB SB SB SB SB SB SBSBSBSB SBSBSBSBSBSBSBSBSBSB10
'
1-STORY
BUILDING
1-STORY
BUILDING
SHELBURNE ROAD (U.S. ROUTE 7)SWIFT STREET
D
D D D D D
D D DDD
D
D
D
D
RIM = 209.0
18" RCP iIN(E) = 202.2
18" RCP iIN(S) =201.3
18" RCP IOUT(W) = 200.6
RIM = 210.8
15" RCP iIN(N) = 204.1
12" RCP iIN(E) =204.3
18" RCP iOUT(W) = 203.9
1-STORY
BUILDINGWWWWWWWWWWWW
W
W
W
W
W
W
W
W
W
APPROX. LOCATION
PER DIGSAFE MARKINGS
EX. 8" WATER MAIN
APPROX. LOCATION
EX. 6" WATER MAIN
(TO BE VERIFIED)
CROSSWALK SIGNAL
POLE
LEGAL LOAD
LIMIT SIGN
UTILITY
COVER
CONCRETE FOOTING
FOR ROUTE 7
OVERHEAD LANE
ASSIGNMENT SIGN
RIM = 207.9
SUMP = 203.1
18" RCP iOUT +/- 202.7 GUPUPUPUPUPUGUG UGUG45'-8"78'-10"SOL. #3 - 75"BUILT-IN TPCONTROLS
FINANCIAL
INSTITUTION
±3,350 SF
S
P
E
ED
TA
B
L
E
MULTIFAMILY
RESIDENTIAL
27 DU
FFE 217.0
BFE 207.0
DA 3 BIO
DA 1 BIO
FDFDFDFDFDFDFD
FD
FDFDFDFDFDFDFDFDFDFDFDFDRDD
DA 7
BIODD
MIXED USE ± 3,240 SF
1ST FLOOR: COMMERCIAL
2ND FLOOR: 3 DU
FFE 212.0
FFE 212.0
DDDDDDDDD D D
D
D
D
DDDD
DD210209211212211210 209208213214216
21
5213
2
1
1 212209
210
211211
210212213213215
216
215216216.5
2172152162
1
4
218218217215209206205.521221
3
W
W
W W WWWWWWWWSSSSSSSSSSSSMH #1
RIM = 215.75
8" iIN = 207.27
6" iIN = 207.5
8" iOUT = 207.17
NEW 8" iIN = 207.0
6" iOUT = 209.0
SMH #2
RIM = 210.95
6" iIN (2) = 207.95
8" iOUT = 207.85
6" iOUT = 209.2
6" iOUT = 208.5
FD
FD DD
D
8" SDR 35 P
V
C s
=0.004 ft./ft.
DMH 2
RIM = 212.0
18" iIN (E) = 201.49
18" iIN (S) = 201.49
18" iOUT (NW) = 201.39
FILTERRA INTERNAL BYPASS
BIOSCAPE 4'X6' MEDIA BAY
CURB INLET = 214.5'
8" iOUT = 211.3'
4" FOOTING DRAIN
ASSUMED INV = 205.0
FILTERRA PEAK DIVERSION
6X10' MEDIA BAY
CURB INLET = 210.5'
12" iOUT ~ 207.09'
DMH4
RIM = 211.3
12" iIN (E) = 206.0
18" iIN (S) = 201.86
18" iOUT (N) = 201.76
OUTLET STRUCTURE 1
18" OVERFLOW GRATE = 215.75
12" iOUT = 212.0
OUTLET STRUCTURE 2
18" OVERFLOW GRATE = 209.83
12" iOUT = 206.0
FILTERRA INTERNAL BYPASS
BIOSCAPE 4X6' MEDIA BAY
6" iIN = 210.5
6" iOUT = 207.8'
OUTLET CONTROL STRUCTURE 4
RIM = 211.5
6" iIN (S) = 206.3
18" iOUT (W) = 206.3
FILTERRA INTERNAL BYPASS
BIOSCAPE 4'X6' MEDIA BAY
PARKING LOT CURB INLET = 208.4'
NW CORNER INLET (TOP OF
MEDIA) = 207.6'
8" iOUT ~ 205.2'
DMH 1
RIM = 210.5
12" iIN (NE) = 205.0
18" iIN (E) = 201.15
18" iOUT (NW) = 201.05
NEW 18" iIN = 201.0
DMH 5
RIM = 211.85
12" iIN (E) = 202.39
6" iIN (FOOTING DRAIN) = 204.0
WITH FLAPPER VALVE AT END
8" iIN (W) = 202.39
18" iOUT (N) = 202.29
OUTLET STRUCTURE 3
18" OVERFLOW GRATE = 206.75
12" iOUT = 202.5
DMH 6
RIM = 209.0
8" iIN (S) = 204.0
8" iOUT (E) = 203.9
EXTENDED DETENTION
THREE - 48" HDPE X 80'
INVERT = 206.3
FILTERRA INTERNAL BYPASS
BIOSCAPE 6'X6' MEDIA BAY
CURB INLET = 211.0
8" iOUT = 207.8'
CURB INLET = 208.4
CB1
RIM = 212.0
12" iOUT = 210.75
DMH 3
RIM = 214.6
12" iIN (E) = 210.0
8" iIN (S) = 209.17
18" iOUT (W) = 204.17
TRENCH DRAIN AT ENTRANCE
TO GARAGE WITH DEEP SUMP
AT OUTLET (SEE DETAIL)
GRATE = 207.0
6" ROOF DRAIN
iOUT = 215.75
4" C900 DR14
1.5" C901 CTS POLY
4" TAPPING VALVE (TYP)
1.5" CURB STOP (TYP)
(COPPER BETWEEN
MAIN & CURB STOP)8" C900 DR148" TEE AND GATE VALVE (TYP)216210211209CB2 (DEEP SUMP)
WITH CURB INLET
12" iIN = 209.8
12" iOUT = 209.7
POTENTIAL FUTURE
10' x 6' GENERATOR
LOCATION
UP UP UPUP6" ROOF DRAIN
8"X6"X6" TEE, 6" DI STUB,
GATE VALVE AND FIRE
PROTECTION HYDRANT,
REDUCE TO 6" C900
AFTER TEE TO BUILDING
13'6" C900 DR144" C900 DR14
DOMESTIC SERVICE
WITH 4" GATE VALVE
6" C900 DR14 FIRE SERVICE
PEASTONE
DIAPHRAGM (TYP.)
10' x 12' TRANSFORMER
w/SCREEN FENCE IF REQ'D
BY GMP
YARD DRAIN
RIM = 214.5
6" iOUT = 207.0
Sheet Title
Project Title
Use of These Drawings
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date By
Revisions
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
E N G I N E E R I N G S U R V E Y
No. 8917
CIVILP
ROF
E
SSIONAL E N G INEERLICEN S E DJENNIFER ANN DESA
U
T
E
LSSTA TE O F VER
M
ONTField Book:
For Local Permitting Only
1. Unless otherwise noted, these Drawings are intended for
preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities.
They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,
the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits,
and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect,
to insure these plans are properly coordinated including, but
not limited to, contract documents, specifications,
owner/contractor agreements, building and mechanical
plans, private and public utilities, and other pertinent permits
for construction.
3. Owner and Architect, are responsible for final design and
location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating
final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user
shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not
transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property.
Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to
the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains
the most current revisions.
PLANNIN G ENVIRON MENTAL
0
Feet
Graphic Scale
20 40 60
15°±VT GridMagnetic
PARCEL ID: 1540-00760 SPAN: 600-188-10694
Utility Plan
C3-01
01/20/2023
1" = 20'
22-523
PJM
CMJ
JAD
Shelburne & Swift
760 & 764 Shelburne Rd. &
31 Swift St.
South Burlington, VT
"I HEREBY CERTIFY THAT, IN THE EXERCISE OF MY REASONABLE
PROFESSIONAL JUDGMENT, THE DESIGN RELATED INFORMATION
SUBMITTED WITH THIS APPLICATION IS TRUE AND CORRECT AND
THE DESIGN INCLUDED IN THIS APPLICATION FOR A PERMIT
COMPLIES WITH THE VERMONT WASTEWATER SYSTEM AND
POTABLE WATER SUPPLY RULES." (REF. ENVIRONMENTAL
PROTECTION RULES CHAPTER 1 §1-306 (b)).
LAST REVISED 02/25/2020
1 02/09/2023 JADPlan Revisions
2 02/16/2023 CMJUtilities
3 05/15/2023 CMJStaff Comments
4 06/26/2023 LETStaff Comments
Sheet Title
Project Title
Use of These Drawings
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date By
Revisions
478 BLAIR PARK ROAD | WILLISTON, VERMONT 05495
802 879 6331 | WWW.TCEVT.COM
E N G I N E E R I N G S U R V E Y
No. 8917
CIVILP
ROF
E
SSIONAL E N G INEERLICEN S E DJENNIFER ANN DESA
U
T
E
LSSTA TE O F VER
M
ONTField Book:
For Local Permitting Only
1. Unless otherwise noted, these Drawings are intended for
preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities.
They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,
the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits,
and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect,
to insure these plans are properly coordinated including, but
not limited to, contract documents, specifications,
owner/contractor agreements, building and mechanical
plans, private and public utilities, and other pertinent permits
for construction.
3. Owner and Architect, are responsible for final design and
location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating
final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user
shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not
transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property.
Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to
the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains
the most current revisions.
PLANNIN G ENVIRON MENTAL
PARCEL ID: 1540-00760 SPAN: 600-188-10694
Water Details
C8-04
1/20/2023
22-523
PJM
CMJ
JAD
Shelburne & Swift
760 & 764 Shelburne Rd. & 31
Swift St.
South Burlington, VT
W 010.1.2
3/4"=1'
LAST REVISED 03/08/2021TRUDELL CONSULTING ENGINEERS
TYPICAL WATER SERVICE TRENCH
LC
SAND BEDDING
SEE PLAN FOR PIPE SIZE
AND MATERIALS
APPROVED BACKFILL TO BE FREE OF
DEBRIS, ORGANIC REFUSE, OR FROZEN
SOIL. FILL TO BE COMPACTED IN 12" LIFTS.
SLOPE OR SHEET THE SIDES OF
TRENCHES DEEPER THAN 5 FEET
TOPSOIL, SEED, AND MULCH,
OVERFILL FOR SETTLEMENT
PAVED AREAS
INITIAL 12" OF SELECT BACKFILL FREE OF
ORGANIC OR FROZEN MATERIAL.
COMPACT TO 95% DENSITY STANDARD
PROCTOR.
WHERE 6' OF COVER CANNOT BE
MAINTAINED, COVER WATER MAIN
WITH 2" INSULATION BOARD. USE 2"
INSULATION BOARD ON SIDES, AS
SHOWN, AND AT ALL ROAD CROSSINGS.
EXTEND INSULATION 10' BEYOND ROAD
IN BOTH DIRECTIONS.
NOTES:
1.INSTALL PER MANUFACTURES RECOMMENDATIONS AND GUIDELINES.
2.IF 6' OF COVER CAN NOT BE MAINTAINED REVIEW AND DISCUSS WITH
PROJECT ENGINEER.
3.ALL TRENCH EXCAVATIONS SHALL MEET OSHA, STATE & LOCAL
REQUIREMENTS & SAFETY REGULATIONS.6"4"6' MIN.SEE PAVEMENTSECTION orMATCH EXISTING2'
TRUDELL CONSULTING ENGINEERS
CL
FOR GRASSED
AREAS
FOR PAVED or
GRAVEL SURFACES
3/4" CRUSHED STONE OR
SAND BEDDING
WATER MAIN
(SEE SITE PLAN FOR
PIPE SIZE & MATERIAL)
ALL BACKFILL TO BE COMPACTED IN
6" LIFTS
SEED AND MULCH, OVERFILL FOR
SETTLEMENT
GRADE AT 2:1 SLOPE
WHEN DEPTH EXCEEDS 5'
WHERE 6' OF COVER CANNOT BE
MAINTAINED, COVER WATER MAIN WITH
2" INSULATION BOARD, AND USE MINIMUM
2" INSULATION BOARD ON SIDES. AT ALL
ROAD, DRIVE AND SIDEWALK (SURFACE)
CROSSINGS INSTALL 2" INSULATION BOARD
ON TOP AND SIDES AS SHOWN AND
EXTEND 10' BEYOND SURFACE IN BOTH
DIRECTIONS. INSULATION SHALL BE FULL
WIDTH OF TRENCH.
DETECTABLE METALLIC WARNING TAPE
LABELED "WATER"
4"x4"x48" PRESSURE TREATED POST OR
EQUIVALENT PLASTIC MARKER EVERY
300' AND AT ALL BENDS (GRASSED
AREAS) PAINTED BLUE UNLESS
INDICATED OTHERWISE BACKFILL FREE OF ORGANIC OR FROZEN
MATERIAL. COMPACTED TO 90% DENSITY
STANDARD PROCTOR IN GRASSED AREAS
INITIAL 12" OF SELECT BACKFILL FREE OF
ORGANIC OR FROZEN MATERIAL
COMPACTED TO 95% DENSITY STANDARD
PROCTOR IN GRASSED AREAS
BACKFILL MATERIAL TO MATCH
STRUCTURAL ROADWAY GRAVEL, SEE
ROADWAY SECTION. COMPACTED TO
95% DENSITY STANDARD PROCTOR
NOTES:
1.THE CONTRACTOR SHALL VERIFY THE
PIPE MATERIAL TYPE AND
SPECIFICATION WITH THE LOCAL
WATER UTILITY BEFORE SUBMITTING
SHOP DRAWINGS FOR, ORDERING, OR
INSTALLING ANY WATER MAIN OR
SERVICE. IF THERE IS ANY
DISCREPANCY MATERIAL
SPECIFICATION ON THE PLANS AND
WHAT THE LOCAL WATER UTILITY
REQUIRES, THE CONTRACTOR SHALL
NOTIFY THE ENGINEER OF THE CHANGE
AND USE THE MATERIAL SPECIFIED BY
SAID UTILITY.
2.LENGTH OF OPEN TRENCH SHALL BE
KEPT TO A MINIMUM.
3.IF UNSUITABLE MATERIAL IS REMOVED
BELOW BEDDING, REPLACE WITH
MATERIAL APPROVED BY ENGINEER
AND COMPACT TO 95% MAXIMUM
DENSITY.
4.NO MECHANICAL TAMPERS SHALL BE
USED DIRECTLY OVER PIPE TO INSURE
PIPE IS NOT DAMAGED.
5.BEDDING TO PROVIDE FIRM, STABLE,
CONTINUOUS AND UNIFORM SUPPORT
FOR THE FULL LENGTH OF PIPE.
6.INSTALL WATER MAIN IN
ACCORDANCE WITH MANUFACTURES
GUIDELINES.
7.IF 6' OF COVER CAN NOT BE
MAINTAINED DISCUSS WITH PROJECT
ENGINEER AND TOWN (IF APPLICABLE)
PRIOR TO INSTALLING. ADDITIONAL
INSULATION OR OTHER MEASURES MAY
BE REQUIRED DEPENDING ON COVER.
8.SUBMIT SHOP DRAWINGS PRIOR TO
INSTALLATION.
9.IN NO CASE SHALL THE WATER MAIN BE
BURIED LESS THAN 4 1/2 FEET BELOW
FINISHED GRADE.
10.ALL TRENCH EXCAVATION SHALL MEET
OSHA, STATE, & LOCAL REQUIREMENTS
& SAFETY REGULATIONS.
W 010.1.1
PIPE OD + 24"24"6"D6"12"6' MINIMUMSEE ROADWAYSECTION OR MATCHEXISTINGTYPICAL WATER MAIN TRENCH
W 020.1.1LAST REVISED 02/09/2021TRUDELL CONSULTING ENGINEERS
TYPICAL GATE VALVE (4" TO 12")
WATER
"WATER" CAST IN COVER
FINISHED GRADE
COATED CAST IRON TWO PIECE
(SLIP TYPE) VALVE BOX WITH FLANGED
TOP & LID. PROVIDE MUD CAP
AND GATE BOX ALIGNER.
2" OPERATING NUT
TURN COUNTER CLOCKWISE TO
OPEN GATE VALVE
AWWA C515 COMPLIANT GATE
VALVE MODEL KS-RW OR APPROVED
EQUIVALENT WITH STAINLESS STEEL
BOLTS
MEGALUG
MECHANICAL JOINT
CONNECTION
3/4" CRUSHED STONE BEDDING
PAVED AREAS
NOTE:
IN REMOTE AREAS SUCH AS CROSS COUNTRY WATER LINE ROUTES, PROVIDE A CONCRETE PAD
24"x24"x8" THICK BEDDED ON 12" OF GRAVEL AND FLUSH WITH GRADE. ALSO PROVIDE 4"x4"
PRESSURE TREATED POST STICKING 48" ABOVE GRADE TO MARK LOCATION.
VALVE ANCHOR, 5 C.F.
CLASS D CONCRETE
USE # 4 BARS TO ANCHOR
VALVE TO CONCRETE
WATER MAIN
NOTES:
1.INSTALL IN ACCORDANCE WITH MANUFACTURES INSTALLATION GUIDELINES.
2.SUBMIT SHOP DRAWING TO PROJECT ENGINEER PRIOR TO INSTALLATION.
3.COORDINATE WITH TOWN PUBLIC WORK DEPARTMENT AND STANDARDS WHEN APPLICABLE.
4.PROVIDE ONE VALVE KEY TO OWNER.6' MINIMUMW 040.1.1LAST REVISED 02/16/2021TRUDELL CONSULTING ENGINEERS
TYPICAL WATER MAIN THRUST BLOCKS
2", 3" & 4"SAFE BEARING
LOAD LBS/FT.²
GRAVEL
SHALE
SOIL
TYPE
CLAY
SAND
TILL
10000
1000
2000
3000
4000
5.0
2.5
2.0
1.5
0.5
90°
7.0
3.5
2.5
2.0
1.0
45°
14.0
7.0
5.0
3.5
1.5
45°
8.0
4.0
3.0
2.0
1.0
10.5
5.5
3.5
3.0
1.0
22.5°45°
4.0
2.0
1.5
1.0
0.5
2.0
1.0
1.0
0.5
0.5
15.0
7.5
5.0
4.0
1.5
6"
90°
18.0
9.0
6.0
4.5
2.0
22.5°
4.0
2.0
1.5
1.0
0.5
90°
25.0
13.0
8.5
6.5
2.5
8"
2.0
5.0
7.0
10.0
21.0
3.0
7.0
9.0
14.0
28.0
22.5°
7.0
3.5
2.5
2.0
1.0 3.5
9.5
12.5
19.0
38.0
90°
10"
45°
1.0
2.5
4.5
5.0
10.5
22.5°
39.0
20.0
13.0
10.0
4.0
12"
90°
55.0
27.5
18.5
14.0
5.5
45°
30.0
15.0
10.0
7.5
3.0
22.5°
15.0
8.0
5.0
4.0
1.5
USE CLASS D (2500 PSI) CONCRETE FOR THRUST BLOCKS. PLACE 4 MIL. POLYETHYLENE BETWEEN FITTING AND THRUST BLOCK. PLACE
THRUST BLOCK AGAINST UNDISTURBED TRENCH WALL - CONCRETE BEARING AREA ON FITTING TO BE A MINIMUM OF 1/2 SQUARE FOOT.
THRUST BLOCKS BASED ON 200 PSI WORKING PRESSURE PLUS SURGE ALLOWANCE OF 100 PSI. IF GREATER THAN 200 PSI SEE PROJECT
ENGINEER FOR SIZE.
90° ELBOW TEE 22 ½ ° ELBOW 45° ELBOW
TRENCH WALL, TYPICAL
UNDISTURBED SOIL, TYPICAL
EXTEND 6" INTO TRENCH
WALL (TYP).
NOTE:
1.FOR REDUCERS, PROVIDE BEARING
AREA FOR THE SOIL TYPE BASED ON 4000
LBS FOR EACH 2" REDUCTION IN SIZE.
2.PROJECT ENGINEER TO OBSERVE ALL
THRUST BLOCKS PRIOR TO BACKFILL.
PICTURES MAY BE USED AT ENGINEERS
DISCRETION.
3.ALSO INCLUDE RETAINER GLANDS ON
ALL BENDS, TEES, CAPS ETC.
4.CONCRETE NOT TO OVERLAP ANY
JOINT.
MINIMUM BEARING AREA IN SQUARE FEET ON UNDISTURBED TRENCH WALLTHRUST BLOCK TABLE
CAP W/ MECH. JOINT
CAP REDUCER
OR TEE
CAP
OR TEE
CAP
OR TEE
CAP
OR TEE
CAP
OR TEE
CAP
WATER/SEWER MAIN SEPARATION DETAIL
18"
18"
WATER MAIN
ONE STANDARD FULL LENGTH OF WATER
MAIN TO BE CENTERED OVER SEWER
SEWER
COMPACTED
CRUSHED STONE
BACKFILL IN 6" LIFTS
SEWER MAIN
9'
ONE STANDARD FULL LENGTH OF DUCTILE
IRON SEWER MAIN TO BE CENTERED OVER
WATER MAIN
PVC SDR 35
SEWER MAIN
UNDISTURBED SOIL
FLEXIBLE COUPLING
INCASED IN CLASS B
CONCRETE
WATER MAINS CROSSING ABOVE SEWERS SHALL BE LAID
TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18
INCHES BETWEEN PIPES. WATER MAIN JOINTS WILL BE
EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE SEWER.
WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER SEPARATION,
THE SEWER SHALL BE DESIGNED AND CONSTRUCTED
EQUAL TO WATER PIPE AND SHALL BE PRESSURE TESTED TO
ASSURE WATERTIGHTNESS PRIOR TO BACKFILLING
2'
6"
6"
WATER
COMPACTED
CRUSHED STONE
BACKFILL IN 6" LIFTS
CLASS B CONCRETE
CRADLE TO EXTEND
TWO FEET BEYOND
WATER MAIN TRENCH
WIDTH EACH SIDE
SEWER MAINS CROSSING ABOVE SEWERS SHALL BE LAID
TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18
INCHES BETWEEN PIPES. SEWER MAIN JOINTS WILL BE
EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER
MAIN. WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER
SEPARATION OR WHERE THE SEWER MUST BE LAID ABOVE
THE WATER MAIN, THE SEWER SHALL BE DESIGNED AND
CONSTRUCTED EQUAL TO WATER PIPE AND SHALL BE
PRESSURE TESTED PRIOR TO BACKFILLING TO ASSURE
WATERTIGHTNESS.
LAST REVISED 02/16/2021 W 030.1.2
WATER MAIN ABOVE SEWERS
PREFERRED METHOD
WATER MAIN BELOW SEWER
NOT HE RECOMMENDED METHOD
NOTES:
1.PARALLEL INSTALLATION: WATER MAINS SHALL BE
LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY
EXISTING OR PROPOSED MANHOLE, SANITARY
SEWER OR FORCEMAIN. THIS DISTANCE SHALL BE
MEASURED EDGE TO EDGE. IF THIS DISTANCE
CANNOT BE OBTAINED, THE WATER MAIN SHALL
BE LAID IN A SEPARATE TRENCH OR ON AN
UNDISTURBED EARTH SHELF LOCATED ON ONE
SIDE OF THE SEWER AT SUCH AN ELEVATION THAT
THE BOTTOM OF THE WATER MAN IS AT LEAST 18
INCHES ABOVE THE TOP OF THE SEWER. WHERE
SEWERS ARE BEING INSTALLED, AND THE ABOVE
SEPARATION CAN NOT BE MET, THE SEWER
MATERIALS SHALL BE WATER MAIN PIPE OR
EQUAL AND SHALL BE PRESSURE TESTED TO
ENSURE WATERTIGHTNESS.
2.CROSSINGS: SEE THE DETAILS TO THE LEFT.
3.SEWER RELATIONS TO WATERMAINS SHALL BE IN
ACCORDANCE WITH THE "RECOMMENDED
STANDARDS FOR SEWAGE WORKS" SO-CALLED
TEN STATE STANDARDS.
4.WATERMAINS TO BE RECONSTRUCTED SHALL BE
PUSH-ON OR MJ D.I. CL52 PIPE, AWWA C900
PVC PRESSURE PIPE OR HDPE SDR9 PRESSURE
PIPE FOR A DISTANCE OF 10 FEET EACH SIDE OF
THE CENTERLINE OF THE SEWER AS APPROVED BY
THE ENGINEER.
5.THE PROJECT ENGINEER SHALL OBSERVE ALL
CROSSINGS PRIOR TO BACKFILL.
6.ANY DEVIATIONS TO THESE MINIMUM
REQUIREMENTS IS SUBJECT TO REVIEW AND
APPROVAL REGULATORY AUTHORITIES.
7.PRIOR TO THE CROSSING THE CONTRACTOR
SHALL SUPPLY INVERT OF SEWER TO THE PROJECT
ENGINEER.
TRUDELL CONSULTING ENGINEERS
W 030.1.1LAST REVISED 02/16/2021TRUDELL CONSULTING ENGINEERS
TYPICAL WATER/SEWER CROSSING
LC
WATER
SEWER
REQUIREMENTS:
1.WATER MAINS CROSSING SEWERS
SHALL BE LAID TO PROVIDE A
MINIMUM VERTICAL DISTANCE OF
18 INCHES BETWEEN THE OUTSIDE
OF WATER MAIN AND THE OUTSIDE
OF SEWER. THIS SHALL BE THE CASE
WHERE THE WATER MAIN IS EITHER
ABOVE OR BELOW THE SEWER. AT
CROSSINGS, ONE FULL LENGTH OF
WATER PIPE SHALL BE LOCATED SO
BOTH JOINTS WILL BE AS FAR FROM
THE SEWER AS POSSIBLE. IF THE
SEWER MAIN IS OVER THE WATER
MAIN, THE FIRST SEWER PIPE JOINTS
ON EACH SIDE OF THE WATER MAIN
MUST BE CONCRETE ENCASED.
SPECIAL STRUCTURAL SUPPORT FOR
THE WATER AND SEWER PIPES MAY
BE REQUIRED. WATER MAINS SHALL
NOT PASS THROUGH SEWER
MANHOLES OR BE SUBMERGED IN
BASINS CONTAINING SEWAGE OR
OTHER GROSSLY CONTAMINATED
OR HAZARDOUS MATERIAL.
2.THE PROJECT ENGINEER SHALL
OBSERVE ALL CROSSINGS, PRIOR TO
BACKFILL.
3.ANY DEVIATION TO THIS MINIMUM
REQUIREMENT IS SUBJECT TO
REVIEW AND APPROVAL OF
REGULATORY AUTHORITIES.
4.PRIOR TO CROSSING THE
CONTRACTOR SHALL SUPPLY INVERT
OF SEWER AND WATER TO PROJECT
ENGINEER.
INVERT
COMPACTED
CRUSHED STONE
BACKFILL IN 6" LIFTS18" MIN.WSR APPENDIX SUBSECTION 8.6.3
W 000.1.1LAST REVISED 02/04/2021TRUDELL CONSULTING ENGINEERS
TESTING WATER MAINS AND HYDRANTS
*ALL TESTING SHALL BE PERFORMED IN THE PRESENCE OF THE TOWN ENGINEER OR PUBLIC WORKS DEPARTMENT IF
APPLICABLE OR PRIVATE OWNER/OPERATOR AND PROJECT ENGINEER (AS DESIGNATED BY OWNER). CONTRACTOR
SHALL PRE-TEST SUCCESSFULLY PRIOR TO CONTACTING PROJECT ENGINEER. THE PRE-TEST IS TO ENSURE PASSING
RESULTS PRIOR TO OFFICIAL TESTING OBSERVATION.
A.AFTER THE PIPE HAS BEEN LAID AND 7 DAYS AFTER THE CONCRETE THRUST BLOCKS AND ANCHORS HAVE BEEN
PLACED, THE WATER MAIN SHALL BE HYDROSTATICALLY TESTED ACCORDING TO THE LATEST EDITION OF THE
AWWA SPECIFICATION C-600, AND VERMONT PLUMBING RULES.
B.CONTRACTOR SHALL SUPPLY ALL NECESSARY APPARATUS TO PERFORM THE HYDROSTATIC TEST.
C. TEST PRESSURE SHALL BE 200 POUNDS PER SQUARE INCH OR 1.5 TIMES THE WORKING PRESSURE MEASURED AT
OR NEAR THE HIGH POINT IN THE SYSTEM, WHICHEVER IS GREATER. TEST SHALL BE A MINIMUM OF 2 HOURS IN
DURATION. TESTING ALLOWANCE SHALL BE DEFINED AS THE VOLUME OF WATER THAT MUST BE SUPPLIED INTO
THE NEWLY LAID PIPE OR ANY VALVED SECTION THEREOF TO MAINTAIN PRESSURE WITHIN 5 PSI (34.5 kPa) OF THE
SPECIFIED TEST PRESSURE AFTER THE PIPE HAS BEEN FILLED WITH WATER AND THE AIR HAS BEEN EXPELLED. THE
TESTING ALLOWANCE SHALL NOT EXCEED THE ALLOWABLE LEAKAGE (L) OR ELSE THE SECTION OF PIPE BEING
TESTED WILL BE CONSIDERED FAILED. TESTING ALLOWANCE SHALL NOT BE MEASURED BY A DROP IN PRESSURE IN
A TEST SECTION OVER A PERIOD OF TIME. REFER TO PIPE MANUFACTURERS RECOMMENDED TESTING
PROCEDURE INCLUDING PIPE STABILIZATION PRIOR TO START OF TEST.
D.THE PROJECT ENGINEER AND THE MUNICIPALITY SHALL BE CONTACTED 48 HOURS PRIOR TO TESTING.
E.ALL VALVES SHOULD BE VERIFIED AS BEING OPEN OR CLOSED AS APPROPRIATE FOR THE PORTION OF THE
WATER MAIN BEING TESTED.
F.ALLOWABLE LEAKAGE SHALL BE COMPUTED BY THE FORMULA: L=(S x D x √P)/148,000 WHERE L IS LEAKAGE IN
GALLONS PER HOUR, S IS THE LENGTH OF PIPE TESTED IN FEET, D IS THE NOMINAL DIAMETER OF THE PIPE IN
INCHES AND P IS THE AVERAGE TEST PRESSURE IN POUNDS PER SQUARE INCH DURING THE TEST.
G.REPLACE AND RETEST ANY WORK FOUND TO BE DEFECTIVE AFTER FAILED TEST AT NO EXPENSE TO OWNER AND
RETEST UNTIL SYSTEM PASSES
A.AFTER TESTING THE WATER MAINS, OPEN THE HYDRANT FULLY AND FILL WITH WATER. TO PREVENT CAPS FROM
BEING BLOWN OFF, VENT AIR FROM ONE OF THE CAPS WHILE IT IS BEING FILLED. WHEN ALL THE AIR HAS
ESCAPED, TIGHTEN THE CAP.
B.ALLOW THE PRESSURE TO BUILD UP TO MAIN LINE PRESSURE AND CHECK FOR LEAKAGE AT FLANGES, NOZZLES
AND THE OPERATING STEM. RECORD STATIC PRESSURE IN PSI.
C.FLOW HYDRANT AND RECORD FLOW RATE IN GPM AND RESIDUAL PRESSURE IN PSI. SUBMIT RESULTS TO PROJECT
ENGINEER.
D.CLOSE THE HYDRANT, REMOVE ONE NOZZLE CAP AND PLACE THE PALM OF YOUR HAND OVER THE OPENING.
DRAINAGE SHOULD CREATE A NOTICEABLE SUCTION. IF NO SUCTION OR HYDRANT DOESN'T HAVE DRAIN,
MANUALLY PUMP WATER OUT OF BARREL.
E.AT PROJECT ENGINEER DISCRETION, ASSIST WITH FLOW TESTING. ENGINEER TO RECORD STATIC AND RESIDUAL
PRESSURE AS WELL AS FLOW RATE.
TESTING WATER MAINS
TESTING HYDRANTS (IF APPLICABLE)
W 000.2.2LAST REVISED 02/04/2021TRUDELL CONSULTING ENGINEERS
DISINFECTION OF WATER SYSTEM
*ALL TESTING SHALL BE PERFORMED IN THE PRESENCE OF THE TOWN ENGINEER OR PUBLIC WORKS
DEPARTMENT AND PROJECT ENGINEER (AS DESIGNATED BY OWNER).
A. PRIOR TO BEING PUT INTO SERVICE, WATER MAINS SHALL BE DISINFECTED ACCORDING TO THE
LATEST EDITION OF AWWA SPECIFICATION C-651. THE TABLET METHOD IN AWWA STANDARD 651 IS
NOT ACCEPTABLE.
B. THE NEW LINE SHALL BE FLUSHED AT A VELOCITY OF NOT LESS THAN 2.5 FEET PER SECOND (OPEN
2-1/2 INCH HYDRANT CONNECTION). FLUSH FOR A PERIOD DETERMINED BY THE PROJECT ENGINEER
FOR THE LENGTH OF MAIN TO BE DISINFECTED.
C. CHLORINATION SHALL BE ACCOMPLISHED BY INTRODUCING A SODIUM HYPOCHLORITE SOLUTION
FOR A RESULTANT CONCENTRATION OF GREATER THAN 25 PARTS PER MILLION OF FREE CHLORINE.
D. USING A NOZZLE AT EACH END HYDRANT, CONTROL THE RATE OF FLOW INTO THE NEW MAIN AND
PROPORTIONALLY FEED THE SODIUM HYPOCHLORITE SOLUTION INTO THE MAIN. AFTER THE SOLUTION
HAS REACHED ALL POINTS IN THE SYSTEM, CLOSE THE VALVE SUPPLYING WATER FROM THE EXISTING
MAIN AND THE END HYDRANTS. MAINTAIN THE HEAVILY CHLORINATED WATER IN THE MAIN FOR 24
HOURS DURING WHICH TIME ALL MAIN LINE VALVES SHOULD BE OPERATED. AFTER 24 HOURS THE
MINIMUM CHLORINE RESIDUAL MUST BE AT LEAST 10 PARTS PER MILLION.
E. FLUSH HEAVILY CHLORINATED WATER FROM THE LINE AND REFILL THE LINE FOR SERVICE (USE
CHLORINE DIFFUSER). TAKE AND SUBMIT TWO BACTERIOLOGICAL SAMPLES (TAKEN 24 HOURS APART)
OF THE WATER TO THE STATE OF VERMONT OR A STATE APPROVED TESTING LABORATORY. IF THE
RESULTS ARE UNSATISFACTORY, THE DISINFECTION PROCEDURE WILL BE REPEATED UNTIL
SATISFACTORY RESULTS ARE OBTAINED.
F. FINISHED WATER STORAGE STRUCTURES SHALL BE DISINFECTED IF APPLICABLE, IN ACCORDANCE
WITH CURRENT AWWA STANDARD C652. TWO OR MORE SUCCESSIVE SETS OF SAMPLES, TAKEN AT 24
HOUR INTERVALS, SHALL INDICATE MICROBIOLOGICALLY SATISFACTORY WATER BEFORE THE FACILITY
IS PLACES INTO OPERATION.
G. DISPOSAL OF HEAVILY CHLORINATED WATER FROM THE DISINFECTION PROCESS SHALL BE
DE-CHLORINATED OR OTHERWISE HANDLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
VERMONT AGENCY OF NATURAL RESOURCES.
H. THE DISINFECTION PROCEDURE (AWWA CHLORINATION METHOD 3, SECTION 4.3 C652) WHICH
ALLOWS USE OF THE CHLORINATED WATER HELD IN THE STORAGE TANK FOR DISINFECTION PURPOSES
IS NOT RECOMMENDED. WHEN THAT PROCEDURE IS USED, IT IS REQUIRED THAT THE INITIAL HEAVILY
CHLORINATED WATER BE PROPERLY DISPOSED IN ORDER TO PREVENT RELEASE OF WATER WHICH
MAY CONTAIN VARIOUS CHLORINATED ORGANIC COMPOUNDS INTO THE DISTRIBUTION SYSTEM.
DISINFECTING WATER MAINS AND SYSTEMS
W 000.2.1LAST REVISED 03/08/2021TRUDELL CONSULTING ENGINEERS
CONTRACTOR'S CERTIFICATION REQUIRED
PRIOR TO THE DESIGN ENGINEER CERTIFYING THAT THE INSTALLATION HAS BEEN INSTALLED IN
ACCORDANCE WITH THE PERMITTED DESIGN, THE CONTRACTOR SHALL PROVIDE A
CERTIFICATION THAT THE WATER SYSTEM WAS INSTALLED AND TESTED IN ACCORDANCE WITH
THE APPROVED DESIGN PLANS. STATE PERMITS REQUIRE THERE SHALL BE NO DEVIATIONS
FROM THE APPROVED PLANS WITHOUT PRIOR APPROVALS. THE DESIGN ENGINEER SHALL BE
NOTIFIED AND ALLOWED TO OBSERVE THE CRITICAL PHASES OF CONSTRUCTION INCLUDING
ANY REQUIRED TESTS. LIKEWISE, THE DESIGN ENGINEER SHALL BE NOTIFIED OF ANY
DEVIATIONS FROM THE APPROVED PLANS. SINCE THE DESIGN ENGINEER DOES NOT
CUSTOMARILY OBSERVE ALL PHASES OF THE WORK, OR ALL TESTING, HE MAY RELY ON THE
CONTRACTOR'S CERTIFICATION AS THE BASIS FOR FINAL CERTIFICATION. THE CONTRACTOR
SHALL THEREFORE SIGN AND RETURN A COPY OF THE FOLLOWING CERTIFICATION UPON
COMPLETION OF THE WORK:
"I HEREBY CERTIFY THAT I HAVE INSTALLED, PROPERLY TESTED, AND SUCCESSFULLY PASSED
THOSE TESTS, AND THE WATER SYSTEM(S) ARE BUILT IN ACCORDANCE WITH THE APPROVED
DESIGN PLANS AND APPLICABLE PERMIT CONDITIONS."
THE CONTRACTOR CERTIFICATION INCLUDES SUPPLIERS AND SUB-CONTRACTORS
CONTRACTOR NAME:
AUTHORIZED AGENTS NAME:
SIGNATURE: DATE:
NOTE ANY DEVIATIONS FROM APPROVED PLANS HERE:
NOTE: THE CERTIFICATION AND THE PROJECT ENGINEER'S SUBSEQUENT CERTIFICATION DOES NOT
VOID THE CONTRACTOR FROM REPAIR OR REPLACEMENT OF DISCREPANCIES DISCARDED AT A
LATER DATE. THE CONTRACTOR REMAINS RESPONSIBLE, INCLUDING CUSTOMARY GUARANTEE
AND WARRANTY PERIODS.
CONTRACTOR'S CERTIFICATION FOR WATER SYSTEM
4 06/26/2023 CMJStaff Comments
W 020.1.5
1"=1'-0"
TRUDELL CONSULTING ENGINEERS
TYPICAL WATER CURB STOP
LCPAVED AREAS
IN NON PAVEMENT AREA MARK LOCATION OF CURB STOP WITH
A 2x4 BROUGHT TO THE SURFACE WITH THE LETTER "W" MARKED
ON IT, SET FLUSH TO GRADE
ERIE CURB BOX WITH
STATIONARY ROD AND
ARCH PATTERN BASE
3/4" - 1" PLUG TYPE
CURB STOP WITH
COMPRESSION
CONNECTIONS
(MUELLER H-25209)
4" x 8" x 16" CLASS D CONCRETE PAD
ON COMPACTED BASE
STAINLESS STEEL
ROD
TYPE K COPPER
TO MAIN
NOTES:
1.3/4" AND 1" CORPORATIONS SHALL BE DIRECTLY TAPPED INTO
DUCTILE IRON PIPE 6" AND LARGER IN DIAMETER. LARGER SIZE
CORPORATIONS UP TO 2" SHALL REQUIRE USE OF A TAPPING
SADDLE. A CONNECTION MADE TO A PIPE THAT REQUIRES A
SADDLE OR IS NOT DUCTILE IRON WILL HAVE A BODY WITH A
SUITABLE OUTLET, SEAL, AND SUITABLE MEANS FOR
ATTACHMENT TO THE MAIN. THE SADDLE SHALL PROVIDE A
DRIP TIGHT CONNECTION AND SHALL BE TEFLON OR EPOXY
COATED WITH STAINLESS STEEL STRAPS, BOLTS, NUTS AND
MECHANISM FOR ATTACHING TO THE PIPE BARREL.
2.INSTALL PER MANUFACTURES INSTALLATION GUIDELINES AND
TOWN PUBLIC WORK STANDARDS WHEN APPLICABLE. ALSO
COORDINATE WITH TOWN ENGINEER WHEN APPLICABLE.
3.PRIOR TO CONSTRUCTION SUBMIT SHOP DRAWING OF
MATERIALS AND INSTALLATION PROCEDURE TO PROJECT
ENGINEER.
4.CHLORINATE AND SUCCESSFULLY TEST WATER QUALITY PRIOR
TO MAKING SERVICE AVAILABLE FOR USE.
EXISTING SOIL
3/4" - 1" QUARTER TURN BALL VALVE CURB STOP
WITH COMPRESSION CONNECTIONS, MUELLER
H-25209 OR CAMBRIDGE BRASS
FOR 1 1/2"-2" ADD ENLARGED FOOTPIECE
CURB STOP6' TYPICAL DEPTH
Landscape Budget Requirement (Land Development Code Article 13):
Estimated Construction Cost: $4,400,000
3% First $250K……....…....$7,500
2% Second $250K…….….$5,000
1% Remaining………………...$39,000
Required Landscape Budget: $51,500
SYM QTY SCIENTIFIC NAME COMMON NAME INSTALL SIZE CONDITION COMMENTS / SPACING COST PER PLANT(installed)TOTAL
TREES
AB Abies balsamea 'Phanerolepis'Caanan Fir 6-8' HT B&B As Shown, Full $840 $0
AF 4 Acer freemanii 'Autumn Blaze'Autumn Blaze Freeman Maple 2.5" Cal B&B Limb to 7' HT $1,025 $4,100
AAM 7 Amelanchier x grandiflora 'Autumn Brilliance'Autumn Brilliance Serviceberry 8-10' HT B&B Multistem, 3 or more trunks $810 $5,670
AMS 1 Amelanchier x grandiflora 'Autumn Brilliance'Autumn Brilliance Serviceberry 8-10' HT B&B Single stem $810 $810
CC Carpinus caroliniana American Hornbeam 3-3.5" Cal B&B Limb to 5' HT $1,675 $0
GT Gleditisia triacanthos var inermis 'Halka'Halka Thornless Honeylocust 2.5" Cal B&B Limb to 7' HT $1,080 $0
NS 1 Nyssa sylvatica "Green Gable'Green Gable Black Tupelo 2.5" Cal B&B Limb to 7' HT $1,075 $1,075
PS 5 Prunus sargentii 'Pink Flair'Pink Flair Sargent Cherry 2.5" Cal B&B Limb to 5' HT $900 $4,500
SHRUBS
BM 2 Buxus microphylla 'Green Mountain'Green Mountain Boxwood #3/18" SP Cont.As Shown $174 $348
CAR 5 Clethra alnifolia 'Ruby Spice'Ruby Spice Summersweet #2 Cont.4' O.C.$84 $420
CAH 5 Clethra alnifolia 'Hummingbird'Hummingbird Summersweet #2 Cont.4' O.C.$84 $420
CS Cornus sericea 'Arctic Fire'Red Twig Dogwood #2 Cont.3 Cane min., 30" HT $86 $0
CSK 79 Cornus sericea 'Kelseyii'Kelsey Compact Red Twig Dogwood #1 Cont.3 Cane min., 30" HT, 30" O.C.$54 $4,266
HAP Hydrangea anomola petiolaris Climbing Hydrangea #3 Cont.As Shown $120 $0
HAI 5 Hydrangea arborescens 'Invincibelle'Invincibelle Hydrangea #2 Cont.4' O.C.$84 $420
HAL 8 Hydrangea arborescens 'Invincibelle Limetta'Invincibelle Limetta Hydrangea #2 Cont.3' O.C.$86 $688
IVF 3 Ilex verticillata 'Berry Heavy'Winterberry Holly #2 Cont.As Shown, Female $84 $252
IVM 1 Ilex verticillata 'Jim Dandy'Winterberry Holly #2 Cont.As Shown, Male $86 $86
JH 39 Juniperus horizontalis 'Bar Harbor'Bar Harbor Creeping Juniper 18" SP Cont.3' O.C.$81 $3,159
RS 5 Rhododendron maximum 'Roseum'Rhododendron #4 Cont.As Shown $145 $725
RAG 22 Rhus aromatica 'Gro-low'Gro-Low Fragrant Sumac #2 / 24 SP Cont.4' O.C.$86 $1,892
RR 21 Rosa rugosa Saltspray Rose #2 Cont.4' O.C.$72 $1,512
SBT 44 Sprirea betulifolia 'Tor'Tor Spirea 15" HT Cont.3' O.C.$78 $3,432
SJL 12 Spirea japonica 'Little Princess'Little Princess Japanese Spirea 15" HT Cont.3' O.C.$78 $936
SAW 24 Spirea x bumalda 'Anthony Waterer'Anthony Waterer Spirea 15" HT Cont.3' O.C.$84 $2,016
TM 12 Taxus x media 'Ever-Low'Ever-Low Creeping Yew #2 / 24 SP Cont.As Shown $133 $1,596
VT Viburnum trilobum 'Wentworth'Cranberrybush Viburnum 3-4' HT Cont. / B&B As Shown $185 $0
PERENNIALS
AD Aruncus dioicus Goatsbeard #2 Cont.36" O.C.$32 $0
AN Aster novae-anglae New England Aster #2 Cont.24" O.C.$28 $0
CAK 132 Calamagrostis × acutiflora 'Karl Foerster'Feather Reed Grass #2 Cont.24" O.C.$33 $4,356
EPM 58 Echinacea purpurea mix Kims Knee High Purple Coneflower #2 Cont.24" O.C.$38 $2,204
EP 27 Echinacea purpurea 'Magnus'Magnus Purple Coneflower #2 Cont.24" O.C.$33 $891
HM Hakenechloa macra Hokone Grass #2 Cont.24" O.C.$45 $0
HMA Hakenechloa macra 'Aureola'Golden Hokone Grass #1 Cont.18" O.C.$33 $0
HS 42 Hosta spp.Hosta species #2 Cont.Use variaties: Guacalome, Francee,
Mouse Ears, Halycone in groups of 5+$42 $1,764
HSS 7 Hosta 'Sum and Substance'Sum and Substance Hosta #2 Cont.36" O.C.$42 $294
IVE Iris versicolor Blue Flag Iris #2 Cont.24" O.C.$27 $0
MML 3 Miscanthus sinensis 'Morning Light'Morning Light Maiden Grass #2 Cont.4' O.C.$35 $105
PVN 30 Panicum virgatum Switchgrass #2 Cont.24" O.C. Use mix: Heavy Metal, Northwind,Shenandoah $33 $990
SS Schizachyrium scoparium 'Blue Paradise'Blue Paradise Little Bluestem #2 Cont.24" O.C.$27 $0
SH 84 Sporobolus heterolepis Prairie Dropseed #2 Cont.18" O.C.$33 $2,772
Total Site Planting COST:$51,699
Hardscape Site Elements QTY UNIT COST PER UNIT TOTAL
Site Furnishings
Benches 28 LF $300 $8,400
Sculpture EA $4,000 $0
Hardscape COST:$8,400
TOTAL LANDSCAPE COST:$60,099
Last Revised 05/15/2023
Opinion of Landscape Costs
Shelburne Road & Swift Street22-523
Prepared by TCE
Preliminary & Final Plat | January 2023
June 30, 2023
VIA EMAIL mkeene@southburlingtonvt.com
Chair, Development Review Board
City of South Burlington, VT
c/o Marla Keene
108 Market Street
South Burlington, VT 05403
Re: Inclusionary Housing
760 & 764 Shelburne Road and 31 Swift Street, South Burlington
Dear Chair:
I recently submitted an opinion regarding the calculation of inclusionary housing units under the
housing bonus provided under § 18.01(g)(2) of the South Burlington Zoning Ordinance. As you
may remember, there is a difference of opinion whether an application in this instance utilizing
the full bonus for 30 units requires 10 inclusionary units (staff’s opinion) or 7 (applicant’s
position). The interpretation is important because for this development and other developments,
staff’s opinion will cause applicants to abandon use of the bonus, which will have the pernicious
effect of causing applicants to build less housing (both market rate and inclusionary) because as
interpreted by staff, the bonus is not a bonus at all.
As follow-up to our discussion, I reached out to Brian Sullivan for his views on the subject.
Brian is not only a recent former member of the South Burlington DRB, but he is also a highly
respected land use and zoning attorney who has no dog in this fight. Our e-mail discussion is
attached verbatim, his calculation and comments being, and I quote:
“My interpretation of Section 18.01(G)(2) (density bonuses) requires a calculation as follows:
1.Determine the total number of units allowed in the applicable district for the applicable
use;
2.Determine how many of those units must be inclusionary, which will be the same number
as the “offset” units;
3.Add the number of offset units to the total determined in step one;
4.Determine the difference between the total number of units and 1.5 x the total number of
units;
MARK HALL
mhall@pfclaw.com
Chair, Development Review Board
C/O Marla Keene
June 30, 2023
Page 2
5. Take the number determined in step 4 and divide it in half – yielding the number of
potential additional inclusionary units, which will be the same as the number of “bonus”
market rate units.
Let’s take the numbers in the City’s Example 4:
1. Total units allowed is 40;
2. Required inclusionary units total 6; which is the same number as the offset units;
3. The total at this point is 46;
4. The difference between the total number of units (46) and 1.5x the allowed amount (60)
is 14;
5. If the developer wants to add all 14, he or she must divide that equally between
inclusionary and market rate “bonus” units. That results in a grand total of 60 units, 13 of
which are inclusionary and 47 of which are market rate. The calculations done in this
Example are, therefore, wrong, at least as to the breakdown of inclusionary vs. market
rate units.
Let’s use the numbers in our case:
1. Total units allowed is 20;
2. Required inclusionary units total 3; which is the same number as the offset units
3. The total at this point is 23;
4. The difference between the total number of units (23) and 1.5x the allowed amount (30)
is 7;
5. If the developer wants to add all 7, he must divide that equally between inclusionary and
market rate bonus units. Of course, 7 is an odd number, so you’d round the inclusionary
up from 3.5 to 4 and the market rate bonus units down from 3.5 to 3. This results in a
grand total of 30 units, 7 of which are inclusionary and 23 of which are market rate.
So, in sum, it is my opinion that your calculations are correct and those of the Planning and
Zoning Department are incorrect.”
Based on simple rules of construing zoning ordinances, the explicit manner of calculation
prevails over an erroneous example. To that point, I followed up with Brian on this “zoning
interpretation 101” hierarchy, to which he replied, “I agree. The language in the Regs is
unambiguous, so it controls. The examples would be useful except for the fact that there is a
math error in number 4.” Attorney Sullivan’s opinion is correct. As the Vermont Supreme
stated,
Chair, Development Review Board
C/O Marla Keene
June 30, 2023
Page 3
[the] goal in interpreting a zoning ordinance is to effectuate the intent of the drafters. In
re Howard Ctr. Renovation Permit, 2014 VT 60, ¶ 9, 196 Vt. 542, 99 A.3d 1013. And
because “[t]he primary purpose of zoning is to bring about the orderly physical
development of a community,” it is “essential” to our inquiry that we examine not only
the plain language of the disputed ordinance, but also the whole of the enactment, seeking
to effectuate its every part. In re Tyler Self-Storage Unit Permits, 2011 VT 66, ¶ 13, 190
Vt. 132, 27 A.3d 1071 (quotation omitted). Where the ordinance's “‘express language
leads to an irrational result,’” we turn to other sources to guide our inquiry into the
drafters’ intent. Confluence Behav. Health, 2017 VT 112, ¶ 20, 206 Vt. 302, 180 A.3d
867 (quoting Tyler Self-Storage Unit Permits, 2011 VT 66, ¶ 6, 190 Vt. 132, 27 A.3d
1071). Because zoning ordinances exist in derogation of private property rights, such
ambiguities are resolved in favor of the landowner. In re Lathrop Ltd. P'ship I, 2015 VT
49, ¶ 29, 199 Vt. 19, 121 A.3d 630.
In this regard, zoning regulations are construed “’in light of the intention indicated by the
caption’ to avoid unfounded interpretations.” State v. Lynch, 137 Vt. 607, 613, 409 A.2d 1001,
1005 (1979) (citing Audette v. Greer, 134 Vt. 300, 302, 360 A.2d 66, 68 (1976)). In this case,
the intent is expressly stated in the caption as a “Density Bonus for Exceeding Inclusionary
Housing Requirements”. The language of § 18.01(G)(2) unequivocally provides for a split in the
bonus units between market and inclusionary. Example 4 contains no such split nor any bonus,
so it’s just a mistake in the drafting of the ordinance that must be ignored.
Respectfully, this matter is resolved by recourse to basic principles of statutory construction, and
I do not see it as a close call. Frankly, I think any 10 lawyers and any 10 judges would opine the
same way, so I again encourage you to run this by counsel for the city. I apologize for pushing
so hard on this point, but this is important because if the current interpretation stands, the project
will lose seven units, four of which would have been inclusionary. Moreover, if the
interpretation stands, it will adversely impact any number of residential projects involving the
bonus.
I’m happy to discuss with counsel if that would be helpful.
Cordially yours,
PAUL FRANK + COLLINS P.C.
Mark Hall
MGH:jtg
cmcneil@southburlingtonvt.gov
8899048_1:14629-00002
From: Mark G. Hall <MHall@pfclaw.com>
Sent: Friday, June 16, 2023 4:31 PM
Hi Brian, thanks for getting back to me. I don’t see an issue with you’re having been on the DRB. May
even help in some ways. The client is Gary Bourne for conflict issues. I have permission to seek an
opinion, but I should get your rate so I can pass along. I’ve attached a draft of the calculation I did that
provides the numbers and the zoning provisions.
The letter explains our calculation for adding 7 additional units under the bonus, which we feel should
be 1 market rental for each voluntary inclusionary rental. Planning is taking the position that all 7
should be inclusionary, which seems to conflict with the operable provision that says:
§ 18.01G(2):
(2) Density Bonuses. When an applicant voluntarily includes, in the base zoning density unit-maximum
for the development, more than the number of inclusionary units required under Section 18.01(C)(1),
then upon the applicant’s request, the development shall receive, in addition to the offset units, a
density bonus. The density bonus shall be one dwelling unit for each voluntary Inclusionary Rental
Unit and two dwelling units for each voluntary Inclusionary Ownership Unit, up to a maximum density
of 50% more than the base maximum density permitted in the zoning district…. Density bonus
dwelling units are not subject to the inclusionary affordability requirements.
(Emphasis added.)
Planning is hung up on an example 4 provided in the ordinance, which states:
Example (4): In a 40-unit rental housing development on a 10-acre plot in a R4 district, the developer is
required to build six (6) inclusionary units. The developer shall receive an offset of six (6) market rate
dwelling units, and the project now includes a total of 46 dwelling units. In order to receive approval for
the maximum 50% density increase (which equates to a maximum of 14 additional units in this example
since the offset units need to be accounted for), the developer includes an additional fourteen (14)
inclusionary units in the base zoning density unit-maximum (40) for which the developer receives 14
bonus density units. In sum, the total project includes 60 units, 20 of which are inclusionary (33% of the
units) and 40 of which are market rate (67% of the units).
I think the example 4 was calculated incorrectly, if one goes by the math provided in the density
provision; otherwise, it’s a bonus without a bonus. The pernicious effect is that the developer just pulls
the additional units, which helps no one. I’ve taken the position that, in conflict. the ordinance
calculation under 18.01G(2) prevails over the example. I don’t see how they can be reconciled, but if I’m
wrong I should know it. Please run your own calculation and, if I’m wrong or missing something, please
let me know. Please feel free to review the ordinance to the extent you need to or look at any case law
you deem necessary for the review. I’m trying to get an answer quickly (my apologies), as planning is
asking for things on an expedited basis.
From: Brian Sullivan <bsullivan@mskvt.com>
Sent: Thursday, June 22, 2023 1:25 PM
2
To: Mark G. Hall <MHall@pfclaw.com>
Subject: [EXTERNAL] RE: Legal opinion
Hi Mark:
Thanks for your patience. I’ve looked at the description of Gary’s project in
light of the applicable South Burlington Land Development Regulations and
the examples given in that section of the LDRs. In brief, I concur with your
reasoning and conclusion. Let me explain.
My interpretation of Section 18.01(G)(2) (density bonuses) requires a
calculation as follows:
1. Determine the total number of units allowed in the applicable district
for the applicable use;
2. Determine how many of those units must be inclusionary, which will be
the same number as the “offset” units;
3. Add the number of offset units to the total determined in step one;
4. Determine the difference between the total number of units and 1.5 x
the total number of units;
5. Take the number determined in step 4 and divide it in half – yielding the
number of potential additional inclusionary units, which will be the
same as the number of “bonus” market rate units.
Let’s take the numbers in the City’s Example 4:
1. Total units allowed is 40;
2. Required inclusionary units total 6; which is the same number as the
offset units;
3. The total at this point is 46;
4. The difference between the total number of units (46) and 1.5x the
allowed amount (60) is 14;
5. If the developer wants to add all 14, he or she must divide that equally
between inclusionary and market rate “bonus” units. That results in a
grand total of 60 units, 13 of which are inclusionary and 47 of which are
market rate. The calculations done in this Example are, therefore,
wrong, at least as to the breakdown of inclusionary vs. market rate
units.
Let’s use the numbers in our case:
3
1. Total units allowed is 20;
2. Required inclusionary units total 3; which is the same number as the
offset units
3. The total at this point is 23;
4. The difference between the total number of units (23) and 1.5x the
allowed amount (30) is 7;
5. If the developer wants to add all 7, he must divide that equally between
inclusionary and market rate bonus units. Of course, 7 is an odd
number, so you’d round the inclusionary up from 3.5 to 4 and the
market rate bonus units down from 3.5 to 3. This results in a grand
total of 30 units, 7 of which are inclusionary and 23 of which are market
rate.
So, in sum, it is my opinion that your calculations are correct and those of the
Planning and Zoning Department are incorrect.
Regards,
Brian (he/him)
Brian J. Sullivan
MSK Attorneys
275 College Street
Burlington, VT 05401
802-861-7000, ext. 1160
www.mskvt.com
bio: https://www.mskvt.com/attorneys-staff/brian-sullivan/
Member of Law Firm Antiracism Alliance
This e-mail message is for the sole use of the intended recipient(s) and may contain confidential and
privileged information. If you are not the intended recipient, please contact the sender by reply e-mail
and destroy all copies or records of the original message.
4
From: Mark G. Hall <MHall@pfclaw.com>
Sent: Thursday, June 22, 2023 1:40 PM
To: Brian Sullivan <bsullivan@mskvt.com>
Subject: RE: Legal opinion
Thanks for jumping on this, Brian. I got the same numbers on the example 4. Do you agree that in this
conflict that the example 4 should be ignored due to the error? My view is that the language of the
provisions stating the manner of calculation prevails.
To: Brian Sullivan <bsullivan@mskvt.com>
Subject: RE: Legal opinion
I agree. The language in the Regs is unambiguous, so it controls. The examples would be useful except
for the fact that there is a math error in number 4.
Regards,
Brian (he/him)
Brian J. Sullivan
MSK Attorneys
275 College Street
Burlington, VT 05401
802-861-7000, ext. 1160
www.mskvt.com
bio: https://www.mskvt.com/attorneys-staff/brian-sullivan/
Member of Law Firm Antiracism Alliance
This e-mail message is for the sole use of the intended recipient(s) and may contain confidential and
privileged information. If you are not the intended recipient, please contact the sender by reply e-mail
and destroy all copies or records of the original message.