Hebron Group, LLC, hereinafter referred to as the applicant, is seeking to amend a previously
approved plan for a 27,100 sf building consisting of three suites (6,352 sf of light manufacturing
use, 9,106 sf of self-storage use, and 10,051 sf of warehousing use) and a common loading dock
permitted as processing & storage use. The amendment consists of adding two 8’ x 40’
accessory structures to the site, 1205 Airport Parkway.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. Hebron Group, LLC, hereinafter referred to as the applicant, is seeking approval to amend a
previously approved plan for a 27,100 sf building consisting of three suites (6,352 sf of light
manufacturing use, 9,106 sf of self-storage use, and 10,051 sf of warehousing use) and a
common loading dock permitted as processing & storage use. The amendment consists of
adding two 8’ x 40’ accessory structures to the site, 1205 Airport Parkway.
2. The owner of record of the subject property is Hebron Group, LLC.
3. The subject property is located in the Mixed Industrial-Commercial District.
4. The application was received on June 6, 2023.
5. The plans submitted consist of the following: sheet A 100, entitled “Floor Plan”, prepared by
Walter M. Adams, Jr., dated and last revised on February 3, 2023; and sheet 1, entitled “Site
Plan”, prepared by Lamoreaux & Dickinson, dated February 2, 2022, and last revised on May
31, 2023i.
ZONING DISTRICT AND DIMENSIONAL REQUIREMENTS
Setbacks, Coverages & Lot Dimensions
The proposed addition of the two accessory structures in the side yard will increase the subject
property’s building coverage by 640 square feet, from 27,970 sf to 28,610 sf. Because the accessory
structures are proposed to be located on an existing parking lot, the impervious coverage will not
increase. The side yard setback for principal structures is 35 feet, but the side yard setback for
accessory structures is only 5 feet – as such, the proposed location of the accessory structures
meets dimensional standards.
IC Zoning District Required Proposed
Min. Lot Size 40,000 sf No Change
#SP-23-023
- 2 -
Max. Building Height Flat Roof 40 ft No Change
Max. Building Coverage 30% 29.2%
Max. Overall Coverage 50% No Change
Max. Front Setback Coverage 30% No Change
Min. Front Setback 50 ft No Change
Min. Side Setback 35 ft No Change
Min. Rear Setback 50 ft No Change
SITE PLAN REVIEW STANDARDS
Only the standards below are affected by this application. All other standards will continue to be
met.
13.14 Subsurface Sewage Disposal Systems
The approved Wastewater Allocation on file for this property allows for the generation of
5,200 gallons of wastewater per day. The existing combination of uses generates an
estimated 630 gallons per day, and the proposed accessory structures will not increase
the estimated generation. The total generation is therefore unchanged and will remain
within the limits of the approved Wastewater Allocation. The Administrative Officer finds
this criterion met.
13.03 Bicycle Parking and Storage
Table 13-3 specifies the minimum number of short-term bicycle parking spaces for any
office use to be 1 per 5,000 square feet GFA. This office building is 27,100 square feet,
requiring 6 short-term bicycle parking spaces. Three ‘inverted U’-style bike racks,
providing 6 spaces, are shown on the plan. The Administrative Officer finds this criterion
met.
13.04 Snow Storage
The snow storage area is indicated on the site plan. The Administrative Officer find this
criterion met.
13.07 Exterior Lighting
Per Section 13.07.A, exterior lighting “shall have such shielding as will direct the light
downward and will prevent the source of light from being visible from any adjacent
residential property or street”. There are no lighting impacts proposed as part of this
application.
OTHER STANDARDS
3.10 Accessory Structures and Uses
Per Section 3.10.A, on lots that are one (1) acre or greater in size, “more than two (2)
accessory structures shall be permitted provided all applicable limitations on coverage and
setbacks in these Regulations are met”, and “the total square footage of all accessory
structures shall not exceed ten (10) percent of the total parcel, or the maximum building
coverage for the district, whichever is lesser”. The subject property is approximately 2.4
#SP-23-023
- 3 -
acres. As such, this property is permitted to have more than two accessory structures, as
long as the property does not exceed maximum lot coverage and the square footage of all
accessory structures combined does not exceed 10% of the total parcel. The accessory
structures also must meet all setbacks and height requirements. The side yard setback for
accessory structures is 5 feet, and the maximum height for accessory structures is 15 feet.
The applicant is proposing to install two 8’6”-high 8’ x 40’ shipping containers in the side
yard of the property. The containers will be fabricated off-site and will be set on existing
pavement without any foundation. The structures will be more than five feet from the
side property line, will not overall lot coverage and building coverage, together total 640
square feet of accessory structure (10% of the area of this lot is 9,815 square feet). The
Administrative Officer finds these criteria met.
14.07 Disposal of Wastes
Per Section 14.07.I, dumpsters “shall be accessible, secure and properly screened with
opaque fencing to ensure that trash and debris do not escape the enclosure(s)”. The
existing dumpster and screening fence meet these standards, and no changes or
alterations to the dumpster enclosure are proposed as part of this application.
Vehicle Trip Generation
The property has an approved trip budget of 97 PM peak hour VTEs, and the current uses
generate 9 PM peak hour VTEs. The proposed accessory structures will not increase this
estimated trip generation. The total trip generation is therefore unchanged and will
remain within the limits of the approved trip budget. The Administrative Officer finds this
criterion met.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves Site Plan
Application #SP-23-023 of Hebron Group, LLC, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall
remain in effect.
2. This project shall be completed as shown on the plan submitted by the applicant and on
file in the South Burlington Department of Planning and Zoning.
3. The applicant must obtain a zoning permit within six (6) months from the date of this
decision or this approval is null and void. The applicant may submit a request for an
extension to obtain a zoning permit under the terms outlined in Section 17.04 of the
LDR’s, but the request must be submitted prior to the expiration of this approval.
4. Any exterior lighting shall be downcast and shielded per Section 13.07 of the Land
Development Regulations.
#SP-23-023
- 4 -
5. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to use of the accessory structures at 1205 Airport Parkway.
6. Any change to the site plan shall require approval by the South Burlington
Administrative Officer or the Development Review Board, as allowed under the Land
Development Regulations.
Signed on this 19th day of June, 2023 by
___________________________________________
Marty Gillies, Acting Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing
a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal
must be accompanied with a $233 filing fee and be filed within 15 days of the date of this
decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant
state permits for this project. Call 802.879.5676 to speak with the regional Permit Specialist.