Loading...
HomeMy WebLinkAboutSD-20-02 - Plans - Non-Record - 0010 Mansfield View LaneS RESERVED ACCESSIBLE PARKING SIGNS 20' S S S EXISTING OFFICE BUILDING A 7,200 SF FFE 396.0 EXISTING PAVED DRIVE DRVT ROUTE 116 - HINESBURG ROAD20' EMERGENCY ACCESS EASEMENT IN FAVOR OF LOT 1 4" CL 52 D.I.DREXISTING STORAGE BUILDING A1 1,000 SF FFE 392.0 GAS SERVICE 7 10 PROPOSED OFFICE BUILDING B (PHASE II) 7,200 SF FFE 387.70 9 34 MANSFIELD VIEW LANE VT ROUTE 116 - HINESBURG ROADMANSFIELD VIEW LANE 385385 386 389 390 388387 392393 394395398397396393PS 390SO. BURLINGTON REALTY COMPANY, LLC SO. BURLINGTON REALTY COMPANY, LLC SBRC PROPERTIES, LLC. "VIEW PROTECTION ZONE" VIEW, LLC PROPOSED OFFICE BUILDING C 4,346 SF FFE 386.10 36 EXISTING HOUSE EXISTING GARAGE 7 6 6PROPOSED SWALEPROPOSED SWALEPROPOSED SWALEEX. SWALE + 389.2 PROPOSED SWALEEX. GRAVEL PATHEX. FENCETTTTTTTT391384398397396395394 39 4 392392381 381391390389389388388 387 387387387386386 386386 385385385385385384 384384 384383384383 383 383 383 3823 8 2 380 382 379 378 384 MT. MANSF I E L D V I E W S H E D MT. MANSF I E L D V I E W S H E D GROUND L E V E L MT. MAN S F I E L D V I E W S H E D VIEW SHED BASE LINE 414.0 AND RISING AT 1.5% EASTERLY VIEW ELEV=412+23'VIEW ELEV=414+29'VIEW SHED BASE LINE 402.0 AND RISING AT 1.5% EASTERLY VIEW SHED BASE LINE 390.1 AND RISING AT 1.5% EASTERLY MT. MAN S F I E L D V I E W S H E D MT. MANSF I E L D V I E W S H E D MT. MA N S F I E L D VI E W S H E D MT. MA N S F I E L D V I E W S H E D 380+ 386.2 + 38 5. 4 + 384. 1 + 383 . 5 382.7 + + 3 8 6 . 5 + 383.5 U E EX. SWALERE-ESTABLISH PRE-EXISTING DRAINAGE SWALE PHASE II PHASE I PHASE IIPHASE IPHASE IIPHASE I+BC 398.2+ 3 9 3 . 0 +393.9**SNOW** STORAGE AREA **SNOW** STORAGE AREA (3) MD (1) CC (4) QB (1) GT (4) AR (1) CC (2) CC (2) MD (1) QB POCKET PARK (1) AR BENCH, TYP. PLANTING NOTES 1.All plant material in the plant schedule shall be nursery grown in accordance with ANSI in accordance with Z.60.1 Standards for measurement of nursery stock. 2.All plants shall be guaranteed by the Contractor for a period of one year from date of receipt of Provisional Acceptance of the completed installation by the Owner. 3.Replacement plantings will be required prior to Final Acceptance for any plants which are missing, not true to specifications, have died or are unhealthy or uncharacteristic of the species (due to excessive pruning, dieback or other reasons). 4.All plant materials shall be selected and tagged at the nursery by Landscape Architect. 5.The Landscape Architect's approval is required for any plant material substitutions. 6.The Contractor is responsible for immediately notifying the Landscape Architect if any plant quantity discrepancies exist between the planting plan and the plant list. 7.All shrubs and trees will be sprayed with the anti-desiccant "Wilt-Pruf" ( or approved equal) prior to the first Winter (no later that November 30). 8.The Landscape Contractor shall have the General Contractor locate all underground utilities in areas to be landscaped prior to commencing any excavation. Adjustments to tree locations will be allowed where utility conflicts are clearly a problem and with prior site approval by Landscape Architect. 9.All plant bed, shrub and tree location shall be staked in the field by Contractor for Landscape Architects approval prior to installation. 10.Adjustments to plant beds shall be approved by Landscape Architect. 11.General Contractor is responsible for all erosion control measures during construction. 12.All disturbed areas are to be topsoiled and seeded or sodded, as indicated in the planting plan. 13.Mulch shall consist of double-shredded hardwood mulch or approved equal and Contractor is responsible for providing samples of mulch to Landscape Architect. Mulch plant materials as shown on plan and details. 14.It is the intent of this contract to avoid any disturbance to existing trees or shrubs on site other than those specifically designated for transplant or removal. 15.Liquidated damages for trees damaged by construction operation shall be $500 per caliper inch. Shrubs shall be $100 each. 16.During construction, and until the end of warranty period, existing trees that are showing signs of stress as determined by the Landscape Architect are to be deep root fertilized, two injections per caliper inch per tree at 18" - 24" depth with Peter's 20/20/20 fertilizer or Landscape Architect approved equal. 17.Contractor is responsible for verifying and confirming all plant counts as supplied by the Landscape Architect with field conditions as constructed. Any discrepancies shall be reported to Landscape Architect for approval and direction. 18.Tree transplanting shall be performed by a suitable hydraulic tree spade, sized as necessary to perform the work. 19.Prior to commencement of any construction, all existing trees to remain shall receive tree protection fence at outer edge of dripline whenever possible. LANDSCAPE ARCHITECTURE WAGNER HODGSON © WHLA ALL RIGHTS RESERVED 2019 VT 802.864.0010 JOB NO. SCALE: DRAWN BY: DATE: wagnerhodgson.comNY518.567.1791 NO.DESCRIPTION DATE CEA OFFICE P.U.D. LOT 1A MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VT 20-001 7 Marble Avenue Burlington, VT 05401 430 Warren Street Hudson, NY 12534 PLOT DATE: 1/10/2020 2:24 PMLANDSCAPE PLAN 1"=20' CS 12.20.2019 L1001001020 SCALE OF FEET U:\Un-numbered projects\CEA Campus\WHLA\CAD\xref\CEA_logo.jpg