Loading...
HomeMy WebLinkAboutSD-23-07 - Supplemental - 0600 Spear Street (56)The Stormwater Section has reviewed the 600 Spear Street Narrative provided by Trudell Consulting Engineers. We would like to offer the following comments: 1. Sheet C3-03: Pipe from DMH 5 to Gravel Wetland 4 conflicts with solar field fence. Please ensure clear access to entire length of pipe for future maintenance. 2. Sheet C8-402: a. Gravel wetland detail: 6” perforated subdrain is called out as wrapped in fabric. Please remove fabric detail to minimize clogging. b. Perforated riser detail: please provide justification for fabric around perforated riser. 3. Greater than 50% of the existing on-site impervious is being redeveloped. Under Section 13.05.3.b of the LDRs, the City requires all on-site impervious be treated if redevelopment or reconstruction exceeds 50% of the existing impervious. Please provide treatment for the entirety of the on-site impervious. 4. Please provide HydroCAD model and modeling results for review. 5. EPSC: please consider using the footprints of the gravel wetlands as temporary sediment basins during construction.