HomeMy WebLinkAboutSD-23-07 - Supplemental - 0600 Spear Street (50)UG
S ØØØØØØØØØØØØØØUT
291
297
290
289 288
288
289
290
291
289
290
291
292
293
295
294 298295296297294293292
291
290
298
2
9
5296
299
298
299
298
297
296
295
294
295298 298
298 297 296
2
9
0 291292293294
294
292
293
294
295
29
8
2
9
9
299298297 BUILDING 8
BUILDING 5
BUILDING 2
BUILDING 7
BUILDING 6
BUILDING 1
W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W
W W W W W WSW W
WWSSSSSSSSSSFM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
S
S
UG UG
DDDDDD
DDDDDDDDDDDD DD D D D D D D D D D D D
D D
D D
D
D
D D
D D
WW W
S
S
BUILDING 3
BUILDING 4
WWDDDDDDDFFE 300.0
FFE 300.0
FFE 300.0
D D D DD
D
S S S S S SDD
296
297
298 299298299299
299
299
299298298
297
29829729
8
298
294295
296 297
298
294
295
296
295
294
294
295
296
2
9
8
299
299
299
294
295
296
299 299
299
297
296
295
296
295
297
296
295
297
296
298
297296298296
298
294
295
293
296
288290
292
PROPOSED 2" CTS C901
WATER SERVICE TO EACH
BUILDING (TYP)
FFE 299.5
FFE 300.0
FFE 299.5
FFE 299.5
FFE 300.0
SMH 1
RIM = 297.5
4" iIN (W) = 290.0
8" iIN (E) = 290.0
8" iOUT (N) = 289.9
PUMP STATION 8' ID
(SEE DETAIL)
RIM = 297.50
iIN (8") = 289.75
FLOOR = 282.0
VALVE PIT 5' ID
(SEE DETAIL)
RIM = 297.5
iIN/OUT = 291.0
1" CTS C901
WATER SERVICE
WWWWWWWWWWWWWWSSSSSSS
S S S S S S S
S
S
S
S
S
S
S S SSSS
298
3
0
0
SMH 3
RIM = 298.25
4" iIN (E) = 291.55
4" iIN (S) = 291.55
8" iOUT (W) = 291.45
SMH 6
RIM = 298.25
8" iIN (S) = 292.02
8" iIN (E) = 292.02
8" iOUT (N) = 291.92
SMH 7
RIM = 299.0
4" iIN (E) = 292.72
4" iIN (N) = 292.72
8" iOUT (W) = 292.62
4" iOUT = 294.5
4" iOUT = 293.5
4" iOUT = 293.5
4" iOUT = 293.5
CLEANOUT (TYP.)
AT ALL SEWER
SERVICE BENDS
PROPOSED 4"
GATE VALVE
4" SDR 35 SEWER
SERVICE SLOPED AT
1
4"/FT MIN FROM EACH
BUILDING (TYP.)299299297
PROPOSED FIRE
PROTECTION HYDRANT
SMH 2
RIM = 297.25
8" iIN (N) = 290.76
8" iIN (S) = 290.76
8" iIN (E) = 290.76
8" iOUT (W) = 290.66
SMH 4
RIM = 298.25
4" iIN (E) = 291.05
4" iIN (W) = 291.05
8" iIN (S) = 291.05
8" iOUT (N) = 290.95
SMH 5
RIM = 298.5
4" iIN (E) = 291.6
4" iIN (W) = 291.6
8" iIN (S) = 291.6
8" iOUT (N) = 291.5
4" iOUT = 293.54" iOUT = 292.5
4" iOUT = 292.5
4" iOUT = 293.5
8x8x8X8 CROSS FITTING
8" GATE VALVE ON NORTH,
SOUTH, & WEST SIDE OF CROSS
PROPOSED 8"X8"X6" TEE, 6"
GATE VALVE AND 6" DI CLASS
52 HYDRANT LEAD (TYP.)
INSTALL 8" C900 DR18 STUB TO
SOUTHERN BOUNDARY AS SHOWN.
CAP AND INSTALL THRUST BLOCK.
INSTALL 8" C900 DR18 STUB TO
NORTHERN BOUNDARY AS SHOWN.
CAP AND INSTALL THRUST BLOCK.
PROPOSED 2"
CURB STOP (TYP)
299
299
4" FLUSHING
HYDRANT4" SDR 35, S = 0.0317 FT/FT8" SDR 35, S =
0
.
0
0
4
F
T
/
F
T
8" SDR 35, S = 0.004 FT/FT
8" SDR 35, S = 0.004 FT/FT8" SDR 35, S = 0.004 FT/FT8" SDR 35, S = 0.004 FT/FT8" SDR 35, S = 0.004 FT/FT
4" C900 DR18
PROPOSED 4"
GATE VALVE
4" FLUSHING
HYDRANT
4" C900 DR188" C900 DR18 8" C900 DR182994" SDR 21 FORCEMAIN
G G G G G
G GGGGGGGG G G G G G G G
G G G G G G G
UG UG UG UG UG UG UGUG UG UG UG UG UG UG
UG
UG
UG UG UG UG
UG UG
CONNECT EXISTING
SEWER SERVICE FROM
METAL BUILDING TO
NEW 4" SERVICE LINE
FROM EXISTING HOME UGUGUGUGUGUGUGUGUGUGUGUG UG UG UG UG UG
297
298299
0
Feet
Graphic Scale
20 40 60
15°±VT GridMagneticSheet Title
Project Title
Use of These Drawings
Scale:
Project Number:
Date:
Drawn By:
Project Engineer:
Approved By:
No. Description Date By
For Permitting Only
Revisions
No. 9020
CIVILABIGAIL A.
D
E
RYSTATE O F VER
M
O
NTPROF
E
SSIONAL
E N G INEERLICE N S E D
Field Book:
1. Unless otherwise noted, these Drawings are intended for
preliminary planning, coordination with other disciplines or
utilities, and/or approval from the regulatory authorities.
They are not intended as construction drawings unless noted
as such or marked approved by a regulatory authority.
2. By use of these drawings for construction of the Project,
the Owner represents that they have reviewed, approved,
and accepted the drawings, obtained all necessary permits,
and have met with all applicable parties/disciplines,
including but not limited to, the Engineer and the Architect,
to insure these plans are properly coordinated including, but
not limited to, contract documents, specifications,
owner/contractor agreements, building and mechanical
plans, private and public utilities, and other pertinent permits
for construction.
3. Owner and Architect, are responsible for final design and
location of buildings shown, including an area measured a
minimum five (5) feet around any building and coordinating
final utility connections shown on these plans.
4. Prior to using these plans for construction layout, the user
shall contact TCE to ensure the plan contains the most
current revisions.
5. These Drawings are specific to the Project and are not
transferable. As instruments of service, these drawings, and
copies thereof, furnished by TCE are its exclusive property.
Changes to the drawings may only be made by TCE. If
errors or omissions are discovered, they shall be brought to
the attention of TCE immediately.
6. It is the User's responsibility to ensure this copy contains
the most current revisions.
1 03/18/22 TCERevised Layout
SPAN: 600-188-11469 PARCEL:
1640-00600
Wastewater
and Water
Utility Plan
C3-02
5/14/2021
1" = 20'
19-268
MMI
AAD
AAD
600 Spear
600 Spear Street
South Burlington, Vermont
"I HEREBY CERTIFY THAT, IN THE EXERCISE OF MY REASONABLE
PROFESSIONAL JUDGMENT, THE DESIGN RELATED INFORMATION
SUBMITTED WITH THIS APPLICATION IS TRUE AND CORRECT AND
THE DESIGN INCLUDED IN THIS APPLICATION FOR A PERMIT
COMPLIES WITH THE VERMONT WASTEWATER SYSTEM AND
POTABLE WATER SUPPLY RULES." (REF. ENVIRONMENTAL
PROTECTION RULES CHAPTER 1 §1-306 (b)).
LAST REVISED 02/25/2020
Final Plat2 03/31/23 CMJ
WATER AND WASTEWATER BASIS OF DESIGN:
THIS PROJECT PROPOSES THE FOLLOWING USES:
·5 BEDROOM HOME WITH 1 BEDROOM ACCESSORY APARTMENT AT 600 SPEAR STREET TO REMAIN
·EXISTING METAL BUILDING TO REMAIN WITH UP TO 10 EMPLOYEES
·32 NEW 2-BEDROOM UNITS (EIGHT BUILDINGS WITH 4 UNITS EACH)
PROPOSED WASTEWATER DEMAND (BASED ON VT EPR CH 1, DATED 4/12/19):
·EXISTING 5 BEDROOM HOME = 5*140 = 700 GPD
·EXISTING 1 BEDROOM HOME APARTMENT = 1*140 = 140 GPD
·METAL BUILDING WITH 10 EMPLOYEES = 10*15 = 150 GPD
·32 NEW 2-BEDROOM UNITS = 32*210 = 6720 GPD
·INFILTRATION FOR 546' OF 4" SEWER = 124 GPD
·INFILTRATION FOR 844' OF 8" SEWER = 384 GPD
TOTAL PROPOSED WASTEWATER DEMAND = 7728 GPD
PROPOSED WATER DEMAND (BASED ON VERMONT WATER SUPPLY RULE, DATED 3/17/20):
·EXISTING 5 BEDROOM HOME = 5*150 = 750 GPD
·EXISTING 1 BEDROOM HOME APARTMENT = 1*150 = 150 GPD
·METAL BUILDING WITH 10 EMPLOYEES = 10*15 = 150 GPD
·32 NEW 2-BEDROOM UNITS = 32*300 = 9600 GPD
·10% REDUCTION FOR LOW FLOW = -1065 GPD
TOTAL PROPOSED WATER DEMAND = 9585 GPD
WATER AND WASTEWATER NOTES:
1.ALL WATER AND WASTEWATER PIPING SHALL BE PRESSURE/LEAKAGE TESTED IN ACCORDANCE WITH THE DETAILS.
2.ALL WASTEWATER TANKAGE AND MANHOLES SHALL BE LEAKAGE TESTED IN ACCORDANCE WITH THE DETAILS.
3.ALL WATER LINES SHALL BE DISINFECTED AFTER CONSTRUCTION IN ACCORDANCE WITH THE DETAILS.
4.ALL WATER MAINS SHALL BE C900 DR18, ALL WATER SERVICES SHALL BE CTS C901, AND ALL HYDRANT LEADS
SHALL BE CLASS 52 DUCTILE IRON.
5.THE LIVE TAP CONNECTION ON THE 12" WATER MAIN SHALL BE COORDINATED WITH THE PROJECT ENGINEER
AND CHAMPLAIN WATER DISTRICT.
6.NO WATER CONNECTION OR TAP SHALL BE LOCATED WITHIN 3 PIPE DIAMETERS OF ANY OTHER FITTING OR
JOINT.
7.NO NON-CIVIL UNDERGROUND UTILITY (COMMUNICATIONS, GAS, ELEC, ETC.) SHALL BE LOCATED WITHIN 4'
(PARALLEL) OF ANY NEW WATER MAIN.
8.WATER AND SEWER SEPARATION SHALL BE IN ACCORDANCE WITH THE DETAILS.
9.WATER CONNECTIONS WILL ONLY BE ALLOWED WITHIN THE HOURS OF 7:00 AM AND 3:00 PM ON REGULAR
CHAMPLAIN WATER DISTRICT BUSINESS DAYS, EXCEPT FRIDAYS. ALL CONNECTIONS MUST BE COMPETED BY 3:00
PM. CONNECTIONS THAT CANNOT BE COMPLETED BY 3:00 PM MAY BE SUSPENDED AND COMPLETED THE
FOLLOWING BUSINESS DAY. A SUSPENDED TAP MAY ENTAIL BACKFILLING THE EXCAVATION UNIT THE
FOLLOWING DAY. CHAMPLAIN WATER DISTRICT (CWD) PERSONNEL HAVE THE AUTHORITY TO SUSPEND
CONNECTIONS THAT THEY DEEM CANNOT BE COMPLETED WITHIN THE TIME PERIOD STATED ABOVE.
10.NO WATER LINES SHALL BE INSTALLED AFTER NOVEMBER 15 OR BEFORE APRIL 1 WITHOUT PRIOR APPROVAL
FROM CHAMPLAIN WATER DISTRICT (CWD). THE APPROPRIATE CWD DIVISION MAY RESTRICT WORK BEFORE
NOVEMBER 15 AND AFTER APRIL 1 DURING ADVERSE WEATHER CONDITIONS. CWD DOES NOT ALLOW
EXCAVATING FOR WATER MAINS DURING THE WINTER MONTHS EXCEPT BY SPECIAL PERMISSION.