SBWD Technical Review Comments SD-23-07 Spear St.
Date: April 25, 2023
Submitted by Jay Nadeau, SBWD Director
Please find the SBWD comments on this project below. I have also provided some comments
directly on the Wastewater and Water Utility Plan, Sheet C3-02.
1. Plans must include a note stating: “All water lines and appurtenances shall be installed in accordance
with the Champlain Water District Specifications and Details for the Installation of Water Lines and
Appurtenances, current edition.”
2. Record Drawings prepared by a VT licensed Professional Engineer shall be provided to the South
Burlington Water Department in pdf. and Auto-CAD format. Drawings shall include ties to all gate
valves and curb stops to sub-meter accuracy.
3. Refer to and specify CWD Specifications for C-900 installation requirements including the installation
of a tracing wire with independent termination boxes. All ferrous materials incorporated in the
installation of the PVC pipe shall be polyethylene encased.
4. Refer to CWD Specifications and Details for Service line and curb stop information and correct details
accordingly.
Sheet Specific Comments-Plan Sheet C3-02
1. Suggest installing bollards at each 4” Flushing hydrant for protection.
2. Service lines less than 4” shall be copper up to the curb stop. CTS may be used beyond the curb stop
into the building.
3. Install 8”x4” reducer and 4” gate valve, all fostered to southern line cross.
4. Install 4” gate valve on water line to 4” flushing hydrants just past last service connections.
5. Maintain minimum 18” separation between water services and mains and wastewater lines at points of
crossings.