Loading...
HomeMy WebLinkAboutSP-23-018 - Supplemental - 1241 Williston Road 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com Application Number SP-______-__________ (office use only) APPLICATION FOR SITE PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. 1. PROJECT STREET ADDRESS: 2. OWNER(S) OF RECORD (Name(s) as shown on deed, mailing address, phone) 3. APPLICANT (Name, mailing address, phone) 4. CONTACT PERSON ((person who will receive all correspondence from Staff. Include name, address, phone): 4a. Contact email address: 6. TAX PARCEL ID # (can be obtained at Assessor’s Office): 7. PROJECT DESCRIPTION a. General project description (explain what you want approval for): 2 Site Plan Application Form. Rev. 01-2020 b. Existing Uses on Property (including description and size of each separate use): c. Proposed Uses on property (include description and size of each new use and existing uses to remain): d: Are Transfer of Development Rights (TDRs) being utilized? Yes No If yes, please identify how many and from which parcel (street address) d. Total building square footage on property (proposed buildings and existing buildings to remain): e. Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine): f. Number of residential units (if applicable, new units and existing units to remain): g. Number of employees (existing and proposed, note office versus non-office employees): h. Type of existing or proposed encumbrances on property (easements, covenants, leases, rights of way, etc.) i. Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): 3 Site Plan Application Form. Rev. 01-2020 8. LOT COVERAGE (ALL information MUST be provided. For Planned Unit Developments involving multiple parcels, attach additional sheets) Total Parcel Size: acres / sq. ft. a. Building: Existing % / sq. ft. Proposed % / sq. ft. b. Overall impervious coverage (building, parking, outside storage, etc) Existing % / sq. ft. Proposed % / sq. ft. c. Front setback non-building coverage (along each street, commercial properties only) Existing % / sq. ft. Proposed % / sq. ft. d. Total area to be disturbed during construction (sq. ft.) * * Projects disturbing more than one-half acre of land must follow the City’s specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. 9. NATURAL RESOURCE INFORMATION a. Are there any Natural Resources (as defined in the Land Development Regulations Article 12) on the subject property? Yes No b. If yes, is the proposed development encroaching into any of these natural resources (list area of resource encroachment by type) c. If yes, please submit the following with this application: i. A site specific or GIS based natural resource mapping or delineation of the entire property as required by Table 12-01. ii. Response to the standards described in the relevant section of Article 12 for the impacted Natural Resource (applicant is strongly encouraged to have a resource expert respond to these criteria). 10. AREA DISTURBED DURING CONSTRUCTION: ___________________SQ. FT. * *Projects must follow the City’s specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one (1) acre require a permit from the Vermont Department of Environmental Conservation. 8. COST ESTIMATES a. New Building or Addition, including initial fit-up (if initial fit-up cost not available, contact Department staff): $ b. Landscaping: $ 5 Site Plan Application Form. Rev. 01-2020 Date of Complete Application: Date Issued Decision: or Date Referred to Development Review Board: _______________________________________________________ Administrative Officer Date The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call (802) 879-5676 to speak with the regional Permit Specialist.