HomeMy WebLinkAboutSP-23-015 - Decision - 0155 Market StreetSP-23-015
1
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
SHEUN POON – 155 MARKET STREET
SITE PLAN APPLICATION #SP-23-015
FINDINGS OF FACT AND DECISION
Site plan application SP-23-015 of Sheun Poon, hereinafter referred to as the applicant, to amend a
previously approved plan for a 10,010 sf mixed-use building including five residential units and 7,610 sf
of commercial space. The amendment consists of adding an outdoor seating area and associated site
improvements, 155 Market Street.
Based on the plans and materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. Sheun Poon is seeking site plan approval to amend a previously approved plan for a 10,010 sf mixed-
use building including five residential units and 7,610 sf of commercial space. The amendment
consists of adding an outdoor seating area and associated site improvements, 155 Market Street.
2. The owner of record of the subject property is Poon Trust, LLC.
3. The subject property is located in Transect Zones 4 & 5 of the Form-Based Code Zoning District and
the Transit Overlay District. Portions of this property not proposed to be impacted by this
application are located in the Wetland Advisory Layer.
4. The application was received on April 17, 2023.
5. The plan submitted is untitled and was prepared by Lai Poon on 4/21/2013.
CITY CENTER FORM-BASED CODE STANDARDS
Section 8.07 Prohibited Materials
No prohibited materials have been proposed.
Section 8.09 Uses Allowed and Changes of Use.
No prohibited uses have been proposed.
Section 8.11 Nonconformities
C. Nonconforming Structures
(1) Authority to Continue. Nonconforming structures may be continued provided conditions in this
Section are met.
(2) Repair and Alterations.
2
This principal structure on this property is a non-conforming structure. The proposed site
modifications do not involve changes that necessitate changes to the structure – as such,
the structure is proposed to remain in compliance with these standards.
Section 14.07 Specific Review Standards
A, B, and G through E. Not applicable.
C. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and properly screened with
opaque fencing to ensure that trash and debris do not escape the enclosure(s). Small receptacles
intended for use by households or the public (ie, non-dumpster, non-large drum) shall not be
required to be fenced or screened.
The property has an existing dumpster area that meets these standards and is not proposed to be
altered as part of this application.
D. Landscaping and Screening Requirements. See Article 13, Section 13.06 Landscaping, Screening,
and Street Trees.
The project consists of minor site modifications, specifically the partial replacement of an existing
grass/lawn area in the front of the building with artificial turf. The applicant is proposing this change to
maintain the appearance of a healthy lawn for aesthetic purposes and to provide an informal outdoor
seating area that may be used by customers and employees of all three commercial uses currently in
operation at the site – a nail salon, a hair salon, and a short-order restaurant. The proposed work will
not impact any previously approved landscaping features and will not require the installation of any
new landscaping features. Snow storage areas have been indicated on previous Landscaping Plans and
are not proposed to change as part of this application.
OTHER
Section 13.07 Exterior Lighting
There are no proposed alterations to the existing exterior lighting plan.
Section 13.03 Bicycle Parking and Storage
The short-term bike parking requirements for commercial use is one (1) space per 5,000 sf of commercial
use. The short-term bike parking requirement for residential uses is one (1) space per ten (10) residential
units. All commercial uses and residential uses, regardless of square footage, require a minimum of four
short-term bike parking spaces. The applicant has previously installed 2 ‘inverted-U’-style bike racks,
providing the minimum requirement of four short term bicycle parking spaces. The work proposed as part
of this application does not increase the number of required short-term bike parking spaces or necessitate
the creation of long-term bike storage spaces. As such, the Administrative Officer finds this criterion met.
Traffic Generation
The proposed outdoor seating area may be used by customers of the commercial space currently in use as
short-order restaurant ‘Hawaiian Grill’ but will not include table service and therefore will not constitute an
increase in the square footage or seating capacity of this use. As such, the proposed outdoor seating area
will not increase the estimated trip generation of the restaurant use or of any other use at this property,
3
and the Administrative Officer finds the proposed project not to constitute an impact on the trip generation
for this property.
Water/Wastewater
As noted above, the proposed outdoor seating area may be used by customers of the commercial space
currently in use as short-order restaurant ‘Hawaiian Grill’ but will not include table service and therefore will
not constitute an increase in the square footage or seating capacity of this or any other use. As such, the
proposed outdoor seating area will not increase the estimated water consumption or wastewater
generation of the restaurant use or of any other use on the property, and the Administrative Officer finds
the proposed project not to require any additional water or wastewater allocation.
DECISION
Based on the above Findings of Fact, the Administrative Officer herby approves site plan application
#SP-23-015 of Sheun Poon, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall remain
in full effect.
2. This project must be completed as shown on the plans submitted by the applicant and on file
with the South Burlington Department of Planning and Zoning.
3. The Administrative Officer concurrently issues Zoning Permit #ZP-23-150.
4. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications must be underground.
5. Any new exterior lighting must be installed or shielded in such a manner as to conceal light
sources and reflector surfaces from view beyond the perimeter of the area to be illuminated.
6. The applicant must obtain a Certificate of Occupancy from the Administrative Officer prior to use
or occupancy of the proposed outdoor seating area.
7. Any change to the approved plan will require approval by the South Burlington Development
Review Board or the Administrative Officer.
Signed on this 11th day of May, 2023 by
____________________________________
Marty Gillies, Administrative Officer
4
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a
Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be
accompanied with a $233 filing fee and be filed within 15 days of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.