Loading...
HomeMy WebLinkAboutSP-23-010 - Supplemental - 1650 Shelburne Road 208 Flynn Avenue, Suite 2A, Burlington, VT 05401  Tel: 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766  Tel: 603-442-9333 414 Union Street, Schenectady, NY 12305  Tel: 518-205-9141 ENGINEERING VENTURES, PC 414 Union Street, Schenectady, NY 12305  Tel: 518-205-9141 March 2, 2023 Marty Gillies Development Review Planner City of South Burlington 575 Dorset Street South Burlington, VT 05403 mgillies@southburlingtonvt.gov Re: Goss Jeep Renovation & Addition, Amendment Application 1650 Shelburne Road, South Burlington, VT 05403 EV Project No. 20001 Marla, On behalf of our client, Goss Jeep, please find attached an Application for Administrative Site Plan Review to amend Site Plan Application #SP-22-045. The application is requesting administrative approval for revisions to the west, south, and north architectural elevations of the proposed showroom addition. The following materials are attached to assist in you review of the requested amendment: · Application for Administrative Site Plan Review. · Project Drawings. The required application fee of $153 has been paid for through the City’s online portal. Project Description The Applicant proposes an amendment to the recent Site Plan approval for application #SP-22-045. The proposed architectural adjustments to the approved project include revisions to the west, south, and north elevations of the proposed showroom addition. There are no proposed revisions to the site plans or landscaping plans. Compliance with the Code The revised architectural design of the showroom addition is compliant with the major design elements required under the Urban Design Overlay District (UDO) and Designated Secondary Node. The project still includes a direct pedestrian access from the existing sidewalk along Shelburne Road to a significant architectural feature at the corner of the proposed northwest corner of the showroom addition (Section 10.05.D.(1)(c)). The architecture of the revised showroom addition (located within a Designated ENGINEERING VENTURES, PC 414 Union Street, Schenectady, NY 12305  Tel: 518-205-9141 Secondary Node) has been developed to present an appearance of two stories as required by the ordinance. The first story of the showroom addition contains 65% of glazing across the width of the building façade on Shelburne Road (60% min. required) and 51% of glazing across the width of the building façade on Green Mountain Drive (40% min. required). The proposed showroom addition is set back 47 feet+/- from the Shelburne ROW, meeting the required minimum setback of 20’. There are no proposed revisions to the service drop-off addition. There are no proposed revisions to the site plans or landscaping plans. No waivers or variances requested. Proposed Construction Schedule April 1, 2023 – November 30, 2023 We trust this submission is complete; however, if you have any additional questions or require any additional information to finalize the permit, please do not hesitate to contact us. Mike Dussault, PE Senior Engineer, Principal Cc: Brian Hoar & Jay Langford – Goss Jeep David Calcaterra – CBRE Brent Kosoc – BBL Construction Services Matt Tyler – Syvertsen Rigosu Architects