March 2, 2023
Marty Gillies
Development Review Planner
City of South Burlington
575 Dorset Street
South Burlington, VT 05403
mgillies@southburlingtonvt.gov
Re: Goss Jeep Renovation & Addition, Amendment Application
1650 Shelburne Road, South Burlington, VT 05403
EV Project No. 20001
Marla,
On behalf of our client, Goss Jeep, please find attached an Application for Administrative Site Plan
Review to amend Site Plan Application #SP-22-045. The application is requesting administrative
approval for revisions to the west, south, and north architectural elevations of the proposed showroom
addition.
The following materials are attached to assist in you review of the requested amendment:
· Application for Administrative Site Plan Review.
· Project Drawings.
The required application fee of $153 has been paid for through the City’s online portal.
Project Description
The Applicant proposes an amendment to the recent Site Plan approval for application #SP-22-045. The
proposed architectural adjustments to the approved project include revisions to the west, south, and
north elevations of the proposed showroom addition. There are no proposed revisions to the site plans
or landscaping plans.
Compliance with the Code
The revised architectural design of the showroom addition is compliant with the major design elements
required under the Urban Design Overlay District (UDO) and Designated Secondary Node. The project
still includes a direct pedestrian access from the existing sidewalk along Shelburne Road to a significant
architectural feature at the corner of the proposed northwest corner of the showroom addition (Section
10.05.D.(1)(c)). The architecture of the revised showroom addition (located within a Designated
ENGINEERING VENTURES, PC
414 Union Street, Schenectady, NY 12305 Tel: 518-205-9141
Secondary Node) has been developed to present an appearance of two stories as required by the
ordinance. The first story of the showroom addition contains 65% of glazing across the width of the
building façade on Shelburne Road (60% min. required) and 51% of glazing across the width of the
building façade on Green Mountain Drive (40% min. required). The proposed showroom addition is set
back 47 feet+/- from the Shelburne ROW, meeting the required minimum setback of 20’.
There are no proposed revisions to the service drop-off addition.
There are no proposed revisions to the site plans or landscaping plans.
No waivers or variances requested.
Proposed Construction Schedule
April 1, 2023 – November 30, 2023
We trust this submission is complete; however, if you have any additional questions or require any
additional information to finalize the permit, please do not hesitate to contact us.
Mike Dussault, PE
Senior Engineer, Principal
Cc: Brian Hoar & Jay Langford – Goss Jeep
David Calcaterra – CBRE
Brent Kosoc – BBL Construction Services
Matt Tyler – Syvertsen Rigosu Architects