Loading...
HomeMy WebLinkAboutAgenda 06_SD-23-06_ 226 Market St_Lot N_SBCC LLC_SK #SD-23-06 1 CITY OF SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD SD-23-06_ 226 Market St_Lot N_SBCC LLC_SK_2023-05- 02.docx DEPARTMENT OF PLANNING & ZONING Report preparation date: April 26, 2023 Plans received: March 29, 2023 225 Market Street, 267 Market Street and 113 Garden Street Sketch Plan Application #SD-23-06 Meeting date: May 2, 2023 Owner South Burlington City Center, LLC P.O. Box 2204 South Burlington, VT 05407 Applicant The Snyder-Braverman Development Company, LLC 4076 Shelburne Road, Suite 6 Shelburne, VT 05482 Property Information Tax Parcel 0450-00000 Form Based Code Transect Zone 5, Transect Zone 4 5.86 acres Engineer Andy Rowe Snyder Homes 4076 Shelburne Road, Suite 6 Shelburne, VT 05482 Location Map PROJECT DESCRPTION #SD-23-06 2 Sketch plan application #SD-23-06 of The Snyder Braverman Development Company, LLC to subdivide an existing 5.86 acre lot developed with a stormwater treatment pond into three lots of 3.71 acres (Lot N1), 1.79 acres (Lot N2), and 0.36 acres (Lot 3) for the purpose of developing three mixed use buildings containing a total of 213 residential units and 27,000 sf non-residential space on Lot N1 and a future City street on Lot N3, to be reviewed under separate administrative site plan application, 225 Market Street, 267 Market Street, and 113 Garden Street. CONTEXT The property is located on the south/west side of Market Street between Garden Street and a planned City street connecting the Library/City Hall driveway through the Blue Mall property and to Dorset Street. The applicant is concurrently seeking administrative site plan approval (#SP-23-011) for development of the lots. The subject subdivision also involves the creation of easements necessary for utility and pedestrian infrastructure. COMMENTS Development Review Planner Marla Keene and Planning and Zoning Director Paul Conner, hereafter referred to as Staff, have reviewed the plans submitted by the applicant and have the following comments. Numbered comments for the Board’s attention are in red. APPLICABLE STANDARDS The LDRs require demonstration that the land to be subdivided can be developed as intended and in accordance with the LDR. See article 15.A.10, 15.A.11, and 15.A.16 of the LDR adopted December 5, 2022. 15.A.04 Classification A. Subdivision Classes. For purposes of these Regulations, subdivisions of land shall be classified as by the Administrative Officer as follows: (1) A Minor Subdivision, to be reviewed under Section 15.A.07 (2) A Major Subdivision, to be reviewed under Sections 15.A.06 and 15.A.07 (3) A Transect Zone Subdivision, to be reviewed under Section 15.A.07 and Article 8, for any subdivision of land within a designated Transect Zone. The lands are within transect zones T4 and T5, therefore the proposed subdivision of land is a Transect Zone Subdivision. Transect Zone Subdivisions are required to undergo sketch plan and final subdivision review. Master Plan and Preliminary subdivision review are not required. 15.A.11 General Standards A. Development Suitability. The applicant must demonstrate that the land to be subdivided is physically suited for its intended use and the proposed density or intensity of development, and that the proposed subdivision will not result in undue adverse impacts to public health and safety, environmental #SD-23-06 3 resources as identified and regulated under Article 12, neighboring properties and uses, or public facilities and infrastructure located on or within the vicinity of the land to be subdivided. The intended use of the Transect Zones can be inferred from the purpose of the Form Based Code zoning district. 8.01A Purpose The City Center Form Based Code (FBC) District is a standalone zoning district with boundaries established on the Official Zoning Map, and has specific rules and standards set forth below which apply solely in the City Center Form Based Codes District. The FBC District implements a form based zoning regulation applicable to the City Center (either the ”Code” or the “FBC”) which encourages sustainable retail, commercial and mixed use development of open land, redevelopment of existing mixed use land and preservation and improvement of residential areas through pedestrian and bicycle connectivity. The FBC District (this article) is designed to maintain and foster improvement to the FBC District’s existing structures and encourage new development and infrastructure that incorporates planned transportation corridors with walking and bicycling coincidental with the automobile. This District aims to preserve the existing residential fabric while stimulating new mixed use growth that facilitates a safe and economically self-sustaining place to live and work. Future development within the City Center FBC District and its Transect Zones shall be of a form of built environment that creates and protects development patterns that are compact, pedestrian oriented and mixed use. Available parking will be a mix of parallel and diagonal on- street and screened off- street. Adequate space for walking, interconnectedness of neighborhoods and convenient parking areas will characterize the district so that there will be a mix of uses within walking distance of dwellings and parking. Intensity of development is defined by the applicable Building Envelope Standards for each transect zone. Excerpted relevant standards are below Standard T4 T5 Building Stories 2 min, 5 max 2 min, 6 max Primary Build-to-zone 0’ min, 12’ Max 0’ min, 6’ max Frontage Buildout 70% min 85% min Percentage of Frontage Buildout within Primary Build-to-zone 75% min 75% min Curb Cuts on Garden St 400’ min distance between curb cuts Prohibited Staff has not identified any concerns with the proposed subdivision pertaining to public health and safety, environmental standards, or impacts on neighboring properties at this sketch plan level of review. Impacts to public infrastructure are discussed in greater detail herein. C. Development Context. The applicant must demonstrate that the subdivision conforms to the planned pattern of subdivision and development in the area, as defined by district purpose statements and standards, or as specified for a type of Planned Unit Development (PUD) under Article 15.C. In addition to meeting required zoning district, transect zone, or PUD standards: (2) Multiple Districts. For the subdivision of land located in more than one zoning district, the district regulations specific to that portion of the subdivision within each zoning district shall apply, except as specified for a Planned Unit Development under Article 15.C. #SD-23-06 4 (a) Subdivision boundaries and lot lines must be located and configured to avoid creating building lots that are split by zoning district boundaries except where the DRB finds such split building lots unavoidable due to pre-existing lot and infrastructure layout. The applicant has indicated on the Overall Site Plan (sheet 1) their belief that this criterion is met. Two of the three proposed buildings are proposed to be split between zoning districts. The applicant has successfully demonstrated that it is viable to split buildings between zoning districts on approved site plan application SP-22-060 for development of Lot B on the opposite side of Market Street. (3) Compliance with Other Regulations. Subdivisions, including building lots, dwelling units, and supporting facilities and infrastructure, must also be designed, configured, and constructed to comply with other relevant standards under these Regulations and other city ordinances and standards in effect at the time of application, including those listed below. • Official Map, adopted under 24 V.S.A. § 4421 • Capital Improvement Program, adopted under 24 V.S.A. § 4430 • Department of Public Works Standards • Fire Prevention and Safety Ordinance • Water and Cross Connection Ordinances • Sanitary Sewer and Stormwater Ordinance • Impact Fee Ordinance • E-911 Ordinance Planning and Zoning Staff reviewed the project with the Community Development Director, the Director of Public Works and the City Stormwater Superintendent. Comments of the Community Development Director: The plans need to show (and the applicant provide) a waterline easement – permanent (in yellow) and temporary for construction (in green) – so that the Garden Street waterline may be looped (connected to) the Dorset Street line. #SD-23-06 5 I would also note that in relation to proposed easement C, that 1) a temporary construction easement and 2) a public recreation access easement across a) Garden Street and b) the Future Public Street needs to be provided in addition to proposed easement C until such time as these future streets are accepted by the City. Comments of the City Stormwater Section: Drainage easements should be 20’ wide centered on the pipe – the northern Easement B is only 15’ Comments of the Director of Public Works: • There appears to be missing water easements (both permanent and temporary) to the City on the southwest corner of the lot near/overlapping an area where the “B” and “C” easements are labeled. • Drainage easements are typically 20’ wide, centered on the pipe. • With regards to Easement C, the rec path, it is possible that this path will be completed prior to City acceptance of Garden Street. We will need a temporary access easement across Garden Street so that the path can connect on the north/south side of Garden Street. At this same #SD-23-06 6 location, we will also need an easement so that users of this path can connect to the west, so that the public can access the existing City ROW near Trader Joe’s, Healthy Living, etc. • It may be some time before the city accepts the “Future Public Street”. Therefore, we will need a temporary access easement on the “Future Public Street” so that the public can access parking associated with City Hall that is currently on the Poon lot and the pedestrian easement (labeled “C”) from Market Street. Also, so that users of a path can access Market Street. • We may need an expanded easement area across the pond spillway proposed for lot N2. How will the path cross the spillway? Construction of a bridge or other crossing may necessitate a wider easement in this location. The comments of the Director of Public Works overlap the comments of the Community Development Director and of the City Stormwater Section. 1. Staff recommends the Board direct the applicant to incorporate the comments of the Community Development Director, Director of Public Works, and Stormwater Section into the next submission for this property. 15.A.16(C) Lots. (1) The arrangement and configuration of lots must allow for the further subdivision of any remaining developable land on the tract or parcel to be subdivided. Where proposed building lots exceed minimum lot area requirements, the DRB may require that such lots be configured and developed in a manner that allows for further subdivision and infill development. (5) The arrangement and configuration of building lots within the subdivision must be consistent with the intended use, street type, and the planned pattern of development for the Zoning District, Transect Zone, or PUD type in which the subdivision is located, including the existing or planned street and block network. 8.04 also includes provisions relevant to the shape of lots, as follows. 8.04 Blocks, Streets, and Alleys A. Location of blocks and streets. (2) Public Facilities on the Official Map (a) Where applicable, the applicant shall construct such street in accordance with the requirements of these Regulations; The proposed subdivision is intended to be the final subdivision of the developable land. Should the applicant later desire to subdivide the land so that each future building is on its own lot, Staff considers a network of easements would be required to provide pedestrian, vehicular, stormwater, and site amenity access. The applicant must provide an irrevocable offer of dedication for the lot for the future Street as part of the application for final subdivision. The design of the street is included in concurrent site plan application #SP-23-011. (8) Unless otherwise specified under these Regulations, building lots must have sufficient developable area to accommodate proposed building types, associated yard or other required open space areas, #SD-23-06 7 site drainage, utilities, or other improvements required under these Regulations, including site plan standards under Article 14. The applicant has demonstrated on the Overall Site Plan (sheet 1) that required civic spaces can be provided on the proposed development lot, Lot N1. Stormwater treatment is partially accommodated on site and partially accommodated in the existing storm pond located on proposed Lot N2. Staff considers this criterion met. (9) A building lot generally must be rectangular in shape, with side lot lines that are perpendicular or radial to the abutting street, and rear lot lines that parallel the street, except as necessary to accommodate existing rights-of-way or other physical site constraints (see Figure 2-1, Lots, Yards and Lot Lines). Irregular or oddly shaped building lots, including flag and through lots, are prohibited, except for: (a) A flag lot, with a minimum of fifteen (15) feet of frontage on the abutting street, as necessary to accommodate a back-lot subdivision and infill development within an existing subdivision, block pattern, or development; (b) A triangular or trapezoidal building lot defined by abutting streets that otherwise has sufficient street frontage and lot area to meet minimum lot requirements; or (c) A through lot with frontage on two parallel or intersecting streets that cannot be further subdivided under minimum lot requirements, provided that front setback requirements can be met on both streets. 15.A.16(C)(9) above requires building lots to be generally rectangular in shape, with a certain set of limited exceptions. Lot N2 and N3 are not building lots and are instead for an approved centralized stormwater treatment practice and for a public street on the official map, respectively. As can be seen on sheet SK1, the proposed Lot N1 is particularly irregular in shape. The applicant is showing on the Overall Site Plan (sheet 1) how three buildings could exist on the lot in a manner that, if subdivided, could be roughly 3 rectangles. Since more than one building can be on a lot in the FBC, Staff considers the proposed shape to be acceptable. The frontage build-out requirements of the T5 zoning district require 85% of the street frontage to be occupied by a building. The frontage build-out requirements of the T4 zoning district require 70% of the street frontage to be occupied by a building. 8.05D also includes provisions relevant to the shape of lots, as follows. 8.05 Parking D. Access to Off Street Parking. Access between adjacent lots and across property lines is required, as stipulated in 14.07F and 13.02F of these Regulations. The applicant has demonstrated on Overall Site Plan (sheet 1) that the frontage buildout requirements can be met for the remining lands of Lot N1, without including lands unnecessary for the approved storm pond in Lot N2. 15.A.15 Sidewalks, Bike Lanes, and Recreation Paths A. Purpose and Intent. As necessary to facilitate pedestrian and bicycle access and circulation throughout the subdivision, and to provide direct pedestrian and bicycle connections to adjoining neighborhoods, public parks, transit stops, and other community focal points or destinations in the #SD-23-06 8 vicinity (e.g., schools, recreation facilities, civic buildings, shopping and employment centers), the applicant must demonstrate that subdivision layout and design, including the proposed street network, incorporates as applicable: (1) Pedestrian-oriented streetscapes, as defined by Street Type under Article 11.A; (2) Pedestrian sidewalks, crosswalks, and mid-block crossings that meet ADA requirements; (3) Interior block pedestrian passages and walkways; (4) Direct pedestrian access from the street to fronting building lots and civic spaces, and to existing and planned transit stops; (5) Bicycle access to all building lots, and existing and planned transit stops; (6) Bicycle lanes, as incorporated by street type; and (7) Existing and planned pedestrian trails and multiuse recreation paths, as identified in the Comprehensive Plan, or on the City’s Official Map. C. Pedestrian Easement. A permanent pedestrian easement twenty (20) feet in width may be required by the DRB, as necessary to facilitate pedestrian and bicycle circulation within the subdivision: (1) Through any block that is six hundred (600) feet or more in length; (2) As a continuation of a dead-end street; (3) To provide direct pedestrian access to an existing or planned transit stop within or adjacent to the subdivision; or (4) In conjunction with a utility easement. Along Garden Street, Lot N is almost 900 feet from southwestern corner of the lot to the northwestern corner of the lot. The resulting block length is even greater, extending past the current Trader Joes/Healthy Living driveway to Dorset Street. The purpose of the City Center zoning districts and of the street types within the City Center zoning districts place strong emphasis on creation of a pedestrian- oriented development pattern. 15.A.15A(3) requires the subdivision design and layout incorporates pedestrian passages and walkways. The applicant has proposed a pedestrian easement along the stormwater pond maintenance access driveway and berm connecting Garden Street to the future public street. 2. Staff recommends the Board direct the applicant to provide the draft language for all proposed easements as part of the final plat application. 3. There are a number of criteria in the remainder of Article 15.A which are required to be addressed as part of the final plat application. Staff recommends the applicant obtain approval for concurrent site plan application #SP-23-011 for development of Lot N1, which will serve as a demonstration that the subdivision review criteria of Article 15.A are met. If the applicant does not obtain approval prior to final plat review, the applicant will need to submit information demonstrating that the proposed subdivision does not preclude compliance with these criteria, which pertain to building layout within the subdivision, design of streets and vehicular access to the project, and infrastructure, utilities, and services, including renewable energy. RECOMMENDATION #SD-23-06 9 Staff recommends that the Board discuss the project with the applicant and conclude the sketch plan meeting. Respectfully submitted, Marla Keene, Development Review Planner Jaycee Park City Center Park Block Standard Applicability Non-Exempt WHITE S T WILLI S T O N R D PATCHEN RDDORSET STGARDEN ST MIDAS DRMA R K E T S TMARY STSAN REMO DRBurlingtonSouth BurlingtonLegend Existing Planned Planned Path Planned Street Right of Way Park Municipal Boundary Tax Parcel Boundary-2021 Form Based Code Area (346 acres) 0 450 900 1,350 1,800225Feet *Approximate locations of proposed roads, to be used for planning purposes only. Please refer to original studies for exact road centerlines. Map Prepared by: M.Needle, CCRPC, using ArcGIS Pro Official Map (City Center Insert)Adopted October 4, 2021 CITY CENTER LOT N Annotated 03-27-23 (Lot N) CATAMOUNT RUNPHASE 1, LLC. N/FMARKET STREET80'LOT B1GARDEN STREET64'POON TRUST, LLC. N/FVOL. 780, PG. 728(155 MARKET STREET)DORSET SQUARE ASSOCIATES N/FVOL. 194, PG. 77VOL. 194, PG. 80VOL. 194, PG. 82VOL. 194, PG. 90VOL. 266, PG. 1203N-SB, LLCN/FVOL. 1366, PG. 92430.49'2 4 8 . 1 8 ' N 4 3 ° 3 5 ' 1 3 " EN5 1 ° 0 9 ' 1 1 "E 1 3 7 . 7 7 '181.29'S77°43'40"W259.46'S07°51'14"E357.56'S82°52'27"WCMSIPFIPFCMF29.97'S08°01'07"ECMSCMSCMSCMSCMSCMSEXISTINGLOT M1PROPOSEDLOT N13.71 ACREIPSN5 1 ° 0 9 ' 1 1 " E 6 1 . 2 3 'IPSN46°25'48"W1 5 8 . 5 8 ' N 4 3 ° 3 5 ' 1 3 " EIPS 60'CMSCMS60.00'EXISTINGLOT M4EXISTINGLOT M5EXISTINGLOT LF U T U R E P U B L I C S T R E E T SOUTH BURLINGTON CITYCENTER, LLC. N/FVOL. 853, PG. 222SOUTH BURLINGTON CITYCENTER, LLC. N/FUNION PLACEAPARTMENTS, LLCN/FPROSPECT PLACEAPARTMENTS, LLC. N/F3N-SB, LLCN/FVOL. 1366, PG. 96S 4 3 ° 3 9 ' 0 0 "W 8 7 . 2 5 'N46°25'48"WR=200.00'L=136.92'R=364.00'L=179.89'S52°41'37"W28.71'R=176.00'L=91.00'2.65'S81°53'47"ER=200.00'L=89.00'R=200.00'L=81.08'APROPOSEDLOT N30.36 ACREFUTURE STREETRIGHT OF WAYB20'15'BB20'CCR=364.00'L=11.85'N27°33'22"W14.57'N5°47'20"W110.82'R=49.00'L=89.37'PROPOSEDLOT N21.79 ACRER=75.00'L=54.60'R=350.00'L=215.83'N35°26'29"W20.00'CMSRICK MARCOTTECENTRAL SCHOOLLOCATION PLANIRON PIPE FOUNDIRON PIPE SETCONCRETE MONUMENT FOUNDNOW OR FORMERLYREVISIONS1. THE PURPOSE OF THIS PLAN IS TO SUBDIVIDE LOT N, CREATING A DEVELOPMENT LOT, A FUTURE STREET ROW,AND A LOT FOR THE STORMWATER POND.2. THIS PLAT WAS COMPILED FROM FIELD SURVEYS AND RECORD RESEARCH INCLUDING THE USE OF THEFOLLOWING PLATS:A."CORPORATE CIRCLE, SOUTH BURLINGTON, VERMONT, SOUTH BURLINGTON REALTY CORP., PROPERTY PLAT."BY WEBSTER-MARTIN, INC., DATED SEPT. 1981, LAST REVISED 5-27-92, AS RECORDED IN SLIDE 248 OF THE CITYOF SOUTH BURLINGTON LAND RECORDS.B. "ALTA/ACSM LAND TITLE SURVEY, CENTURY PARTNERS, 100 DORSET STREET, SOUTH BURLINGTON, VERMONT."BY TRUDELL CONSULTING ENGINEERS, DATED DECEMBER 9, 1997, LAST REVISED 11/26/07, AS RECORDED INSLIDE 509 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.C."SOUTH BURLINGTON SCHOOL DISTRICT, SOUTH BURLINGTON CENTRAL SCHOOL, 10 MARKET STREET, SOUTHBURLINGTON, VERMONT. " BY CIVIL ENGINEERING ASSOCIATES, INC., DATED MAY 19, 2004, LAST REVISED12-17-04 AS RECORDED IN SLIDE 447 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.D."SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTH BURLINGTON CITY CENTER, LLC",SHEET PL-1, BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 10-14-16, LAST REVISED04-04-18 AS RECORDED IN SLIDE 625.1 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.E."SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTH BURLINGTON CITY CENTER, LLC",SHEET PL-2, BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 01-25-18, LAST REVISED06-11-18 AS RECORDED IN SLIDE 625.2 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.F."5 LOT SUBDIVISION SOUTH BURLINGTON CITY CENTER, INC., MARKET STREET SOUTH BURLINGTON, VT"SHEETS P1 & P2, BY CIVIL ENGINEERING ASSOCIATES, INC. DATED 06-01-18 AS RECORDED IN SLIDE 626.1 & 626.2OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.G."SUBDIVISION PLAT", SHEET PL-1 BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS, INC. DATED 07-15-19,LAST REVISED 10-19-21, AS RECORDED IN SLIDE 646.3 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.2. BEARINGS SHOWN ON THIS SURVEY ARE BASED ON GPS OBSERVATIONS RECORDED IN OCTOBER, 2016.3. THIS PROPERTY MAY BE SUBJECT TO OTHER EASEMENTS AND/OR RIGHTS-OF-WAY.4. THE RIGHT-OF-WAY WIDTH FOR MARKET STREET OF 80 FEET IS BASED ON A DEED RECORDED IN VOL. 687, PAGE143.LOT NSUBDIVISIONSKETCH PLANSOUTH BURLINGTONCITY CENTER, LLCLANDS OFMARKET ST. & GARDEN ST. SOUTH BURLINGTON, VTABRKBsht. no.scaledateG A R D E N S T R E E T checkeddrawndescriptiondatebySK1AS NOTEDGRID PROJECTSITEWESNNTS N/F LEGEND ABUTTING PROPERTY LINEAPPLICANTTHE SNYDER-BRAVERMANDEVELOPMENT COMPANY, LLC4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VT 05482LANDOWNERSOUTH BURLINGTON CITY CENTER, LLCC/O SOUTH BURLINGTON REALTY CO.P.O. BOX 2204SOUTH BURLINGTON, VT 05407DEED REFERENCE: VOL. 853, PAGE 222PARCEL AREA: 5.86 ACRESTAX MAP PARCEL: 0450-00000.LIPFIPSNOTES:CMFCONCRETE MONUMENT TO BE SETCMSCALCULATED POINT NO MARKER FOUND OR SETDORSET STREETIBY STREETSAN REMO DRBARRETT STWILLISTON ROAD600WHITE STHINESBURG ROADMARKET ST60120240 SCHEDULE OF EASEMENTS 1" = 60 FEETSIDELINE OF EASEMENT03-27-23PROJECT BOUNDARYBAEXISTING RIGHT OF WAY TO BENEFIT PARCEL AT 155 MARKET ST TO OBTAIN ACCESS TO THEPREMISES FROM THE CURBCUT ON MARKET ST (FORMERLY CORPORATE DR)THE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMGARDEN STREET HOUSINGLIMITED PARTNERSHIPN/FCITY OF SOUTHBURLINGTONN/FVOL. 1493, PG. 117(180 MARKET ST)PROPOSED PROPERTY LINEPROPOSED STORMWATER EASEMENT TO THE CITY OF SOUTH BURLINGTONCPROPOSED 20' WIDE PEDESTRIAN EASEMENT TO THE CITY OF SOUTH BURLINGTONCITY OF SOUTHBURLINGTONN/F 308 310 309 309 310311311312 310305 3123123143153143123 1 1 3113113113103103113123123 1 2 31 2 298308308305305308305300 300 300305308298 299305310 3 1 0 31031 0 309311310308309307309312314314DDD305307UUUUUU312311311311310310 3 1 0 3 10 311312MARKET STGARDEN STREETLOT M4EX. SIDEWALKEXISTING BOXSTORM POND 118'SEE PLANS BY WAGNERHODGSON FOR LAYOUT ANDLANDSCAPING IN MINI PARKLOT M5110.2' 1 0 0 .0 '209.1'NEW CONCRETE SIDEWALKEXISTING PAVED SIDEWALKPROPOSED 61 UNITRESIDENTIAL BUILDINGBIKE RACKS(4 HOOPS)5' CONCRE T E S I D EW A LK20' R.30' R.10' R.20' R.22'20'20' R.CONCRETE CURBCONC R E T E CU R B RAMPTRASH & RECYCLING CONTAINERSTO BE LOCATED IN PARKING GARAGEBLDG B1MARKET STREETCI T Y H A L L / SCHOO L DR I V EWAY FU TURE PUB L IC S TREE T 3 2 4 '490'LOT B-B2LOT B-B1TRANSECT T-4TRANSECT T-5TRANSECT T-4TRANSECT T-58 7 'L=137'358'28'3'L=91'289'181'199' 2 4 8 'EXISTING CONCRETE SIDEWALKEXISTING PAVED SIDEWALKEXISTING CONCRETE SIDEWALKEX IS T ING CONC RE T E S I D EW A L KPA VED P ARK ING AREAPAVED PARKING AREAE X I S T ING G R AVE L S UR F AC E E X I S T IN G P A V ED D R I V ECLASS 2 WETLAND50'WETLAND BUFFER EXISTING RIGHT OF WAY TO BENEFIT THEPARCEL AT 155 MARKET STREET TOOBTAIN ACCESS TO THE PREMISES FROMTHE CURB CUT ON MARKET STREET312313312311310309312311310310310312312311 308 307305313312312 303308 TEMPORARY STRUCTURE (TENT)TEMPORARY STONE/GRAVEL STORAGE AREATEMPORARY STONE/GRAVEL STORAGE AREATEMPORARY GRAVEL ACCESSSITE GRADING ASSOCIATED WITHTHE TEMPORARY STORAGE AREAIS NOT COMPLETE192' T E M P . JO B T R A I L E R SOUTH BURLINGTON CITY CENTERCATAMOUNT RUN - PH.IIMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing03-17-23KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN2EXISTINGCONDITIONS PLAN1-888-DIG-SAFE PRIOR TO ANY EXCAVATION.THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT GRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.#155 MARKET STREETMIXED USE BUILDINGLOT B#112 GARDEN STREET#303 MARKETSTREETLEGENDEXISTING CONTOUREXISTING PROPERTY LINEEXISTING EDGE OF TREES / SHRUBS313EXISTING STREET TREEEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLESIDELINE OF EASEMENTNOTES:1.THE PURPOSE OF THIS PLAN IS TO PRESENT THE EXISTING CONDITIONS OF LOT N.DATA IS BASED UPON A TOPOGRAPHIC SURVEY PERFORMED BY BARNARD & GERVAISIN OCTOBER 2022, AND RECORD DRAWINGS FOR MARKET STREET.2.SEE GARDEN STREET DESIGN PLANS FOR STREET AND UTILITY RELATED INFORMATIONWITHIN THE RIGHT OF WAY. THE TRAVEL LANES AND CURB OF THE SOUTH SEGMENTOF GARDEN STREET ARE SUBSTANTIALLY COMPLETE. THE MAJORITY OF THESIDEWALKS REMAIN UNCONSTRUCTED.3.SEE MARKET STREET RECORD DRAWINGS FOR ADDITIONAL UTILITY RELATEDINFORMATION WITHIN THE RIGHT OF WAY.4.SEE THE SUBDIVISION PLAT FOR BOUNDARY RELATED INFORMATION.(UNDER CONSTRUCTION)(UNDER CONSTRUCTION) 302.5302.5 302.5302.5 302.5 LLLL L LL 310 309 309 310311311 310305 3123123143153143123 1 1 3113113113103103123123 1 2 31 2 298308 308305305308305300 300 300305308298 299305310 3 1 0 31031 0 309311310308309307309312314314DDD305307UUUUUU312311311311310310 3 1 0 3 10 311312MARKET STLOT M410' WIDE SHARED USE PAVED PATH6' WIDE CONCRETE SIDEWALKEX. SIDEWALKEXISTING BOXSTORM POND 1SEE PLANS BY WAGNERHODGSON FOR LAYOUT ANDLANDSCAPING IN MINI PARKGARDEN STREETLOT M5110.2' 1 0 0 .0 '209.1'NEW CONCRETE SIDEWALK6' C ON CR E TE S I D EW A LK6' CONCRETE SIDEWALKPROPOSED 61 UNITRESIDENTIAL BUILDINGBIKE RACKS(4 HOOPS)6' WIDE CONCRETE SIDEWALK5' CONCRE T E S I D EW A L K20' R.30' R.10' R.20' R.22'20'20' R.CONCRETE CURBCONC R E T E CU R B RAMPTRASH & RECYCLING CONTAINERSTO BE LOCATED IN PARKING GARAGEBLDG B1MARKET STREETCI T Y H A L L / SCHOO L DR I V EWAY FU TURE PUB L IC S TREE T 3 2 4 'LOT B-B2LOT B-B1TRANSECT T-4TRANSECT T-5TRANSECT T-4TRANSECT T-56' WIDE CONCRETE SIDEWALK8 7 . 2 'L=136.9 '28.4'2.7'L=91.0'289.4'181.3'137.8'61 .2 ' 2 4 8 . 2 '60'6' W I D E CON CRE TE S I DEW A L K 10' WIDE SHARED USE PAVED PATH1 0 ' W IDE SH A RED U S E P A V ED PA TH BUILDING A2BUILDING A1BUILDING A3FU TUR E PUB L IC S TRE E TBIOERETENTION AREAPOCKET PLAZALOT N13.69 AC.LOT N21.81 AC.TRASH & RECYCLINGSTRUCTUREPLAZA AT STREETLEVEL OVER RAMPTO PARKING GARAGETYPICAL RAILING ALONGTOP OF RETAINING WALL22'22'15' R.TRANSECT T-5TRANSECT T-4TRANSECT T - 5TRANSECT T - 4 MOUNTABLECONCRETE CURBMOUNTABLECONCRETE CURBCONCR E T E C UR B CONCRETE CURB5' R .5' R.15' R.15' R.30' R.54' R.22'20'10' R.30' R.22'EXISTING PAVED DRIVEPROPOSED 20' WIDE PEDESTRIANEASEMENT TO THE CITY OF SOUTHBURLINGTON20'CLASS 2 WETLAND50'50' WETLAND BUFFEREXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CON CRE TE S I DEW A L K (4) BIKE RACKS(8 SPACES)(4) BIKE RACKS(8 SPACES)5' WIDE CONCRETE SIDEWALK 5' WIDE CONCRETE SIDEWALK 5' WIDE CONCRETE SIDEWALK5' WIDE CONC. SIDEWALKEXISTING PAVED PARKINGEXISTINGPAVEDPARKINGSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILS20'20'8'8'22'15' R.15' R.10' R.15' R.12' R.18'8'8'8'9'EL E CELEC ELEC18'8'8'8'9'24'18'9'24'8'8'8'10' R.15' R .10' R.10' R.1 5 8 . 6 'L=81.1 'L=89.0'L=11.6'L=179.9'357.6'L=4 9 . 0 '14.6'110.8'L=49.4'L=54.6'L=215.8'430.5'S PEEDTABLE SPEEDTABLE20.0'(3) BIKE RACKS(6 SPACES)(3) BIKE RACKS(6 SPACES)(4) BIKE RACKS(8 SPACES)TYPICAL INFORMALSITTING AREA - SEELANDSCAPE PLANSCONCRETE CURB CONCR E T E CUR B SOUTH BURLINGTON CITY CENTERCATAMOUNT RUN - PH.IIMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing03-17-23KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN1OVERALL SITE PLANWILLISTON ROADLOCATION MAPNOT TO SCALEMAR Y S T R E E T EXIT 14INTERSTATE 89MIDAS RDHINESBURG ROADINTERSTATE 89MARKET STREETMARCOTTECENTRALSCHOOLDORSET STREETAPPLICANTTHE SNYDER-BRAVERMANDEVELOPMENT COMPANY, LLC4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VT 05482LANDOWNERSOUTH BURLINGTON CITY CENTER, LLCP.O. BOX 2204SOUTH BURLINGTON, VT 05407WHITE STSITENOTES:1.THE PURPOSE OF THIS PLAN IS TO PRESENT THE PROPOSED LAYOUT OF LOT N AND THEASSOCIATED BUILDING AND SITE IMPROVEMENTS. SEE THE MARKET STREET ANDGARDEN STREET DESIGN PLANS FOR STREET AND UTILITY RELATED INFORMATIONWITHIN THE RIGHT OF WAY.2.FOR LOT N PERIMETER BOUNDARY INFORMATION, SEE THE SOUTH BURLINGTON CITYCENTER, LLC SUBDIVISION PLAT BY LAMOUREUX & DICKINSON CONSULTING ENGINEERS,INC., LAST REVISED 10-19-21 AND RECORDED IN SLIDE 646.3 OF THE CITY LAND RECORDS.3.LOT N IS SUBJECT TO A PROPOSED SUBDIVISION. SEE THE PROPERTY PLAT BYBARNARD & GERVAIS, LLC FOR DETAILED INFORMATION ON LOTS N1-N3.GRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.GARDENSTREETLEGENDPROJECT BOUNDARY 310EXISTING TREELINEABUTTING PROPERTY LINESIDELINE OF EASEMENTEXISTING CONTOUR#155 MARKET STREETMIXED USE BUILDINGLOT BBUILDING B2BIKE PARKINGBLDGDWELLINGUNITSNON-RESIDENTIALSPACESHORT TERM BIKE SPACESLONG TERM BIKE SPACESCHANGINGFACILITYUNISEXSHOWERCLOTHESLOCKERREQUIREDPROVIDEDREQUIREDPROVIDEDBLDG A110113,500 SF14 (10.1 + 4 MIN.)14103 (101 + 2)104NOTREQUIREDNOTREQUIRED1REQUIREDBLDG A26213,500 SF10 (6.2 + 4 MIN.)1464 (62 + 2)64NOTREQUIREDNOTREQUIRED1REQUIREDBLDG A350NONE585054N/AN/AN/AZONING TRANSECT BOUNDARYEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLELOT BBUILDING B1#112 GARDEN STREET#303 MARKETSTREETSHEET INDEX1OVERALL SITE PLAN2EXISTING CONDITIONS PLAN3GRADING PLAN - BLDG A1 & A24GRADING PLAN - BLDG A35UTILITY & LAYOUT PLAN - BLDG A1 & A26UTILITY & LAYOUT PLAN - BLDG A37EPSC PLAN8LIGHTING PLAN9DETAILS - SITEWORK10DETAILS - SITEWORK & STORM11DETAILS - EPSC & STORM12DETAILS - WATER13DETAILS - WATER & INSETS14PAVEMENT MARKING & SIGN PLAND2STORMWATER DETAILS (BY VHB)LOT N3FUTURE STREET ROW0.36 AC.PROJECT DATA:ZONING DISTRICT: FORM BASED CODETRANSECT ZONE T4 & TRANSECT ZONE T5LOT DATA:LOT N1 = 3.69 ACRELOT N2 = 1.81 ACRE (STORM POND)LOT N3 = 0.36 ACRE (FUTURE ROW)PROPOSED BUILDING:BUILDINGS A1 & A2: MIXED USE BUILDINGBASEMENT - PARKING GARAGEFLOOR 1T-4:RESIDENTIAL UNITST-5:NON-RESIDENTIALFLOORS 2-4T-4 & T-5: RESIDENTIAL UNITSBUILDING A3: RESIDENTIALBASEMENT - PARKING GARAGEFLOORS 1-4T-4:RESIDENTIAL UNITSPARKING STANDARDS (T-4 & T-5)FORM BASED CODE REQUIREMENTS:VEHICLE PARKINGMAXIMUM 2 SPACES PER RESIDENTIAL UNITBIKE PARKINGSHORT TERM BIKE PARKING1 SHORT TERM SPACE REQUIRED PER 10 DWELLING UNITS1 SHORT TERM SPACE PER 5,000 SF FOR RETAIL / RESTAURANT / OFFICELONG TERM BIKE PARKING1 LONG TERM SPACE PER 1 DWELLING UNITLONG TERM SPACES = 50% OF SHORT TERM SPACES FOR RETAIL / RESTAURANT / OFFICEVEHICLE PARKINGBUILDING / LOTDWELLINGUNITSPROPOSED PARKING SPACESGARAGESURFACETOTALBLDG A1 / LOT N11017944123BLDG A2 / LOT N262483482BLDG A3 / LOT N350341549OPEN SPACE REQUIREMENTS (T-4)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITOPEN SPACE REQUIREMENTS (T-5)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITNON-RESIDENTIAL, <20,000 SF·5% OF NON-RESIDENTIAL GROSSFLOOR AREAOPEN SPACEBLDGDWELLINGUNITSNON-RESIDENT.SPACEOPEN SPACEREQUIREDPROPOSED OPEN SPACELDA O/S CREDITPROVIDEDTOTALBLDG A110113,500 SF6,735 SF(6,060 + 675)3,367.5 SF(50% MAX.)990 SF SNIPPET (A1) +1,300 SF SNIPPET (A1)+ 2,400 SFPOCKET PLAZA +1,175 SF SNIPPET (A2)+ 3,500 SFRAIN GARDEN (A3)16,430 SFBLDG A26213,500 SF4,395 SF(3,720 + 675)2,197.5 SF(50% MAX.)BLDG A350NONE3,000 SF1,500 SF(50% MAX)TOTAL14,130 SF7,065 SF9,365 SFBUILDING ENVELOPE STANDARDS - FRONTAGE BUILDOUT:REQUIRED FRONTAGE BUILDOUTT-470% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)T-585% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)PROPOSEDMARKET STREET - LOT N1 / BLDG A2TOTAL STREET FRONTAGE = 430.5 FT (ALL IN T-5)TOTAL FRONTAGE BUILDOUT = 185.6 FT + 185.5 FT = 371.1 FTTOTAL FRONTAGE BUILDOUT = 86% (371.1 FT / 430.5 FT = 86%)FUTURE PUBLIC STREET - LOT N1 / BLDG A2TOTAL STREET FRONTAGE = 239.7 FT (T-5 = 150 FT T-4 = 89.7 FT)TOTAL FRONTAGE BUILDOUT = 191.4 FTTOTAL FRONTAGE BUILDOUT = 80% (191.4 FT / 239.7 FT = 80%)THE PROPOSED FRONTAGE BUILDOUT FOR THE FUTURE PUBLIC STREET (191.2 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (190.3 FT) FOR THE T-4 & T-5.[(150 FT X 0.85) + (89.7 FT X 0.70) = 190.3 FT)]GARDEN STREET - LOT N1 / BLDGS A1 & A3TOTAL STREET FRONTAGE = 761.6 FT (T-5 = 151.3 FT T-4 = 610.3 FT)TOTAL FRONTAGE BUILDOUT= 590.0 FT = 369.9 FT (BLDG A1) + 220.1 FT (BLDG A3)TOTAL FRONTAGE BUILDOUT = 77% (590.0 FT / 761.6 FT)THE PROPOSED FRONTAGE BUILDOUT FOR GARDEN STREET (590.0 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (555.8 FT) FOR THE T-4 & T-5.[(151.3 FT X 0.85) + (610.3 FT X 0.70) = 555.8 FT)]