Loading...
HomeMy WebLinkAboutSP-22-056 - Supplemental - 0154 da Vinci Drive (10)1 Gendron, Christopher From:Tom DiPietro <tdipietro@southburlingtonvt.gov> Sent:Tuesday, February 21, 2023 3:00 PM To:Gendron, Christopher; Adam Cate Subject:RE: 'EXTERNAL'BETA Campus Parking | SP-22-056 Chris,    I’m good with the responses. Thank you for the opportunity to comment.    ‐Tom    From: Gendron, Christopher <Chris.Gendron@stantec.com>   Sent: Friday, February 17, 2023 3:01 PM  To: Tom DiPietro <tdipietro@southburlingtonvt.gov>; Adam Cate <acate@SouthBurlingtonVT.gov>  Subject: 'EXTERNAL'BETA Campus Parking | SP‐22‐056            This message has originated from an External Source. Please use proper judgment and caution when opening  attachments, clicking links, or responding to this email.         Hi Tom, Adam, We had a chance to review your comments on the BETA Campus parking application and offer the following responses and have provided the requested information. Please review what we have provided and if you have any questions, please don’t hesitate to reach out. If you’re good with our responses, please respond to that effect as backup to provide to P&Z. 1. Please confirm that the applicant’s intent is for both Valley Road and DaVinci Drive to remain private. Confirmed.  2. Please confirm that the applicant’s intent is to maintain ownership of all trails (referred to as rec path on sheet L‐000).  Confirmed.  3. What is the trail material? Bituminous Asphalt Pavement  4. Please confirm that the applicant’s intent is to maintain ownership of wastewaterpump stations and force mains.  Confirmed.  5. Sheet C‐202A shows an existing abandoned force main. Is this line capped on private property or at Williston Road?  Please provide some history on this line, if available. Plan is to have this cut, capped and abandoned at the Right‐of‐way  once the system gets switched over to the new pump station. Spring 2023.  6. Sheet C‐102 – Due to the amount of line work in the area, the work proposed on Williston Road is difficult to decipher.  Please provide a zoomed in sheet showing these areas. Plans and details attached. See sheets CR‐104 and CR‐105 (page 4  and 5)  for zoomed in area. These were reviewed and approved by VTrans.  7. Provide a detail for the widening of Williston Road. Specifically, I’d like to understand where pavement will be added /  replaced. My assumption is that Williston Road will receive a new top coat of pavement from curb to curb within the  project limits (i.e. the area where it is being widened). Also provide details on line‐striping materials proposed. Plans and  details attached. See sheet CR‐101 (page 1) for typical section. Your assumption is correct, new topcoat curb to curb.  8. The applicant is reminded that they will need a ROW permit to work in any City owned ROW. If working in a section of  Williston Road that is owned by VTrans, the applicant is reminded that they will need an 1111 permit from VTrans. The  portion of Williston Road ROW impacted by this application is a State highway. There is no City owned ROW involved  with this project. Section 1111 was issued on 09/02/22. We had our preconstruction meeting with VTrans on February 3,  2 2023 to review the conditions of the section 1111 permits in preparation to begin work in March. This work remains  unchanged from the previously approved SD‐21‐28 application.  9. The applicant is proposing new sidewalk in the Williston Road ROW owned by the State of Vermont. On‐going  maintenance of this sidewalk will likely be a condition of the 1111 permit. The proposed sidewalk does not connect to any  existing sidewalk that is maintained by the City. We support the construction of this new sidewalk infrastructure, but the  applicant must agree to maintain it until such time as it connects to the City’s existing sidewalk network. Alternatively,  the applicant can  connect the proposed sidewalk to the City’s existing sidewalk further to the west on Williston Road (near 2026 Williston  Road). Once this connection is made, the City will maintain the sidewalk. The applicant agrees to maintain the sidewalk  until such time a connection is made.   10. Provide a detail for the wastewater connection at the intersection of Valley and Williston Road. Attached is the  wastewater connection application provided to Betsy Brown on 9/15/2022 that includes a detail.  11. Please provide a detail for the bus shelter. Foundation detail is in the attached plan set, sheet CR‐102  (page 2). See  Enseicom Bus Shelter cut sheets attached.    Best, Christopher Gendron PE  Associate Direct: 802-497-6402 Mobile: 802-324-0920 christopher.gendron@stantec.com Stantec   The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.   Caution: This email originated from outside of Stantec. Please take extra precaution.   Attention: Ce courriel provient de l'extérieur de Stantec. Veuillez prendre des précautions supplémentaires.   Atención: Este correo electrónico proviene de fuera de Stantec. Por favor, tome precauciones adicionales.