Submittal requirement Response for Site Plan Submittal 10/6/2022
√Completed application form; one (1) digital copy of plans; and a list of the owners or
record of abutting property owners
See exhibits 000_narrative, 001_application and 002_abutters list
√Name and address of the owner of record, applicant, and owners of record of abutting properties; and name and address of engineer(s), architect(s), landscape
architect(s) preparing plans, plan preparation date, and date and description of all
revisions shown on all plan sheets
See exhibits 000_narrative and 003_plan sheet index
√Date, true north arrow and scale (numerical and graphic). The preferred scale shall be not more than one hundred (100) feet to the inch, or not more than sixty
(60) feet to the inch where lots have less than one hundred (100) feet of frontage.
See plan sheets
√Narrative accompanying the application to include the following: (a) description of the project; (b) demonstration of compliance with applicable review standards;
(c) list of submission elements; and (d) list of any changes made to plans from previous submittals under the same application
See exhibit 000_narrative and 003_plan sheet index
√List of waivers the applicant desires from the requirements of these regulations and accompanying narrative describing the request(s), detailing the City's
authority to grant the request(s) and describing why the waiver(s) should be granted
No waivers requested
√Estimated project construction schedule, construction phasing, and date of completion, and estimated cost of all site improvements. (note: for FBC s, only public
infrastructure information required)
See exhibit 000_narrative
√Any other information or data that the Administrative Officer or Development Review Board shall require for a full assessment of the project pursuant to the Land
Development Regulations
See exhibit 000_narrative
√Location map, showing relation of subject property to adjacent properties and surrounding area.See plan sheet 002A_Location Plan
√Boundaries and area of existing subject property(ies), proposed property lines, continues properties, boundaries of all zoning districts, transects, and overlay
districts, and all designations on the City's Official Map, and lots within the proposed numbered.
See plan sheet 002A_Location Plan
√Location of existing restrictions on land, such as easements and covenants.See plan sheet 001A_Location Plan and 002 _Existing Conditions Plan.
√Location of planned restrictions on land, such as easements and covenants.See plan sheet 001A_Location Plan and 002 _Existing Conditions Plan.
√Lot area in square feet and acres, and lot coverage calculations including building, overall, and front yard coverage and the location and layout of any off‐street
parking or loading areas, traffic circulation areas, pedestrian walkways, and fire lanes.
See exhibit 000_narrative and sheet 007_Site Plan_C‐012
√Point‐by‐point lighting plan and cut sheets for all proposed outdoor lighting within the site See plan sheet 033A_site lighting plan_EA‐101B
√Preliminary grading, drainage, landscaping and buffering plan in accordance with Article 13, Supplemental Regulations.See plan sheets 008_Grading and Drainage Plan_C‐201, 056_A‐
Build_Grading_and_Drainage_Plan_C204A, 029_Landscape_Plan_L200_10‐05‐2022
√The extent and amount of cut and fill for all disturbed areas, including before‐and‐ after profiles and cross sections of typical development areas, parking lots and
roads, and including an erosion and sedimentation control plan, and proposed locations of sediment sink/setting pond and interceptor swales.
See Plan sheets 025_Erosion and Sediment Control Plan_C‐071 and 026 Erosion and Sediment
Control Plan_C‐071
√The location of any outdoor storage for equipment and materials if any, and the location, type and design of all solid waste‐related facilities, including dumpsters
and recycling bins.
See plan sheet 007_Site Plan_C‐012
√Estimate of all earthwork, including the quantity of any material to be imported to or removed from the site or a statement that no material is to be removed or
imported.
See exhibit 000_narrative
√Location of existing structures on the site, and showing all site conditions to remain.See plan sheet 002 _Existing Conditions Plan.
√Existing water courses & buffers, wetlands & buffers, base flood elevations if located in an area of special flood hazard, wooded areas, ledge outcrops, and other
natural features.
See plan sheet 002A_Location Plan
√Existing and proposed contours at a maximum vertical interval of two (2) feet.See plan sheets 009_Grading_and_Drainage_Plan_C‐021, 009A_Drainage and Grading Plan_C‐021B,
056_A‐Build_Grading_and_Drainage_Plan_C204A
√Detailed specifications and locations of planting, landscaping, screening, and/or buffering materials.See plan sheets 027_Overall_Landscape_Plan_L000, 029_Landscape_Plan_L200,
030_Landscape_Plan_L201 and 031_Landscape_Plan_L202.
√A list of existing vegetation, with the location, type, and size of existing trees of six inches or greater in caliper.See plan sheet L‐100 Layout & Materials Plan
√A written plan to preserve and protect significant existing vegetation during and after construction. Such plan will be of sufficient detail that the City of South
Burlington will be able to inspect the site during construction to ensure that existing vegetation is protected as per the plan.
Previously submitted under SD‐21‐28
√Detailed landscaping plan, specification of materials, costs, and phasing plan, including vegetation to remain, types of new plant materials, identified by common
name and botanical name, sizes of all new plant materials by height and/or diameter at time of planting and at maturity, quantities of each of the planting
materials, and treatment of the ground surface (paving, seeding, or groundcover) for all plantings, screening, buffering, and stormwater infiltration.
Previously submitted under SD‐21‐28. See exhibit 006_Landscaping Cost Estimate and 007_A‐
build_Landscaping Cost Estimate.
√Detailed erosion control plan demonstrating compliance with these regulations See Plan sheets 025_Erosion and Sediment Control Plan_C‐071 and 026 Erosion and Sediment
Control Plan_C‐071BUILDINGS
DRB SITE PLAN SUBMISSION REQUIREMENTS
PROJECT DESCRIPTION
SITE INFORMATION
LANDSCAPE FEATURES ‐ REVIEW
\\us0261‐ppfss01\workgroup\1794\active\179450350\transportation\permitting\City of South Burlington\site plan ‐ parking lot\
006_DRB submission requirements.xlsx Page 1 of 2
Site
Plan
Submittal requirement Response for Site Plan Submittal 10/6/2022
√Existing and proposed structures See plan sheet 005_Overall_site_plan_C‐010 and 002 _Existing Conditions Plan.
√Letter of intent from the Agency of Transportation confirming that the Agency has reviewed the proposed plan and is prepared to issue an access permit under 19
.S.A. § 1111, and setting out any conditions that the Agency proposes to attach to the section 1111 permit.
N/A
√Plans showing the location, size and invert elevations of existing and planned
sanitary sewers, storm water drains, and fire hydrants and location and size of water, gas, electricity and any other utilities or structures
See plan sheets 009_Grading_and_Drainage_Plan_C‐021, 056_A‐
Build_Grading_and_Drainage_Plan_C204A, 014_Water_and_Sewer_Utility_Plan_CW‐300
√Location of existing septic systems and wells.No existing septic systems or wells near subject development.
√Existing and proposed water and wastewater usage Previously submitted under SD‐21‐28
√Location and design of all utility distribution facilities See plan sheets 007_Site Plan_C‐012 and 054_A‐Build_Site_Plan_C202A
√The location and details of all the improvements and utilities, including the location of all utility poles, utility cabinets, sewage disposal systems, water supply
systems, and all details and locations of the stormwater management system.
See plan sheets 007_Site Plan_C‐012 and 054_A‐Build_Site_Plan_C202A and
020_Water_and_Sewer_Details_CW‐501
√Preliminary designs of any bridges or culverts which may be required.No bridges are required. See plan sheets 009_Grading_and_Drainage_Plan_C‐021 and 056_A‐
Build_Grading_and_Drainage_Plan_C204A for drainage information.
√Construction drawings of all required improvements.See plan sheets
√The length of all straight lines, the deflection angles, radii, length of curves and central angles of all curves tangent distance and tangent bearings for each street.See plan sheets 007_Site Plan_C‐012 and 054_A‐Build_Site_Plan_C202A
√All means of vehicular access and egress to and from the site onto public streets,
and all provisions for pedestrian access and circulation.
See plan sheets 007_Site Plan_C‐012 and 054_A‐Build_Site_Plan_C202A
√Analysis of traffic impacts, if required by the traffic overlay district and/or the DRB.Previously submitted under SD‐21‐28
√Proposed stormwater management system, including (as applicable) location,
supporting design data and copies of computations used as a basis for the design capacities and performance of stormwater management facilities
See plan sheet C‐111 Grading and Drainage Plan, profile sheets C‐211 to C‐212 and detail sheets C‐
511 to C‐513 for drainage feature information. See exhibit 006 Stormwater Supporting Information
√Detailed plans, designs and finished grades of retaining walls, steps, ramps, paving,
site improvements, fences, bridges, culverts, and drainage structures.
See plan sheets 009_Grading_and_Drainage_Plan_C‐021, 056_A‐
Build_Grading_and_Drainage_Plan_C204A
√Initial Site Conditions Map See plan sheet 002 _Existing Conditions Plan.
√Complete Site Conditions Map
River Corridors. Field verification/ delineation of top of bank / top of slope for
permanent and intermittent surface waters by a qualified professional, where not mapped by VT DEC. All materials required by Section 12.07
See plan sheet 002 _Existing Conditions Plan.
STREETS AND UTILITIES
\\us0261‐ppfss01\workgroup\1794\active\179450350\transportation\permitting\City of South Burlington\site plan ‐ parking lot\