HomeMy WebLinkAboutSP-22-056 - Supplemental - 0154 da Vinci Drive (5)Burlington International Airport
BETA Technologies Master Plan MP-21-02
Lot Coverage Tracking
Dated:10/7/2022
By:C. Gendron, Stantec
Revised:-
By:-
Lot Area =11.52 Lot Area =28.90
Permit #Project Name
Lot Coverage
(Acres)
Building
Coverage
(Acres)
Lot Coverage
(%)
Max Lot
Coverage
(%)
Building
Coverage
(%)
Max Building
Coverage
(%)
Lot Coverage
(Acres)
Building
Coverage
(Acres)
Lot Coverage
(%)
Lot Coverage
Allowed
(%)
Building
Coverage
(%)
Building
Coverage
Allowed
(%)
Lot Area
(Acres)
Gross Square
Feet
(GSF)
Floor to Area
Ratio
(FAR)
Max Floor to
Area Ratio
(FAR)
ZP-22-163*BETA Assembly (A-Build)1.77 0.35 15%70%3%40%6.20 3.05 21%50%11%30%40.42 181,300 0.103 0.304
SP-22-24 BETA GA Hangar 1.77 0.35 0%70%3%40%7.32 3.57 4%50%12%30%40.42 205,300 0.117 0.304
*includes the 15,100 sf existing commercial building to remain
Lot Area =11.52 Lot Area =28.90
Permit #Project Name
Lot Coverage
(Acres)
Building
Coverage
(Acres)
Lot Coverage
(%)
Max Lot
Coverage
(%)
Building
Coverage
(%)
Max Building
Coverage
(%)
Lot Coverage
(Acres)
Building
Coverage
(Acres)
Lot Coverage
(%)
Lot Coverage
Allowed
(%)
Building
Coverage
(%)
Building
Coverage
Allowed
(%)
Lot Area
(Acres)
Gross Square
Feet
(GSF)
Floor to Area
Ratio
(FAR)
Max Floor to
Area Ratio
(FAR)
TBD BETA Campus Parking 3.85 0.35 18%70%3%40%7.32 3.57 0%50%12%30%40.42 205,300 0.117 0.304
SD-21-28 BETA Assembly (Full-Build)3.85 0.35 0%70%3%40%10.05 6.30 9%50%22%30%40.42 386,300 0.219 0.304
Active Projects
BETA PUD FAR
BETA PUD FAR
Pending Projects
Mixed Commerical Industrial District Airport Industrial District
Mixed Commerical Industrial District Airport Industrial District