Loading...
HomeMy WebLinkAboutSP-23-002 - Supplemental - 0200 Market Street (9)OWNER SOUTH BURLINGTON SCHOOL DISTRICT 550 DORSET STREET SOUTH BURLINGTON, VT 05403 VIOLET NICHOLS; INTERIM SUPERINTENDENT P: 802.652.7000 DORE & WHITTIER ARCHITECTS, INC. 260 MERRIMAC STREET BUILDING 7, 2nd FLOOR NEWBURYPORT, MA 01950 P: 978.499.2999 F: 978.499.2944 212 BATTERY STREET BURLINGTON, VT 05401 P: 802.863.1428 F: 802.863.6955 CIVIL + SITE ENGINEERING VENTURES 208 FLYNN AVE BURLINGTON, VT 05401 P: 802.863.6225 HVAC + ELECTRICAL CONSULTANT L.N. CONSULTING, INC. 208 FLYNN AVE #2J BURLINGTON, VT 05401 P: 802.655.1753 STRUCTURAL CONSULTANT ENGINEERING VENTURES 208 FLYNN AVE BURLINGTON, VT 05401 P: 802.863.6225 TELECOMM PLUMBING CONSULTANT L.N. CONSULTING, INC. 208 FLYNN AVE #2J BURLINGTON, VT 05401 P: 802.655.1753 ARCHITECT L.N. CONSULTING, INC. 208 FLYNN AVE #2J BURLINGTON, VT 05401 P: 802.655.1753 LOCATION MAP: ORCHARD SCHOOL LOCATION MAP: CENTRAL SCHOOL SOUTH BURLINGTON ES MODULARS MARCOTTE CENTRAL ELEMENTARY SCHOOL & ORCHARD ELEMENTARY SCHOOL 10.19.22 D&W PROJECT # 21-0823 PROGRESS SET SHEET NUMBER SHEET NAME ARCHITECTURAL G.0 COVER GENERAL AG.1 ABBREVIATIONS, GENERAL NOTES AG.2 WALL TYPES, TYPICAL DETAILS, PARTITION NOTES AG.3 DOORS ARCHITECTURAL A1.1 ORCHARD OVERALL & DEMO PLAN A1.2 ORCHARD FLOOR PLAN & RCP A1.3 ORCHARD ROOF PLAN A1.4 ORCHARD EXTERIOR ELEVATIONS, SECTIONS A1.5 ORCHARD FINISH PLAN, FINISH SCHEDULE A2.1 CENTRAL OVERALL &DEMO PLAN A2.2 CENTRAL FLOOR PLAN & RCP A2.3 CENTRAL ROOF PLAN A2.4 CENTRAL EXTERIOR ELEVATIONS, SECTIONS A2.5 CENTRAL FINISH PLAN, FINISH SCHEDULE