Loading...
HomeMy WebLinkAboutSP-23-002 - Supplemental - 0200 Market Street (7) MEMORANDUM Vermont | Massachusetts www.doreandwhittier.com December 14, 2022 To: Marty Gillies, SB Planning and Zoning From: Rani Philip, Dore & Whittier Architects, Inc. Subject: South Burlington School District – RMCS School Site Plan Application Project Name: SBSD Elementary School Building Assessments - ZEMs Project Number: 21-0823 Dear Marty, Attached please find the Site Plan Application for the RMCS School Modular Project. Project Information: Owner of Record: South Burlington School District 577 Dorset Street, South Burlington VT 05403 Applicant: South Burlington School District 577 Dorset Street, South Burlington VT 05403 Property Abutters: See attached List of Abutters Design Team: Dore & Whittier Architects, Inc. 212 Battery Street, Burlington VT 05401 Engineering Ventures, PC 208 Flynn Ave, Ste 2A, Burlington VT 05401 Wagner Hodgson landscape Architecture 7 Marble Avenue, Burlington VT 05401 Plans Enclosed: 2022 Elementary School ZEMs – Rick Marcotte Central School dated 10/31/22 (6 sheets) RMCS Temporary Classrooms Stormwater Package (17 pages) South Burlington ES Modulars, Marcotte Central School – Progress set dated 10/19/22 (9 sheets) Marcotte Central Elementary School, South Burlington ES Modulars –dated 11/16/22 (1 sheet) Estimate, South Burlington ES Modulars –dated 11/16/22 (1 sheet) Project Description: The South Burlington Elementary Schools Modular Addition (the Project) includes the placement of four classrooms built from pre-fabricated building modules (i.e. “modular construction”) east of the p:\sbsd elementary school bldg assessments 21-0823\arch\admin\k - zem concept\permitting\rmcs fbc application\cover letter.docx Page 2 of 2 existing Rick Marcotte Central School building located at 10 Market Street. Also included is the construction of a connecting walkway to access the modular classrooms from the existing school, and associated site work. To the best of our knowledge, this submission complies with applicable review standards. Enclosed in this submission are the following: • List of Abutters • Drawing set: 2022 Elementary School ZEMs – Rick Marcotte Central School dated 10/31/22 (6 sheets) • RMCS Temporary Classrooms Stormwater Package (17 pages) • Drawing set: South Burlington ES Modulars, Marcotte Central School – Progress set dated 10/19/22 (9 sheets) • Drawings: Marcotte Central Elementary School, South Burlington ES Modulars –dated 11/16/22 (1 sheet) • Estimate, South Burlington ES Modulars –dated 11/16/22 (1 sheet) Project Schedule: • Upon permitting approval and budget approval, this project will commence in Spring of 2023 with an estimated 3-month construction duration. • Phasing is to be determined. We kindly request waivers for the following items: • Point-by-point lighting plan and cut sheets for all proposed outdoor lighting within the site: No building-mounted lights included. WAIVER REQUESTED for point-by-point lighting plan. • Solar ready roof analysis report: WAIVER REQUESTED Given the temporary nature of this project, a solar ready roof analysis has not been conducted. Sincerely, Rani Philip, Associate AIA, CDT, LEED AP