Loading...
HomeMy WebLinkAboutSP-22-020 - Supplemental - 0039 Bowdoin Street (5)Proposed Water flows: Proposed N&C Office Building at 39 Bowdoin St., South Burlington - Municipal Water Connection·17 Employees x 15 gpd/employee =255 gpd Total Proposed Water Flow and Municipal Water Allocation Needed =255 gpd Proposed Sewer flows: Proposed N&C Office Building at 39 Bowdoin St., South Burlington - Municipal Sewer Connection·17 Employees x 15 gpd/employee =255 gpd Total Proposed Sewer Flow and Municipal Sewer Allocation Needed =255 gpd September 21, 2022 Northeast Territories, Inc Proposed Water/Sewer Design Flows for Commercial Buildings 66 Bowdoin Street, South Burlington, VT 05401 Prepared by: Civil Engineering Associates 10 Mansfield View Lane - South Burlington, VT 05403 9/21/2022 P:\AutoCADD Projects\2019\19145\3-Permitting\3-State Applications\Wastewater\Design Flows Table 220921