HomeMy WebLinkAboutMP-21-02A - Supplemental - 3070 Williston Road (2)575 Dorset Street South Burlington, VT 05403 ttel 802.846.4106 ffax 802.846.4101 www.sburl.com
Permit Number MP-______-__________
(office use only)
APPLICATION FOR MASTER PLAN REVIEW
All information requested on this application must be completed in full. Failure to provide the requested
information either on this application form or on the plans will result in your application being deemed
incomplete, and a delay in scheduling for the Development Review Board.
1) OWNER OF RECORD (Name as shown on deed, mailing address, and phone)
2) LOCATION OF LAST RECORDED DEED (Book and page #)
3) APPLICANT (Name, mailing address, phone, and e-mail)
4) APPLICANT’S LEGAL INTEREST IN PROPERTY (i.e. fee simple, option, etc.)
5) CONTACT PERSON (Name, mailing address, phone, and e-mail
5a) CONTACT EMAIL ADDRESS:
6) PROJECT STREET ADDRESS:
7) TAX PARCEL ID #(may be obtained online or at the Assessor’s Office):
8) PROJECT DESCRIPTION:
a) General project description (explain what you want approval for):
b) Existing uses on property (please describe sizes of each separate use, if applicable)
City of Burlington, Burlington International Airport, Burlington International Airport, 1200
Airport Drive #1
Book 13, page 271
BETA Technologies, Inc. 1150 Airport Drive, South Burlington VT 05403
Land Lease
Art Klugo, BETA Technologies Inc., 461 Avenue D, Williston VT 05495 phone: 802-373-8112
aklugo@beta.team; christopher.gendron@stantec.com
154 Da Vinci Drive, South Burlington VT, 05403
2000-0000
Development of a BETA Technologies campus including a manufacturing facility, two
commercial buildings and a General Aviation and Training Facility
Retired Quarry, Commercial/Retail/Office Space Building (23,000 sf), Maintenance Garage
(2,900 gsf), Landscaping Retail Business (1,700 gsf), Small Warehouse (5,850 gsf)
2 Master Plan Application Form. Rev. 01-2020
c) Proposed uses on property (please describe the size or number of units and nature of proposed uses)
d) Maximum total number of residential units and/or square footage of uses to be developed, including any
existing units and/or uses to remain:
e)Maximum proposed building height (if applicable)
f) Proposed phasing (please describe the number of total phases and, if applicable at this time, the number of
units or square feet of uses to be proposed in the first phase):
9)MASTER PLAN UMBRELLA CRITERIA
a) Total acreage of involved property(ies)
b) Total acreage of first phase for development (if known at this time)
c) Total number of residential units and/or sq ft of all uses requested
d) Existing impervious coverage, entire site (sq ft and %):
e)Maximum proposed impervious coverage, entire site (sq ft and %):
f) Maximum existing building coverage, entire site (sq ft and %) :
g) Maximum proposed building coverage, entire site (sq ft and %):
h) Estimated number of existing PM peak hour vehicle trip ends:
i) Maximum proposed number of PM peak house vehicle trip ends:
j) Existing or proposed encumbrances on property (easements, covenants, leases, rights of way, etc.)
Manufacturing Facility (355,000 gsf), Office and Retail (37,800 gsf), Commerical (15,600
gsf), Combined General Aviation Building and Hangar (Hangar: 60,000 gsf and Training
Facility: 25,000 gsf)
N/A
45'
See section VIII 15.B.04(I) – PHASING PLAN and Table 5 - GROSS FLOOR AREA
SUMMARY in the narrative for project phasing and associated square footages.
Total project acreage = 40.43 acres
Approximately 21.5 acres
Previously approved sq. ft. = 534,450 sq. ft ; refer to Section B(a), page 4 of the MP-21-02
Findings of Fact and Decision.
IC: 366,218 sf, 73.0%; AIR-I: 81,808 sf, 6.5%
IC: 242,000 sf, 48.2%; AIR-I: 597,000, 47.4%
IC: 28,965 sf, 5.8%; AIR-I: 0 sf, 0%
IC: 24,500 sf, 4.9%; AIR-I: 280,000, 22.2%
96 trips
539 trips
The project spans over 5 parcels as indicated on the grand list all owned by the City of
Burlington (3060, 3062, 3064 and 3090 Williston Road). Existing leases exist within these
properties.
Art Klugo