Hebron Group, LLC, hereinafter referred to as the applicant, is seeking to amend a previously
approved plan for a 27,100 sf building consisting of 21,100 sf of processing and storage use and
6,000 sf of indoor recreation and restaurant use. The amendment consists of changing the uses
to include three suites (6,352 sf of light manufacturing use, 9,106 sf of self-storage use, and
10,051 sf of warehousing use) and a common loading dock permitted as processing & storage
use, 1205 Airport Parkway.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. Hebron Group, LLC, hereinafter referred to as the applicant, is seeking approval to amend a
previously approved plan for a 27,100 sf building consisting of 21,100 sf of processing and
storage use and 6,000 sf of indoor recreation and restaurant use. The amendment consists
of changing the uses to include three suites (6,352 sf of light manufacturing use, 9,106 sf of
self-storage use, and 10,051 sf of warehousing use) and a common loading dock permitted
as processing & storage use, 1205 Airport Parkway.
2. The owner of record of the subject property is Hebron Group, LLC.
3. The subject property is located in the Mixed Industrial-Commercial District.
4. The application was received on February 10, 2023.
5. The plans submitted consist of the following: sheet A 100, entitled “Floor Plan”, prepared by
Walter M. Adams, Jr., dated and last revised on February 3, 2023; and sheet 1, entitled “Site
Plan”, prepared by Lamoreaux & Dickinson, dates and last revised on February 2, 2022. No
site modifications are proposed; elements shown as “proposed” on the provided site plan
were approved in site plan amendment #SP-22-009.
ZONING DISTRICT AND DIMENSIONAL REQUIREMENTS
Setbacks, Coverages & Lot Dimensions
No changes affecting compliance with these standards are proposed.
SITE PLAN REVIEW STANDARDS
#SP-23-003
- 2 –
Only the standards below are affected by this application. All other standards will continue to be
met.
Vehicle Trip Generation
The previous combination of uses generated 51 PM peak hour VTE. The property has an
approved trip budget of 97 PM peak hour VTEs. The new trip generation with the
proposed change of use is estimated to generate a total of 9 PM peak hour VTEs. This VTE
total is well within the established trip budget, and the Administrative Officer finds this
criterion met.
13.14 Subsurface Sewage Disposal Systems
Per section 13.14A, “no building or structure shall be erected or altered” without
provision of an “adequate sewage disposal system”. The approved Wastewater Allocation
on file for this property allows for the generation of 5,200 gallons of wastewater per day.
The proposed combination of uses will generate an estimated 630 gallons per day. This
proposed total generation is within the limits of the approved Wastewater Allocation. The
Administrative Officer finds this criterion met.
13.03 Bicycle Parking and Storage
Table 13-3 specifies the minimum number of short-term bicycle parking spaces for any
office use to be 1 per 5,000 square feet GFA. The square footage of this office building
complex was listed at 27,100 sf in the most recently approved Site Plan application for this
property, requiring 6 short-term bicycle parking spaces. Two ‘inverted U’-style bike racks
already exist, providing accommodation for 4 bicycles. These existing bike racks are
located on a paved and striped area in proximity to the southeast building entrance. The
applicant must modify the proposed site plan to include two additional short-term bicycle
parking spaces, which must be provided by one additional ‘inverted-U’-style bike rack, to
be installed in accordance with the regulations in Section 13.03.B(2) of the LDRs in the
same area as the existing bike racks. The Administrative Officer finds the applicant must
show these two new spaces on the site plan prior to the issuance of a zoning permit.
13.04 Snow Storage
Per Section 13.04(B)(7), “snow storage areas must be specified and located in an area that
minimizes the potential for erosion and contaminated runoff into any adjacent or nearby
surface water.” The snow storage area is indicated on the site plan. The Administrative
Officer find this criterion met.
13.07 Exterior Lighting
Per Section 13.07.A, exterior lighting “shall have such shielding as will direct the light
downward and will prevent the source of light from being visible from any adjacent
residential property or street”. There are no lighting impacts proposed as part of this
application.
14.07 Disposal of Wastes
Per Section 14.07.I, dumpsters “shall be accessible, secure and properly screened with
opaque fencing to ensure that trash and debris do not escape the enclosure(s)”. The
existing dumpster and screening fence meets these standards, and no changes or
#SP-23-003
- 3 –
alterations to the dumpster enclosure are being proposed as part of this application. As
such, the Administrative Officer finds this criterion met.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves Site Plan
Application #SP-23-003 of Hebron Group, LLC, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall
remain in effect.
2. This project shall be completed as shown on the plan submitted by the applicant and on
file in the South Burlington Department of Planning and Zoning.
3. The plans must be revised to show the changes below prior to issuance of a zoning
permit:
a. Add two short-term bicycle parking spaces, which must be provided by one
additional ‘inverted-U’-style bike rack, to be installed in proximity to the
southeast building entrance in accordance with the regulations in Section
13.03.B(2) of the LDRs.
4. The applicant must obtain a zoning permit within six (6) months from the date of this
decision or this approval is null and void. The applicant may submit a request for an
extension to obtain a zoning permit under the terms outlined in Section 17.04 of the
LDR’s, but the request must be submitted prior to the expiration of this approval.
5. Any exterior lighting shall be downcast and shielded per Section 13.07 of the Land
Development Regulations.
6. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to use of the building at 1205 Airport Parkway.
7. Any change to the site plan shall require approval by the South Burlington
Administrative Officer or the Development Review Board, as allowed under the Land
Development Regulations.
Signed on this 3rd day of March 2023 by
___________________________________________
Marty Gillies, Acting Administrative Officer
#SP-23-003
- 4 –
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing
a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal
must be accompanied with a $233 filing fee and be filed within 15 days of the date of this
decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant
state permits for this project. Call 802.879.5676 to speak with the regional Permit Specialist.