Tesla, Inc., hereinafter referred to as the applicant, is seeking to amend a plan for a 46,703
square foot supermarket. The amendment consists of changing the use of all 46,703 sf to
automobile sales use and automobile service & repair use and associated minor site
improvements, 40 Fayette Road.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a plan for a 46,703 square foot supermarket. The
amendment consists of changing the use of all 46,703 sf to automobile sales use and
automobile service & repair use and associated minor site improvements, 40 Fayette
Road.
2. The owner of record of the subject property is Southland Enterprises, Inc.
3. The subject property is located in the C1-Auto zoning district.
4. The application was received on February 3, 2023.
5. The plan submitted consist of:
Sheet No. & Title Prepared by Plan Last Revised on:
C1-01; Existing Conditions TCE 12/13/2022
C2-01; Overall Site Plan TCE 12/13/2022
C2-02; Site Plan TCE 12/13/2022
Trash Dumpster Enclosure TCE 3/10/2021
A.401a; Exterior Elevation -
Renovation
Jacobs Engineering Group 1/12/2023
A.401b; Exterior Elevation Jacobs Engineering Group 1/12/2023
6. The subject property is part of a Planned Unit Development (PUD) presently consisting
of a 46,703 sf supermarket, a 151,266 sf shopping center (including outdoor garden
center), a 3,585 sf bank with drive through service, a 3,014 sf standard restaurant and a
4,116 sf short order restaurant. This application seeks to amend the approved use for
the 46,703 sf supermarket and proposes associated renovations of that building’s
interior and exterior. The proposed changes to the subject building do not include a
subdivision of land or represent a significant impact on the form or function of this PUD
#SP-23-005
- 2 -
as a whole. As such, this application is being reviewed as a Site Plan amendment, not as
a PUD amendment. The subject property remains part of a PUD.
ZONING DISTRCIT & DIMENSIONAL REQUIREMENTS
Setbacks, Coverages & Lot Dimensions
No changes affecting compliance with these standards are proposed.
SITE PLAN REVIEW STANDARDS
Only the standards below are affected by this application. All other standards will continue to be
met.
13.03 Bicycle Parking and Storage
As per Table 13-3, this use has a short-term bicycle parking requirement of one space per
5,000 sf GFA. At 46,703 sf, this building is required to provide ten short-term parking
spaces. The applicant is proposing to meet the requirement with the installation of five
‘inverted U’ bike racks to the southwest of the existing building, in proximity to the
building entrances on the west and south sides of the building. The five ‘inverted U’ bike
racks will provide two short-term bicycle parking spaces each, for a total of ten spaces.
The proposed bike racks must adhere to the design guidelines found in Section 13.03.B(2)
of the LDRs. The Administrative Officer finds this criterion met.
13.04 Snow Storage
Per Section 13.04(B)(7), “snow storage areas must be specified and located in an area that
minimizes the potential for erosion and contaminated runoff into any adjacent or nearby
surface water.” The snow storage area is indicated on the site plan. The Administrative
Officer find this criterion met.
13.07 Exterior Lighting
Per Section 13.07.A, exterior lighting “shall have such shielding as will direct the light
downward and will prevent the source of light from being visible from any adjacent
residential property or street.” There are no lighting impacts proposed as part of this
application.
13.14 Subsurface Sewage Disposal Systems
Per section 13.14A, “no building or structure shall be erected or altered” without
provision of an “adequate sewage disposal system”. The existing use on the property has
an approved wastewater allocation of 4,125 gallons per day. The proposed change of use
will result in a total wastewater generation of 2,770 gallons per day, which is below the
approved allocation. As such, the proposed change of use does not present any
wastewater impacts.
14.07 Disposal of Wastes
Per Section 14.07.I, dumpsters “shall be accessible, secure and properly screened with
opaque fencing to ensure that trash and debris do not escape the enclosure(s)”. The site
plan identifies the location of the proposed dumpsters and includes a detail sheet showing
#SP-23-005
- 3 -
that the dumpsters will be screened in a manner that meets applicable standards. The
Administrative Officer finds this criterion met.
Vehicle Trip Generation
The proposed use is classified as ‘automobile sales (new)’, or ITE land use code #840, and
is estimated to generate 105 PM peak hour vehicle trip ends based on the square footage
of the use, which is significantly fewer than the 417 PM peak hour vehicle trip ends
generated by a supermarket of the same square footage. As such, the proposed change of
use does not present any traffic impacts.
DECISION
Based on the above Findings of Fact, the Administrative Officer herby approves site plan
application #SP-23-005 of Tesla, Inc., subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall
remain in effect.
2. This project shall be completed as shown on the plan(s) and shall be on file in the South
Burlington Department of Planning and Zoning.
3. The Administrative Officer concurrently issues Zoning Permit #ZP-23-049.
4. Bicycle racks must meet the minimum requirements of 13.14 and Appendix G.
5. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to occupancy and/or use of the building.
6. Any change to the site plan shall require approval by the South Burlington Development
Review Board or the Administrative Officer.
Signed on this 28th day of February, 2023 by
Marty Gillies, Acting Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing
a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal
must be accompanied with a $233 filing fee and be filed within 15 days of the date of this
decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant
state permits for this project. Call 802.879.5676 to speak with the regional Permit Specialist.