State of Vermont Agency of Natural Resources Department of Environmental Conservation Drinking Water and Groundwater Protection Division WASTEWATER SYSTEM AND POTABLE WATER SUPPLY PERMIT
LAWS/REGULATIONS INVOLVED
10 V.S.A. Chapter 64, Potable Water Supply and Wastewater System Permit
Wastewater System and Potable Water Supply Rules, Effective September 29, 2007
Chapter 21, Water Supply Rules, Effective December 1, 2010
Regional Offices – Montpelier/Essex Jct./Rutland/Springfield/St. Johnsbury
Landowner(s): MITCHWARTZ Properties, LLC
329 Dorset Street
South Burlington VT 05403
Permit Number:
WW-4-5069
This permit affects the following properties in South Burlington, Vermont:
Lot Parcel SPAN Acres Book(s)/Page(s)#
321 0570-00321 600-188-11721 0.17 Book:1077 Page(s):285
325 0570-00325 600-188-15734 0.17 Book:898 Page(s):26
1 0.34
This project, consisting of the demolition of an existing three bedroom single family residence and doctors office on separate
lots, merging of the two lots into one new lot being 0.34 acres, and construction of new two story building with medical
office with 6 staff and 45 patients, and six 1-bedroom apartment units, construction of new water and sewer service lines,
located on 321 & 325 Dorset Street in South Burlington, Vermont, is hereby approved under the requirements of the regulations named above subject to the following conditions.
1. GENERAL
1.1 The project shall be completed as shown on the plans and/or documents prepared by Jennifer Desautels P.E., with
the stamped plans listed as follows:
Title Sheet Number Plan Date Revision Date
A Boundary Survey of the Property of Dr. Mitchell Schwartz C1-01 02/20/2018
Site Plan C2-02 06/01/2018
Site Details C8-01 06/01/2018
Sanitary Details C8-02 06/01/2018
Water Details C8-03 06/01/2018
1.2 This permit does not relieve the landowner from obtaining all other approvals and permits PRIOR to construction including, but not limited to, those that may be required from the Act 250 District Environmental Commission; the
Drinking Water and Groundwater Protection Division; the Watershed Management Division; the Division of Fire
Safety; the Vermont Department of Health; the Family Services Division; other State departments; or local officials.
1.3 The conditions of this permit shall run with the land and will be binding upon and enforceable against the landowner
and all assigns and successors in interest. The landowner shall record and index this permit in the South Burlington
Land Records within thirty, (30) days of issuance of this permit and prior to the conveyance of any lot subject to the
jurisdiction of this permit.
1.4 The landowner shall record and index all required installation certifications and other documents that are required
to be filed under these Rules or under a specific permit condition in the South Burlington Land Records and ensure
that copies of all certifications are sent to the Secretary.
1.5 No permit issued by the Secretary shall be valid for a substantially completed potable water supply and wastewater
system until the Secretary receives a signed and dated certification from a Vermont Licensed Designer (or where
allowed, the installer) that states:
Wastewater System and Potable Water Supply Permit WW-4-5069 Page 2 of 3
“I hereby certify that, in the exercise of my reasonable professional judgment, the installation-related
information submitted is true and correct and the potable water supply and wastewater system were
installed in accordance with the permitted design and all the permit conditions, were inspected, were
properly tested, and have successfully met those performance tests”,
or which otherwise satisfies the requirements of §1-308 and §1-911 of the referenced rules.
1.6 This project is approved for demolition of the two structures and the construction of a new 2 story building with a
medical office and apartments. Construction of additional nonexempt buildings, including commercial and
residential buildings, is not allowed without prior review and approval by the Drinking Water and Groundwater
Protection Division and such approval will not be granted unless the proposal conforms to the applicable laws and
regulations. No construction is allowed that will cause non-compliance with an existing permit.
1.7 Each purchaser of any portion of the project shall be shown a copy of the Wastewater System and Potable Water
Supply Permit and the stamped plan(s), if applicable, prior to conveyance of any portion of the project to that
purchaser.
1.8 By acceptance of this permit, the landowner agrees to allow representatives of the State of Vermont access to the
property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with the Vermont
environmental and health statutes and regulations, and permit conditions.
1.9 Any person aggrieved by this permit may appeal to the Environmental Court within 30 days of the date of issuance
of this permit in accordance with 10 V.S.A. Chapter 220 and the Vermont Rules of Environmental Court
Proceedings.
2.WATER SUPPLY
2.1 The components of the potable water supply herein approved shall be routinely and reliably inspected during
construction by a Vermont Licensed Designer (or where allowed, the installer) who shall, upon completion and prior
to occupancy of the associated building, report in writing to the Drinking Water and Groundwater Protection Division
that the installation was accomplished in accordance with the referenced plans and permit conditions, as specifically
directed in Condition #1.5 herein.
2.2 This project is approved for connection to the water supply system owned by the City of South Burlington as
depicted on the plan(s) stamped by the Drinking Water and Groundwater Protection Division. The project is
approved for 1404 gallons of water per day.
2.3 The landowner shall install and maintain backflow prevention devices that conform to Vermont Department of
Public Safety standards and NFPA 13 for any connection of a sprinkler fire suppression system to a public drinking
water system.
2.4 This permit is based, in part, on a determination by the municipality that sufficient capacity exists in the municipal
water supply and associated water distribution system to accommodate the design flow of this project. This permit
does not imply that the municipality will grant allocation for the project subject to this permit to physically connect
to or receive water from the municipal water supply. It is recommended the landowner forward a copy of the final
municipal allocation to the Drinking Water and Groundwater Protection Division with the installation certification
required by Condition 1.5 of this permit for inclusion in the project file.
3.WASTEWATER DISPOSAL
3.1 The components of the wastewater system herein approved shall be routinely and reliably inspected during
construction by a Vermont Licensed Designer (or where allowed, the installer) who shall, upon completion and prior
to occupancy of the associated building, report in writing to the Drinking Water and Groundwater Protection Division
that the installation was accomplished in accordance with the referenced plans and permit conditions, as specifically
directed in Condition #1.5 herein.
3.2 This project is approved for connection to the City of South Burlington Airport Parkway wastewater
treatment facility as depicted on the plan(s) stamped by the Drinking Water and Groundwater Protection Division.
The project is approved for 1200gallons of wastewater per day.
3.3 This permit is based, in part, on a determination by the municipality that sufficient capacity exists in the wastewater
treatment facility and associated sewerage collection system to accommodate the design flow of this project. This
permit does not imply that the municipality will grant allocation for the project subject to this permit to physically
connect or discharge wastewater to the municipal sewer. It is recommended the landowner forward a copy of the
final municipal allocation to the Drinking Water and Groundwater Protection Division with the installation
certification required by Condition 1.5 of this permit for inclusion in the project file.
Wastewater System and Potable Water Supply Permit WW-4-5069 Page 3 of 3
Emily Boedecker, Commissioner
Department of Environmental Conservation
By ________________________________ Dated July 19, 2018
Jessanne Wyman
Regional Engineer
Essex Junction Regional Office
Drinking Water and Groundwater Protection Division
cc: Jennifer Desautels P.E. South Burlington Planning Commission
Department of Public Safety, Division of Fire Safety