HomeMy WebLinkAboutBATCH - Supplemental - 0100 Van Sicklen RoadCITY OF SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD \drb\sub\singh\preIiminary.srp.doc DEPARTMENT OF PLANNING & ZONING Report preparation date: March 13, 2003 Application received: February 10, 2003 A&M CONSTRUCTION 2-LOT, 5-UNIT PLANNED RESIDENTIAL DEVELOPMENT PRELIMINARY PLAN APPLICATION #SD-03-10 Meeting date: March 18, 2003 Applicant Owner A & M Construction, LLC Narinder Singh P. O. Box 9357 28 Whiteface Street South Burlington, VT 05403 South Burlington, VT 05403 Engineering Property Information Skip McClellan Tax Parcel 1750 00100 R Llewellyn -Howley, Inc. Volume 557, Page 22 20 Kimball Avenue, Suite 202N SEQ & CO Districts South Burlington, VT 05403 ±4.57 Acres Location Map NOTE: The mapped wetlands shown here are not necessarily locally accurate and require field verification. CITY OF SOUTH BURLINGTON 2 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc A & M Construction, LLC, hereafter referred to as the applicant, is requesting preliminary plan approval from the Development Review Board (DRB) for a 2-lot, 5-unit Planned Residential Development (PRD) at 100 Van Sicklen Road. The subject property contains approximately 4.57 acres and falls within the Southeast Quadrant (SEQ) District. Portions of the subject property also fall within the Conservation and Open Space (CO) District. Associate Planner Janet Hurley and Administrative Officer Ray Belair, referred to herein as Staff, have reviewed the plans submitted on February 10, 2003 and have the following comments. Zoning District & Dimensional Requirements According to Section 6.401 of the Zoning Regulations, the maximum allowable residential density for the subject property is 1.2 units per acre, or 5 units. Five units are proposed. The applicant has provided calculations for building and overall coverage for Lot 1 containing the existing house, and Lot 2, which will contain 2 duplexes. The application form shows proposed building height is 25 to 30 ft. Table 1. Dimensional Requirements SEQ Zoning District Required Proposed Min. Lot Size 12,000 ft. 53,500 ft. Max. Densit 1.2 units/acre _ 1.1 units/acre Min. Frontage (Single Family) 85 ft. >85 ft. �( Min. Frontage(Multifamily) 120 ft. >120 ft. Max. Building Coverage 20% <20% Max. Overall Coverage 40% <40% Min. Front Setback 20 ft. ±68 ft. Min. Side Setback 10 ft. ±32 ft. Min. Rear Setback 30 ft. ±32 ft. �I Max. Building Height 40 ft. 30 ft. Min. Floor Area/Unit 864 ft.2 2,200 ft. �l zoning compliance Restricted Areas within the SEQ District No buildings are proposed within SEQ restricted areas. An existing residential drive is proposed to be removed and replaced with a shared drive to serve all 5 residences. The shared drive will pass through the SEQ restricted area, and the new driveway for the existing house falls almost entirely within the restricted area. Pursuant to Section 6.501(a) of the Zoning Regulations, the construction of roads to serve approved development is allowed within SEQ restricted areas. In addition, utilities must be placed underground and public recreation paths are allowed. The plans show underground water and wastewater lines crossing the SEQ restricted area. Electrical and telephone lines are not shown on the plans. A recreation path easement is also shown within the restricted area. CITY OF SOUTH BURLINGTON 3 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc 1. The applicant must provide calculations of residential density within contiguous development areas within each lot of the proposed subdivision. Such density measures shall not exceed 4 units per acre. Section 6.403 of the Zoning Regulations requires that the no more that 4 dwelling units per acre may be located within the limits of a contiguous designated development area within a single parcel of land. Consequently, the applicant must provide calculations of residential density for contiguous development areas within each lot of the proposed subdivision. 2. The plans should be revised to clearly delimit and label the SEQ restricted areas and SEQ development areas on the subject property. Sheet 1 of the plans indicates 100' Open space setback from Van Sicklen centerline" and "500' Open space setback from Route 116' centerline" delineations. These correspond to the boundaries between SEQ restricted areas and SEQ development areas. The plans should be revised to label these areas accordingly. Conservation and Open Space District 3. The applicant must provide delineation of all wetlands on the subject property delineated by a qualified wetlands consultant. The subject property contains wetlands as indicated on the South Burlington wetlands map. The CO District includes all wetlands and buffer areas 50 ft. in width surrounding all wetlands. The plans show an existing pond on the property and a 50 ft. buffer surrounding the pond. However, a mapped wetland (as depicted on the City of South Burlington Wetlands Delineation Project map and shown on the map on page 1 of this report) and corresponding buffer to the west of the pond is not shown on the plans. Furthermore, the development of structures is proposed to occur in the location of this mapped wetland. Although, the local accuracy of this data must be verified in the field, it is the applicant's responsibility to provide such verification from a qualified wetlands consultant. 4. If a wetlands delineation on the property confirms that the proposed construction of the 4 duplexes encroaches into the CO District, the applicant must provide evidence prepared by a qualified wetlands consultant that the encroachment will not adversely affect wetland functions as described in Section 3.503 of the Zoning Regulations. If encroachment into the CO District is proposed, the applicant must provide evidence that the encroachment will not adversely affect wetland functions as described in Section 3.503 of the Zoning Regulations. Accordingly, the proposed encroachment should not alter the water storage capacity, water quality, wetland functions and values, or wildlife and fisheries habitat provided by the wetland. Pursuant to Section 3.40 of the Zoning Regulations, approved uses within the CO District shall be subject to the following standards: (a) No use shall damage or otherwise alter adversely the character of soils or vegetation, or impair the quantity or quality of surface water or ground water. Appropriate erosion control measures to be used during and after construction are detailed on Sheet 6 of the plans. The plans indicate that silt fencing and hale bale check damns will be CITY OF SOUTH BURLINGTON 4 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc utilized. However, Staff notes that the proposal involves completely filling a mapped wetland. The applicant has not yet provided evidence concerning the delineation of and potential impacts on this mapped wetland. (b) Excavation or filling shall be permitted only to the extent necessitated by an approved use. Staff recommends that this standard be included as a condition of approval. However, in addition, the applicant must provide evidence that any proposed encroachment into the CO District will not adversely affect wetland functions. (c) The cutting or removal of trees or other natural vegetation shall be allowed only to the extent necessitated by an approved use. 5. The plans need to be revised to show the extent of removal of existing vegetation within the CO District. The plans do not indicate whether or to what extent existing trees or other natural vegetation will be disturbed. (d) Any application for a use within the CO District requiring review by the DRB shall require review and comment by the South Burlington Natural Resources Committee (NRC). The NRC reviewed the plans at its March 6, 2003 meeting. The NRC recommended that the DRB continue the preliminary plan hearing until the applicant provides a wetlands delineation and analysis of wetland impacts, which can be reviewed by the NRC (See Appendix A). Section 26.202(b) of the Zoninq Regulations 6. Staff recommends that the applicant withdraw this preliminary plan application and resubmit a new preliminary plan application to be considered under the proposed Land Development Regulations. Pursuant to Section 26.202(b) of the Zoning Regulations, the DRB shall require roads serving more than 3 units to be public roads. The proposal is presumably for a private street. The proposed Land Development Regulations would allow the DRB to approve a private roadway with a single access on a public roadway if it serves no more than 10 dwelling units. If the applicant desires that the proposed roadway be private, Staff recommends that the application be withdrawn and resubmitted to be considered under the proposed regulations. Subdivision Development Requirements & Design Standards Section 400 of the South Burlington Subdivision Regulations establishes general design requirements for subdivisions according to the following categories. Streets 7. The applicant must submit alternative proposed names for the road serving the development. CITY OF SOUTH BURLINGTON 5 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc Section 401.1(e) requires that streets are identified by name on the final subdivision plat. Therefore, the applicant must submit alternative proposed names for the shared road to be considered by the Planning Commission prior to final plan approval. Pursuant to Section 401.1(k) of the Subdivision Regulations, the DRB may approve a private roadway serving 3 or less separate residential lots. The proposed road will serve 5 residential units on 2 lots. 8. Staff recommends granting a waiver to allow the proposed 18 ft. road width pursuant to Section 513 of the Subdivision Regulations. However, the plans need to be revised to provide a complete cross -sectional detail of the proposed road and station locations should be shown along the entire length corresponding to a road profile. Pursuant to Section 401.1(i) of the Subdivision Regulations, all private roads must be built to the minimum standards for public roads. However, curbing may be waived and width can be a minimum of 24 ft. wide without parking. The plans show an 18 ft. wide paved roadway. Staff believes this is an appropriate width for the relatively small residential subdivision proposed and recommends that the DRB grant a waiver on the road width pursuant to Section 513 of the Subdivision Regulations. However, more construction details need to be provided demonstrating appropriate slope and drainage. Sheet 4 of the plans includes a partial cross-section entitled "Paved Driveway Section." The plans need to be revised to include a complete cross-section of the proposed 18 ft. wide road and station locations along the entire length corresponding to a road profile. Lot Layout Proposed lots comply with the minimum standard width to length ratio of 1 to 5. However, without appropriate wetlands information, Staff cannot determine whether lots are laid out such that they can be developed in full compliance with the Zoning Regulations and with consideration to natural constraints on the subject property. Pedestrian Access 9. Concurrent with final plan submission, the applicant must submit a draft easement deed for the proposed recreation path easement, which shall be reviewed and accepted by the City Attorney. The Recreation Path Committee (RPC) reviewed the sketch plan for the proposed development in November 2002. The RPC recommended that a 20 ft. recreation path easement be provided along Van Sicklen Road and also along the easterly side of the property (See Appendix B). Accordingly, the preliminary plans show a 20 ft. recreation path easement to be dedicated to the City of South Burlington. The applicant must submit a draft easement deed for this recreation path easement, which shall be reviewed and accepted by City Attorney Tim Eustace. Water 10. The applicant must abide by all requirements outlined by Water Superintendent Jay Nadeau in his letter dated March 7, 2003. Pursuant to Section 404 of the Subdivision Regulations, the municipal water system shall be extended to provide adequate water supply at an acceptable pressure for the proposed subdivision. CITY OF SOUTH BURLINGTON 6 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc The plans were reviewed by Water Superintendent Jay Nadeau. The applicant will need to abide by all requirements outlined by Mr. Nadeau in his letter dated March 7, 2003 (See Appendix C). Fire Protection 11. The Fire Chief needs to review the revised plans prior to final plan approval by the DRB. Section 405 of the Subdivision Regulations requires that the plans be reviewed by the Fire Chief or a designee to insure that adequate fire protection can be provided. On November 1, 2002, Fire Chief Doug Brent provided comments on the previously submitted sketch plan for the subject property (See Appendix D). Mr. Brent indicated that water availability for fire suppression is currently inadequate and residential sprinkler systems should be installed. Staff notes that the preliminary plans include a fire hydrant at the end of the extended water line on Lot 2. The plans should be reviewed again by Mr. Brent prior to final approval by the DRB. Sewage Disposal 12. The applicant must obtain final wastewater allocation approval for the proposed development. Pursuant to Section 406.1 of the Subdivision Regulations, the applicant will need to obtain final wastewater allocation approval from the Director of Planning and Zoning prior to final subdivision approval by the DRB. Utility Lines 13. The City Engineer shall review and approve the location and ownership of all utility easements. Section 407 of the Subdivision Regulations requires that utility lines be underground. Underground water and sewer lines are shown on the plans. The City Engineer has reviewed the plans and offered comments (See Appendix E). Locations of the proposed utility corridors are appropriate. Outdoor Lighting In accordance with Section 408 of the Subdivision Regulations, outdoor lighting shall be provided in compliance with the site plan and performance standards set forth in the Zoning Regulations. However, Staff notes that the site plan and performance standards set forth in the Zoning Regulations do not apply to single family residential lots such as the proposed Lot 1. Outdoor lighting for Lot 2 will be evaluated below under Site Plan Review Standards. Storm Drainage 14. The stormwater drainage plans must comply with the requirements of Section 409 of the Subdivision Regulations. In addition, the City Engineer shall approve the stormwater drainage plan prior to final plan approval by the DRB. Section 409.1 of the Subdivision Regulations requires the applicant to plan for the removal of spring or surface water resulting from the proposed development. The design of the drainage system shall use natural waterways and drainageways to the fullest extent possible. Stormwater drainage facilities must be located within street right-of-ways where feasible, or within unobstructed CITY OF SOUTH BURLINGTON 7 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc easements of appropriate width. The City Engineer shall approve the stormwater drainage plan. Pursuant to Section 409.2, drainage facilities must be large enough to accommodate potential runoff from the entire upstream drainage area under conditions of total potential development. Pursuant to Section 409.3, the stormwater drainage plans must include an assessment of the effect of the proposed development on existing downstream drainage facilities. Monumentation 15. A survey plat must be submitted showing appropriate monumentation at all lot comers pursuant to Section 410 of the Subdivision Regulations. In addition, the survey plat must identify all relevant zoning district boundaries. Section 410 of the Subdivision Regulations requires that appropriate survey monumentation be set at all lot corners and angle points. In addition, Section 203.1(h) of the Subdivision Regulations requires preliminary plan applications to include a complete survey of the subject property prepared by a licensed land surveyor. The plans no not include a survey plat. Consequently, the applicant must submit a survey plat that includes appropriate monumentation and identifies all zoning district boundaries, including CO District boundaries, and boundaries between SEQ restricted areas and development areas. Open Space & Recreation Areas Adequate open space and recreation areas are provided Site Preservation & Landscaping Section 412 of the Subdivision Regulations establishes standards for site preservation and landscaping. Section 412.3 establishes guidelines for erosion and sediment control during and after construction. Erosion control plans are included and detailed on Sheet 6 of the plans. Pursuant to Section 412.4, two trees shall be planted on each residential lot. Lot 1 is primarily wooded and already developed, and Lot 2 will contain existing trees and other vegetation. However, the applicant should provide additional information about what existing vegetation may be removed. Landscaping plans will be reviewed below under Site Plan Review Standards. Excavation & Grading 16. Excavation and grading plans must comply with Section 413 of the Subdivision Regulations. Energy Conservation 17. The plans should demonstrate energy efficient design as detailed in Section 414 of the Subdivision Regulations. Pursuant to Section 414 of the Subdivision Regulations, the proposed subdivision shall be designed to take advantage of solar radiation and landscaping should be designed to provide wind barriers and reduce heat loss and heat gain. In addition, the length of roadways and utilities shall be minimized. Landscaping will need to be evaluated as noted above. Utility Easements 18. Concurrent with final plan submission, the applicant must submit draft easement deeds for CITY OF SOUTH BURLINGTON 8 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary srp doc all necessary utility easements. Utility easements are shown. As indicated already, these must be shown and approved by the City Engineer. In addition, all legal documents pertaining to utility easements must be reviewed and approved by the City Attorney. Directional Signs & Addresses Addresses must be installed in accordance with Section 416 of the subdivision regulations. In addition, the addresses of all residences shall be appropriately labeled on the final plat. PRD Review Standards Pursuant to Section 26.15 of the Zoning Regulations, PRDs shall comply with the following standards and conditions: (a) Will not result in undue water or air pollution. In making this determination the DRB shall at least consider (1) the availability and capacity of municipal sewer facilities or the nature of soils and subsoils and their ability to support waste disposal adequately, (2) the elevation of land above sea level and in relation to floodplains, (3) protection of ground and surface water through appropriate vegetative buffers and retention structures, and (4) all applicable State of Vermont regulations. 19. The plans need to be revised to show detailed stormwater drainage plans No on -site wastewater treatment is proposed. Erosion control and landscaping plans are included; however, stormwater treatment measures and facilities are not detailed. As indicated already in this report, the applicant needs to provide a wetlands delineation and analysis of wetlands impacts. (b) Will have sufficient water available for the foreseeable needs of the development 20. Staff recommends that the comments of Water Superintendent Jay Nadeau dated March 7, 2003 be incorporated as conditions of approval. Water Superintendent Jay Nadeau has reviewed the plans and provided a number of comments in a letter dated March 7, 2003 (See Appendix C). Staff recommends that Mr. Nadeau's comments be incorporated as conditions of the DRB's approval. (c) Will not cause unreasonable soil erosion or reduction in the capacity of the land to hold water so that a dangerous or unhealthy condition may result In addition to the stormwater drainage details, the plans must include acceptable details of erosion control measures to be used during and after construction. The erosion control plans must meet the standards set forth in Section 413 of the Subdivision Regulations. Grading and erosion control plans are detailed on Sheet 6 of the plans. (d) Will not cause unreasonable highway congestion or unsafe conditions with respect to the use of highways, existing or proposed. The existing curb cut will be replaced by a new shared curb cut. The plans do not provide a measure of sight distance for the new curb cut. Five dwelling units are proposed for the site. This is CITY OF SOUTH BURLINGTON 9 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\singh\preliminary.srp.doc an increase of 4 units. Institute of Transportation Engineers (ITE) data indicate that residential condominiums generate on average 0.54 trips per dwelling unit per weekday PM peak hour of an adjacent street. According to ITE data then, the proposed development on Lot 2 will generate approximately 2.16 trip ends per weekday PM peak hour of an adjacent street. Staff does not believe that the proposed development will cause a significant reduction in level of service on roads in the vicinity. (e) Will not cause an unreasonable burden on the ability of the city to provide educational services or facilities. The addition of 4 units of housing will result in relatively minimal impact on the South Burlington School District. (� Will not cause an unreasonable burden on the ability of the city to provide municipal or governmental services and facilities. The applicant will need to abide by the requirements of the Water Superintendent, Fire Chief, and City Engineer. (g) Will protect important natural resources, including streams, wetlands, scenic views, wildlife habitats, and special natural features. 21. The applicant must provide details on the proposed management and protection mechanisms for open space within the development. Pursuant to Section 26.153 of the Zoning Regulations, open space within the proposed PRD shall be protected by appropriate legal mechanisms to insure its maintenance and appropriate use. Accordingly, the applicant must provide details on the proposed management and protection mechanisms for open space within the development. Such information may include draft deed covenants or other legal mechanisms. Draft legal documents need to be reviewed and approved by City Attorney Tim Eustace. (h) Will not have an undue adverse effect on the scenic or natural beauty of the area, is aesthetically compatible with surrounding developed properties and will protect rare and irreplaceable natural areas and historic sites. Staff believes the project is aesthetically compatible with surrounding developed properties. No historic or rare and irreplaceable natural areas are known to occur on the subject property. (i) Will provide convenient allocation and distribution of common space in relation to proposed development and will conform to the city's recreation plan. The proposed development does not conflict with the South Burlington recreation plan. As noted already, the plans show a 20 ft. recreation path easement pursuant to the request of the RPC. (j) 1146111 provide efficient layout and high -quality installation, construction, and maintenance of public facilities and conform to the city's street and utility plan. These standards are evaluated above under subdivision development requirements and design standards. CITY OF SOUTH BURLINGTON 10 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\sinah\preliminary. srp doc (k) Will provide for cooperation with adjoining properties in the extension of roadways, drainage facilities, and utility lines. Direct utility and vehicular access is provided off of Van Sicklen Road for the proposed development. Cooperation with adjoining landowners is necessary for the sewer main, and Water Superintendent Jay Nadeau has requested that the applicant coordinate the installation of a water line with the Summersweet Subdivision to the east of the subject property. (I) Will conform to the city's Comprehensive Plan. The Comprehensive Plan establishes a goal for the SEQ District of promoting development that protects and preserves contiguous areas of open space and important natural resources. The proposed PRD offers an appropriate density to accomplish these goals, but as indicated already, the applicant must provide a wetlands delineation and analysis of impacts of any encroachment into the CO District. The Comprehensive Plan also establishes the goal of providing an extensive off - road path system to residents. Accordingly, the proposed PRD includes a 20 ft. wide recreation path easement. Site Plan Review Standards In accordance with Section 26.154(b) of the zoning regulations, PRD applications shall be reviewed under the site plan requirements. Pursuant to Section 26.102 of the Zoning Regulations, the DRB may consider the following in its review of a site plan application: (a) Pedestrian and vehicular access. Pedestrian and vehicular access is discussed above. (b) Circulation. Circulation is two-way on the multifamily lot and two hammerhead turnarounds are provided. Driveway width is indicated to be 18 ft. As noted above, Staff believes this is an appropriate width for the proposed development of 4 new residential units on Lot 2 and in keeping with the requirements of Section 26.254 of the Zoning Regulations. (c) Parking. 22. The plans need to be revised to clarify the number of parking spaces proposed. The site plan shows 10 exterior parking spaces, and presumably 10 garage spaces. However, the plans should be revised to confirm the number of garage spaces. Pursuant to Section 26.252 of the Zoning Regulations, the number of off-street parking spaces on the site must meet the requirements in listed Table 3. Table 2. Off -Street Parking Reauirements Proposed Use Parking # Spaces Standard Required Multifamily 2 per unit + 1 ! 9 Residential per 4 units CITY OF SOUTH BURLINGTON 11 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING - \drb\sub\sinyh\preliminat� srp doc Pursuant to section 26.253(b), bicycle parking shall be provided for residents on the subject property. A bicycle rack is indicated nearest Unit #4. (d) Landscaping, screening, and outdoor lighting. A cedar hedgerow is proposed along the easterly boundary of Lot 1 adjacent to the proposed road. Furthermore, a number of tree and shrub plantings are proposed for Lot 2. Staff notes that the 3 trees shown southerly of the pond on Lot 2 are mislabeled "PS," whereas the plant list includes 3 Austrian Pines (PN). Plants within the 4 planting beds outside of each duplex unit are not labeled, but it is fairly clear from the plant list which plants are which. Public Works Arborist Craig Lambert has review the landscaping plans and offered a number of comments regarding tree plantings (See Appendix F). In particular, Mr. Lambert outlines advisable tree planting details. He also recommends moving the 4 Japanese Tree Lilacs further from the rear of the duplex structure to prevent the need for excessive pruning. 23. The applicant needs to provide evidence that the proposed landscaping plan meets or exceeds the minimum landscaping costs. Such evidence may include more landscape plantings to screen new development or restore disturbed areas on the subject property. The applicant has provided a building const estimate of $480,000, which requires minimum landscaping costs of $12,100 for Lot 2. Although the cedar hedge is proposed to be planted on Lot 1 along the Lot 1 /Lot 2 property boundary, Staff feels it is appropriate to include it in order to determine whether minimum landscaping costs are met. The proposed landscaping supplements existing vegetation and appears to offer an acceptable level of screening; however, Staff estimates that the costs of the proposed landscaping will not meet the $12,100 minimum required cost. Therefore, the applicant should provide evidence that the proposal meets or exceeds the minimum required landscaping costs. Such evidence may include more landscape plantings to screen new development or restore disturbed areas on the subject property. RECOMMENDATION Staff recommends that the DRB recommend that the applicant withdraw this application and resubmit a new preliminary plan application that addresses the items noted in the comments section above. In particular, the plans must include a wetlands delineation prepared by a qualified wetlands consultant and a survey plat. A resubmitted preliminary plat application would be reviewed under the proposed Land Development Regulations allowing the DRB to approve a private roadway to serve the proposed development. Respectfully submitted, Janet M. Hurley, Associate Planner Copy to: Skip McClellan, Llewellyn -Howley, Inc. APPENDIX A CITY OF SOUTH BURLINGTON NATURAL RESOURCES COMMITTEE 2-LOT, 5-UNIT SUBDIVISION PRELIMINARY PLAN APPLICATION #SD-03-10 RECOMMENDATIONS FOR APPROVAL A & M Construction, LLC, hereafter referred to as the applicant, is requesting preliminary plan approval from the Development Review Board (DRB) for a 2-lot, 5-unit subdivision on 4.57 acres on Van Sicklen Road in the Southeast Quadrant District. Portions of the subject property fall within the Conservation and Open Space (CO) District. MOTION by Cures 5hayJ seconded by 9i II .5G17 uele, to recommend the DRB continue preliminary plan #SD-03-10 until the following conditions are met: The applicant must provide delineation of all wetlands on the subject property as determined by a qualified wetlands consultant. 2. If encroachment into the CO District is proposed, the applicant must provide evidence that the encroachment will not adversely affect wetland functions as described in Section 3.503 of the Zoning Regulations. Accordingly, the proposed encroachment should not alter the water storage capacity, water quality, wetland functions and values, or wildlife and fisheries habitat provided by the wetland. This assessment must be accomplished by a qualified wetlands consultant. 3. The Natural Resources Committee must have an opportunity to review the delineation and analysis prior to preliminary plan approval. Peter Jones nay/abstain Lori Lustberg — e�nay/abstain Lani Ravin — e?9/nay/abstain Bill Schuele — re/nay/abstain Chris Shaw —} ey /nay/abstain Eileen Brady -Whitney — e�nay/abstain MOTION CARRIED by a vote of (0 - ® - b Signed this ) day of l��t�2�.M 2003, by r Lani Ravin, Chair \drb\sub\singh\nrc. rec.doc APPENDIX B SOUTH BURLINGTON RECREATION DEPARTMENT 575 DORSET STREET, SOUTH BURLINGTON, VT 05403 TEL: (802) 846-4108 • FAX: (802) 846-4101 J �M.u.uu.rgl'r. BRUCE OWEILL, CLP DIRECTOR THOMAS HUBBARD, CLP i ASS'T DIRECTOR To: Ray Belair, Administrative Officer From: Recreation Path Committee Re: Van Sicklen Road sub -division Date: November 5, 2002 The South Burlington Recreation Path Committee reviewed the plans for the proposed five unit sub -division on Van Sicklen Road. The committee recommends that a 20 foot recreation path easement be provided along the Van Sicklen Road side of the property and also along the east side of the property. MEMBER: VERMONT RECREATION AND PARK ASSOCIATION - NATIONAL RECREATION AND PARK ASSOCIATION Souti. Burlington Fire Depai ,,anent APPENDIX D 575 Dorset Street South Burlington, VT 05403 (802) 846-4110 Douglas S. Brent, Fire Chief November 1, 2002 Ms. Juli Beth Hoover, Director of Planning and Zoning City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Narinder Singh, Van Sicklen Road Dear Juli: I have reviewed the plans for the proposed construction of the planned residential development on Van Sicklen Road. I have also made a site visit to try to envision the siting of this project. I have the following recommendations: 1. Compliance with all requirements of Vermont Labor and Industry Fire Prevention Division codes and standards. 2. Due to travel distance from South Burlington Fire Department Station 1 all multi- unit buildings should be provided with automatic residential sprinklers. 3. Installation of the necessary fire alarms required for an occupancy such as this. 4. Fire Department Sprinkler Connection location to be specified by SBFD. Number and location of fire hydrants to be determined by the South Burlington Water Department. Actual final spotting of said hydrants to be done jointly with SBFD. At this point these seem to be the major issues which present themselves. As this project moves forward additional items may surface which could be dealt with as needed with the assistance of the owner and Labor and Industry. Should you need any further assistance on this project please feel free to contact me. S � Douglas S. Brent Fire Chief APPENDIX E Bill Szymanski, City Engineer Engineering Review March 13, 2003 A & M Construction 2-lot, 5-unit PRD Preliminary Plans 100 Van Sicklen Road 1. There may be extensive ledge where the water and sewer mains are to be constructed especially along Van Sicklen Road. Ledge sounding should be taken to determine the extent of this ledge. 2. Water and sewer mains outside of Van Sicklen Road shall be private and maintained by the homeowners. 3. Plans shall include a profile of the sewer main and private drive. 4. The pond should be enclosed with a fence. 5. Culvert pipe at drive shall be concrete or plastic, not metal. 6. Entrance drive radii should be at least 20 feet to accommodate trucks. 7. A roadway typical section should be shown on the plans. 8. An adequate water supply is a problem. The applicant's engineer shall work with the City Water Department to address these problems. APPENDIX F Craig Lambert, Public Works Arborist 2/13/03 Landscape Review Preliminary Plat Van Sicklen Rd Property Llewellyn -Howley Inc Tree planting detail needs revision. 1. Trees shall be planted such that each tree's root collar is at or slightly above final grade (elevating the root collar above final grade will enhance survival in heavy, poorly drained soils). 2. Tree wrap can be used for protection during transport but should be removed after planting is completed. 3. The planting hole shall be dug 2-3 times the diameter of the root ball with sloping sides. The root ball shall be placed on undisturbed soil to prevent settling and shifting of the tree. 4. Stake trees only when needed (high winds, trees with light container root balls, etc...). When staking is required, trees should be staked loosely to allow the trunk to sway. Stakes shall be removed after 1 year. 5. Existing soil shall be used as backfill unless of such poor quality as to be detrimental to plant growth. Clods shall be broken up and stones, roots, and debris larger than 1 inch shall be removed from backfill. 6. All burlap, ties, and wire cages shall be cut away or folded into the bottom of the planting hole. 7. A 2-4 inch layer of mulch shall be placed over the root ball and backfill. Mulch shall not be placed against the tree trunk. II. 1 recommend moving the tree lilacs further away from the buildings. Mature crown size for these trees is 15-20 feet. In the current location, the trees will soon grow into the buildings, requiring excessive pruning. DEVELOPMENT REVIEW BOARD 18 MARCH 2O03 The South Burlington Development review Board held a regular meeting on Tuesday, 18 March 2003, at 7:30 p.m., in the Conference Room, City Hall, 575 Dorset 5t. Members Fresent: J. Dinklage, Chair; G, Quimby, K. Farley, M. Boucher Also Fresent: R. 5el3ir, Administrative Officer; J. Hurley, Planning Assistant; 5. McClellan, M. Gravelin, D. Gage, R. Frey, K. 5mith, D. Henson, T. Krinski, F. O'Leary, D. Burke, R. Veve 1. Other Business: Mr. Belair reported that the City Council has appointed Michelle Kupersmith to fill the vacancy left by Mr. Cameron's resignation. 5he could not be reached in time for her to attend this meeting. 2. Review Minutes of 18 February 2005: Ms. Quimby moved to approve the Minutes of 18 February as written. Mr. Farley seconded. Motion passed unanimously. 3. Freliminary Flat Application #5D-03-10 of A & M Construction. The applicant is requesting preliminary plat approval for a 2-lot, 5 unit planned residential development at 100 Van 5icklen Road. The subject property contains approximately 4.57 acres and falls within the 5outheast Quadrant District. Fortions of the subject property also fall within the Conservation and Open 5pace District: Mr. McClellan showed an air photo of the property. It is the second property down the hill and now has an existing house and access. The applicant would subdivide the lot into 2 lots. The existing house would remain on one lot. The existing drive would be closed, and the house and second lot would share a common access. The private utilities would be abandoned and all utilities would become municipal. The applicant noted that Mr. Belair has said that this application falls under the existing zoning regulations. Under those regulations, the application would not pass, but it would be acceptable under the proposed new zoning regulations. The applicant has been advised to present the plan, Oct Board feedback, and then withdraw it and reapply when the new regulations are applicable. DEVELOPMENT REVIEW BOARD 18 MARCH 2O05 PAGE 2 Mr. McClellan Said there is a wetland Shown on the city map. He went out with Cathy O'Brien last week, and She determined there is not wetland in the proposed development area. The proposed common drive would be in an Open Space zone. Members were OK with this as a trade-off for closing the one curb out. Mr. McClellan Said that zoning lines would be added to the plan. He then asked if the owners could mow the lawn up to the pond to use the pond for swimming. Mr. Belair said there is a question of whether it is a use that predates the zoning regulations. This is a unique situation as this is a CO District that was created by a homeowner. Mr. Dinklage suggested checking with the Natural Resources Committee. Mr. McClellan noted that the City Engineer recommends putting a fence around the pond for safety. Mr. Dinklage said when the pond is transformed into an "attractive nuisance" the liability of the homeowners would come into play. Mr. McClellan said the buildings would be oriented to look at Camel's Hump. There is a 20-foot easement at the request of the Rec Path Committee. Mr. McClellan showed the location. Jay Nadeau of the Water Department wants a water connection to 5ummersweet. The applicant said they would give the Water Dept. what they want. They will also comply with what the Fire Chief wants. Mr. McClellan showed the route of the sewer system. The City Engineer is concerned about ledge. The applicant indicated they will construct it with that in mind. There will be no freestanding pole -mounted lights in the development. All lighte would be mounted on the building. Cut sheets will be provided. All drainage would be surface drainage. Mr. McClellan showed the location of swalee and noted that everything winds up in the pond before it goes anywhere. DEVELOPMENT REVIEW 50AKD 15 MARCH 2O03 FAGE 3 Mr. Gage, owner of the property due east of the project, Said that the pond leaks, and he is concerned with any additional water going into it. He Said the water from the pond ends up in his basement. Mr. McClellan Said the rate of flow into the pond would be 1e55 even though the volume will be more. Mr. Dinklage Suggested Mr. Gage think about what he might ask of the developer in order to addreoo the problems with water from the pond. Mr. Gage asked when the wetland wao ae0000ed. Mr. McClellan Said last Thursday. All the qualities needed for a wetland were assessed and none were found to be present. Mr. Boucher asked about a road study at Hinesburg Rd/Van 5icklen Load intersection. Mr. 5elair noted there would be improvements to that intersection required for the Marceau development. Mr. McClellan Suggested they might divert some of the Surface water to the opposite Side of the existing berm so that it won't get into the pond. Mr. Gravelin asked if the pond could be drained. He felt it was a menace. He said he wao told it wasn't drained because it is a wetland. He Suggested having a drain So that in normal circumstances it would drain dry. Mr. Dinklage asked the applicant to deal with the Natural Kesourceo Committee on this i55ue. Mr. McClellan then asked to withdraw the application. 4. 5ite flan Application #5F-03-02 and Conditional USe Application #CU-03-02 of Kenneth F. 5mith. The applicant iS requesting Site plan approval for new construction of a 9.450 Sq. ft. multiunit Structure to be used for a mix of uses at 57 Commerce Avenue. In addition, the applicant i5 requesting conditional use approval forthe following conditional uses: rental of equipment and miscellaneous items; automobile repair and Service; and indoor recreational facilities. The Subject property contains 1.09 acres and falls within the Mixed Industrial and Commercial and Conservation and Open Space DiotrictS: Mr. Henson noted the property is at 57 Commerce Avenue, not Commercial Drive. CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 July 30, 2003 Skip McClellan Llewellyn -Howley, Inc. 20 Kimball Avenue, Suite 202N South Burlington, Vermont 05403 Re: Four (4)-Unit PUD — 100 Van Sicklen Road Dear Mr. McClellan: Enclosed, please find a copy of the Findings of Fact and Decision on the above referenced project approved by the Development Review Board on 7/15/03 (effective 7/29/03). Please note the conditions of approval including the requirement that the final plat application be submitted within 12 months. If you have any questions, please feel free to contact me. .'7 Sincere)y, Raymond J. Belair Administrative Officer Encl. R # Permit Number SD- CITY OF SOUTH BURLINGTON APPLICATION FOR PRELIMINARY SUBDIVISION PLAT REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Narinder Singh, 28 Whiteface St., So. Burlington, VT 05403 (802) 658-5984 2) LOCATION OF LAST RECORDED DEED (Book and page #) Vol. 557, P. 22-24 3) APPLICANT (Name, mailing address, phone and fax #) A & M Construction Corporation, Inc. P.O. Box 9347, So. Burlington, VT (802) 865-4250 4) CONTACT PERSON (Name, mailing address, phone and fax Skip McClellan, LLEWELLYN-HOWLEY INCORPORATED, 20 Kimball Ave., Ste. 202N, South Burlington, VT. (802) 658-2100 5) PROJECT STREET ADDRESS 100 Van Sicklen Road, So. Burlington, VT 05403 6) TAX PARCEL ID # (can be obtained at Assessor's Office #1750 00100 R 7) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use One single family home b) Proposed Uses on property (description and size of each new use and existing uses to remain Construction of four, three bedroom condominium units in two, 55' x 86' duplex structures. Existing home to remain unchanged. c) Total building square footage on property (proposed buildings and existing buildings to remain) 1,800 s.f. home to remain, four units of 2,200 s.f. each to be constructed -total 10,600 s.f. d) Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) 25'-30' high residential structures e) Number of residential units (if applicable, new units and existing units to remain) 1,800 s.f, home to remain, four units of 2,200 s.f. each to be constructed -total 10,600 s.f. f) Number of employees & company vehicles (existing and proposed, note office versus non -office employees) N/A g) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable) N/A h) List any changes to the subdivision, such as property lines, number of units, lot mergers, etc. 8) LOT COVERAGE a) Building: Existing 1.4 % Proposed b) Overall (building, parking, outside storage, etc) Existing 1.9% Proposed Lot #1 - 5.2 %, Lot#2 - 4.3 % Lot#1— 9.0%, Lot#2 —12.8% c) Front yard (along each street) Existing 2.5 % Proposed 3.3 % 9) COST ESTIMATES a) Building (including interior renovations): $480,000.00 b) Landscaping: $12,100.00 c) Other site improvements : $64,000.00 (Sanitary Sewer, Water Main, Pavement) 10) ESTIMATED TRAFFIC a) Average daily traffic for entire property (in and out): Lot#1 - 6 vte, Lot#2 — 23 vte b) A.M. Peak hour for entire property (in and out): Lot#1 - 1 vte, Lot#2 — 2 vte c) P.M. Peak hour for entire property (In and out): Lot#1 - 1 vte, Lot#2 — 2 vte 11) PEAK HOURS OF OPERATION: N/A 12) PEAK DAYS OF OPERATION: N/A 13) ESTIMATED PROJECT COMPLETION DATE: 2004 14) PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (11" x 17") of the plans must be submitted. A subdivision application fee shall be paid to the City at the time of submitting the final plat application (see Exhibit A). 'r: I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT SIGNATURE OF PROKRTY OWNER Do not write below this line DATE OF SUBMISSION: L//, ///1 n I have reviewed this preliminary plat application and find it to be: 19 Complete /,? ❑ Incomplete of Planning & Zoning or Designee date A ------- / --- L ' w 9 i — — a 0D-- - t7xz a _- // w, • -- - \ -- - -_ / - \ --___- -_ I APProumate l«vllm enlafln \ ___ >/ I a�fewafm anfpas ea to9 k` _ i - I ---- a remaKd r LOCUS LEGEND ! / ------- ` r ERTY LINO <'ONSERVATION ZONE - — — — - N/F SPmcer / ��.��.��� _ __ I I `5\ S[.0. RE5IRICTCD AREAS . I , 81/ROINC 5[iBACK / • ' coNTow SANITARY SEWER M.N. • / / ,� r '� �•� tyP'E / 1 \�`� �r\ / - 1' STOR;v SEWER IAN l�) / / �' X % `•�`/ \ / / SIoRw SEWER INLET ■ ❑ /_ - i J^+t 1La 1 I E.;,(og man -mode Pond V �r s R HYDRANT �.. • Y // / L/mR o/ Reefrkfed AreP Lct f SANITARY / r � GATE VALVE a• w / / 900from Nineaeurq Rood cenlmllne 5J,500 a I .` or n P i SCWER �s�e'vte� .._... e' vc N/F Cope 1( 1 1 30 CT fflBlel ref end9l '� i i i pv d SlORN SEWER WATER SUPPLY —x—a w— -w- - e a / / Lynlf o/ SEO Nb.. Area I r f� E TREE LRK / / .... EDGE OF WATER ^� LOt 1 /r, /! ` t •' the awrtt III me vme wtm / / /, •� F DENSITY Iolm mm . 1.2 umis/— - —11 --d 1.23 «res . r ]volts/acre r 3 Unes wlowed ' ` '"" '• �• n. -. _ J / J# / f .eft, 2: mfm us Resldded wroa - BvgdaDle w<o A mnf/«r< 1 . / 1 Unlra opA-d 1.23 « s (LOIN) oB9 atte s (reabicled) = 0.31 acres , e r Reemenfml wd o fee1—�-- � .. '. '• ' 1 11 � ' / sq„ i 't-`..ledE— � / // ` I Cos .wNmg c re cut Mel:•YL......,`.-..• nod I; +mod`• ' • ♦ _ TRIO %2 unR,/« - Un;Is d -' ^ — 3.34 «res , 1.2 unllf/ame = 4.0 Unl1, vn0-1M1 4 �. _ -- ` `• ^ "� / ? / Maefnotl eb: mMvs Res/rlcled br mhvs Cmserwlbn Zanez mhvs ` m eos ^ ` pmtl : BuRdo6k wro . a units/acre UnAa dbxed 3 34 «(relN) - oT.s «f (Ndf.e) os« , NOTES I`—e,Nezn) - ozs es (ne) = t.sq «opdm A un/ae - 66 I - -- •-.., ._.,,. .'- - _,.. 8 U,;Is olbwetl 1. Ownm or 1— Norhtl.r 9 Resldmllol unlls ormosed 28 Wnlle fare St, S,, BVIIMgtm, VT ONO a' ,• ~ .v _. M COVERAGE w-Ea T.I. lot m 31500 a1 IOOz Pr... (e.ht/n9) eulbin91 Prwoud PwA;nq 2.180 s.f. 2,OA0 a.I 5.2z in TOIW Covered A.820 e% 9.Oz Frml Ymd 6.T11 a.I f00R Frml Cavmed 0 n1.. Oz LOT 2 Totm — — 145,e33 s1 lox Pr.= lkldMq, P .. Ad P—oq 6,J00 ,1. 12, I00 f,1. AM 8..'Sz Io CaY<red 18, coo if 12.6z Front Ymd Front Covered 5.480 a.f 370 a.1 Imx Sm 2. ARbIlcmi: A" C11,11,0160 P.O. Bo. 9347 S. BvdIngfan, VT 05403 3, 1.1N — A,—: 46 (+/-) acres A. Zm.d: sovfhevsf Ovodronf (SEC) 5. P—Iff prgpmty the MfmmPllon Iron pm mulled T.C. Scwnelder-Pbl PIm Im Rea/dentt- by urWnows perfpns as W.— by Psw.eY. 6. E.ISIMq Ippogrgpny I— USCS mappMq and /boned field wwe. All cmimrf should be considmed opprq.lmgte. T. E.4" I -tune, Mfmmafbn I— P Idl pngr ofoayny N and Ilm;letl d survey. 8. Llmll I 'wlbllfe m" scaled I— Clly 0 S-II BurlMylon Smt—I Ouodront Zminq Nob. 9. E.l.Nng — I'd wastewater d;fb— IINd to b. -dined. All u0Y11es I. be —'a. to foe munklpal fy2fm�a .+ E7n..l+lss.aa0 rr. Ep.•• GRAMICSCALE w / is s ee m U 'I IOCItO 30 K. LLEWELLYN-HOWLEY I M C O R P O R A T R D ngbamrreq g N E� P.mP�9 AISA9 WI1.— Pod 1 ( 1 e.ufR WBinyMa TIR62)6Rl12ft1q V.rmoat 05Ag3 IWxv Ilf >A' I.cum VAN SICKLEN ROAD PROPERTY a ' Sketch Plan J aeWnE, .W ErWvl"� ]0010E1°N° fWe.n 1 v 1 IfaIWnI.r/11N IYIaI p.1 o nNwule .ewva ar/aa/Oi ARLI Ma. Ra,IN.n .✓sw.�Is�Tu.iwWYe.fssresser l.uwMllr Il.aa C.eMneWf11 LLEWELLYN • HOWLEY I N C O R P O R A T E D November 1, 2004 Mr. William Szymanski, P.E. City Engineer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: A&M Construction Van Sicklen Road File: 2002063 Dear Bill: Michael Gravelin, A&M Construction, is prepared to construct the roadway to access his project off of Van Sicklen Road. For this phase of construction, the City requires a letter of credit or bond from A&M Construction for the construction cost of this roadway. The roadway is 300 +/- feet, 26 feet wide (no curbs, sidewalks, or utilities). We estimate the construction to be $45,000. We request your concurrence on the amount necessary for a bond or letter of credit. Please contact us if you need additional information. Thank you for your assistance. Sincerely, Llewellyn -Howley Incorporated Lance A' Llewellyn, P.E. cc: Michael Gravelin Ray Belair Engineering • Land Development • Permitting 20 Kimball Ave., Ste. 202N • South Burlington • Vermont • 05403 T 802.658.2100 • F 802.658.2882 • e-mail: Ihinc@lhinc.net www.lhinc.net LLEWELLYN • HOWLEY I N C O R P O R A T E D November 1, 2004 Mr. William Szymanski, P.E. City Engineer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: A&M Construction Van Sicklen Road File: 2002063 Dear Bill: Michael Gravelin, A&M Construction, is prepared to construct the roadway to access his project off of Van Sicklen Road. For this phase of construction, the City requires a letter of credit or bond from A&M Construction for the construction cost of this roadway. The roadway is 300 +/- feet, 26 feet wide (no curbs, sidewalks, or utilities). We estimate the construction to be $45,000. We request your concurrence on the amount necessary for a bond or letter of credit. Please contact us if you need additional information. Thank you for your assistance. Sincerely, Llewellyn -Howley Incorporated Lance A. lewellyn, P.E. cc: Michael Gravelin Ray Belair Engineering • Land Development • Permitting 20 Kimball Ave., Ste. 202N • South Burlington • Vermont • 05403 T 802.658.2100 • F 802.658.2882 • e-mail: Ihinc@lhinc.net www.lhinc.net is Itv k UAL Sn,_aFN lJ Landscaping Pursuant to Section 13.06(A) of the proposed Land Development Regulations, landscaping and screening shall be required for all uses subject to site plan and PUD review. Pursuant to Section 13.06(Bx4) of the Land Development Regulations, snow storage areas must be shown on the plans. The plans do not show snow storage areas. Landscaping budget requirements are to be determined pursuant to Section 13.06(G)(2) of the Land Development Regulations, and shall be prepared by a landscape architect or professional landscape designer. Based on the proposed project costs, the minimum landscape requirement is $12,000. The applicant has submitted a landscape plan and landscape budget that indicates $12,090 of landscaping is proposed for the site. According to Section 13.06(F)(3) of the South Burlington Land Development Regulations the Development Review Board shall require street trees to be planted sixty feet on center on both sides of the street, on average and there should be a minimum of two (2) street trees per lot. Also, the Regulations state the applicant shall submit a landscaping phasing plan with the subdivision application. The City Arborist reviewed and approved the plans on June 20, 2003. Stormwater Stormwater treatment is proposed via overland flow to the existing man-made pond on the easterly side of the property. Other The plans include street addresses based on E-91 l addressing standards. DECISION Motion by Gayle Quimby, seconded by Roger Farley, to approve Final Plat Application #SD-03- 73, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. 3. The plat plans shall be revised to show the following changes and shall require approval from the Administrative Officer. Four (4) copies of the approved revised plat plans shall be submitted to the Administrative Officer prior to recording: a) The final plat plans shall be revised to clearly depict adequate snow storage areas. 1.1 b) The final plat plans shall be revised to indicate the correct lot coverage information, as described in the application. c) The final plat plans shall be revised to comply with the requests of the City Engineer, as outlined in his comments dated November 13, 2003. d) The final plat plans shall be revised to show the name of the road, as approved by the Planning Commission. e) The final plat plans shall be revised to eliminate the walkway extending from Unit #3. t) The final plat plans shall be revised to comply with the requests of the City Arborist, as outlined in his letter dated June 20, 2003. g) The final plat plans shall be revised to incorporate the requests of the South Burlington Water Department, as outlined in the letter from Jay Nadeau, dated December 4, 2003. 4. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 5. Stormwater drainage plans must comply with the Vermont Stormwater Management Manual, pursuant to Section 15.13(F) of the Land Development Regulations. 6. The applicant shall comply with the requests of the South Burlington Water Department, as outlined in the letters from Jay Nadeau, dated March 7, 2003, May 19, 2003, and December 4, 2003. 7. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 8. The applicant shall comply with the requests of the South Burlington Fire Department, as outlined in the letter from Chief Brent dated November 11, 2002. 9. Exterior lighting shall comply with Section 13.07 of the Land Development Regulations. In addition, exterior lighting details shall be submitted to the Administrative Officer for approval, prior to issuance of a zoning permit. 10. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. 11. Pursuant to Section 13.06(F)(3) of the South Burlington Land Development Regulations, the applicant shall submit a landscaping phasing plan and budget for the street trees with the subdivision application, prior to issuance of a zoning permit. Subsequently, the applicant shall post a landscape bond for the total cost of the street tree landscaping, as determined by the above - referenced landscape budget, prior to the issuance of the first zoning permit. This bond shall 7 remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 12. The applicant shall post a landscape bond for $12,000, prior to the issuance of the first zoning Permit- This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 13. Pursuant to Section 15.17 of the South Burlington Land Development Regulations, the applicant shall submit a Certificate of Title showing the ownership of all property and easements to be dedicated or acquired by the City, and said Certificate of Title shall be approved by the City Attorney. 14.Occupancy shall not take place in the proposed units until the applicant has obtained final water allocation approval from the South Burlington Water Department. 15. The applicant must obtain final wastewater allocation approval from the Director of PIanning and Zoning, Juli Beth Hoover, prior to issuance of a zoning permit. 16. Pursuant to Section 15.17 of the South Burlington Land Development Regulations, prior to issuance of the first zoning permit or start of utility or road construction, the applicant shall submit all appropriate legal documents including easements (e.g. irrevocable offer of dedication and warranty deed for proposed public roads, utility, sewer, drainage, water, and pedestrian paths, etc.) to the City Attorney for approval and recorded in the South Burlington Land Records. 17. Prior to the start of construction of the improvements described in condition # 16 above, the applicant shall post a bond which covers the cost of said improvements. within 14 days of the completion of required improvements (e.g. roads, water main18. Pursuant to Section 15.14(E)(2) of the South Burlington Land Development Regulations, s, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer, "as -built" construction drawings certified by a licensed engineer. 19 Pursuant to Section 15.08 (D) of the South Burlington Land Development Regulations, the applicant shall submit homeowner's association legal documents prior to the issuance of the first zoning permit. The documents that include language that: a. ensures that the garages will not be converted to living space; b. prohibits clearing or disturbance of land within wetlands or wetland buffers; AND c. ensures that the association shall assume all maintenance responsibilities for the stormwater drainage facilities until such time as a future City stormwater utility accepts the stormwater infrastructure. I 20. Prior to issuance of the first zoning permit, the applicant shall relocate the sewer main to the satisfaction of the Public Works Director and submit four (4) sets of revised plans. 21. The Development Review Board approves the local public street without sidewalks or curbing. 22. Pursuant to Section 15.02(3) of the Land Development Regulations, the Development Review Board approves a setback waiver of 15', for a total front yard setback of 5' from the public street right-of-way. 23. Any changes to the final plat plans shall require approval of the South Burlington Development Review Board. 24. The final plat plans (sheet 2 and the survey plat sheet) shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plans, the applicant shall submit a copy of the survey plat and sheet 2 in digital format. The format of the digital information shall require approval of the Director of Planning and Zoning. Chuck Bolton - yea/nay/abstain/not present Mark Boucher - yea/nay/abstain/not present John Dinklage - yea/nay/abstain/not present Roger Farley - yea/nay/abstain/not present Michele Kupersmith - yea/nay/abstain/not present Larry Kupferman - yea/nay/abstain/not present Gayle Quimby - yea/nay/abstain/not present Motion Carried by a vote of 7-0-0. Signed the -Z) day of December, 2003, by John Dinklage, Cfiair State of Vermont WASTEWATER SYSTEM AND POTABLE WATER SUPPLY PERMIT LAWS/REGULATIONS INVOLVED Environmental Protection Rules Effective August 16, 2002 Case Number: WW-4-2141 PIN: EJ04-0194 Landowner: Narinder Singh Address: 28 White Face Street South Burlington VT 05403 This project, consisting of a two lot subdivision identified as Lot 41 being 1.2 acres with an existing three bedroom single family residence and Lot #2 being 3.3 acres proposed for the construction of two three bedroom duplexes served by municipal water and wastewater services located off Van Sicklen Road in the City of South Burlington, Vermont, is hereby approved under the requirements of the regulations named above subject to the following conditions. GENERAL 1. This permit does not relieve the permittee from obtaining all other approvals and permits as may be required from the Department of Environmental Conservation, Water Supply Division — telephone (802) 241-3400, Water Quality Division — telephone (802) 241-3770, the Department of Labor & Industry — telephone (802) 828-2106 or (802) 879-2300, and local officials prior to proceeding with this project. 2. The project shall be completed as shown on the following plans which have been stamped "approved" by the Wastewater Management Division: Project 2002063, Sheet 1 "Overall Site Plan dated 12/20/02 last revised 5/05/04; Sheet 2 "Site Plan" dated 12/20/02 last revised 5/05/04; Sheet 3 "Sanitary Sewer and Water Main Extension Plan" dated 12/20/02 last revised 5/05/04; Sheet 4 "Roadway and Utilities Profiles" dated 3/25/03 last revised 5/05/04; Sheet 6 "Details" dated 12/24/02 last revised 2/24/04; and Sheet 7 "Specifications" dated 12/24/02 last revised 2/24/04 prepared by Llewellyn — Rowley, Inc. and on Job #027009 "Plat Showing Retracement Survey and Proposed Subdivision of Property of Narinder Singh & Jasbir Kaur" dated February 28, 2002 last revised March 26, 2003 prepared by Button Professional Land Surveyors, P.C. 3. The project shall not deviate from the approved plans in a manner that would change or affect the exterior water supply or wastewater disposal systems, building location or the approved use of the building, without prior review and written approval from the Wastewater Management Division. 4. The conditions of this permit shall run with the land and will be binding upon and enforceable against the permittee and all assigns and successors in interest. The permittee shall be responsible for the recording of this permit and the "Notice of Permit Recording" in the South Burlington Land Records within thirty, (30) days of issuance of this permit and prior to the conveyance of any lot subject to the jurisdiction of this permit. Wastewater System and Potable Water Supply Permit WW-4-2141 Narinder Singh Page 2 5. This project has been reviewed and approved for the existing single family residence on Lot #1. The permittee shall not construct any other type structures requiring plumbing, including public buildings, duplexes, condominium units, or commercial buildings, without prior review and approval by the Wastewater Management Division. Such approvals will not be granted unless the proposal conforms to the applicable laws and regulations. 6. The Wastewater Management Division now reviews the water and wastewater disposal systems under 10 V.S.A., Chapter 64 — Potable Water Supply and Wastewater System Permit. 7. By acceptance of this permit, the permittee agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with the Vermont environmental and health statutes and regulations. 8. A copy of the approved plans and this permit shall remain on the project during all phases of construction, and upon request, shall be made available for inspection by State or local personnel. WATER SUPPLY & WASTEWATER DISPOSAL 9. No permit issued by, the Secretary shall be valid for a substantially completed potable water supply and wastewater system until the Secretary receives a certification from a designer or the installer, signed and dated, that states: "I hereby certify that, in the exercise of my reasonable professional judgment, the installation -related information submitted is true and correct and the potable water supply and wastewater system were installed in accordance with the permitted design and all permit conditions, were inspected, were properly tested, and have successfully met those performance tests." This shall include the water supply system and wastewater collection system, water service lines and sanitary sewer lines to each structure. This shall include connection of the existing single family residence on Lot #1 to the proposed municipal sewer collection system prior to the occupancy of any duplex unit on Lot #2. 10. The project is approved for water supply by connection to the municipal water system as depicted on the approved plans. The Wastewater Management Division shall allow no other method, or location of obtaining potable water without prior review and approval. 11. The water main extension is approved provided the water main extension is constructed in strict accordance with the Agency of Natural Resources, Water Supply Division's "Public Water System Permit to Construct " Project #E-1580 WSID #5091to Narinder Sinhg dated October 8, 2004. 12. The project is approved for wastewater disposal by the construction of a connection to the municipal wastewater treatment facility as depicted on the approved plans. The project is approved based on a maximum of 210 gallons of wastewater per day per unit or residence. The Wastewater Management Division shall allow no other method, or location of wastewater disposal without prior review and approval. Wastewater System and Potable Water Supply Permit WW-4-2141 Narinder Singh Page 3 13. A professional engineer, registered in the State of Vermont, is to generally supervise the construction of the sanitary sewer line extensions, and upon completion of construction, the supervising engineer is to submit to the Wastewater Management Division, a written certification stating all construction has been completed in accordance with the stamped approved plans. Dated at Essex Junction, Vermont on October 14, 2004. Jeffrey Wennberg, Commissioner Department of Environmental Conservation By Ernest Christianson Regional Engineer C For the Record South Burlington Planning Commission & Select Board A & M Construction Corporation, Inc. Llewellyn — Howley, Inc. Water Supply Division Water Quality Division Department of Labor & Industry PUBLIC HEARING SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD The South Burlington Development Review Board will hold a public hearing at the South Burlington City Hall, Con- ference Room, 575 Dor- set Street, South . Bur- lington, Vermont on Tuesday, December 2, . 2003, at 7:30 P.M. to consider the following, 1. Preliminary plat application #SD-03-72 of University of Vermont for a planned unit, develop- - ment consisting of the construction of a 254,100 GFA three level . parking garage (176,400 GFA in South Burlinggto) to accommodate 1315 parking spaces, -97 Spear St. 2. Final . plat . appli- cation #SD-03-74 of. the Snyder ` Group, for a L ,Inc. planned unit develop- ment consisting of, 31 single family dwellings and- one (1) existing: -sing- le family dwelling on 26.8 acres,1700 Spear St. 3: Final plat. appli'- cation #SD-03,73.' of A & M Construction Corp. for a planned unit clevelop- ment consisting of: 1) subdividing, a 4.6 acre lot into two (2) lots of 1.3 acres (lot #1), and 3.3 acres (lot #2), and 2) construction two (2) 2- family dwellings on lot #2,100 Van Sicklen Rd. 4. Conditional use application #CU-02-17 of RCC. Atlantic, Inc. seek- ing conditional use, ap- proval under Section 14.10, Conditional Use Review, of the South . Burlington Land Deve- lopment regulations. Re- quest . is for permission to allow the replacement . of a 90 foot communica- tions tower with,. a 100 foot monopole tower, i,.>. 2026 Williston Road' i Copies of the applica- tions are available- for public . inspection at the South . Burlington City Hall. John Dinklage, Chairman +South Burlington Deve- lopment Review Board ' November 15, 2003 State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conervation State Geologist RELAY SERVICES FOR HEARING IMPAIRED 1-800-253-0191 TDD>VOICE 1-800-253-0195 VOICE>TDD July 9, 2004 Narinder Singh 28 White Face Street South Burlington VT 05403 AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Wastewater Management Division Essex Regional Office III West Street Essex Junction, VT 05452 Telephone: (802) 879-5656 Subject WW-4-2141, PIN EJ04-0194; Proposed 2 lot subdivision with an existing single family residence and proposed two 3 bedroom duplexes located at 100 Van Sicklen Road in the City of South Burlington, Vermont. Dear Mr. Singh: I have reviewed the application and technical information submitted for the above referenced project. Unfortunately, there were items that were not included or were insufficient and I was unable to determine if this project meets the minimum standards of the Environmental Protection Rules. Please provide the following information: 1. Please provide the approval letter by the Water Supply Division for the water line extension. Please respond within thirty, (30) days from the date of this letter. Re -submittals that are incomplete, or made after thirty days may result in the denial of the project. Once I receive the information requested, I will continue my review of the project. If you have any questions as to what is needed, please contact me. Sincerely, Ernest Christianson Regional Engineer cc: South Burlington Planning Commission Llewellyn — Howley, Inc. Regional Offices - Barre/Essex Jct./Rutland/Springfield/St. Johnsbury State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conervation State Geologist RELAY SERVICES FOR HEARING IMPAIRED 1-800-253-0191 TDD>VOiCE 1-800-253-0195 VOICE>TDD June 2, 2004 Narinder Singh 28 White Face Street South Burlington VT 05403 AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Wastewater Management Division Essex Regional Office I I I West Street Essex Junction, VT 05452 Telephone: (802) 879-5656 RE: WW-4-2141, 2 lot subdivision; Lot #1 being 1.2 acres with an existing 3 bedroom single family residence and Lot #2 being 3.3 acres for proposed 4-3 bedroom duplexes located at 100 Van Sicklen Road in the City of South Burlington, Vermont. Dear Applicant: We received your completed application for the above referenced project on June 1, 2004, including a fee of $855.40 paid by check #0173 & 3803. Under the performance standards for this program, we have a maximum of 45 days of "in-house" time to review your application. If we require further information from you to make a decision, the time until we receive it is not included in the in-house performance standards. If you have any questions about the review process, or if you have not received a decision on your application within the 45 in-house days, please contact this office. We have forwarded the information contained in your application to the Information Specialist for this region. A Project Review Sheet will be sent to you indicating other state agencies and departments you should contact regarding additional permits or approvals you may need under their programs. If you have not already done so, you should also check with town officials about any necessary town permits. For the Division of Wastewater Management Ernestine Chevrier Regional Office Coordinator cc: City of South Burlington Lance Llewellyn A & M Construction Corporation, Inc. Fe ,cral C aces - Barre/Essex Jct./Rutland/Springfield/St. Johnsbury State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conervation State Geologist RELAY SERVICES FOR HEARING IMPAIRED 1-800-253-0191 TDD>VoiCE 1-800-253-0195 VoiCE>TDD May 25, 2004 Narinder Singh 28 White Face Street South Burlington, VT 05403 Dear Ladies and Gentlemen: AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Wastewater Management Division Essex Regional Office 111 West Street Essex Junction, Vermont 05452 Telephone (802) 879-5656 Subject: Application for Wastewater System & Potable Water Supply Permit for a 2 lot subdivision; Lot # 1 being 1.2 acres with an existing 3 bedroom single family residence and Lot #2 being 3.3 acres for 4-3 bedroom condos in 2 duplexes located at 100 Van Sicklen'Road ih`the City of South Burlington, Vermont. We have reviewed the application materials and have completed the "application completeness checklist:"' Unfortunately, your application was incomplete and information was missing. Enclosed are copies of the application forms you submitted. Please submit the following information: 1. Please submit another check in the amount of $4.90. The fee for Lot #1 with a single family residence is $175.00. The fee for Lot #2 is 1620 gpd x .42 = $680.40; $680.40 + $175.00 = $855.40 2. Please submit 2 sets of site plans with ALL boundary dimensions. Also the plans submitted by Llewellyn -Howley were not stamped. If you have questions or are unsure what is needed to complete the application package, please contact me... We will hold your application materials. Once you have the missing or incomplete information, please,,, send the materials to this office along with the enclosed copies. Once we have determined that the application materials are complete, the application will be accepted and will be assigned to one of the engineers to be reviewed. For the Division of Wastewater Management Wit, Ernestine Chevrier Regional Office Coordinator cc: City of South Burlington Lance Llewellyn A & M Construction Corporation, Inc. L M & N Real Estate Investments, LLC Regional Offices - Barre/Essex Jct./Rutland/Springfield/St. Johnsbury Agency of Natural Resources For office use only Department of Environmental Conservation Wastewater Management Division Application # WASTEWATER SYSTEM & POTABLE WATER SUPPLY PIN # Complete application PERMIT APPLICATION Received on Under the authority of 10 V.S.A. Chapter 64, the Environmental Protection Rules, Chapter 1, Wastewater System & Potable Water Supply Rules, and Chapter 21, Water Supply Rules, Appendix A. Part 11 — Small Scale Water Systems) ' Month Day Year Please print or type. Note: There are line by line instructions available to help you complete this application form. In many cases a licensed designer will be required for your project, who will be able to help complete this application form. Note: The content of this form may not be altered. Alteration of the content of the form may result in an invalid application or permit. Electronic versions of the form are available. 1. Landowner(s) name (as shown on property deed) If there are multiple landowners, please provide a separate sheet listing each landowner, their mailing address, signature, and date. Narinder Singh 2. Mailing address for landowner(s). 3. Telephone number(s). 28 White Face St., So. Burlington, VT 05403 (802) 658-5984 4. Co -applicant name. A&M Construction Corporation. Inc. 5. Mailing address for co -applicant. 6. Telephone number. P.O. Box 9347, So. Burlington, VT 05403 (802) 865-4250 7. Name of licensed designer. Lance A. Llewellyn, P.E., Llewellyn -Howley Incorporated 8. Mailing address for licensed designer. 9. Telephone number. 20 Kimball Ave., Suite 202N, So. Burlington, Vt 05403 (802) 658-2100 10. Does this project involve a failed water supply or wastewater disposal system? ❑Yes ® No. 11. Project location. Please include a location map. 12. City or Town. Street or Road. (911 Street or Road Address if available) So. Burlington, VT 100 Van Sicklen Rd. 13. Project name (if applicable). 14. If an existing lot, what date 15. Total acreage of property was the lot created? 4.5 acres 1940's Wastewater System & Potable Water Supply Permit Application Paqe 2 16. Number of lots created, if 17. List each lot number and the acreage of the lot. If any lot is subdividing property. developed with a structure, describe the use. All of the property Include any lots subject to must be described, including any remaining or retained land and deferral restrictions. any land subject to deferral restrictions. 2 Lot #1 (1.2 acres) will have the existing 3 bedrrom home, Lot #2 (3.3) acres will be developed with 4- 3 bedroom condominium units in two duplex structures. 18. Deed reference. 19. Prior permits or exemptions issued by the Agency of Natural Book(s) 557 Resources for subdivision of land or construction of public buildings. Page(s) 22-24 The permits or exemptions issued by the Agency would have prefixes of EC, DE, LUP, CC, PB, WW, HE, AM or HB followed by the number of the project. None 20. Detailed project description. Subdivide existing 4.6± acre parcel into two lots, Lot #1 1.2 acres, Lot #2 3.3 acres. Proposed Lot #1 will contain the existing 3 bedroom single family home. The existing on -site wastewater disposal field and on -site well will be abandoned. Water and sewer connections will be made to the existing, extended, municipal system. Four, three bedroom condominiums in two duplex structures will be built on Lot #2. Approximately 300' of 26' wide, paved, public roadway and parking will be constructed to provide access. Existing municipal water and sewer mains will be extended west along Van Sicklen Road from a recently constructed system at Stone House Commons. 21. Does the proposed wastewater disposal 22. Is the wastewater disposal system located system use the enhanced prescriptive or in a municipality that does not have both performance -based minimum site a confirmed planning process and valid conditions? zoning bylaws? ❑ Yes ® No. If yes, indicate which. ❑ Yes ® No 23. Water supply Existing flows 405 GPD Increase 1,620 GPD Total 2,025 GPD Is the water source located within a 100 year floodplain? ❑ Yes ® No Owner of system if not applicant So. Burlington Water Department Wastewater System & Potable Water Supply Permit Application Paqe 3 24. Wastewater Disposal System. Existing flows 210 GPD Inc:rPasP 1 214 rPD Total 1,424 GPD If using a municipal wastewater treatment system, owner of system City of So. Burlington If using an Indirect Discharge System, ID# 25. Global Positioning System (GPS) Coordinates. (WGS 84 or NAD 83 Criteria) with accuracy of +/- 50' for water systems and wastewater systems serving the project. ------------------------------------------------------------------------------------------- Existing Water Sources (GPS Coordinates) Proposed Water Sources (GPS Coordinates) Existing Wastewater Systems (GPS Coordinates) Proposed Wastewater Systems (GPS Coordinates) 26. List any easements required and enclose a copy of the signed easement agreements. 20' wide water and sewer easement from Old Stone House Owners Association to Developer (temporary). Applicant to transfer easement to the City of So. Burlington upon City acceptance of utilities systems. See letter enclosed. 27. Will there be any construction or land disturbance on the property in or near a wetland, or in or near a wet area on the property? ❑ Yes ® No Wetlands Program - Telephone (802) 241-3700. 28. Is the proposed well located within 1 mile of a hazardous waste site as designated by the Hazardous Materials Division? ❑ Yes ® No Telephone (802) 241-3888. 29. Is any portion of the wastewater disposal system located in or near a water Source Protection Area as designated by the Water Supply Division? ❑ Yes ® No. Telephone (802) 241-3400. 30. Is the lot or project located in any applicable flood prone area? ❑ Yes ® No. 31. Act 250: Number of lots (of any size) created by applicant/landowner within a five mile radius of this subdivision, or within the environmental district within the last five years? If yes: # of lots in town/s 32. Application Fee $850.50 Please refer to attached fee schedule for calculations or contact your regional office for assistance. 33. Has anyone from the regional office been to the site? ❑ Yes ® No If so, please provide the name of the staff member and the date of the visit. Wa4tPwatP.r System & Potable Water SUDDIV Permit ADDlication Page 4 34. Signatures and Acknowledgements. In order to insure compliance with the requirements of the regulations administered by the Department of Environmental Conservation, Wastewater Management Division, it may be necessary to visit the property. As this would involve a Department employee entering private property, we request your approval to do so. If we do visit your property, do you have any special instructions? "As landowner of the property for which I am requesting a permit from the Department of Environmental Conservation, I understand that by signing this application I am granting permission for the Department employees to enter the property, during normal working hours, to insure compliance of the property with the applicable rules of the Department. I understand that I am not allowed to commence any site work or construction on this project without written approval from the Department of Environmental Conservation." Narinder Singh Landowner(s) name. (printed) Landowner(s) signature. Date If there are several landowners, and there is not room to fit the information on this form, please attach an additional sheet with the names, mailing addresses, signatures, and dates. If an attorney signs for the landowner, please submit a copy of the authorization document that grants the power of attorney specific to land transactions. 35. Designer statement. "I hereby certify that the design -related information submitted with this application is true and correct, and that, in the exercise of my reasonable professional judgment, the design included in this application for a permit complies with the Vermont Wastewater System and Potable Water Supply Rules and the Vermont Water Supply Rules." Designer name. (printed) Lance A. Llewellyn, P.E. Designer signature. Date Form Revised Januafy 2, 2003 e-form LLEWELLYN x HOWLEY I N C O R P O R A T E D TRANSMITTAL LETTER Date: February 26, 2004 To: Ray Belair Zoning Administrator City of South Burlington, VT Re: A&M Construction Van Sicklen Road Final Documents File: 2002063 Copies: Message: Please find attached four sets of the plans, a recordable of sheet 2 (Site Plan) and a recordable of the survey plat to satisfy the requirements of the Subdivision approval #SD-03-73. Please call if you have questions or require additional information. Sincerely, LLEWELLYN-HOWLEY INCORPORATED e! �—"' — Y� — � P Skip McClellan 20 Kimball Ave. Ste. 202N, South Burlington, Vermont 05403 T 802-658-2100 F 802-658-2882 e-mail: Ilewellinc@aol.com Engineering Land Development Permitting DEPARTMENT OF PLANNING & ZONP4G 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 December 8, 2003 Skip McClellan Llewellyn -Howley, Inc. 20 Kimball Avenue, Suite 202N South Burlington, VT 05403 Re: Final Subdivision Plat Application #SD-03-73 Dear Mr. McClellan: Enclosed, please find a copy of the Findings of Fact and Decision of the above referenced project approved by the South Burlington Development Review Board on 12/2/03 (effective 12/5/03). Please note the conditions of approval, including that the amended final plat plans must be recorded in the land records within 90 days (must be submitted by 3/4/04) of this approval or this approval is null and void. If you have any questions, please contact me. Sincerely, Brian Robertson, Associate Planner Encl. )&11,8�� _�ALQ DEVELOPMENT REVIEW BOARD 2 DECEMBER 2003 Brian Belisle said he is concerned the ditch won't do what they say it will. Ms. Quimby moved to approve Final Plat Application #SD-03-74 of The Snyder Group, Inc., subject stipulation in the draft motion as amended above. Mr. Farley seconded. Motion passed 5-1 with Mr. Boucher opposing. 4. Continued Site Plan Application #SP-03-38 of Wesco, Inc., to amend a plan for an existing 1600 sq. ft. service station with eight fueling positions: six gasoline and two diesel. The amendment consists of: 1) converting the service station to a convenience store with 12 seat deli, 2) constructing a 456 sq. ft. addition for convenience store use, 3) eliminating one gasoline pump (two fueling positions), 4) relocating two gasoline pumps (four fueling positions under current canopy), and 5) replacing and relocating existing diesel pump (two fueling positions) with a new pump (2 fueling positions) and a 24"x24" canopy, 1,118 Williston Rd: Mr. Simindinger said they are fine with the proposed decision. Mr. Dinklage questioned the size of the canopy which seems too big for just 2 fuel pumps. Mr. Simindinger asked the Board to approve it and they will come back with a new canopy design. Mr. Belair said this is a non -complying structure and if it is removed, it has to be replaced with a compliant structure. Mr. Boucher moved to approve Site Plan Application #SP-03-38 of Wesco, Inc., subject to the stipulations in the draft motion. Ms. Quimby seconded. Motion passed unanimously. 5. Public hearing: Final Plat Application #SD-03-73 of A&M Construction Corp. For a planned unit development consisting of: 1) subdividing a 4.6 acre lot into two lots of 1.3 acres (lot #1) , and 3.3 acres (lot #2) and 2) constructing two 2-family dwellings on lot #2, 100 Van Sicklen Road: Mr. McClellan said there has been one change since preliminary plat: the private drive has become a public street. There will be no sidewalks or curbs per an agreement with Bruce Hoar. Mr. Belair said a stipulation will have to be added for that. There will also have to be a stipulation to waive setbacks. Mr. Belair said the Water Dept. can't look at the plan till tomorrow. There is a condition that they must approve it, so there may be infrastructure changes before recording. Stipulation 3e was deleted. -5— DEVELOPMENT REVIEW BOARD 2 DECEMBER 2003 Mr. Kupferman asked if the homeowners association will maintain the pond as it is. Mr. McClellan said the intent is to lower the level and keep it as a storage pond. Mr. Gage, who lives to the east of the project said there is a flow from the pond down the north side of his property line. There will be a change in overland flow, and he is concerned with changing the height of the pond as wildlife may be affected. He asked why it is being done. Mr. McClellan said to create more storage at the surface. The well that feeds the pond will be shut off. The pond will become more of a stormwater pond. Mr. Gage said there will be more fluctuation in the pond if they do that. Mr. McClellan didn't think so. I �I Mr. Gage also noted the entrance onto Van Sickley Rd. is an issue because there are so many close calls in that area. He asked where the entrance is. Mr. McClellan said it is after where the I road evens out and starts to come up again. Mr. Gage noted the road has become an unfriendly place to be. You can't walk or bike there. He felt it will be hazardous. Mr. Dinklage said residents should keep reporting incidents to the police. Mr. Gage said clearly Muddy Brook has been altered by the Snyder project. He felt it needs to be looked at. Mr. Gage also noted they have a well and he wants an assurance it will not be altered by this project. Mr. McClellan said they are not injecting anything into the sub -surface. Chances of surface water getting into the well are very slim. Mr. Belair asked if there will be blasting. Mr. McClellan said maybe. Mr. Belair said that can affect a well. Mr. Gage said he wanted assurance that the applicant will solve any problem they are involved in creating. Mr. McClellan said they would solve any problems. Ms. Quimby moved to approve Final Plat application #SD-03-73 of A&M Construction Corp. subject to the stipulations in the draft motion as amended above. Mr. Farley seconded. Motion passed unanimously. 6. Miscellaneous application #MS-03-05 of James Carris to encroach into a Class II wetland buffer with a single family dwelling, 7 Beechwood Dane: Mr. Carris said they want to build a retirement house as the last home on Beechwood Lane. He referred to letters from Cathy O'Brien saying there would be minimal impact to the wetland and also minutes of the Natural Resources Committee outlining a stipulation. Mr. Dinklage asked if any fill will be required. Mr. Carris said no. Mr. Belair suggested a "before and after" contour plan. Mr. Carris said he will do that. Mr. Kupferman was concerned with putting houses in buffers. He asked if can be moved closer to the road and not require the setback. Mr. Belair said a variance would be required, but they might meet the criteria. CITYOFSOUTHBURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENTREVIEWBOARD Report preparation date: November 20, 2003 \drb\sub\a&m\final.doc Plans received: October 3, 2003 100 VAN SICKLENROAD - PLANNED UNIT DEVELOPMENT FINAL PLAT PLAN APPLICA77ON #SD-03-73 Agenda #5 Meeting date: December 2, 2003 Owner Applicant Narinder Singh A&M Construction Corporation, Inc. 28 Whiteface Street P.O. Box 9347 S. Burlington, VT 05403 S. Burlington, VT 05403 Engineer Property Information Llewellyn -Howley, Inc. Tax Parcel 1750-00100-R 20 Kimball Ave., Suite 202N SEQ District S. Burlington, VT 05403 4.6 Acres Location Map a E, n e 3' Lame A& AM CITY OF SOUTH BURLINGTON 2 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&m\final.doc A&M Construction Corporation, Inc., hereafter referred to as the applicant, is requesting final plat plan approval for a for a planned unit development consisting of: 1) subdividing a 4.6 acre lot into two (2) lots of 1.3 acres (lot # 1) and 3.3 acres (lot #2), and 2) constructing two (2) 2-family dwellings on lot #2, 100 Van Sicklen Road. The Development Review Board granted preliminary approval for this project on July 15, 2003 (minutes enclosed). Associate Planner Brian Robertson and Administrative Officer Ray Belair, referred to herein as Staff, have reviewed the plans submitted on October 3, 2003 and have the following comments. ZONING DISTRICT & DIMENSIONAL REQUIREMENTS Table 1. Dimensional Requirements SEQ Zoning District Required Proposed Mill. Lot SIZe Lot #1: 12,000 SF Lot #2: 40,000 SF Lot#L 54,987 SF Lot #2: 145,491 SF Max. Building Coverage 15% 5.2% J Max. Overall Coverage 12.8% Min. Front Setback >20 ft. Min. Side Setback EOft. >20 ft. Min. Rear Setback >30 ft. Max. BuildingHeight 30 ft. J zoning compliance Density This lot supports a density of five (5) units (1.2 units/acre x 4.6 acres = 5.52) and five (5) units are proposed. The acreage of the developable area on the subject property is 2.06 acres. Thus, the allowable density with the calculation is eight (8) units (4 units/acre x 2.06 acres = 8.24). The subject property meets the density requirements of the Land Development Regulations. Restricted Area No buildings are proposed within SEQ restricted areas. An existing residential drive is proposed to be removed and replaced with a shared drive to serve all 5 units. The shared drive will pass through the SEQ restricted area, and the new driveway for the existing house falls almost entirely within the restricted area. Pursuant to Section 9.06 (B) of the Land Development Regulations, the construction of roads to serve approved development is allowed within SEQ restricted areas. In addition, utilities must be placed underground and public recreation paths are allowed. The plans show underground water and wastewater lines crossing the SEQ restricted area. Electrical and telephone lines are not shown on the plans. A 1 ' CITY OF SOUTH BURLINGTON 3 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&m\final.doc recreation path easement is also shown within the restricted area. PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the proposed Land Development Regulations PUDs shall comply with the following standards and conditions: (a) Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project Pursuant to Section 15.13(B)(1), municipal water service must be extended to serve the proposed development. Prior to final plat approval, the applicant must obtain final water allocation approval from the South Burlington Water Department. 1. The applicant .shall comply with the requests of the South Burlington Water Department, as outlined in the letters from Jay Nadeau, dated March 7, 2003 and May 19, 2003 (attached). 2. The applicant shall obtain final wastewater allocation approval from the Director of Planning and Zoning, Juh Beth Hoover, prior to issuance of a zoning permit. (b) Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. Grading and erosion control details are on Sheet 6 of the plans. 3. The proposed project shall adhere to standards_ for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. (e) The project incorporates access, circulation and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. The driveway serving the house on lot #1 will be eliminated. A new 18' wide private road will be constructed to serve both parcels. This private road does not comply with Section 15.12(C)(3) (a) of the Land Development Regulations. This Section requires a public road to serve the proposed project. The applicant has been made aware of this conflict between the plans and the Land Development Regulations and will be revising the plans to attempt to come into compliance with this requirement. Circulation is two-way throughout the site and staff believes the circulation plan is adequate. 4. The applicant shall revise the plans to come into compliance with Section 15.12(C) (3) of the Land Development Regulations, which requires the road serving the proposed project to be built to public specifications, prior to final plat plan approval. (d) The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans show a 50-foot wetland buffer around the man-made pond. No encroachment is proposed CITY OF SOUTH BURLINGTON 4 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&m\final.doc within the buffer. The City's Wetland Map indicates that a wetland is present in the area where the two (2) structures are proposed. A report from Cathy O'Brien, dated March 17, 2003 (attached) indicates that this area is not a wetland and the wetland map is in error. (e) The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning distriet(s) in which it is located Staff feels the proposed project is visually compatible with the planned development pattern in the area and is in conformance with the stated purpose of the SEQ, as outlined in Section 9.01 of the South Burlington Land Development Regulations. (� Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas Between the restricted areas and the existing pond on the site, staff feels that open space areas on the subject property are sufficient. (g) The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided The South Burlington Fire Chief has reviewed the plans for the proposed project. S. The applicant shall comply with the requests of the South Burlington Fire Department, as outlined in the letter from Chief Brent dated November 11, 2002 (attached). (h) Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that & compatible with the extension of such services and infrastructure to adjacent landowners The plans depict two (2) proposed 20' wide utility easements on the property, both running from the property line along Van Sicklen Road. There is also a 15' wide utility easement extending from the proposed roadway to Lot #1. In addition, the plans depict a 20' wide recreation easement along the southerly and easterly property lines, as requested by the Recreation Path Committee in their letter dated November 5, 2002 (attached). (i) Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards Staff feels the proposed road, utilities, and recreation easement are sufficient. The applicant has not submitted exterior lighting details (cut -sheets) for the proposed units. 6. Exterior lighting shall comply with Section 13.07 of the Land Development Regulations. In addition, exterior lighting details shall be submitted to the Administrative Officer for approval, prior to issuance of a zoning permit. CITY OF SOUTH BURLINGTON 5 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&m\final.doc 7. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground 8. The plans shall be revised to comply with the requests of the City Engineer, as outlined in his comments dated November 13, 2003 (attached). G) The project & consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The Comprehensive Plan establishes a goal for the SEQ District of promoting development that protects and preserves contiguous areas to open space and important natural resources. The proposed project offers an appropriate density to accomplish these goals. The Comprehensive Plan also establishes the goal of providing an extensive off -road path system to residents. Accordingly, the proposed project includes a 20-foot wide recreation path easement. SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the Land Development Regulations, any PUD shall require site plan approval. Section 14.06 establishes the following general review standards for all site plan applications: (a) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. Staff feels the project accomplishes a desirable transition from structure to site and from structure to structure. The applicant has submitted an adequate landscaping plan. In addition, the project has incorporated a 20' wide recreation easement through the property, in compliance with the requests of the Recreation Path Committee. According to Table 13-1 in Section 13.01(B) of the Land Development Regulations, a total of nine (9) spaces are required for the two (2) duplexes and 16 spaces are provided (eight (8) covered spaces and eight (8) surface spaces). Section 13.01(6)(5) requires that bicycle parking or storage facilities are provided for employees, residents, and visitors to the site. A bicycle rack is depicted on the plans. (b) Parking shall be located to the rear or sides of buildings to the greatest extent practicable. Parking spaces are provided in the garages of the proposed units and in the driveways if the proposed units. (c) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings - The scale of the proposed buildings is compatible with the site and existing buildings in the area. The height of the proposed buildings is 30', which is under the 40' height maximum for the City. i CITY OF SOUTH BURLINGTON 6 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&mlfinal.doc (d) Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground Staff has already noted that the utility lines must be underground. (e) The DRB shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. No information on architectural elements is provided. Staff does not feel it is necessary for the Development Review Board to review the architectural details of the proposed project. (n Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. Again, details of architectural elements have not been provided. In addition to the above general review standards site plan applications shall meet the following specific standards as set forth in Section 14.07 of the Land Development Regulations: (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The existing driveway off of Van Sicklen Road is proposed to be eliminated, with a new driveway to be constructed off of the proposed private roadway. Therefore, all five (5) units will be access via one (1) curb - cut. As indicated previously in this report, the proposed project must be served by a public street. Staff does not feel there is a need to provide additional access easements on the property. (b) Electric, telephone and other wire -served utility lines and service connections shall be underground Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Staff has already indicated that utility lines must be underground. (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). There are no dumpsters proposed for the project. Landscaping Pursuant to Section 13.06(A) of the proposed Land Development Regulations, landscaping and screening shall be required for all uses subject to site plan and PUD review. CITY OF SOUTH BURLh..3TON 7 1 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&m\final.doc Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow storage areas must be shown on the plans. The plans do not show snow storage areas. 9. The plans shall be revised to clearly depict adequate snow storage areas, prior to recording of the final plat plan. Landscaping budget requirements are to be determined pursuant to Section 13.06(G)(2) of the Land Development Regulations, and shall be prepared by a landscape architect or professional landscape designer. Based on the proposed project costs, the minimum landscape requirement is $12,000. The applicant has submitted a landscape plan and landscape budget that indicates $12,090 of landscaping is proposed for the site. 10. The applicant shall post a landscape bond for $12, 000, prior to the issuance of the first zoning permit. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. The City Arborist reviewed and approved the plans on June 20, 2003. His comments are attached. Stormwater Stormwater treatment is proposed via overland flow to the existing man-made pond on the easterly side of the property. 11. Stormwater drainage plans must comply with the Vermont Stormwater Management Manual, pursuant to Section 15.13(F) of the Land Development Regulations. Other The plans include street addresses based on E-911 addressing standards. 12. Pursuant to Section 15.17 of the South Burlington Land Development Regulations, the applicant shall submit a Certificate of Title showing the ownership of all property and easements to be dedicated or acquired by the City, and said Certificate of Title shall be approved by the City Attorney. 13. The plans shall be revised to indicate the correct lot coverage information, as described in the application, prior to recording of the final plat plans. 14. The plans shall be revised to show the name of the road, as approved by the Planning Commission, prior to recording of the final plat plans. CITY OF SOUTH BURLIIv fTON 8 t DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\sub\a&m\final.doc RECOMMENDATION Staff recommends that the South Burlington Development Review Board approve Final Plat Application #SD-03-73, conditional upon the numbered items in the "Comments" Section of this report being addressed. Respectfully submitted, Brian Robertson, Associate Planner Copy to: Skip McClellan DEVELOPMENT REVIEW BOARD 15 JULY 2003 PAGE 6 An amended landscape plan was presented with more detail on plantings. A planting analysis plan was done and this has been revised to accommodate changes in the plan. Mr. Nedde then reviewed the encroachments into and crossing of buffers. There are no impacts from buildings. Mr. Belair noted that Cathy O'Brien felt this is the best plan for this number of units. Mr. Boucher was concerned that some units have no back yards, and he felt people will use the wetlands for a backyard and begin cutting there. Mr. Nedde said there will be a physical barrier to prevent that. Mr. Bolton said the development documents should indicate that lawns cannot extend into the wetland and that trees cannot be cut. Mr. Belair stressed that there is no regular check-up on this by staff. Mr. Dinklage noted that since the development is right on the banks of Potash Brook, there is reason to give it a lot of scrutiny. Mr. Bolton said he would like the City Attorney to review the condo documents to be sure they cover the Board's concerns. Mr. Nedde showed the location of newly created retention ponds: east of "A" building, behind unit "C" adjacent to I-189 right of way (the largest one), between "D" Street and units "X" and "W," and the pond that collects the runoff from Dorset St. just to the south of the Dorset St. entrance. Trees are not proposed on both sides of the major street, only on the side with the rec path. The city Arborist will review the plans. Mr. Belair said he wants to see a full-size landscape plan so the Arborist can review it. He also wants to see the results of the "what if s" with regard to turning lanes. Mr Boucher then moved to continue the hearing until 16 September. Ms. Quimby seconded. Motion passed unanimously. 7. Public Hearing: Preliminary Plat Application #SD-03-37 of A&M Construction Corporation, Inc., for a planned unit development consisting of: 1) subdividing a 4.6 acre lot into two lots of 1.3 acres (lot #1) and 3.3 acres (lot #2), and 2) constructing two 2-family dwellings on lot #2, 100 Van Sicklen Road: Mr. McClellan said they have resubmitted the same project under the new regulations. They are OK with the easement for the rec path. J DEVELOPMENT REVIEW BOARD 15 JULY 2003 PAGE 7 They are thinking of lowering the level of water in the man-made swimming pond (it is now 5-6 feet deep). Mr. Belair said this is OK with staff. Mr. Belair said there has to be a note on the plan regarding site distances. He had no other issues. Mr. Farley moved to approve preliminary plat application #SD-03-37 of A&M Construction Corporation, Inc., subject to the stipulations in the draft motion of 15 July 2003. Ms. Quimby seconded. Motion passed unanimously. 8. Public Hearing: Application #CU-03-11 of Joe and Tony Handy seeking conditional use approval under Section 14.10, Conditional Use Review, of the South Burlington Land Development Regulations. Request is for permission to construct a 1000 sq. ft. addition to a convenience store, 1333 Williston Road: and 9. Site Plan Application #SP-03-21 of Joe & Tony Handy to amend a previously approved site plan consisting of: 1) a 6000 sq. ft. convenience store with pumps (fueling positions), 2) a 6000 sq. ft. retail store, 3) a 2899 sq. ft. restaurant with 110 seats. The amendment consists of: 1) constructing a 1000 sq. ft. of retail space addition to the existing convenience store, 2) converting 2000 sq. ft. of retail space to general office use, and 3) converting 1000 sq. ft. of retail space to storage space for the 1000 sq. ft. of convenience store expansion, 1333 Williston Road: Mr. Dickinson noted this plan substitutes a general office use in the existing liquor store to reduce the impact of traffic and parking. They feel that the relocation of the liquor store to the convenience store is not an expansion of the convenience store and that the only thing being added is the office use. Mr. Dickinson said they are concerned that the conditional use application was accepted and warned which was a "low blow" from staff and then in the new regulations the use is "not allowed." Mr. Bolton said that he went out and measured from the corner of the building to gas pumps at 63 ft. With the addition, this would be cut to 43 ft. This makes a bad situation even worse. Mr. Boucher said he didn't understand how they can add a use and have the trip ends be reduced. SOUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802) 864-0435 March 7, 2003 Mr. Skip McClellan Llewellyn -Howley, Inc. 4049 Williston Road South Burlington, VT 05403 Re: Van Sicklen Road Property South Burlington, VT Dear Skip: The South Burlington Water Department has reviewed the preliminary plans for the above referenced project. Please refer to my original comments of 10-18-02 and find my comments below. 1. The South Burlington Water Ordinance requires a minimum pipe size to be eight -inch (8"). Please correct the water main planned for this project to be that required pipe size. 2. Fire flow conditions must be able to meet the requirements stated in the water Specifications of this Department, as well as any conditions set forth by the Fire Department. This area of Hinesburg Road is subject to conditions relative to a dead end line downstream of large commercial customers. A minimum 35 psi rule under normal conditions, and a minimum 20 psi rule under fire flow conditions that are common in well looped systems may be limited in this project area. Sufficient engineering and design must be incorporated in order to meet State Water Supply Rule and the above Specification requirements. This project may require the installation of a water booster pump station to meet domestic and fire flow conditions. The ownership of such a pump station would be private. Nearby projects at a similar elevation have incorporated the use of a pump station, or smaller lines, incapable of supplying minimum fire flow volumes. 3. Looping should be designed to connect to the Wessel project located north east of this site. If system modeling determined that an eight -inch line was not possible between the two projects, then a small line should be designed to connect the two projects together that will eliminate two dead -ends and help to improve water quality conditions. 4. The South Burlington Water Department ordinance states that "All water lines and appurtenances not located in the City right-of-way or public grounds shall be considered private pursuant to the ordinance and others of the City," and; 1 \l 5. "The Department shall not maintain any water lines that have not formally been accepted by the City, except in subdivisions that are designed to Department specifications and are intended to be accepted," and; 6. "All water lines and appurtenances located within an area so designated as restricted or private by the developer shall be considered private." The proposed water main would be considered private from the point that it connects to the Stone House Commons water main to, Van Sicklen Road, and from Van Sicklen Road down the drive for this project up to and including the proposed hydrant. The further extension of the water line to loop into the Wessel project would also be considered private up to the point within that project that the City has ownership. 7. Historically, the South Burlington Water Department has practiced overseeing the repair and maintenance of all water mains and appurtenances off from those mains not located in the ROW or deeded over to the City after formal approval. 8. It must be understood that this Department would only provide the service of overseeing the repair and maintenance of all water mains and appurtenances after we have inspected and approved the installation of the water main and service lines beyond the City owned locations. 9. The property owner would have to provide access to the Department for the means of undertaking water distribution emergency repairs and maintenance. Access would also have to be provided to the Department for those curb stops located outside the City ROW for disconnecting service to delinquent accounts provided that the City of South Burlington follows the requirements set forth in State Statute Title 24 V.S.A. Chapter129, Uniform Water and Sewer Disconnect. 10. The labor rate would be the same as approved in the Management Contract by the Champlain Water District and the City of South Burlington, revised annually. 11. The above referenced labor and material charges are in addition to any fee required under the South Burlington Water Department Ordinance, such as but not limited to private fire hydrants and sprinkler systems. At this time private fire hydrants are assessed a $100 per hydrant annual fee. 12. All domestic services and fire sprinkler systems that are connected to the public water system shall be protected according to their degree of hazard, with a backflow prevention assembly, and an appropriate thermal expansion system. Please contact this department for more information on backflow protection devices. 13. The SBWD shall be sent any future hard copy plans involving this project for review. Future plans must include details and specifications as required in the above referenced Specifications. 14. The SBWD shall be notified prior to backfilling to inspect all joints, fittings, main line taps, appurtenances and water line crossings. 15. Further review changes may be required as this project proceeds through the permit process. 16. A hard copy set of As-Builts as well as one electronic copy in Auto- CAD.DWG Version 14 Format or newer shall be supplied to this department upon completion of the water system improvements. If you have any questions or concerns, please call me. Sincerely, So Burlington Water Department Jay adeau Superintendent CC: Janet Hurley Doug Brent George Dow Plan Reviews: Van Sicklen Rd, 3-03 SOUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802) 864-0435 May 19, 2003 Mr. Skip McClellan Llewellyn -Howley, Inc. 4049 Williston Road South Burlington, VT 05403 Re: Van Sicklen Road Property South Burlington, VT Dear Skip: The South Burlington Water Department has reviewed the revised Preliminary Plans for the above referenced project. Please refer to my comments of March 7, 2003 and find more comments below. 1. The South Burlington Water Ordinance requires a minimum pipe size to be eight -inch (8"). The private water main proposed for this drive has not been corrected to be that required pipe size. Future plans shall show an eight -inch main up to the hydrant tee. 2. Fire flow conditions must be able to meet the requirements stated in the water Specifications of this Department, as well as any conditions set forth by the Fire Department. This area of Hinesburg Road is subject to conditions relative to a dead end line downstream of large commercial customers. A minimum 35 psi rule under normal conditions, and a minimum 20 psi rule under fire flow conditions that are common in well looped systems may be limited in this project area. Sufficient engineering and design must be incorporated in order to meet State Water Supply Rule and the above Specification requirements. This project may require the installation of a water booster pump station to meet domestic and fire flow conditions. The ownership of such a pump station would be subject to the terms of the South Burlington Water Ordinance and this Department. Nearby projects at a similar elevation have incorporated the use of a pump station, or smaller lines, incapable of supplying minimum fire flow volumes or supporting fire hydrants. 3. The South Burlington Water Department ordinance states that "All water lines and appurtenances not located in the City right-of-way or public grounds shall be considered private pursuant to the ordinance and others of the City," and; 4. "The Department shall not maintain any water lines that have not formally been accepted by the City, except in subdivisions that are designed to Department specifications and are intended to be accepted," and; 5. "All water lines and appurtenances located within an area so designated as restricted or private by the developer shall be considered private." The proposed water main would be considered private from the Van Sicklen Road down the drive for this project up to and including the proposed hydrant. 6. Historically, the South Burlington Water Department has practiced overseeing the repair and maintenance of all water mains and appurtenances off from those mains not located in the ROW or deeded over to the City after formal approval. 7. It must be understood that this Department would only provide the service of overseeing the repair and maintenance of all water mains and appurtenances after we have inspected and approved the installation of the water main and service lines beyond the City owned locations. 8. At this time private fire hydrants are assessed a $100 per hydrant annual fee. This Department must be advised of the name, address, and telephone number of the person designated to respond to private hydrant bills. 9. All domestic services and fire sprinkler systems that are connected to the public water system shall be protected according to their degree of hazard, with a backflow prevention assembly, and an appropriate thermal expansion system. Please contact this department for more information on backflow protection devices. 10. The SBWD shall be sent any future hard copy plans involving this project for review. Future plans must include details and specifications as required in the above referenced Specifications. 11. The SBWD shall be notified prior to backfilling to inspect all joints, fittings, main line taps, appurtenances, water line crossings, and testing. 12. Further review changes may be required as this project proceeds through the permit process. 13. A hard copy set of As-Builts as well as one electronic copy in Auto- CAD.DWG Version 14 Format or newer shall be supplied to this department upon completion of the water system improvements. If you have any questions or concerns, please call me. Sincerely, South Burling n Water Department koe Jay adeau Superintendent CC: Janet Hurley Doug Brent Plan Reviews: Van Sicklen Rd, 5-19 Van Siclden Road Property Preliminary Plat Llewellyn and Howley Inc. 6/20/03 Overall the landscaping is acceptable. The one recommendation I have is to move the Blue Spruces further off the driveway. These trees will attain a crown width of 10-20 feet and in the present location will soon grow out into the driveway, requiring the trees to be pruned on frequent basis CT OR "TT33ALREJ, =2 To: Ray Belair, Administrative Officer From: Recreation Path Committee Re: Van Sicklen Road sub -division Date: November 5, 2002 The South Burlington Recreation Path Committee reviewed the plans for the proposed five unit sub -division on Van Sicklen Road. The committee recommends that a 20 foot recreation path easement be provided along the Van Sicklen Road side of the property and also along the east side of the property. 'TERRI-kjT T' P -4'IT --T LH,�'MOI,IA DA,FKAS4n. City Engineer Comments A & M Construction 100 Van Sicklen Road 11/13/03 1. Basement and footing drains shall be shown on the plan. 2. Sewer manholes must be accessible to mobile cleaning equipment. Manholes 1 & 2 will be difficult to access. 3. Road shoulders should be gravel not topsoil. 4. Benchmarks shall be noted on the plans. 5. The pond should be fenced in. 6. Plans showing the location of the gas main shall be submitted for review and approval. 7. The Spear Street intersection should have left turn lanes. SOS. -Burlington Fire Depa 1 L. ent 575 Dorset Street South Burlington, VT 05403 (802) 846-4110 Douglas S. Brent, Fire Chief November 1, 2002 Ms. Juli Beth Hoover, Director of Planning and Zoning City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Narinder Singh, `Ian Sicklen Road Dear Juli: I have reviewed the plans for the proposed construction of the planned residential development on Van Sicklen Road. I have also made a site visit to try to envision the siting of this project. I have the following recommendations: I. Compliance with all requirements of Vermont Labor and Industry Fire Prevention Division codes and standards. 2. Due to travel distance from South Burlington Fire Department Station 1 all multi- unit buildings should be provided with automatic residential sprinklers. 3. Installation of the necessary fire alarms required for an occupancy such as this. 4. Fire Department Sprinkler Connection location to be specified by SBF'D. 5. Number and location of fire hydrants to be determined by the South Burlington Water Department. Actual final spotting of said hydrants to be done jointly with, SBFD. At this point these seem to be the major issues which present themselves. As this project moves forward additional items may surface which could be dealt with as needed with the assistance of the owner and Labor and Industry. Should you need any further assistance on this project please feel free to contact me. S'6e, el Douglas S. Brent Fire Chief V.)/ 1 / / UJ ffwiN LU : G I rAA 0V445ZJ043 1 kIL11, V DI -loll µJ V V L Cathy O'Brien Wetland Consulting 839 Oak Hill Road, Williston, VT 05495 (802) 878-6022 March 17, 2003 Skip McClellan Llewellyn -Howley, Inc. 20 Kimball Ave, Suite 202N South Burlington, VT 05403 RE: Van Sicklen Road Property, South Burlington, VT Dear Skip: On March 13, 2003, I met with Mike Gravelm, the backhoe operator, and yourself on the property on the northern side of Van Sicklen Road in South Burlington. The South Burlington Wetland Map shows a kidney shaped wetland and a pond on this property. I reviewed the property to determine if the mapping was correct_ Despite the winter conditions, with the help of the backhoe, I was able to examine the soils, the vegetation and hydrologic conditions. I found that the area had been incorrectly mapped as a wetland. South Burlington's wetland map is based on photo interpretation of 1992 Color Infrared Photography, limited field work, site specific wetland delineations on file with the State Wetlands Office, and soils information. Field work was done to determine site conditions in a variety of "signatures" on the photography. I therefore went back to review the 1992 color infrared aerial photographs at the Natural Resources Consulting Services at their Williston office. There is a slightly darker signature on the photos that is kidney shaped, as mapped on the wetland map. Field work, however, revealed that this Signature was not due to wetness. The man-made pond shown on the wetland map was accurately mapped. This pond is clearly seen on the attached copy of the aerial photograph. For an area to be considered a wetland, it must meet the technical criteria for three parameters: a dominance of hydrophytic vegetation, hydric soils and wetland hydrology. An area that meets the criteria for each of the three parameters is considered a wetland Hydrophytic vegetation is defined as macrophytic plant life growing in water, soil or on a substrate that is at least periodically deficient in oxygen as a result of excessive water content. The U.S. Fish and Wildlife Service has developed a list that ranks each plant species based on its frequency of occurrence in wetlands. VJ/ 11 / uo 111ViN LU: LO rAA OUL4nZOOLa UaLl", V w-lell µ!J VVL On site, I found that the area that had been mapped is a gently sloping hillside, sloping to the east. It encompasses a portion of the existing mowed grass yard to the north and a steeper ledgy area with woody vegetation to the south east of the lawn. The dominant vegetation in this area is staghorn sumac, honeysuckle, raspberry, burdock, and mullen. The dominant vegetation is upland vegetation, not wetland vegetation. It does not meet the criterion for wetland vegetation. Hydric soils are soils that are saturated, flooded, or ponded long enough during the growing season to develop anaerobic conditions in the upper pan. The publication "Field Indicators for Identifying Hydric Soils in New England, 1998, second edition, is used to determine whether a soil is hydric. I directed the backhoe operator to dig a test pit in the lowest portion of the mapped area. I found the soils to be silty loam with a brighter chroma than hydric soils. The brighter colors and the lack of mottling in the upper part of the soil profile are indicators of an upland soil. Soils with low chroma colors in the upper part of the soil profile are hydric soils. The soils in the mapped area do not meet the criteria for hydric soils. An area has wetland hydrology when it is saturated to the surface orinundated for typically a week or more during the growing season. Since it is difficult to examine wetland hydrology during much of the year, indicators have been developed that allow hydrology to be analyzed, even in the winter. The lack of these indicators show that the hydrology criteria have not been met. The attached Army Corps of Engineers Data Sheet summarizes the information presented above. In conclusion, the wetland mapping on this site was in error. The area that was mapped is not a wetland. Please call me at 878-6022 if you have any additional questions. Sincerely, Cathy OBrien enc: copy of 1992 aerial color infrared photograph COE Wetland Data Sheet FOR USE WITH '1987 CORPS WETLANDS DELINEA-HON MANUAL Project i{I4� Vo�� ,G��,C, r \"z "<Cge(I Tloneect: Plat: 6`11— Dole; DATA -- vEGEIATWNRotlo oum Species F14001mlysONLY) Dominonee Percent Domrwnce NWI , Siolut ►lots: vse aslsrlsk to Wicole MC-. FACU. or UK species rAh observed odeptlons to enlbAd hydrology TALLY (Dominants ONLY) OBL rACW (AC ,rAC- •fACU rUPL rAC- FACU UPL SUBTOTAL (HYDROPHYTES): v SUBIOrAE: 1.0 ` 1 0 TOTAL: 100 s SUBTOTAL (HYDROPHYTES e, 07 _ PERCENT ;,; � ,' rn unVl•nelE� (*SCR10E VEGEIATION DISTURBANCE: DCSCRISE AOAPTATIOIIS: i DATA - SOIL Suit Tnsonomy: Corps of CnQlnecrs ��'f err 40 Re tonal Oralnn Cb Criterion: Is PubGehed Soil Survey Available? Yes No 0 Tillo/Date (jTC V\ Cm,'�'J r-7aLC+oeWObynot'oppSoil Type Mapped. 'ac ,Mk ped? Yes & No❑ Depth Hodson kla4le Color (Munasll, Hobl) color of Mollies (Munson, Moist) USDA Te,lure, bon or manganese nodules or conurlions, restrictive Abondonee/Contra at layers, tool distribution. aeid4ed rxceiihWas. ale, ncr� �- �?►cj CaCan)rite VA. Atmarks; 5 O` 1�e>?1JA . yrat ` e- F V !` T i t -1 G S 0 r k'? �� : , a� r � �' a, 15 Sketch landscape Position: FOR USE WITH 1987 CORPS WETLAI\ 1. -Na' 6.11 eM Wk-1re ll a-1,11— lhel Ibo sell. Hal 11*110C 01 DUI ULIL10401A1NN NOIE • •r ry -ne .ww eywN a•qe ar Nau.nn win a u.e •.Iwo- Inn .:.�Nr+ l•sr•f1 S1efe. mwr b i.•Fsrasdelr, � 1 � D[l(RUINA:IOfI x thh 1014,0 eke nethe w r ►o Iossrol.l. 1, —11.41 elf.r. � IIVONOL06Y ns no (� Sol Is Irepventle PONDED a FLOODEO for a dv-elIOA longer the. Ike •sebs during the growing saoson. (elloth on-t.ptanollon of rho bolls tot your conclusions). the soil Motels the Cogs of Engineers rtgionol ctlltrio it a VERY POORLY DRAINED SOIL' and there h no s.idence of allowed hydrology. lhs 104 meets fhb Geepe of Engineers reglenaf c111er4e as a POORLY DRAINED SOIL and there Is no evidence of *Bend hydrology. 19 Us soil meals the Corps of ingineers eeglonal erifulo as a SONEWNAi POORLY OMIIIEO SOIL that has either of the fallowing Iwo characlorlstke.: Yes NO ❑ U I. W%Nn i Inches of the toil surface there are: Yet No a, soil mallets within en A er Ale haloon *reel the subsoil to mottled throughout; OR b, cornn"A (o marry, distinct at prominent mottles with o yywlde lot ehroma 3 or lee; OR CD�e, disllnel a framinont coldised rhirosphenos and the subssit la mottled throughoul. Q i. Within ?d Inches of the fell surface, there are mettles which ors ,:nano, to many, distinct or prominanl, and that ere ehrema g or less, and one of Ih. lalb+inq; Yet It o to the helltaw Thal Ile +ItAie 10 ench.1 of 11, eeO orfato avid db.el ly beneoli o dark" A or AP howls ors, IRA molds is chtomo 3 er less: the moltho ore at least IOR 1n abundance and dist'.mcl or pror..lnent, 14. When a dof$P' Ap %*risen Is between 10 and 14 inches lhick, wetness marphotogy may be masted by organic molter, Normally, those problem situations ■5l be considered hydrtc when; i, hydtophytes oft prevalent, 1. there is no evidence of eltsred hydrology, and 0. In the hoOran 11141 1es Lrettty bon.alh the Aft harllan, The mettle color I& tevemo 3 at less end molllts aft at lead IOL to obvndonce and distinct or prominent. Chet# here and *Hoch o description of yaw procedure& and cenclosiem A one of the following opllone ►tie chosen for your hydrlo sal delsfminoli.n: m.ssur.d redo. pelenNafs, eO.r—Ide Is" for fan Foul Iran tell (s,e,-Oipyr4N), er other meoskwomonis and obotnolians. a lypleaNy In New England, solh hovlAll these motphologies will be classified In on ayvic subaider or an aouic sabgnwp In soil lo-onomy .- Note: o dark A or Ap Is dclinti as ha-Ing o volve of 3 or Isse Re mob s: stet '1 v ❑ Recorded Oolo: Spoons, loke or tidal qe Aerial Photograph Other to Recorded Cola A.e-tab REPORI ANY OF 111E FOLLOW11 Ooplh to Free W, Ospll, la Saluralio. Describe Alirred Nydfotag ❑ Inundoled Q Satuvaleel In upper 1 ❑ Waive %lark• ❑ will Unto, ❑ Sediment Oeposile ❑ Drainage Pelleem wi Ramer\t: CONCLUSION`, 1reAsed: ? artalse then SO Perceni "Id llydtk Soils Criterion Melt Wtltand hydrology Present? Ren.a.bs: 1 °r.. �, ... >r�Yi�,�.• °�'i'x :.-� r;,Qa+.1, "`t- s _.s_i '." �o "ate "��'.�. , VT Rol -w 'Y� {s��� �� � K ate ,. +�.. ^e .may E�i+�i.` ` ` �4 ` ,�Tt`'` •• ' a '9� r� °!i "^..Ti iF• y'i}Py�Y`.T'; __p.{{ ,�ircl} Y T E. 2�'l lA, tk Prk.a' Pit ilk f t. �t ' "0y 5_ `?.;��'3y • i A � -. �.a "�'I ,yT . -.� ,ey�� -�` . T pC. �. �= qva a�jir�:� ] 'a, ". • `+s airy' n�1e��.1kDrr? f t p •�i OH`.. - €t1 -i;'T, _}`-� 3..r ,. _b ag. },?Ok•Y. Y. •'3 6� f f*�,t:' ) #. .�� .y ffin ;� - .. �yj if° ¢ • �l��'` Y .. -�Y-3 ° +1 } � � � �y ,�Y' w� 'p my - a:r•6 �' �•� fi ,,.. � -"tk �i _'iJ r' � aft, 211 r ! p q.� _ �•.c., ,,, .emu �j <p ^?� }'.'�" r s::. TAN 4 _ y, �� � - •r,• i ._�{off •i, ff, Y`1,_ • Y Y ' e .: b{:Aim ... ..,• r... :raw K�• .w .'_7 $ 5, 3 .� or - k: MEMORANDUM TO: South Burlington Planning Commission FROM: Betsy McDonough, E 9-1-1 Coordinator DATE: November 20, 2003 RE: New Street Names 1. Brian Waxler has requested the following name for his proposed private street located off Shelburne Road: Tumblebrook Drive This name is acceptable as there are no similar street names in South Burlington or Burlington. 2. A & M Construction has requested the following name for their proposed private street off Van Sicklen Road: Maple Court Please note that the City already has two (2) streets that begin with "Maple". They are as follows: Maple Street Maplewood Drive I would NOT recommend that this name be approved and ask that the developer provide us with a new name that carries no similarities to street names within the City OR the City of Burlington. ... �rr.ri �> �... ..r... NEI GRAPM WALE LLEWELLYN•HOWLEY —VAN SICKLEN ROAD PROPERTY — Y riyr. YIYr� nrI ,mr� ��Y1e WI Rdb.km PY, INCORPORATED Enginwnrq Pwwittig9 Cmwkkg 3a.ic.a I AW rtrr rrr it ��mr RnIA M1r Er, • r �� RAW mom , Mck- 20 n SO MFM II Are. f Imll 656 Ll2 S.u�6wlnq.. T (W1)E961,O0 v.. _ O� — Site Plan RrY 3 6 .�.m. I. ..4" .r C.uMYw .rM�r�Yr��Y��Y�rlr�wY� outh Burlington Street Department 575-CORSET STREET SOUTH BURLINGTON, VERMONT 05403 T L(802) 65 -7961 Of FICF t04 LANDFILL RE,' Memorandum TO: Design Review Board FROM: Bruce K. Hoar, Public Works Director DATE: December 2, 2003 CC: Ray Belair, Zoning Administrator RE: Gravelin Van Sicklen Road Property I have met with the Developers Engineer in regards to this project. I agree to the reduction in road width to 26' based on the number of units that will be served by this project. All other city standards are to be met. The R.O.W. is to be 50'. The plans show the sewer line running behind the properties and remaining private. I do not agree with this mix. If the street is to become public then the main sewer line will become part of the city infrastructure. The sewer main will be located in the center of the road and built to city standards. I do believe that the city and developer can reach agreement with the sewer line adjustment. All signage and stripping for this project is the responsibility of the developer and shall comply with the MUTCD Millennium Edition. The developer shall provide fire hydrant flags. SOUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802)864-0435 December 4, 2003 Mr. Skip McClellan Lewellyn-Howley, Inc. 20 Kimball Ave. South Burlington, VT 0504 RE: Van Sicklen Road Property South Burlington Dear Skip: The South Burlington Water Department has reviewed the Final Plat plans for the above referenced project. Please find my comments below and refer also to my previous letters. 1. All domestic services and fire sprinkler systems that are connected to the public water system shall be protected with a backflow prevention assembly, and an appropriate thermal expansion system in compliance with the Ordinance For The Control Of Cross Connections Within The Water System Of the City Of South Burlington. Please contact this department for more information on backflow protection devices. 2. Eight -inch Ductile Iron (DI) water pipe shall have no less than three (3) brass wedges installed at each joint. Bury depth to the new main shall be six feet (6') to the top of the pipe. 3. All details shall be corrected to comply with those details found in the Specifications and Details for the Installation of Water lines and Appurtenances for all Water Systems Owned by the Champlain Water District the City of South Burlington, Colchester Fire District #1, and the Village of Jericho. All water installation work and water distribution material must comply with these specifications. 4. All hydrants shall meet the previously mentioned specifications, and a hydrant flag shall be supplied with each hydrant: Hydrant drains shall have all drains plugged prior to installation. 5. Fire flow conditions must be able to meet the requirements stated in those specifications, as well as meeting any conditions set forth by the Fire Department. This area of Hinesburg Road is subject to conditions relative to a dead end line downstream of large commercial customers. A minimum 35 psi rule under normal conditions, and a minimum 20 psi rule under fire flow conditions that are common in well looped systems may be limited in this project area. Sufficient engineering and design must be incorporated in order to meet State Water Supply Rule and the above Specification requirements. 6. Normal working pressure in the distribution system for this project shall be designed to produce 60 psi and not less than 35 psi. Further, the SBWD Specifications for Water Lines and Appurtenances requires all hydrants in a residential development be able to supply no less than 500 gpm. at 20 psi at the worst case hydrant residual pressure. The developer and his engineer is responsible for ensuring any hydraulic design for this project considers these requirements. The developer and engineer are responsible for all inadequacies in water supply pressure for fire and domestic requirements, including those associated with the aforementioned changes. It may be necessary, after your firm reviews hydraulic modeling, to include a booster pump station for this development. 7. The proposed 8" water main on Maple Court shall be located between the edge of ROW and the paved portion of the road and drive, not under the paved portion as indicated on the plans. 8. The proposed location of the 1" service to the existing home should be placed out side of the driveway. 9. Curb stops shall be located just inside the ROW, between the property line and road edge. They shall not be placed in the pavement or traveled ways. All service lines shall be installed so as to run in a straight line from the water main to curb stop. Service lines should run in a straight line from curb stop to building. 10. The SBWD shall be sent any future hard copy plans involving this project for review. Future plans must include details and specifications as required in the above referenced Specifications. 11. The SBWD shall be notified prior to backfilling to inspect all joints, fittings, main line taps, appurtenances, water line crossings, and testing. 12. Further review changes may be required as this project proceeds through the permit process. 13. A hard copy set of As-Builts as well as one electronic copy in Auto-CAD.DWG Version 14 Format or newer shall be supplied to this department upon completion of the water system improvements. If you have any questions or I can be of further assistance, please call me. Sincerely, A.T. Nadeau Superintendent CC. Brian Robertson DD. Doug Brent Plan Reviews: Van Sicklen Road- final review I Permit Number SD- 0 CITY OF SOUTH BURLINGTON APPLICATION FOR FINAL SUBDIVISION PLAT REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Narinder Singh, 28 Whiteface St., So. Burlington, VT 05403 (802) 658-5984 2) LOCATION OF LAST RECORDED DEED (Book and page #) Vol. 557, P. 22-24 3) APPLICANT (Name, mailing address, phone and fax #) A & M Construction Corporation, Inc. P.O. Box 9347, So. Burlington, VT (802) 865-4250 CONTACT PERSON (Name, mailing address, phone and fax Skip McClellan, LLEWELLYN-HOWLEY INCORPORATED, 20 Kimball Ave., Ste. 202N, South Burlington, VT. (802) 658-2100 5) PROJECT STREET ADDRESS 100 Van Sicklen Road, So. Burlington, VT 05403 6) TAX PARCEL ID # (can be obtained at Assessor's Office # 1750 00100 R 7) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use One single family home b) Proposed Uses on property (description and size of each new use and existing uses to remain Construction of four, three bedroom condominium units in two, 55' x 86' duplex structures. Existing home to remain unchanged. c) Total building square footage on property (proposed buildings and existing buildings to remain) 1,800 s.E home to remain, four units of 2,200 s.f. each to be constructed -total 10,600 s.E d) Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) 25'-30' high residential structures e) Number of residential units (if applicable, new units and existing units to remain) 1,800 s.f. home to remain, four units of 2,200 s.E each to be constructed -total 10,600 s.f. f) Number of employees & company vehicles (existing and proposed, note office versus non -office employees) N/A g) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable) N/A 8) LOT COVERAGE a) Building: Existing 1.4 % Proposed b) Overall (building, parking, outside storage, etc) Existing 1.9% Proposed c) Front yard (along each street) Existing 2.5% 9) COST ESTIMATES Lot #1 - 5.2%, Lot #2 - 4.3% Lot #1 — 9.0%, Lot #2 — 12.8% Proposed 3.3 % a) Building (including interior renovations): $480,000.00 b) Landscaping: $12,100.00 c) Other site improvements : $64,000.00 (Sanitary Sewer, Water Main, Pavement) 10) ESTIMATED TRAFFIC a) Average daily traffic for entire property (in and out): b) A.M. Peak hour for entire property (in and out): c) P.M. Peak hour for entire property (In and out): 11) PEAK HOURS OF OPERATION: 12) PEAK DAYS OF OPERATION: 13) ESTIMATED PROJECT COMPLETION DATE: 2 Lot#1 - 6 vte, Lot#2 — 23 vte Lot#1 -1 vte, Lot#2 — 2 vte Lot#1 -1 vte, Lot#2 — 2 vte N/A N/A 2004 14) PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (I I" x 17") of the plans must be submitted. A subdivision application fee shall be paid to the City at the time of submitting the final plat application (see Exhibit A). I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT SIGNATURE OF PROPE TY OWNER Do not write below this line DATE OF SUBMISSION: I have reviewed this preliminary plat application and find it to be: m l Co p ete ; ❑ & Zoning or Designee 3 dl q LEGEND PLANT LIST — _ Proposed Eedeting \ �_ iralss �- ,_ '►-' `. 6 PN Phw NW. Auatrkn Ph' Y-B' high Property Line _ �r er; i r-..o�. 4 SR Sple90 roticwet- Japmeae m LH- f f/2•_2• Easement Une — .. — .. —. -_ _ Zone Lbnit r.,... Is m atop vaddmtdk nrpv Dark Amrkm ArbwNtw e'-Y BuAding Setbod - ` \ �� 2 Gr n.dhtak enaea,mw snadtma.tr Hanyow.t 2-2 7/2"Contour/I ` _ 2 PC Plom pan9ena Cdrade 9hre SO— Y-tY Apyoxknole —I- e.Wthp PL—G.0 Red. SEq RastrI.Hone wt•Water a.P— areo fo be ° ' abandmed and rwnowd a j ` !` • � �� � I AC Ace, lwtmkwm Tate#m Napls 1'-2 I/2' 2 RC Rhododerr CQWa Wee cetawbo RhododenNm 3 9d. Sanitary Sewer M.H. •I N j A' # �� r 1 SB We. x bumdda AnMmy Watery Sp"- ] po'. Storm Sewer M.H. (UI �' '•`t 2 BM Buaue miovpnlAa aht.7— Bawvod 3 0. Waoeea arm to rw h - - ,. ..\ 2 8 .4nrp•rae procwnbme Jeparrw Gorden uLnpw 2 qd. Storm Sewer Inlet ■ o • _-__ Gate Hydrant N anitary Sewer �9�rP10e� •-•.e • P1C..... / Slpn - E wy.n y arkl. [em r/ S j arountl N P rkina (J_T)grml).. Y l l St— Sewer —er—r ...-.r. Ir ar.__ t\ J � 1 NN/I a deelaratron tdren rwn --� �. / WOfer sftpplyPropw•d Hy4crt - RM = 39a.0a Well - Inv In = 383 ]o S. Buengton oRlcbl map. Fouts ]B1.60 Gverh—d Whe Naforol Gos its hone —r _. _.r_ .. _... Break exN[hp 4' (crammed) sewx 0.. Silt Fence —. e— awrvlce. C —f new p•PW yid 1,v; y� mruat &r. oY `•,, ! ea —tk [craw W. Tree Line Edge of Water utiltty Polesign Curb Stop I� v \ I Edalhg man made pmd c 1 Appr .t. o/.vtM t _ 1 _ d. ..w.. I ewraw71' � _ unle o/ aw sww Ion• Lot 1 �R•°° I f ,r a o I' _ y0_ _ ' a marmed- eoe pad a — — — 1\ eao' 0em Hk..awg Read eN trm. ---- e4,9 7 a Lwna _ i f.3 fe m— , f }J � tw h9 @@I} F'xlsa ran om � E i� Re8)tlm r I I � �,•i I i(�,,. / }})• 411 PkWdx sad (s tYp.) ` '.�� \ be the murce or the Pme watt e•PVC Prlmte ee.—y wwer /- / Lacafe erlwthq water earwn _ Bike Rack NH/Y _ e Ivfh9 alructure Connect -382.00 f ' • Inr out = 381.90 J. 1 s N �- I �... � T� .T �7i •may � g ,;�M1 \ RECEIVEL J. +m { MAY 13 2003 Mvn388.3 In 381.10 38 -` City of So. Burlington V7D Ski awe .xr una wrn aa+ rled Rcad - r - -- o/ wv[er of eswr Inwe AN -A work to be prMned h aeaordenm With the •SpecBcalime and I.- b the rneldlebon o1 wvtar ----_ __ - --' Ihee and wPartma — Iar dl watt apt—e by the champlaln Water Dlatricl, the City o/ Soath- B,,1h,glan, CO.—., Fke DI. Hct /1, and the - wnape lla9e - GRnrxtc sere LL ea EWELLYN HOWLEYI FVAN SICKLEN ROAD PROPERTY aenriPtrelrwltlr Ply' _- __. - —. _. m a f0 s I N C O R P O R A T E O Prel'min:y Pln -_ 1 www euea. mvWac wP+r s'auvhrnue. /+rN' M1senf eittg final Pin a 01N=t. nwme --- - NOrth� 1Incha IO k. sw. f lmrrl asaaeoe $It@ PlanJ ..a saaastsa Rev e m eMe bv.. Ilewnllk•earicenr CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 July 11, 2003 Skip McClellan Llewellyn -Howley, Inc. 20 Kimball Avenue, Suite 202N South Burlington, Vermont 05403 Re: 100 Van 5icklen Road Dear Mr. McClellan: Enclosed io the agenda for next Tuesday's Development Review Board meeting and Staff comments to the Board. Please be Sure that Someone io at the meeting on Tuesday, July 15, 2003 at 7:30 p.m. at the City Hall Conference Room, 575 Dorset Street, Sincerely 1(aymond J. Belair Adminiotrative Officer Encl. MEMORANDUM TO: DEVELOPMENT REVIEW BOARD FROM: RAYMOND,J. BELAIR, ADMINISTRATIVE OFFICERV.� DATE: ,JULY 11, 2003 RE: A Er M CONSTRUCTION CORPORATION, INC. A Er M CONSTRUCTION - TWO (2) DUPLEX PUD - PRELIMINARY PLAT This property consists of a planned unit development consisting of. 1) subdividing a 4.6 acre lot into two (2) lots of 1.3 acres (lot #1) and 3.3 acres (lot #2), and 2) constructing two (2) 2-family dwellings on lot #2, 100 Van Sicklen Road. The sketch plan was reviewed on VW03 (minutes enclosed). This property located at 100 Van Sicklen Road lies within the SEQ Zoning District. It is bounded on the north, east and west by residences, and on the south by Van Sicklen Road. Access: The driveway serving the house on lot #1 will be eliminated. A new 18 foot wide private road will be constructed to serve both parcels. This private road complies with Section 15.12 ( C ) (3) (a) of the Land Development Regulations. The private road does not comply with Section 15.12 (D) (3) of the Land Development Regulations, which requires a minimum 20-foot wide road without parking. Subsection (4) of this section allows the Board to modify this request "if it specifically finds that such modification is in furtherance of Comprehensive Plan policies and the goals for the specific zoning district in which a project is located, and that such modification is consistent with provisions for the public health, safety and welfare and the orderly development of the City. In making such a finding, the Development Review Board shall consider the recommendation of the City Engineer, Director of Public Works and Fire Chief with respect to the City's ability to provide public services to the proposed subdivision or PUD." Page #2 Lot size: Both lots will meet the minimum lot size of 12,000 square feet. Density: This lot generates five (5) units (1.2 units acre x 4.6 acres = 5.52) and five (5) units are proposed. Applicant should provide acreage of developable area on lot #2 as shown on the SEQ Zoning District maps. Coverage/setbacks: Building coverage for lot #1 is 5.2% and for lot #2 is 4.3% (maximum allowed is 15%). Overall coverage for lot #1 is 9% and for lot #2 is 12.8% (maximum allowed is 30%). Setback requirements are being met for the existing house and the proposed duplexes. Restricted Area: No buildings are proposed within SEQ restricted areas. An existing residential drive is proposed to be removed and replaced with a shared drive to serve all 5 units. The shared drive will pass through the SEQ restricted area, and the new driveway for the existing house falls almost entirely within the restricted area. Pursuant to Section 9.06 (B) of the Land Development Regulations, the construction of roads to serve approved development is allowed within SEQ restricted areas. In addition, utilities must be placed underground and public recreation paths are allowed. The plans show underground water and wastewater lines crossing the SEQ restricted area. Electrical and telephone lines are not shown on the plans. A recreation path easement is also shown within the restricted area. Section 9.06 (A) of the Land Development Regulations states that land in a restricted area shall not included in any lot created for residential development. Lot #2 is such a lot. This section goes on further to state that "as a condition of approving a subdivision of land that results in the creation of a lot located entirely or partially in a restricted area, the Development Review Board may require the recording of a notice of appropriate restrictions regarding such Page #3 remaining lot in the land records." Staff does not see the need of recording a notice of conditions. Wetland buffer: The plans show a 50-foot wetland buffer around the man-made pond. No encroachment is proposed within the buffer. The wetland area on the City's wetland map is shown on the plan where the two (2) duplexes are proposed. A report from Cathy O'Brien (see enclosed) indicates that this area is not a wetland and the wetland map is in error. The designation of the buffer should read "wetland buffer" and not "Conservation Zone." Landscaping: The minimum landscaping requirement for the two (2) duplexes is $12,000. The applicant has not submitted a landscape budget as required under Section 13.06 (G) (3) of the Land Development Regulations so staff is unable to determine whether the proposed landscaping meets the minimum requirement. The plans do not indicate who prepared the landscaping plan. The final plat submittal should include a landscape budget prepared by a landscape architect or professional landscape designer. The final plat submittal should also include the name of the landscape professional who prepared the landscaping plan. Pam: A total of nine (9) spaces are required for the two (2) duplexes and 16 spaces are provided (eight (8) covered spaces and eight (8) surface spaces). A bike rack is provided as required. Lighting: The final plat submittal should include exterior lighting details. Street Name/Numbering: The final plat submittal should include a proposed street name and addresses for the single-family dwelling and two (2) duplexes based on the E911 addressing system. Pedestrian Access: The Recreation Path Committee (RPC) reviewed the sketch plan for the proposed development in November 2002. The RPC recommended that a 20 ft. recreation path easement be provided Page #4 along Van Sicklen Road and also along the easterly side of the property. Accordingly, the preliminary plans show a 20 ft. recreation path easement to be dedicated to the City of South Burlington. The applicant must submit a draft easement deed for this recreation path easement, which shall be reviewed and accepted by City Attorney Tim Eustace. Other: Sheet 2 of the plans indicates "Limit of Open Space Zone" delineations. These correspond to the boundaries between SEQ restricted areas and SEQ development areas. The plans should be revised to label these areas accordingly. PRD Review Standards Pursuant to Section 15.18 of the Land Development Regulations, PRDs shall comply with the following standards and conditions: a) Will not result in undue water or air pollution. In making this determination the DRB shall at least consider (1) the availability and capacity of municipal sewer facilities or the nature of soils and subsoils and their ability to support waste disposal adequately, (2) the elevation of land above sea level and in relation to floodplains, (3) protection of ground and surface water through appropriate vegetative buffers and retention structures, and (4) all applicable State of Vermont regulations. The plans need to be revised to show detailed stormwater drainage plans. b) Will have sufficient water available for the foreseeable needs of the development. Staff recommends that the comments of Water Superintendent Jay Nadeau dated May 19, 2003 be incorporated as conditions of approval. Page #5 c) Will not cause unreasonable soil erosion or reduction in the capacity of the land to hold water so that a dangerous or unhealthy condition may result. In addition to the stormwater drainage details, the plans must include acceptable details of erosion control measures to be used during and after construction. The erosion control plans must meet the standards set forth in Section 16.03 of the Land Development Regulations. Grading and erosion control plans are detailed on Sheet 6 of the plans. d) Will not cause unreasonable highway congestion or unsafe conditions with respect to the use of highways, existing or proposed. The existing curb cut will be replaced by a new, shared curb cut. The plans do not provide a measure of sight distance for the new curb cut. Sight distance information should be provided with the final plat submittal. e) Will not cause an unreasonable burden on the ability of the City to provide educational services or facilities. The addition of 4 units of housing will result in relatively minimal impact on the South Burlington School District. f) Will not cause an unreasonable burden on the ability of the City to provide municipal or governmental services and facilities. The applicant will need to abide by the requirements of the Water Superintendent, Fire Chief, and City Engineer. g) Will protect important natural resources, including streams, wetlands, scenic views, wildlife habitats, and special natural features. No adverse affect is expected relative to these natural resources. Page #6 h) Will not have an undue adverse affect on the scenic or natural beauty of the area, is aesthetically compatible with surrounding developed properties and will protect rare and irreplaceable natural areas and historic sites. Staff believes the project is aesthetically compatible with surrounding developed properties. No historic or rare or irreplaceable natural areas are known to occur on the subject property. i) Will provide convenient allocation and distribution of common space in relation to proposed development and will conform to the City's recreation plan. The proposed development does not conflict with the South Burlington recreation plan. As noted already, the plans show a 20-foot recreation path easement pursuant to the request of the RPC. j) Will provide efficient layout and high -quality installation, construction, and maintenance of public facilities and conform to the City's street and utility plan. These standards are evaluated above under subdivision development requirements and design standards. k) Will provide for cooperation with adjoining properties in the extension of roadways, drainage facilities, and utility lines. Direct utility and vehicular access is provided off of Van Sicklen Road for the proposed development. Cooperation with adjoining landowners is necessary for the sewer main, and Water Superintendent Jay Nadeau has requested that the applicant coordinate the installation of a water line with the Summersweet Subdivision to the east of the subject property. 1) Will conform to the City's Comprehensive Plan. Page #7 The Comprehensive Plan establishes a goal for the SEQ District of promoting development that protects and preserves contiguous areas to open space and important natural resources. The proposed PRD offers an appropriate density to accomplish these goals. The Comprehensive Plan also establishes the goal of providing an extensive off -road path system to residents. Accordingly, the proposed PRD includes a 20-foot wide recreation path easement. v' 7/15f03 MOTION OF APPROVAL A Er M CONSTRUCTION I move the South Burlington Development Review Board approve preliminary plat application #SD-03-3 7 of A Er M Construction Corporation, Inc., for a planned unit development consisting of. 1) subdividing a 4.6 acre lot into two (2) lots of 1.3 acres (lot #1) and 3.3 acres (lot #2), and 2) constructing two (2) 2-family dwellings on lot #2, 100 Van Sicklen Road, as depicted on an eight (8) page set of plans, page one (1) entitled "Plat Showing Retracement Survey and Proposed Subdivision of Property of Narinder Singh Erjasbir Kaun 100 Van Sicklen Road South Burlington, Vermont", prepared by Button Professional Land Surveyors, P.C., dated February 28, 2002, with the following stipulations: 1)All previous approvals and stipulations, which are not superseded by this approval, shall remain in effect. 2)The plans shall be revised prior to final plat submittal as follows: a. The plans shall be revised to provide the acreage of the development area on lot #2 as shown on the SEQ Zoning Map. b. The plans shall be revised to change the notation of the wetland buffer to read "Wetland Buffer" and not "Conservation Zone". c. The plans shall be revised to note the name of the landscape professional that prepared the landscaping plan. d. The plans shall be revised to include a proposed street name for the private street and show the E-911 addresses for the existing single-family dwelling and proposed duplexes. e. The plans shall be revised to change the designation "Limit of Open Space Zone" to "Restricted Area". f. The plans shall be revised to provide detailed stormwater drainage information. g. The plans shall be revised to provide sight distance information for the proposed access drive. h. The plans shall be revised to incorporate the recommendations of the City Arborist and South Burlington Water Department 3)Pursuant to Section 15.12 (D) (3) of the Land Development Regulations, the Board approves an 18-foot wide private road to serve the development in place of the required 20-foot wide access drive. It is the Board's opinion this modification is in furtherance of the Comprehensive Plan policies and goals for the SEQ Zoning District and that such modification is consistent with provisions for the public health, safety and welfare and the orderly development of the City. 4)Pursuant to Section 9.06 (A) of the Land Development Regulations, the Board approves lot #2 being partially in a restricted area. 5)The final plat submittal shall include a landscape budget prepared by a landscape architect or professional landscape designer. 6)The final plat submittal shall include details (cut -sheets) for all proposed exterior lighting. 7)Prior to issuance of a zoning permit for the first building, all appropriate legal documents including easements (e.g., irrevocable offer of dedication and warranty deed for the proposed public recreation path) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 8)The applicant shall comply with the recommendations of the Fire Chief outlined in a letter to juli Beth Hoover dated 11%1f02. 9)The stormwater drainage system shall be maintained by the homeowners association and so noted in the homeowner documents. Prior to issuance of a zoning permit for the first building, the homeowner documents shall be reviewed and approved by the City Attorney for compliance with this requirement. 10)The final plat application shall be submitted with twelve (12) months. LU o v= W �' d m LLI 4 W L F3 40 ret4(llch,011 (Srogh) CITY OF SOUTH BURLINGTON NATURAL RESOURCES COMMITTEE MINUTES OF MARCH 6, 2003 The South Burlington Natural Resources Committee met on Thursday, March 6, 2003 at 7:00 PM in the Upstairs Conference Room. Members Present: Eileen Brady -Whitney, Peter Jones, Lori Lustberg, Lani Ravin, Bill Schuele, and Chris Shaw. Others Present. Associate Planner Janet Hurley, David Fuqua, Jeffrey & Elizabeth Goldberg, David Burke, Terry Krinsky, Sarah Dcpp, Errol Briggs, Ralph Veve Chair Lani Davin called the meeting to order with a quorum of committee members present at approximately 7:10 PM. Development Review: The committee reviewed subdivision plans and draft recommendations for the 5-lot, 4- unit Goldberg subdivision on Dorset Street and Autumn Hill Road. Committee members questioned the location of Black Dog Drive. David Fuqua explained that the location will minimize design and construction changes that will be necessary if and when Black Dog Drive is abandoned in favor of Autumn Hill Road. No paving is proposed. The Goldbergs expressed concern about proposed maintenance restrictions. They would like the ability to till and apply fertilizers for organic gardening/agriculture on Lot 5. The committee assured the Goldbergs that it does not wish to prohibit organic gardening or agriculture. The committee asked questions about the extent current of haying activity. The Goldbergs explained that whatever ground is dry is cut up to twice per year by a farmer. The Goldbergs questioned why the committee would want to limit cutting to once per year. Peter Jones explained that reproductive success of certain ground nesting bird species could be jeopardized by more frequent cutting. Motion was made and passed to recommend approval subject to 4 conditions. See attached "Goldberg 5-Lot, 4-Unit Subdivision, Recommendations for Approval." 2. Bill Wessel requested time to prepare a wetlands delineation and analysis for the committee. Consequently, the Wessel application will move to the April 3, 2003 agenda. 3. David Burke gave an overview of the White hock proposal. Originally the subdivision was approved for 36 residential lots. It was reapproved for 30 lots because the current owner/developer felt the lots were too small. Fill was approved on Lots 13, 14, and 15 within the Conservation and Open Space (CO) District. Administrative Officer Ray Belair indicated that such approval does not mean that back yard lawns can be maintained on these lots within the CO District. The applicant is proposing a compromise in which a dense dogwood hedgerow 100 ft. from the road right-of-way will be planted to mark the rear of the lots. This would extend up to 25 ft. into the CO District_ Succession would be allowed to occur beyond the hedgerow. Janet Hurley gave an update on Development Review Board (DRB) thinking on the proposal. The DRB would like to deny the proposed encroachments into the CO District, CITY OF SOUTH BUR I6NGTON (NATURAL RESOURCES COMMITTEE (March 6, 2003 Page 2 of 5 but continued the hearing on the application until April 15, 2003, because no one was present to represent the applicant at the hearing on March 4, 2003. The applicant had requested a continuance in order to get feedback from the NRC. Ms_ Hurley also reported that the City Attorney had counseled Mr. Belair that the DRB does not have the authority to allow the proposed encroachment pursuant to Section 3.503 of the Zoning Regulations because the Winooski River does not fit the definition of drainageway. Mr. Burke challenged the interpretation of the Winooski River channel edge, noting that the closest edge to the subject property was only a secondary channel. Committee members countered that the intent is to protect the water within the river. Anything entering the secondary channel will thereby enter the main channel. Landscape Architect Terry Krinsky described the history of land use at the site and described his vision for a naturalized field and successional growth between the proposed back yards and the Winooski River. Mr. Krinsky maintains that the proposal adds at least 50 ft. of woody vegetated buffer and a buffer line that homeowners will respect. He notes that a cedar hedge was not proposed because in 30 years it would not blend in with the naturalized growth. He suggested that a cedar rail fence would offer an appropriate buffer edge as an alternative to the dogwood hedgerow. Lani Ravin concluded that the committee wants to support the DRB position. However, if the DRB chooses to allow the encroachment, the committee would like to recommend the conditions that were detailed in the committee's draft motion. 4. A & M Construction had requested NRC review of its proposed development on Van Sicklen Road be delayed in order to prepare a wetlands delineation and analysis for the committee and the DRB. Accordingly, a motion to recommend continuance of the A & M Construction application passed. See attached "2-Lot, 5-Unit Subdivision, Preliminary Plan Application #SD-03-10, Recommendations for Approval." 5. The committee discussed the JAM Golf application for encroachment into the CO District by two as -built berms. Lori Lustberg stated that she would prefer not to make a decision until the committee has all appropriate information from the applicant. The committee agreed and the motion to recommend continuance of the JAM Golf application passed. See attached "Vermont National Country Club, Revised Final Plan Application #SD-03- 02, Recommendations for Approval." 6. Ralph Veve described the land use history of the site. It was farmed until the interstate was constructed. The interstate caused semi -impoundment in the area that was exacerbated by the Glendale development. The wetland is of a recent nature_ It serves as a backdrop for Dorset Commons Apartments, and has attracted discarded tires and shopping carts that Mr. Veve routinely removes. David Burke then offered a description of the surrounding neighborhood, including Dorset Commons and the more recent Town Place Suites. The application involves dissolving one lot that lies entirely within the interstate setback and adding the balance to the proposed building lot and to Dorset Commons. According to Mr. Veve, the "interstate lot" predates the Zoning Regulations. Development on the buildable portions of the new lot is proposed. Allowable density for the lot would be six units. Only 4 units are proposed. In total, 0.08 acres of encroachment into the CO \nrc\min\030603. min. doc CITY OF SOUTH BURLINGTON NATURAL RESOURCES COMMITTEE March 6, 2003 .Page 3 of 3 District is proposed. According to Mr. Burke, Town Place Suites encroached into the CO District directly to the east of the proposed development. Mr. Burke explained that there is a 3 ft. difference in elevation from northerly to southerly on the proposed building lot. The buildings will be guttered to discharge on the front. Drainage will proceed westerly and then southerly in a swale along the Oakwood Drive extension. The applicant is receptive to the idea of rain gardens at building foundations to enhance on -site infiltration. Ms. Hurley asked whether the applicant wanted all parking proposed. The applicant said the proposed parking complies with the requirements. Ms. Hurley suggested that the applicant could ask for a waiver. Mr. Veve asked his designer to avoid the CO District as much as possible. Mr. Burke explained that the proposed configuration is about as good as it gets for 4 units. Sarah Dopp asked about the height of the structures. Mr. Burke explained that they are 2-story structures. Higher would require elevators, which is not feasible for 4-units. The buildings meet the 25 ft. buffer requirements of the old regulations, but a proposed hedge would extend further into the buffer. Lani Ravin posited the following issues: (1) the city has a 50 ft. buffer for a reason and she is hesitant to snake it 10 ft_; (2) this property falls in the vicinity of the City Center and if the city wants compact development, this is where it should go. Peter Jones asked what level of rental units these would be. Mr. Veve described them as 3-bedroom units, which would not be high -end. Mr. Jones noted that these units would be addressing housing needs. Errol Briggs explained that the wetland does not senfe significant functions and values. Furthermore, in Mr. Briggs' view, the impact of the proposed development will not significantly alter what values the wetland does serve. The wetland cannot store water; the project will not make the stream course vulnerable to erosion (Mr. Veve noted there is a small trickle all year except when frozen); water quality will not be affected, as drainage from surrounding development follows storm sewers; and the use/enjoyment of adjacent property would not be affected. The wetland is an island in a sea of development. Lani Ravin asked whether frogs inhabited the wetland. Mr. Briggs said if there are frogs, they are most likely transients moving along the interstate corridor. The site contains a dry pine stand, which is not attractive to amphibians. The woods is such a fragment that it would not maintain wood frogs. There is no hydrophytic vegetation on site. There is no threatened or endangered species habitat. From the interstate, one cannot see that it is wetland. The insignificant size makes it unattractive for educational purposes. Again, Mr. Briggs concluded that the functions that are served would not be unduly impacted by the proposed buffer encroachment. Peter Jones asked where the hedge tpsould be located. Mr. Burke noted that it would be planted along the proposed buffer impact line as shown on the plans. Lori Lustberg agreed that because of the location and type of housing proposed, that this is the type of encroachment that should be forgiven. Chris Shaw stated that the surrounding development makes the idea of a 25 ft. buffer for this project ridiculous. He thinks even the hedgerow is unnecessary. He said the wetland has no significant functions and it 1n rclm i n \03 0603. min. d oc CITY OF SOUTH BURL111tGTON NATURAL RESOURCES COMMITTEE March 6, 2003 Page 4 of 5 would be churlish to throw in conditions requiring a buffer with a hedgerow. Eileen Brady -Whitney agreed. Lani Ravin asked the committee to consider cumulative effects. Bill Schuele said he was in agreement with Mr. Shaw, but would add a hedgerow. Peter Jones agreed that he would like to see a hedgerow marking the encroachment limit. Mr. Shaw pointed out that the hedgerow would interfere with rain gardens. Mr. Burke noted that the applicant knows that he is asking for encroachment and is okay with the idea of requiring a hedgerow and rain gardens. Lani Ravin said she would move to accept the draft motion as written. There was a discussion about whether native species would be a necessary requirement. The consensus view was that the hedgerow species did not need to be native, but should not occur on the Vermont invasive species list. The motion passed as amended. See attached 1-Lot, 4-Unit Planned Unit Development, Sketch Plan Application #SD-02-84, Recommendations for Approval." NRC Charter Changes: Janet Hurley will prepare a draft charter and send it out to the committee for review prior to the next meeting. 2003 Work Plan: The committee discussed items that members would like to see on the NRC work plan for the year. Other than working on a charter change, the committee offered the following areas for focus. Enabling Legislation for Local Pesticide and Herbicide Ordinances: Lani Ravin expressed a desire to continue to put efforts toward the passage of enabling legislation for local pesticide ordinances. She noted that the big gun lobbyists are coming out to oppose the bill. There is no golf course exemption. The key is that it is enabling legislation that would allow local partnerships as opposed to regulation by the state. Insect Pest Management (IPM) options could be pursued instead of constant required public notification of pesticide applications. Ms. Ravin noted that this is really behind the scenes work, rather than work requiring meeting time. UVGtl1 Conservation Eiology Class: Peter Jones noted that he is still enthusiastic about developing a relationship with the University of Vermont Conservation Biology class. A continued relationship could be beneficial to the city. Open Space: Lani Ravin noted that the committee would like to work on open space priorities. The committee should make recommendations to the City Council on how the Conservation Fund should be used. Work with the South Burlington Land Trust can move toward accomplishing this. Sarah Dopp noted that the land trust has a small subcommittee that makes recommendations to the City Council as to properties that would be appropriate for the conservation fund. Chris Shaw agreed that the committee should work to prioritize the properties that are listed in the South Burlington Open Space Strategy. Ms. Ravin noted that the Open Space Strategy does not address the availability of these properties, and affirmed that the committee should address this. Chris Shaw said stewardship should also be a work goal for the committee. He would like to see conservation of the citys historic resources and stewardship of resource lands \nnc\min\030603. min. doc CITY OF SOUTH BURLINGTON NATURAL RESOURCES COMMITTEE March 6, 2003 Page 5 of 5 held by the city. There was a discussion about the Caulkins Farm. The committee agreed that it is good that it is used by the National Gardening Association (NGA) because the use fills a vacuum_ The NGA has plans to develop a small conference center there. Education: Peter Jones noted that Lori Lustberg, who had to leave the meeting just prior to the Veve motion, is interested in educational initiatives. Lani Ravin noted that training in the Keeping Track Program would raise committee credibility and add to committee discussions. Keeping Track training could be offered to other city residents. Green Up Day: Peter Jones is preparing an article on Green Up Day for The Other Paper. He noted that Robert Babcock, who initiated Green Up day, has moved to South Burlington. Janet Hurley is this year's contact person. Chris Shaw will be contacting the Scoutmasters for the Boy Scouts and Girl Scouts about Green Up Day 2003. Vernal Pools: Lani Ravin shared information about a book entitled Preserving Vemal Pools in Suburbia published by the Wildlife Conservation Society. The committee decided this would be a good book to have. It is only $10.00. Minutes of February 4, 2003: MOTION by Lani Ravin, seconded by Bill Schuele to accept the minutes of February 4, 2003. The MOTION CARRIED with a vote of 4-0. Next Meeting: Thursday, April 3, 2003, 7:00 PM. Janet Hurley announced that she may not be available to attend for the next meeting, but would send packets out in advance. Adjournment: The meeting was adjourned at approximately 10:00 PM. Respectfully submitted on this day of A ri, 2003, Chris Shaw NRC Clerk - (; eol,� J t M. Hur ey Associate Planner \nrc\mink03O6O3. min. doc LLEWELLYN • HOWLEY I N C O R P O R A T E D March 18, 2003 Mr. Ray Belair Zoning Administrator South Burlington City Hall 575 Dorset Street South Burlington, VT 05403 Re: A&M Construction property, 100 Van Sicklen Road File: 2002063 Dear Ray, We are in receipt of your staff comments for the above referenced project. We would like to respond to your document with this letter. We will plan to distribute copies to the DRB at our Preliminary Plat hearing, March 18. Restricted Areas within the SEQ District We request the driveway to Lot # 1 to be constructed within the restricted area along Van Sicklen Road as shown on the Site Plan. 1. Calculations are provided on sheet 1, Overall Site Plan, under the heading "Density". 2. Plans will be revised to indicate the restriction lines as Zone Limits, not setbacks. Conservation and Open Space District 3. Wetlands indicated on the official wetlands map have been determined to be in error. Please find attached a letter from Cathy O'Brien summarizing her investigation of the site. You indicated in our telephone conversation of March 17 that no additional wetland investigations will be required for this project. 4. Although we are unsure if it is required, a 50' conservation zone has been delineated around the existing pond. This project will not impact that, or any other, conservation zone. (a) The project will not fill a wetland. See letter by Cathy O'Brien. (c) 5. We request a clarification of this requirement; The area to the west of the existing pond is currently mowed lawn for swimming access to the pond. We would like to continue to mow (cut) the existing grass to maintain this access. Proposed tree lines and vegetation impacts have been indicated on the Site Plan as an irregular line. Perhaps they can be more clearly labeled. (d) This delay requested by the NRC will not be required. See letter by Cathy O'Brien. Section 26Z 2(b) of Zoning&gulations 6. We agree with your recommendation to withdraw this application. We will reapply under Engineering • Land Development • Permitting 20 Kimball Ave., Ste. 202N • South Burlington • Vermont • 05403 T 802.658.2100 • F 802.658.2882 • e-mail: llewellinc@aol.com I the new Proposed Land Development Regulations at a later date. Subdivision Develment Requirements &Design Standards 7. The street name will be submitted prior to Final Plat. 8. Cross sections, stations and a profile for the proposed 18' wide, paved roadway will be provided with the next application. Lot Layout Lots 1 and 2 are appropriately sized. No wetlands will be found in the area of development. Buildings are oriented to take advantage of the view of Camel's Hump to the northeast. Pedestrian Access 9. Draft easement documents will be submitted for review by the City's attorney. Water 10. We have been in contact with Jay Nadeau and intend to layout and construct our water distribution system in conformance with the Water Department's requirements. Fire Protection 11. We will submit updated drawings and fire flow calculations to the fire Department. If Mr. Brent feels that sprinklers are required, they wil I be installed. Sewage Dis osal 12. Preliminary wastewater allocation approval has been obtained. Final approval requests will be submitted following Preliminary Plat approval. UhIiU Lines 13. Any and all easements will be sized and located as required by Mr. Szymanski. Outdoor Lighting No pole mounted exterior luminaries are proposed for either lot 1 or 2. Appropriate sharp cutoff fixtures will be located on the proposed buildings to provide area lighting to the project. Storm Drainage 14. As is currently the pattern, stormwater will be diverted to grassed swales and sheet flow areas for treatment and attenuation before reaching the existing pond. Grading and drainage plans will be submitted to Mr. Szymanski for review. Monumentation 15. A survey and subdivision plat has been completed by Button Professional Land Surveyors and will be submitted with the next application. LLEWELLYN • HOWLEY I N C O R P O R A T E D EneW Conservation The proposed buildings are nestled into a thickly treed area for wind protection. Utility Easements Any and all easements will be sized and located as required by Mr. Szymanski. Legal documents will be submitted for review by the City's attorney. Directional Sins & Addresses Addresses will be provided prior to Final approval. PRD Review Standards (d) Sight distance calculations were provided to the City engineer at the Sketch Plan phase. Additional copies can be included in the next application. (g) Most of the open space on Lot 1 is currently protected by the City's Open Space Zone ordinance. Lot 2 will have a condominium association to protect the remaining open areas. Copies of Condominium covenants and documents will be provided to the City's attorney for review. Site Plan Review Standards (c) Parking 22. There are two spaces in the garage and two spaces in the driveway for each unit proposed. A total of 20 spaces are proposed. (d) Landscaping, screening, and outdoor lighting 23. The plans will be revised to correctly indicate species and incorporate the comments of the City Arborist. We request a waiver of the remaining landscaping cost requirements as the site is very heavily wooded. We feel the project is adequately screened and landscaped. The applicant agrees with staff to withdraw this application and reapply under the Proposed Land Development Regulations. We will include and consider all comments by staff in that application. However, in order to clarify the requirements of the City, we do request to be heard by the DRB on the scheduled meeting of March 18. Sincerely, LLEWELLYN-HOWLEY INCORPORATED o uu;- Skip McClellan 2063 PP response 031803.doe LLEWELLYN • HOWLEY I N C O R P O R A T E D VJ/ 11/U4) 1Y1U1V GV:LI CAA 0VL40L00L^ k ULIlp V W-1CI1 Cathy O'Brien Wetland Consulting 839 Oak Hill Road, Williston, VT 05495 (802) 878-6022 March 17, 2003 Skip McClellan LIewellyn-Howley, Inc. 20 Kimball Ave, Suite 202N South Burlington, VT 05403 RE: Van Sicklen Road Property, South Burlington; VT Dear Skip. On March 13, 2003,1 met with Mike Gravelin, the backhoe operator, and yourself on the property on the northern side of Van Sicklen Road in South Burlington. The South Burlington Wetland Map shows a kidney shaped wetland and a pond on this property. I reviewed the property to determine if the mapping was correct_ Despite the winter conditions, with the help of the backhoe, I was able to examine the soils, the vegetation and hydrologic conditions. I found that the area had been incorrectly mapped as a wetland. South Burlington's wetland map is based on photo interpretation of 1992 Color Infrared Photography, limited field work, site specific wetland delineations on file with the State Wetlands Office, and soils information. Field work was done to determine site conditions in a variety of "signatures" on the photography. I therefore went back to review the 1992 color infrared aerial photographs at the Natural Resources Consulting Services at their Williston office. There is a slightly darker signature on the photos that is kidney shaped, as mapped on the wetland map. Field work, however, revealed that this signature was not due to wetness. The man-made pond shown on the wetland map was accurately mapped. This pond is clearly seen on the attached copy of the aerial photograph. For an area to be considered a wetland, it must meet the technical criteria for three parameters: a dominance of hydrophytic vegetation, hydric soils and wetland hydrology. An area that meets the criteria for each of the three parameters is considered a wetland. Hydrophytic vegetation is defined as macrophytic plant life growing in water, soil or on a substrate that is at least periodically deficient in oxygen as a result of excessive water content. The U.S. Fish. and Wildlife Service has developed a list that ranks each plant species based on its frequency of occurrence in wetlands. UJ/ it / UJ IVIUA LU: 40 rAA OU4404004- %iULllq U Ui'1C11 On site, I found that the area that had been mapped is a gently sloping hillside, sloping to the east. It encompasses a portion of the existing mowed grass yard to the north and a steeper ledgy area with woody vegetation to the south east of the lawn. The dominant vegetation in this area is staghorn sumac, honeysuckle, raspberry, burdock, and mullen. The dominant vegetation is upland vegetation, not wetland vegetation. It does not meet the criterion for wetland vegetation. Hydric soils are soils that are saturated, flooded, or ponded long enough during the growing season to develop anaerobic conditions in the upper part. The publication "Field Indicators for Identifying Hydric Soils in New England, 1998, second edition, is used to determine whether a soil is hydric. I directed the backhoe operator to dig a test pit in the lowest portion of the mapped area. I found the soils to be silty loam with a brighter chroma than hydric soils. The brighter colors and the lack of mottling in the upper part of the soil profile are indicators of an upland soil. Soils with Iow chroma colors in the upper part of the soil profile are hydric soils. The soils in the mapped area do not meet the criteria for hydric soils. An area has wetland hydrology when it is saturated to the surface orinundated for typically a week or more during the growing season. Since it is difficult to examine wetland hydrology during much of the year, indicators have been developed that allow hydrology to be analyzed, even in the winter. The lack of these indicators show that the hydrology criteria have not been met. The attached Army Corps of Engineers Data Sheet summarizes the information presented above. In conclusion, the wetland mapping on this site was in error. The area that was mapped is not a wetland. Please call me at 878-6022 if you have any additional questions. Sincerely, Cathy OBrien enc: copy of 1992 aerial color infrared photograph COE Wetland Data Sheet FOR USE WI H-1 '1987 CORPS WETLANDS DFI INFATIAN NAAN11 W J Project Title: ` t?Cor 'A� IlwnhOr: D .y Tionaecl: Plot: [ Dale: 3 1 �✓ ���. DATA -- VEGE'TATi0N SIFotum and Species {OOMINAN•TS ONLY) Dominance Rollo Percent Dominance NWI Slotut 45 1 t-\4C e V` Note: vie allsris► 4 to-lndicole rAC-. FACU. of UPC species rilh observed odeptione to Wslbnd hydrology TALLY Mominonls ONLY) 081. TACW (AC tlAC- tPACU rVPI IAC- i'ACU UPL SUBTOTAL IWOROPN00)! SUUBTOTAL• TOTAL: 1,0 IDO s SUBTOTAL (NYOROPNYTES ty�r PERCENT - o �• ttNNUYh1Y l EJ TIESCRIDE VEGETATION TwSTURBANCE: OESCRIOE AOAPTATlONS: l ' F 1 DATA - SOIL Sad Taeonemy. Corpps o! En0lneIII IGs A ..1 ems. , st C. C e1I'"Y i VY Re tonal O`ran M a Clog `11 E Cdlerlon; It Published Soil Survey Available? Yet No Q Title/Date {rfV .N Cat, -.a j Sy Soil Type Mapped r4-% � Ob rvol�•gns *&k Y"� O V"--- Conlitm �ype Mopped? Yes S No Depth Ilodson Lialele Color (Llunssll. Ilobl) Color of Mollles ( hns,". Moist) USDA Tesluft, bon or mangenase nodules or conuslions, restrictive �r ;t0 1'i Yc� �1 Apundanes/Controel layers, fool distribution, oeidieed Fhitospheret, etc. 10 16.0 Le .t- t o ►a S i 1�` �o�`��" rnt3'Pt• 1� � f t AcmwAs; �s- r SAelch Landscape P" ian. tj ti YE, i Xb) 0 ' - t ._ '+K<..,•+". n.Ylarf .•f yy +_ j i P - r F •D4a .may'; � 1 �+� ie, F•t'� i' � �S R, t iq a a "',.fix • y� I PAW, iA Nt :�K�� .� I is - _ f { * • 'r� } - �:.,� a •• .. ; ,. �� d n ,,t: ��' � x '' a �,W �� - .. - �a'rY"+� 'si.an s..,:::ynt�-,.... ... .;g . r" ,. _ � � �- • w �,.. � .. 3 -» � y Ef•. .. }t fir` � ;�.. ta• .;t i {Q1�',. � '•c, >.e �. : � - S'nY �y � >r$ v '� Za•- r vi. Et:.k#a $ J/`�+.� .. t y ,: et.'• "„ iK.. a .D. A'� ++." '. ' . �• � a "ani �� 4}, �� aG •`� 'A 't I i�n, J �i �i�; ,0 i7. -31 � .ppf C+k 3 §.'S.:,nr��f ,Y tl'' , i ' � , y � , i r `� � tN {• i tt D F•:e . t j r�r �� � 4i�`� s M� t+ �y'�'-s�� i` ate, �ib''�g„ - - J `. � •D � f ��. @� "q�,{;��i._yi, J Y,r • ' i>: i ��: It _ _ a . Y i f- _ t �.'�"�r •�b , .pxr`.1.PTt �--�C.'j,. � 'F `5, "•a . � t�4 Ir' �i • C�.,� � }RS � s. ;,�; a��4 � ,t� ��, i �K.:. y ,r ,'#, .ice,. - i �:� 1 - .. � �� Dz �"'✓ .r. ; ��. -:r �' 4t+ t'�. � +a � k" - Sy'+4 #' ; � i. F�." -.!tl' t •'����in t y� f t;, i.l'.t.�',.�,. •�JfY^ ae" � AS'?�G da'.. 'd' ^ � it t ,.,y' ' - - a^{..ia. { J•'+3�e' .� I�'a �'" r� ':.<.�`„ ! .•�I ))�/gyt:M i'" A.;,a.< "$}ar�,C,`.J,��.7,5�'�{/ '�;ay.Nk�S`'.•'fay`�' ,j - iz. �. •� �.., a � ` ar _ ' 'E , 15` �' � tE�:,i� �5�1 *'� ^Y ' .Y19fFr. $~..�cn � , � F� ,.' � ` P� # A ",;•ti a �, �� , _ 1 '� 3 � rx to 2"� sn „'�� � „5 m � '#.�4 �, � � F�, f�,�,AB+_ • c 't"'+c, _a} ..k. •aim° .a,9+^ D(gto� 1 p FOR USE WITH 1987 CORPS WETLAI\ I. •rsw M .s the reab.be to alt.n.v th.I the sJ Ie N01 NtinrC E: .4. OLILMU01AIIDN NOI uorerer rt use Nlt:a+ IRA wt Nr. ltyr+a Stales nq b. It.lt+re Mlr, 1 Iwo Marp.IM naanl —r M Yarevw .dw u.,.l. -ve.ei ta Yee No f7 Sol Is fragaentlr PONDER a FtOn0EO for o durelbn longer Ihon Iwo scab. during Ilk yror;ng saesen, (alloeh on t.planollon of the bolls lot your canebrs;onl). ❑ the sow meets the Cap of Enotneers regional ctllvrp e1 e VERY POORLY DRAINED SOIL and then h no svldtnca of altered hydrology, Ike cow meets lhb Cerpa of Entisears teglaner crNarlo as a POORLY DRAINED SOIL' and there Is no cvtdence of atived hydrology, ❑yA the vow Mesta the Cap of Eng;nevrs regional erilulo as e e/�!_ SOMEWHAT POORLY GRAIIIEO SOIL thol hat other of lha lollo►inq two thartaclerhilka': yes NO ❑ O I. WhNn 6 Inches of the roil surface there arc Yet No a led moHlss .Ilhitn an A a. All hellion and the subsoil It mottled throughout; OR Lg b, tomman to many, dialiml or prominent `mollies with o_ynotric Iat chromo 3 or Ito; OR c, diallnct it penunvni oddiaed rhiroepheres - `y' and 114 1piNK 6 mottled throughout. Qci. ]. Within ?I Inches of the s 11 surface, there ere mollies .hkh Ql ore wmmon to many, dislincl or promincnl, and %hot as ehramo g or Ips, and on. of the lalbwing: Yet Nq a. In the bell Ion Thal Iles vIlh;. 10 Inches of the sow arfacs and direclly benealh a dark" A or AP halan, The mold, it chromo 3 or late: the melllu are eo I Icasl TOR In obundonce and d;st;ncl or pronsTnenl, 0 b, When a dorY'Ap loilson Is between 10 and 11 inches Ihkb, .elness morphology moy be masted by, organic moiler, Normally. Iheas problem slluationa w;ll be considered hydrk when: t, hydrophylts ore Prevalent, 1. There Is no evidence of o4arod hydrology, end W. In the barlion that Net Alecly bonselh the All herlson, the mo1rL color 1■ chromo 3 or less and molllee ate at keel 107 in abundance and distinct or prominent. CD Cheek hero and ailscsi o deser;ptlas of yaw proudurat and c oncholians w one of the lolo.lng oplions •a's chosen for Four bydtlo call dale+m{natlen: Motsused itdov polentiula, cofarmalrlc tell for fellow Iron tell (�,or,-Oipy+kit), 6r other megllnrmsnis end obstnoHane, . Typically In New Enilortd, solh sieving these maphologles +ill be clactiflad In on agvlc wbardar or an acluic svbgraup In toll lo.coomy .+ Note: a dart A or Ap Is dtflned as ho+Ing o volve of 3 or line ynin a f3ETEnuINAllof� ItYOROLOGY ❑ Recorded Dole: Sitcom, We or tidal gc Aerial Photograph Other K."a Recorded (laic A.olab REPORT ANY OF 111E FOLLOWII Depth to Free Wolec Oepth to Soluroliont Oeacriba Allcred Hy ❑ Inundated ❑ Saturated In upper 1 ❑ Water MelLs p Cliff lines ❑ Sediment Deposits 0 Drainage Patterns wi d Aemetts: E� 1t C CONCLUSION', inwseel: Oteoltr than 50 Percept "Id llydlk Soils Crdadon Mel? �E WNtond Ilydrology Present? i Aemorba: t -e�-C E PUBLIC HEARING SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD The South Burlington Development Review Board will hold a public hearing at the South Bur- lington City Hall, Confer- ence Room, 575 Dorset Street, South Burlington, Vermont on Tuesday Julyy 15, 2003, at 7:30 P.M. to consider the fol- lowing: 1. Application #CU-03-11 of Joe & Tony Handy seeking. conditional use approval under Section 14.10, Conditional Use Review, of the South .Burlington Land Development Regulations. Request is for permission to cons- truct. a 1000 sq. it adds- tionto a convenience store, 1333 Williston Road. 2. Preliminary plat application #SD-03-35 and final plat application #SD-030.36 of Northfield Savings Bank for 'a planned unit develop- ment consisting of: 1) razing a 3500 sq. ft. 12 unit motel, 2) razing a single-family dwelling, and 3) constructing a 2500 sq. ft. bank with a drive through facility, 1120 Shelburne Road. 3. Preliminary plat. application #SD-03.37 of A&M Construction Corpo- ration, Inc. for a planned unit development con- sisting of: 1) subdividing a 4.6 acre lot Into two (2) lots of 1.3 acres clot #1) and 3.3 acres' (lot #2), and 2) constructing two (2) 2-family dwellings on lot #2, 100 Van Sicklen Road. 4. Preliminary plat application #SD-03.38 of Homestead Design, Inc.' for a planned unit deve- lopment on a 44,78 acre parcel consisting of: 1) nine (9) 3-unit multi -fami- ly dwellings, 2) 14 four (4) unit multi -family dwel- lings, and 3) one (1) 6- . unit multi -family dwelling, 895 Dorset Street. 5. Master Plan application #MP-03.01 of Highlands Residential' Development Co., LLC to amend a planned unit development consisting of a 18 hole golf course and 295 residential units. The amendment cons- ists of increasing the number of units to 357, approval of a maximum building and lot cove- rage, approval of road- way network and update of traffic study, Dorset Street. Copies of the applica- tionsare available for public inspection at the South Burlington City Hall. John Dlnklage, Chairman South Burlington Deve- lopment Review Board June 28,2003 Quantity Species Size Unit Price Total Price 3 Austrian Pine 7'-8' $138.00 $414 4 Japanese Tree Lilac 1 '/z"-2" $110.00 $440 14 Dark American 6'-7' $75.00 $1,050 Arborvitae 2 Shademaster 2"-2'/2" $180.00 $360 Hone locust 2 Colorado Blue 7'-8' $138.00 $276 Spruce 4 Totarian Maple 2"-2 'h" $220.00 $880 8 Catawba 3 gal. $23.25 $186 Rhododendron 8 Anthony Waterer 3 gal. $14.00 $112 Spirea 8 Wintergreen 3 gal. $26.25 $210 Boxwood 8 Japanese Garden 2 gal. $15.25 $122 Juniper $4,050 X 2.5 = $10,125 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 MEMORANDUM TO: South Burlington Natural Resources Committee FROM: Janet M. Hurley, Associate Planner DATE: March 3, 2003 CC: Skip McClellan, Llewellyn -Howley, Inc. 2-lot, 5-unit Subdivision Preliminary Plan Application #SD-03-10 NRC Meeting Date. March 6, 2003 A & M Construction, LLC, hereafter referred to as the applicant, is requesting preliminary plan approval from the Development Review Board (DRB) for a 2-lot, 5-unit subdivision on 4.57 acres on Van Sicklen Road. Portions of the subject property fall within the Conservation and Open Space (CO) District, as shown on the following map: 2-lot, 5-unit Subdivision Preliminary Plan SD-03-10 NRC March 6, 2003 Page 2 of 2 The CO District includes all wetlands and buffer areas 50 ft. in width surrounding all wetlands. The plans show an existing pond on the property and a 50 ft. buffer surrounding the pond (see attached plan). However, a mapped wetland (as depicted on the City of South Burlington Wetlands Delineation Project map and shown on the map above) and corresponding buffer to the west of the pond is not shown on the plans. Furthermore, the development of structures is proposed to occur in the location of this mapped wetland. Although, the local accuracy of this data must be verified in the field, it is the applicant's responsibility to provide such verification from a qualified wetlands consultant. If encroachment into the CO District is proposed, the applicant must provide evidence that the encroachment will not adversely affect wetland functions as described in Section 3.503 of the Zoning Regulations. Accordingly, the proposed encroachment should not alter the water storage capacity, water quality, wetland functions and values, or wildlife and fisheries habitat provided by the wetland. A preliminary plan hearing is scheduled before the DRB on March 18, 2003. Staff recommends that the Natural Resources Committee (NRC) request the DRB to continue the Preliminary Plan hearing until the applicant provides information from a qualified wetlands consultant that addresses the issues raised above and the NRC has an opportunity to review such information. \drb\sub\singh\nrc. mem.doc ILY. Must go as Sealed oils, on forms Mn cp Autnu ... r, planning * W8 Miss iiim /r great people skills to Due to al furnished by the State, PUBLICHEiA"'uG 83Barlow Street lannin for a Path Call (a02) 334- will be received until SOUTH BURI N Winooski, VT Alignment Feasibility (802) 864.3320 provide group and 5pm. 11:00 a.m. prevailing DEVELOPI, The office 01 the Study for the Town r 9 year old ReVie- time on Friday, March pEVtEW BOMK Architect, Guillot Vivian- South Hero. The goal 6 rSOnt7 S private instruction at pherd/St. Bar- 14, 2003, at the office of Viehmann Architects the Study is to improve our on -site driving ix to good home. Contract Administration, Inc., safety for non -motorized range from June 1" At - give him up, but Room 219. North Lobby, The South Burlington 284 S o u t h U n i o n travelers between the At-FRussianGASKS (SO) through September Brant of young National Life Building, Development Review Street ten Point Fishing Accessas masks g pMont alter, VT for the Board will hold a public g V T and the village of Southew with6'". PGA member or ireat homearnHe construction of the pro- hearing at the South Bur- p5401 I ° t o n , Hero.Because of thelter andapprentice required. he outdoors. He ject hereinafter des- lington City Hall, Confer- complexity of issues in -a $50ve him the atten• cribed: The time of re- ante Room, 575 Dorset A Pre -bid Conference will volved, consultants are el$5itsSend resume to: needs and de- calving and opening bids Street, South Burlington, be held at the site, 65 encouraged pl develop -ilable. Be Smugglers' Notch may be postponed due Vermont on Tuesday, multi -disciplinary ap- Resort Please call for to emergencies or unfo- y Barlow. Street, Winooski, roach to this project. safe and may peace Human Resources 02Pleas 396 g � March 18, 2003, at 7:30 Vermont at 10:00 A.M. phis study will be com- stayy with us. reseen conditions. p,M. to consider the fol- Monday , 3 March 2003. Call j882) 748.4743. 4323 VT Rte 108 S S 141 Wooden, Size lowing: Additional site visits may Plated in cooperation Smugglers' Notch, r91/2.HollowCore LOCATION: Statewide be arranged by contact- with and under the su- VT 05464 >omeHardware. STP CRAK (18): This 1 Preliminaryy plat in Andre Robert at tact) pervision of NRPC 2 SKIING TICKETS To 802) 899-1990 work is to be performed application #SD-03-10 of g through agreements with Magic Mountian. Good 1-888-754-7684 in the northern region of 655-2360 ext. #28. For the Town of South Hero Any Time.$20Each. www.smuggs.com/Jobs DOG Black Mini A&M Construction Corpo- uestions regarding the g y ( ) h Poodle, Neu- the State on the follow- ration for a planned rest, q g f1 and the Vermont A enc 802 563-2903 in route: I-89 NB St. s ecificatlons or bidding of T r a n s p o r t a t i o n Shots, Papers. g dential development Pocess please contact (VTrans). The Regional i-2482 A I b a n s Town (m m consisting of: 1) subdi- rank M. Guillot, AIA, ----- 117.85) to Highgate (mm vidin a 4.57 acre parcel Commission has bud 7 FREE DOG 130.254); 1-89 SB Broak- with an existing single (802)862.9631. sled approximately = .Y Full -Time LNAS eryGood, 5 Mo. field (mm 36.900) to 12,000 in consultation y family dwelling into two Wanted for Evening Shift t Lab, Part Chow. Montpelier (mm 53.050); (2) lots of 1.23 acres (bt EdWillenbaker fees for the Study. (802)872-7190 US 7 St.Albans Town #1) and 3.34 acres (lot Executive Director, Con- -- 1 .1 3 3 10 mm Vactin officer The deadline for submis- Come join our team! We have PUPPIES Adorable #2), and p constructing g Mix, Ready For 1.928); US 5 Newport two (2) duplexes on lot Winooski Housing Au- sion of proposals is noon on March 8, Can City (min 0.000 to mm #2 100 Van Sicklen thonty on Monday, March 31, full-time positions available e- 0.860); US 2 St.Joh- 802 655-2360ext. #22 2003. NRPC Is an equal our Evening shifts. Come expe- een Anytime. Call Road. opportunityemployer, rience our fun atmosphere. We )6-2887Anytime nsbury (min 4.684 to 2 A p p I i cation ( ) mm 8.000); US 2 East #CU-03-02 of Kenneth ns s rDBged RANGE, Kenmore, Montpelier mm 1.600) to nesses are encouraged have aver enerous benefits P ( Smith seeking condition- February 27, 28, 2003 .leaning oven needs Marshfield (mm 0.330); al use appproval under March to apply. package wed e happy to pres- otherwise ok. You US 2 Williston (mm Section 26.05, Condl- iway. Call (802) 862- 1,724 to Richmond (mm tional Uses, of the South REQUEST FOR For a complete version ent to you. Check out our 0.822); VT 15 Walden Burlin ton Zoning Routh PROPOSALS(RFP) of the RFP, please con employee recognition / appreci- PAC DP WEIGHT (mm 4,095) to Danville lations Request Is for FROM GENERAL tact the Northwest Regi ation activities that we run all ER, You come take (mm 1.837); VT 36 St.A- ion to allow the CONTRACTORS onal Planning Commis Call tact) take Ibans (min 2.834) to Be- followin uses: rental a sion, 7 Lake Street, the time. Be sure to inquire loans l( (min 2.507); VT equipment and rentalmisclof ESSEX JUNCTION Suite 201, St. Albans, about our sign -on bonus We 100 Hyde Park (mm neous items; automotive SCHOOL DISTRICT VT05958,phone: (802) care about those who care for MATTRESS 5.555) to Eden (mm repair and service; and IS SEEKING TO 5245958. Queen Size, Good 4.248); VT 100B More -indoor recreational set. UPGRADE THE our residents! Please contact: ondition. U Pick UP town (mm 0.000 to mm vices, ec Commerce MECHANICAL AND March 1,2003 (802) 864-4790 1.200); VT 114 Canaan Avenue. 57 ELECTRICAL TOWN OF CHARLOTTE udith Wilson, DNS t o mm l i c a t i o n ' INFRASTRUCTURE AT ZONING BOARD J IDDLEBURY Natural 8.258); VT 141 Canaan 3 A P P OF ADJUSTMENT Starr Farm Nursin Center wds Coop is planning (m m 0.000 t o m m #CU-03-03 of Frey En- ALBERT D. LAWTON expansion of our retail 0.493); VT 122 Lyndon terprises, Inc. d/b/a A PUBLIC SCHOOL 98 Starr Farm Road ,tore requiring the re- (min 0.000 to 0.500); VT Earls Cyclery & Fitness BUILDING Burlington, VT 05401 oval of 2 small houses 14 Barre Town (mm seeking conditional use Pursuant of Title 24 and $t t #9 & 9A Washington 1.706) to Barre City aPPr0val under Section the Charlotte Zoning By- (802) 658-6717 :. The Co-op would like (mm1.193); VT 117 Esex 26.05, Conditional Uses, The Essex Junction laws the Board of Ad- EOE o donate these strut- (min 3.340) to Richmond of the South Burlington School District (EJSD) is justment will hold, public res to any organization (mm0.6.34 Zoning Regulations. seeking to upgrade the hearings beginnng at forarelocation,com- Request is for permis- mechanical and electrical 7:30 p.m . at the Town leted by May1, 2003. If CONSTRUCTION BE- sion to place a 8.5'x 40' infrastructure at the Al- Hall, 159 Ferry Road, nterested, please con-ING: Work to be per. metal storage container bert D. Lawton Middle Wednesday March 19, STARR FARM tact Glenn Lower, formed under this project in a parking area asreta I School located et 104 2003 to hear the tolls- N U R E 1 N C c E N T E R S t in Essex wing• General Manager, at includes the routing and accessory use o a Maple tree (802)388-7 76 in bi• use, 500 Williston Junction, VT. The pro- Request of Point Bay Conditional sealing of cracks 'LYING 2 ft, X 4 ff, t u m i n o u s c o n c r e t e Road. Jett includes new class- Marina, for. to Laminated Shelv• pavement on existing 4. A p p l i c a t i o n room ventilators, air Use approval Section #CU-03-04 of Roman 4.5.0 to expand, the boat distribu- r Full -Time 30 Pieces Available, state highways and the Catholic Diocese of Bur- handlers, power lion panels, and miscel• storage area by 25,000 ul (802)877.1561 appropriate traffic con- and to Install a trot lington seeking Good!• laneous general cons- pe Thrifty tional use approval under permanent boat launch. RN'S LPN's rchandise truction items. quick, easy, and Section 26.05, Condi- work greats Call Plans and Bid Proposals A lications are available tional Uses, of the South PP Wanted for Day and Evening may bee seen and ob- The EJSD is solicitin ty3321. Burlington Zoning Re u from Genera for review during regular rained at the Agency of 9 g proposals Plannin and Zoning of- rSNING MACHINE, Transportation, Montpe- lations. Request is or Contractors to be Prime firshous tpoint Heavy Duty lier, VT. Minimum wage permission to expand Contractor for this work. is Comejoinourteam!WehaveFull- time positions available on our Day De capacity. You take rates predetermined by cemetery, which an GlonaJ Warden, use to the ad- and Evening shifts (Monday - Friday - a6901Please call (802) the Secretary of Labor accessory The project is to be 6 for the project are set jacent church, to include: completed in three (3) Clerk, Zoning Board of for P Adjustment No Weekends). Come experience our NATERTANK30Gallon out in the advertised 1) site preparation Hyydro Pneumatic With specifications. and bid additional gravesites, 2) Phases from summer 2003 to completion in fall March1,2003 fun atmosphere. We have a very gener- 5HP,GouldsPumpp. proposals, and such constructing Columbari- sPumall osELL aDLEITEYS°WITIIA um, and 3) additional of 2005. All three TOWN OFUNDERHILL included in ousbenefitspackagewe'dbehappyto present to you. Check out our Pump Needs ZONING BOARD (802)434-6413 CLASSIFIED AD, CALL65&3321. parcel roadways to serve phases are this RFP, but proposals ADJUSTMENT employee reco recognition / appreciation g PP the new areas. OF for Phase 1 (summer NEARING activities that we run all the time. Be Copies of the only may be con• sure inquire about our sign -on ble for sider lions are available for sidered. The Underhill Zoning inspection at the Board of Adjustment will ERE E bonus! We care about those who care s! Please public South Burlington City Copies of the complete hold a public hearing on for our residents! contact: at Reprographics at 60 at 7:00 PM In the Under - John der- WOODEN Halt. documents are available Monday, March 17, dr- John Dinklage, Chairman Commerce St., Williston, hill Town Nall with the Judith Wilson, DNS South Burlington VT. Partial sets of do- following agenda: Starr Farm Nursing Center Development Review currents will not be s Board available. Documents 7:00 - The request of SKIDS 98 Starr Firm Road VT 05401 are available at cost. Peggy Bsloin, $64 Plea- i sent Valley Road for a Burlington, (802) 658-6717 Contact Bob Peelers at the: March 1, 2003 This project will be sub- conditional use to ope- EOE I7 REQUEST FOR Jett ti commissioning rate a craft shop. The 1 urlittrttatt rQQ rQ�$ BIDS inspections by an Inds -property (the M is n- Gated m the Mt. Man - r7 "Xs pendent agent con- A L o r. A c. CUSTOM Separate sealed BIDS tracted by EJSD. sfield Scenic Preserva- for tion Districi. The request STARR FARM will be received 802-660-1801 COMMONS AREA CAR- A walk through will be comes under Chapter III M' Chapter N U R E I f C CENT E R PET REPLACEMENT at held on Tuesday, March Section and Winooski Housing 11, 2003 at 3:00 p.m. at VIII Section B (5) of the the _ De sell ary Cot wo: Mo intr fes: of I tea is e sta an( pit L and Th Permit Number SD- 03 - / 0 CITY OF SOUTH BURLINGTON APPLICATION FOR PRELIMINARY SUBDIVISION PLAT REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Narinder Singh, 28 Whiteface St., So. Burlington, VT 05403 (802) 658-5984 2) LOCATION OF LAST RECORDED DEED (Book and page #) Vol. 557, P. 22-24 3) APPLICANT (Name, mailing address, phone and fax #) A & M Construction Corporation, Inc. P.O. Box 9347, So. Burlington, VT (802) 865-4250 4) CONTACT PERSON (Name, mailing address, phone and fax Skip McClellan, LLEWELLYN-HOWLEY INCORPORATED, 20 Kimball Ave., Ste. 202N, South Burlington, VT. (802) 658-2100 5) PROJECT STREET ADDRESS Van Sicklen Road, So. Burlington, VT 05403 i0d 6) TAX PARCEL ID # (can be obtained at Assessor's Office #1750 00100 R 7) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use One single family home b) Proposed Uses on property (description and size of each new use and existing uses to remain Construction of four, three bedroom condominium units in two, 70' x 60' duplex structures. Existing home to remain unchanged. c) Total building square footage on property (proposed buildings and existing buildings to remain) 1,800 s.E home to remain, four units of 2,200 s.f. each to be constructed -total 10,600 s.f. d) Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) 25'-30' high residential structures e) Number of residential units (if applicable, new units and existing units to remain) 1,800 s.f, home to remain, four units of 2,200 s.f, each to be constructed -total 10,600 s.f. f) Number of employees & company vehicles (existing and proposed, note office versus non -office employees) N/A g) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable) N/A h) List any changes to the subdivision, such as property lines, number of units, lot mergers, etc. 8) LOT COVERAGE a) Building: Existing 1.4 % Proposed Lot #1 - 5.2%, Lot#2 - 4.3% b) Overall (building, parking, outside storage, etc) Existing 1.9% Proposed Lot#1— 9.0%, Lot#2 —12.8% c) Front yard (along each street) Existing 2.5% Proposed 3.3% 9) COST ESTIMATES a) Building (including interior renovations): $480,000.00 b) Landscaping: $12,100.00 7500 4- 16 0 0 c) Other site improvements: $64,000.00 (Sanitary Sewer, Water Main, Pavement) 10) ESTIMATED TRAFFIC a) Average daily traffic for entire property (in and out): Lot#1 - 6 vte, Lot#2 — 23 vte b) A.M. Peak hour for entire property (in and out): Lot#1 - 1 vte, Lot#2 — 2 vte c) P.M. Peak hour for entire property (In and out): Lot#1-1 vte, Lot#2 — 2 vte 1 l) PEAK HOURS OF OPERATION: N/A 12) PEAK DAYS OF OPERATION: N/A 13) ESTIMATED PROJECT COMPLETION DATE: 2004 14) PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (I I" x 17") of the plans must be submitted. A subdivision application fee shall be paid to the City at the time of submitting the final plat application (see Exhibit A). 2 I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATURE OF APPLICANT SIGNATURE OF PROPERT OWNER Do not write below this line DATE OF SUBMISSION: Z 7 0 3 I have reviewed this preliminary plat application and find it to be: Complete ❑ Incomplete z//v/o3 DirecVr of Planning & Zoning& Designee RECEIVED FEB 10 2003 K CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 MEMORANDUM To: Bruce O'Neill, Recreation Director FROM: Raymond J. Belair, Administrative Officer RE: Recreation Path Committee Project Review DATE: October 28, 2002 The Development Review Board will be reviewing the following two (2) projects, which may be of interest to the Recreation Path Committee. 1. A & M Construction — Sketch plan for a 5 unit planned residential development at 1750 Van Sicklen Rd — to be reviewed on Nov. 5, 2002 2. John Larkin & Ralph DesLauriers, Jr. — Sketch plan for a 160 unit planned residential development, Quarry Hill Rd. — to be reviewed on Nov. 19, 2002 ]DEVELOPMENT REVIEW BOARD MEMO November 5, 2002 MEETING Parking: The minimum parking requirement is five (5) spaces, one space per guest bedroom and two for the owners (2 + 3=5 spaces). The applicant is proposing seven parking spaces. A single accessible parking space is required and should be so noted on the plan, and on the site with appropriate signage. The width of an accessible space is 13 feet total. The plan should reflect the correct width for the accessible space. The site has more than adequate parking and staff recommends two of the proposed spaces be converted to a single accessible space. Bicycle parking or storage facility is required, and should be noted on the plan. Landscaping: There is no minimum landscaping requirement based on minimum construction costs. Lighting: Any floodlights or non-downcasting and non -shielded firxtures should be removed or replaced with downcasting and shielded light fixtures approved by the Director of Planning and Zoning prior to installation. Dumpsters: No proposed dumpsters. 10) SKETCH PLAN, TWO LOT SUBDIVISION, 1750 VAN SICKLEN ROAD This project consists of a planned unit development, which includes: 1) a two (2) lot subdivision, lot # 1 is 1.25 acres and lot #2 is 3.34 acres, 2) construction of four (4), three (3) bedroom housing units in two (2) buildings on lot #2, and 3) a single-family residence to remain on lot #1. This property located at 1750 Van Sicklen Road lies within the Southeast Quadrant zoning district. It is bounded on the north, east, and west by single family residential lots, and on the south by Van Sicklen Road. Access/circulation: Access is provided via a paved 18 foot private roadway. The proposed roadway serves a multi -family residential lot, and serves four (4) units. The preliminary plat plan should be revised to show any access drives located across Van Sicklen Road. The preliminary plat plan should also show a turnaround at the end of the private roadway. Coverage/setbacks: Lot #1 proposed building coverage is 5.2% (maximum allowed is 20%). Overall building coverage is 9% (maximum allowed is 40%). Lot #2 proposed building coverage is 4.3%, and the overall coverage is 12.8%. All setbacks are met. Density: The allowable density for this project is 5 units as proposed. One of the units is the existing single family dwelling (4.57 acres x 1.2 units/acre = 5.4 units). The proposed density complies with Section 6.403 of the zoning regulations. The developable area for lot #1 is .34 acres which results a maximum of 1.36 units on lot #1 (.34 acres x 4 units/ acre = 1.36 units). The developable area for lot #2 is 1.69 acres, which results in a maximum of 6 units (1.69 acres x 4 units/acre = 6.76 units). 13 DEVELOPMENT REVIEW BOARD MEMO November 5, 2002 MEETING Parkins: The parking requirement is 2.25 parking spaces per unit, or 11 parking spaces. The proposal includes three guest parking spaces and covered parking. The preliminary plat plan should indicate how many covered parking (garaged spaces) are being provided and show a bike storage area or bike rack. City Engineer: The City Engineer stated in his comments (enclosed for your review) that the plans should be updated as follows: 1) the location of proposed sewer and water lines if all properties are to connect to municipal services, 2) the private roadway should have a turnaround, and 3) to indicate the sight line distances in both directions on Van Sicklen Road. C.O. District/wetland buffer: The applicant should show the location of all delineated wetlands and their associated buffer. If encroachment is proposed, a report addressing the criteria found in Section 3.503 (a)-(e) of the zoning regulations should be supplied prior to preliminary plat submittal. This will allow the Natural Resources Committee to review any proposed encroachment and make recommendations to the DRB. South Burlington Fire Department: Comments from the Fire Department are enclosed for your review. South Burlington Water Department: The applicant must comply with all comments provided by the Water Department (enclosed). The applicant is working with the City and the Water Department to address water storage and pressure issues for the project related to the City's water system. Other: ■ A report addressing Section 26.151 of the zoning regulations should be submitted with the preliminary plat application. ■ The plan should make provisions for mailbox clusters if needed. The applicant should consult with the post office on mail delivery options and obtain written confirmation of a decision from the post office. • The minimum size of the proposed multi -family units should be noted on the preliminary plat plan. ■ The preliminary plat application should include street numbers based on the E911 address system. 11) SKETCH PLAN, PLANNED UNIT DEVELOPMENT 222 DORSET STREET (FITZPATRICK BUICK) This project consists of a planned unit development consisting of 1) converting 18,175 sq. ft. auto sales and service facility to retail use, 2) constructing a 6,000 sq. ft. building for a restaurant use, and 3) constructing a 22,500 sq. ft.. building for general office use. This property is currently the Fitzpatrick Buick dealership. It is located at 222 Dorset Street and lies within CD 1, the City Center Design Review Overlay District 1, and the C. O. District/ wetland buffer. It is bounded on the north by a single family residence and 14 To: Applicants From: Stephanie Smith, City of South Burlington RE: Project Staff Notes Date: October 21, 2002 Re: A & M Construction, 1750 Van Sicklen Road Overview: This project consists of a sketch plan application for a residential development consisting of: 1) a two lot subdivision, lot # 1: 1.25 acres and lot #2: 3.34 acres, and 2) construction of 4 duplexes on lot #2, 1750 Hinesburg Road. Issues: The plat plan should be revised to show any wetlands as shown on the City of South Burlington Wetlands Delineation map and their associated 50' buffer, and any wetlands delineated on site. If encroachment is proposed, a report addressing the criteria found in Section 3.503 of the zoning regulations should be supplied prior to preliminary plat submittal (for review by the Natural Resources Committee and the Development Review Board). The plat plan should show existing and proposed water and sewer lines. The plat plan should be revised to show any existing private driveways, or access drives across from the proposed 18' foot private drive for this subdivision. A report should be submitted addressing the PRD criteria under section 26.150 of the zoning regulations, with the preliminary plat submittal. Completeness of Plan: The applicant has submitted sufficient information for Development Review Board to consider the application with the above exceptions noted. Please provide additional information by October 28, 2002. Recommendation: Staff recommends this application be authorized to proceed for preliminafy- fit consideration at the November 5, 2002 meeting. �v�p,,,A 575 Dorset Street Phone: 846-4106 Fax: 846-4101 Fax To: Skip McClellan From: Stephanie A. Smith Fax: 658-2882 Date: October 21, 2002 Phone: Pages: 2 Re: 1750 Van Sicklen Road CC: Dear Mr. McClellan: Please find attached the preliminary comments on the above referenced application. The project is currently scheduled to be considered by the Development Review Board on November 5, 2002. If you wish to respond to these comments or submit additional information, please do so no later than October 28, 2002. Please be sure that someone is at this meeting to represent your application. If you have any questions, please feel free to give me a call. Sincerely, Stephanie A. Smith Associate Planner City of South Burlington, Planning & Zoning City Engineer Comments Development Review Board Van Sicklen Road N. Singh 1. The end of the entrance drive should have a turnaround. 2. Water and sewer services should be shown. 3. The sight distance on Van Sicklen Road especially westerly shall be determined. SOUTH BURLINGTON WATER DEPARTMENT 403 Queen City Park Road South Burlington, VT 05403 Phone: (802) 864-4361 Fax: (802)864-0435 October 18, 2002 Llewellyn -Howley, Inc. 4049 Williston Road South Burlington, VT 05403 Re: Van Sicklen Road Property South Burlington, VT Dear Skip: The South Burlington Water Department has reviewed the plans for the above referenced project. Please find my comments below. I. At this time the City of South Burlington does not have sufficient water storage for any new development of this size. Please complete the attached Application for Water Allocation and return it to the South Burlington Water Department as soon as possible. As the project continues, a final Application for water allocation will need to be requested for approval for water allocation. No construction shall be permitted that may restrict or encumber water supply and storage for the Citys current customers. 2. All construction drawings and plans shall have a note stating "All work to be performed in accordance with the Specifications and Details for the Installation of Water Lines and Appurtenances for All Water Systems Owned by the CWD, the City of South Burlington, Colchester Fire District #1, and the Village of Jericho" 3. Fire flow conditions must be able to meet the requirements stated in those specifications, as well as meeting any conditions set forth by the Fire Department. This area of Hinesburg Road is subject to conditions relative to a dead end line downstream of large commercial customers. A minimum 35 psi rule under normal conditions, and a minimum 20 psi rule under fire flow conditions that are common in well looped systems may be limiting in this project area. Sufficient engineering and design must be incorporated in order to meet State Water Supply Rule and the above Specifications requirements. This project may require the installation of a water booster pump station to meet domestic and fire flow conditions. The ownership of such a pump station would be private. 4. Please send this office plans for the water system design as it continues through the permit process. 1 5. Further changes may be required as this project proceeds through the permit process. This department shall be notified of any changes to this project with revised, updated hard copy plans sent directly to us for further review. 6. A hard copy set of As-Builts as well as one electronic copy in Auto- CAD.DWG Version 14 Format or newer shall be supplied to this department upon completion If you have any questions or concerns, please call me. Sincerely, South Burlington Water Department rJaydeau Superintendent Enc. CC: Stephanie Smith Permit Number SD- APPLICATION FOR SUBDIVISION SKETCH PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the plans will result in your application being rejected and a delay in the review before the Development Review Board. For amendments, please provide pertinent information only. 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Narinder Singh, 28 White Face St., So. Burlington, VT 05403 (802) 658-5984 2) LOCATION OF LAST RECORDED DEED (Book and page #) Vol. 557, P. 22-24 3) APPLICANT (Name, mailing address, phone and fax #) A & M Construction Corporation, Inc., P.O. Box 9347, So. Burlington, VT (802) 865-4250 4) APPLICANT'S LEGAL INTEREST IN THE PROPERTY (fee simple, option, etc.) Partnership 5) CONTACT PERSON (Name, mailing address, phone and fax #) Skip McClellan, LLEWELLYN-HOWLEY INC., 4049 Williston Road, So. Burlington, VT (v) 658-2100, (fax) 658-2882 6) PROJECT STREET ADDRESS: 1750 Van Sicklen Road, So. Burlington, VT 7) TAX PARCEL ID # (can be obtained at Assessor's Office) # 1750 00100 R 8) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) One single family home b) Proposed Uses on property (description and size of each new use and existing uses to remain) Construction of four, three bedroom condominium units in two, 70' x 60' duplex structures. c) Total building square footage on property (proposed buildings and existing buildings to remain) 1,800 s.E home to remain, four units of 2,200 s.f. each to be constructed -total 10,600 s.f. d) Proposed height of building (if applicable) 25'-30' high residential structures e) Number of residential units (if applicable, new units and existing units to remain) 1,800 s.f, home to remain, four units of 2,200 s.f, each to be constructed -total 10,600 s.f. f) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable) 9) LOT COVERAGE a) Building: Existing 1.4 % Proposed 4.6% b) Overall (building, parking, outside storage, etc) Existing 1.9% Proposed 11.3% c) Front yard (along each street) Existing 2.5% Proposed 3.3% 10) TYPE OF EXISTING OR PROPOSED ENCUMBRANCES ON PROPERTY (easements, covenants, leases, rights of way, etc.) None 11) PROPOSED EXTENSION, RELOCATION, OR MODIFICATION OF MUNICIPAL FACILITIES (sanitary sewer, water supply, streets, storm drainage, etc.) None 12) OWNERS OF RECORD OF ALL CONTIGUOUS PROPERTIES & MAILING ADDRESSES (this may be provided on a separate attached sheet) Hendley, Edith & Jane Paul Kwon, Soon & Mikyung Lumholdt, Joyce 20 Highland Terrace 10 Highland Terrace So. Burlington, VT 05403 So. Burlington, VT 05403 Spencer, Keith Cale, Maureen 2 Van Sicklen Road So. Burlington, VT 05403 Gage, David & Kathy Lollipop Trust 200 Van Sickle Road So. Burlington, VT 05403 13) ESTIMATED PROJECT COMPLETION DATE 2004 14) PLANS AND FEE Plat plans shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (I I" x 17") of the plans must be submitted. A sketch subdivision application fee is free. I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SIGNATUR&OF APPLICART SIGNATURE OF PROPERTY -OWNER Do not write below this line DATE OF SUBMISSION: C j I (l � a,,, I have reviewed this sketch plan application and find it to be: omplete ❑ Incomplete Director of & Zoning or Designee LLEWELLYN . HOWLEY I N C O R P O R A T E D TRANSMITTAL LETTER Date: September 11, 2002 To: Ray Belair Zoning Administrator City of South Burlington, VT Re: Van Sicklen Road Property File: 2002063 Copies: Message: Enclosed you will find: An application for Sketch Plan consideration. Please schedule this application to be heard at the earliest D.R.B. meeting. Sincerely, LLEWELLYN-HOWLEY INCORPORATED Skip McClellan 4049 Williston Road -South Burlington -Vermont .05403 T 802.658.2100.F 802.658.2882 •e-mail: Ilewellinc@aol.com Engineering -Land Development -Permitting