HomeMy WebLinkAboutSP-22-039 - Supplemental - 0370 Shelburne Road (21)The Stormwater Section has reviewed the “370 Shelburne Rd” site plan prepared by O’Leary-Burke Civil
Associates, PLC, dated 10/17/22. We would like to offer the following comments:
1. This project is located in the Engelsby Brook watershed. This watershed is listed as stormwater
impaired by the State of Vermont Department of Environmental Conservation (DEC). Please note
that the Engelsby Brook is now classified as a warm water stream.
2. The project proposes to convert an existing commercial space on the second floor of a building
located at 370 Shelburne Rd to residential use, as well as add a third floor to the building. This
project will also include general site improvements. As the project does not proposed greater
than 5,000 SF of new impervious and redevelopment, the project is not subject to the
stormwater management requirements listed in Section 13.05 of the LDRs.
3. The applicant should provide a detailed EPSC plan, indicating location of inlet protection,
designated construction entrance(s), as well as locations of silt fencing. The applicant is
recommended to provide inlet protection on the catch basin to the north of the proposed
sidewalk, as well as on the catch basin to the north of the Shelburne Rd access where planting is
proposed.