Loading...
HomeMy WebLinkAboutBATCH - Supplemental - 0000 Van Sicklen Road (2)CITY OF SOUTH BURLINGTON Subdivision Application - FINAL PLAT I Name of Applicant II Name of Subdivision III Indicate any changes to name, address, or phone number of owner of record, applicant, contact person, engineer, sur- veyor, attorney or plat designer since preliminary plat application: IV Indicate any changes to the subdivision, such as number of lots or units, property lines, applicant's legal interest in the property, developmental timetable, since preliminary plat application V Attach a final plat drawing (originals not needed) showing the following information: (1) Proposed subdivision name or identifying title, the name and address of the record owner and subdivider, the name, license number and seal of the licensed land surveyor, the boundaries of the subdivision and its general location in relation to existing streets or other land marks, scale (numerical and graphic), date and true north arrow. (2) Street names and lines, pedestrial ways, lots, reservations, easements, and areas to be dedicated to public use. (3) Sufficient data acceptable to the City Engineer to determine readily the location, bearing and length of every street line, lot line, boudary line and to reproduce such lines upon the ground. Where applicable these should be tied to reference points previously established by the city. -2- (4) The length of all straight lines, the deflection angles, radii, length of curves and central angles of all curves, tangent distances and tangent bearings for each street. (5) By property designation on such Flat, all public space for which offers of cession are made by the subdivider and those spaces title to ;which is reserved by him. (6) Lots within the subdivision numbered in numerical order within blocks, and blocs lettered in alphabetical order. (7) The location of all of the improvements referred to in Section 301.1*and in addition thereto the location of all utility poles, se -.,age disposal syst ails, .eater supply systems and rough grading and other devices and iethods of draining the area affecting the subdivision. Ooet,, svaD�v�1a-� c am• (n) Permanent reference monu:�ants yho-:n thus: and lot corner stela rher s shown thus: "O" . (9) Construction dra,,;ings of all : equired i-. rovelaents. VI -.ncl ose supporting documents listed belo,a or request that t'aey be required as a condition of final plat approval: (1) Copies of proposed deeds, agreements or other docu-a:�nts showing the manner in which open space, including park and recreational areas and school site areas, are to De dedicated, reserved and maintained and a certificate of the City Attorney that these documents are satisfactory. (2) A certificate of the City lingineer as to the satisfactory completion of all improvements required by the Commission, or, in lieu of any required improve -meats not so completed, a performance bond to secure completion of such improvements and their i7,aintenance for a period of two years, and written evidence that the City Council is satisfied either with the bonding or surety company or with security furnished by the subdivider. (3) A copy of such covenants or dead restrictions as are in- tended to cover all or part of the tract. (4) A prospectus describing the management organization if one is required. (5) In the case of a subdivision or development served by a privately owned and/or maintained street:. (a) a copy of all proposed deeds, agreements, or other documents .ahich convey or relate to the use of a privately ov-ned street or right-of-way, and a certi- ficte of the City Attorney that these documents are satisfa--tory. I -3- (b) a completed contract between the lando•,,mer and the city regarding the number of lots or dwelling units to be served by the proposed right-of-way or private street and the responsibility for the road -ray maint- enance, along with a certificate of the Ci'.-7=,ttorney that the contract is satisfactory. (signature) applicant or contact person Cate 91 Y PLANNING COMMISSION DECEMBER 12, 1978 • The South Burlington Planning Commission held a meeting on Tuesday, December 12, 1978 at 7:30 pm in the Conference Room, City Hall, 1175 Williston Road Members Present Sidney Poger, Chairman; Ernest Levesque, George Mona, Peter Jacob, James Ewing, Kirk Woolery (late) Member Absent James Draper Others Present Stephen Page, Planner; Mary and John Kuda, Doreen and Doug Kendall, Bill Mikell, Tyler Hart, Bob Watson, Terrance Boyle, Jim Lamphere, Susanna Adams, Benjamin Donnelly, Paul Bortz Minutes of December 5. 1978 It was moved by P. Jacob, seconded by E. Levesque and passed without dissent, to accept the minutes of December 5. 1978. Public hearing on final plat application of Smart Associates for a 3 lot subdivision, north of Van Sicklen Road__ Tyler Hart said that the proposal was for a 3 lot subdivision off Van Sicklen Road. The original parcel of land was 100 acres and last year 4 lots were sold, leaving a 48 acre piece of land. This land will contain a PUD (planned unit development) of 3 3acre lots with the rest of the land held in common and to remain open space. 7 1/2 acres of the 48 aye in Williston. Mr. Hart said that the 3 lots would be placed on the west side of the property and have a small city street built between the Kendall and Watson properties. This will have a cul-de-sac and be paved so that school busses and fire trucks as well as snow plows can get down it and turn around without problems. Off the cul-de-sac will be private gravel drives for the lots. Mr. Hart said that water would be from drilled wells and that there would be on -site sewage disposal. Each lot would have its own septic system and leach field but those fields would be in the common area. Each owner will be responsible for his system and Mr. Hart said it was possible for one of them to have a problem without the other two having one also. Covenants will be drawn up to protect the open space and to maintain the septic systems. Mr. Hart said a pedestrian trail was shown on the plan and would be offered to the city - it runs along the brook and the east property line. The agreement to maintain the open space applies to the land in Williston as well as the land in South Burlington. Mr. Hart was asked to go over the sewage plans. He said that from the individual septic systems on each lot would run a 4" plastic pipe to the individual leach fields in the common area. He said most of the soil in the area was not good for sewage disposal but that there were some areas where they could comply with the Vermont Health Regulations governing that. K. afoolery arrived at this point. Mr. Hart said that they had dug test pits in the area this summer and that they had put an observation well in which would monitor monthly water 2. PLANNING COPL?ISSION DECEMBER 12. 1978 • in the area. This is a 4" plastic pipe stuck 9' into the ground. He said he had not seen any water in that pipe so far. A trench has been dug on the west to prevent water from entering the area. Mr. Hart said he knew the area got wet in the spring but he felt they could direct the water out of the area. He said they had 6' of sand where they needed 7' to meet the regulations and he said they could do some terracing to meet that. S. Page said the City Engineer was satisfied with the disposal plans. Mr. Bob Watson, an adjoining neighbor, said that the field was very wet even now with the dry fall the city has had and he asked about the 10 acre zoning in the area. He said that when he bought his home he felt that there would be one ouse on every 10 acres of land behind him, which was not the same as 3 3-acre lots with a lot of open space. S. Page replied that the city had zoned the Southeast Quadrant that -way about 4 years ago as a holding action to slow development. It later became apparent that lots were being set off in strange ways to comply with the 10 acre zoning, such as the bowling alley or spaghetti lots seen in the first part of the subdivision of this 100 acres of land. The Co=ission, in an effort to deal with this, amended the zoning to allow clustering of units so that the overall density does not exceed 10 per acre but the developer can choose the best place to put the homes. This is the first such clustering proposal they have reviewed. S. Poger added that the Commission felt that 10 acre zoning encouraged rich ghettos, which was a problem. He said the city never intended to say that the Southeast Quadrant would remain in 10 acre zoning forever. The consensus of the Commission was that the clustering proposal was appropriate in this case. It was also pointed out that with the land held in common between these three lots, if the zoning were ever changed it would probably be harder to further subdivide that land because of dealing with three people. Mr. John Kuda expressed a great deal of concern with the approval of this plan. E. Levesque noted that the Commission was not unanimously for the present 10 acre zoning in the Southeast Quadrant, saying that he felt it was discriminatory and created elitest housing in the city. Mr. Watson said this was the first time he had been informed of the proposal. The Planner sent him a letter as an adjoining property owner which warned him of the hearing. S. Poger wondered if adjoining owners should be notified of every meeting (the Commission had met before on this application), but S. Page said the line had to be drawn somewhere and to warn neighbors of every meeting would create an enormous amount of paper work. He added that the city was not required to notify property owners but did so because they wanted people to know what was going on. It was noted that the Commission would start revising the Comprehensive Plan on January 2 and that they met almost every Tuesday and that S. Page was available in city hall if people wanted to talk about their concerns and desires regarding Southeast Quadrant zoning. Mr. Kuda said he had paid a lot for his lot and that he depended on the Commission to protect his investment. If the zoning in the Quadrant were to be changed to 112 acre zoning, it would defeat the reason for his investment. He was told that the Commission was nct out to protect his investment, but to be sure the rules and regulations in the city were followed and he was invited and encouraged to come talk to the Commission during the revision of the Comprehensive Plan, which would take 6-8�►onths and invGlve as many citizens as were willing tc come in and talk. Yx. Lamphere asked when the clustering provision had been added to the zoning regulations and was told it was in August and that there had been a 3. r �r PLANNING COMMISSION DECEMBER 12, 1978 public hearing on it before the Commission and another one before the Council. He said he had some concerns about the sewage disposal but felt that that would be resolved at the Act 250 hearing. Mr. Watson again raised the question of .the wetness of the land, saying that it was almcst marshy and he hoped that question would be addressed. -K. Woolery moved to close the public hearing -on the final plat application of Smart Associates. E. Levesque seconded the motion, which passed with all in favor. K. Woolery moved that the South Burlington Planning Commission approve the final plat application of Smart Associates, for a 3 lot subdivision, as depicted on a lan set of 2 pages, prepared by Trudell Consulting Engineers dated 11 1 and 11 3 78s subject to the following stipulations: 1. A bend shall be posted for the ccrstruction of the city street__ and the common portion of the private drive, in an amount determined by the City Engineer, prior to issuance of building permits. 2. Street name lot line distances and bearings, existing monuments monuments to be set at all lot corners , public rcadway distances, bearings and curve,data, shall all be shown on the final plat. 3. All utilities shall be underground. 4. The com--cn porticn cf the private drive shall be constructed per the City Engineer's recommendations memo of 12 8 8 . 5. The final plat shall be recorded within 90 days. 6. The recreation fee of W is required. 7. The ledge outcropping along the west side of the proposed street shall be removed per the City Engineer's memo of 12 8 78. 8. The following legal documents shall be as approved by the City Attorney a. restrictions showing they separately. on the Watson conveyance and the common c are not usable for buildin b. easements or covenants over the common open space for the purpose of the private drive, sewer pipe, and leach field associated with each lot. c. city street deed. The motion was seconded by J. Ewing and passed with all in favor. Review minor revisions to Stonehedge final plat Mr. Terry Boyle said that they warted to revise phase 1 of the plan to include a swimming pool and tennis court, to be located to the n,,rth of the model unit. K. Woolery asked if the city had the as -built utility plans for this project yet and was told that they had 3-'-scale plans. The water mains are flLe,sec k � State of Vermont Department of Fish and Game Department of Forests, Parks, and Recreation Department of Water Resources Environmental Board Division of Environmental Engineering Division of Environmental Protection Natural Resources Conservation Council Smart Associates, Inc. c/o Richard Segal 1690 Williston Rd. So. Burlington, Vermont 05401 AGENCY OF ENVIRONMENTAL CONSERVATION Montpelier, Vertnont 05602 DIVISION OF PROTECTION 111 'Test Street Essex Junction, Vermont 05452 April 16, 1979 Re: EC4-0501 - Smart Associates, Inc., Three Lot Subdivision Located Off Van Sicklen Road in So. Burlington, Vermont Dear Mr. Segal: A site inspection of the above referenced project was conducted by this office last month with your consultant, Tyler Hart. Water was observed at 4 feet in the westerly observation well and 3 feet in the easterly observa- tion well. The Subdivision Regulations require 6 feet to the highest ground water. Therefore, based upon this requirement, the disposal site proposed to serve three houses will not meet the standards of the Subdivision Regulations. Enclosed please find a copy of the Certification of Non -Compliance. If You have any questions or wish to appeal this decision, you can contact P. Howard Flanders, Chief Review Engineer of the Protection Division. Sincerely, 17 Eric Blatt Asst. Reqional Engineer EBgn Enc: 1 cc: Tyler Hart So. Burlington Planning Comm. P. Howard Flanders, PE STATE OF VERMONT AGENCY OF ENVIRONMENTAL CONSERVATION CERTIFICATION OF NON-COMPLIANCE Re: EC4-0501 ) Certified NOT to comply with Vermont Smart Associates, Inc. ) State Board of Health Regulations, c/o Richard Segal ) Chapter 5, Sanitary Engineering, Sub- 1690 Williston Road ) Chapter 10, Part 1, Subdivisions So. Burlington, VT 05401 ) This project,consisting of a three -lot subdivision located off Van Sicklen Road in South Burlington, Vermont, is hereby certified NOT to satisfy the requirements of the regulations named above for the following reasons: Section 5-906(B)(4)(b) requires that there be at least six feet of soil cover above the highest ground water level within the continuous area. A diversion ditch was dug around three sides of the continuous area with the intent of lowering the water table below 6' within the continuous area. A site inspection was conducted in March, 1979. Two observation wells were inspected one at the eastern end and one at the western end of the disposal area. Water was found in the easterly tube at 3 feet and 4 feet in the westerly tube. Because of the high ground water level within the disposal site, this subdivi- sion does not meet the requirements of the Subdivision Regulations. FOR THE DIVISIQN OF PROTECTION Eri att; .t. Regional Engineer Dated at Essex Junction, Vermont this l6th day of April, 1979. Distribution: Applicant Permit Administrator Tyler Hart So, Burlington Planning Comm. 2. PLANNING COMMISSION NCVEMBER 8, 1977 permission to build 2 phases of the project, or 88 units. Mr. Poger replied that as far as the Commission understood, this project was to receive the next available sewer capacity and that that was just about all they could do. Mr. Page said that Mr. Szymanski had not felt that the report made adequate allowance for infiltration into the pipes and said that during the last wet period, some of the flows in the treatment plant had been pretty high, which showed that infiltration was significant. Mr. Morency said that he could not quarrel with the report but that the largest number differences occurred with the motels and the housing for the elderly. He added that the Commission and the city could not bank on people using water restrictors until more data was in on that. He said that he felt that the difference was a matter of opinion - a judgement call. Mr. Poger moved to conclude the public hearing and Mr. Morency seconded. The motion passed unanimously. Mr. Poger said that the heart of the question was whether the Commission had the power to allocate sewer space or not. He pointed out that the Commission had designated Brand for the next capacity and that the Council had then extended sewer lines out to Country Club Estates. He said that Brand was assured the next capacity as far as the Commission was able to assure it, but that he could not vote for another phase based on the engineering report they had been given. Mr. Page pointed out that the Commission's preliminary approval had stated that there was not enough capacity for any phases and that the Commission would listen to requests to build on a phase -by -phase basis as the capacity became available. Mr. Woolery asked whether, if no action were taken by Chalet Susse within a reasonable period from the time of approval, the Commission could give their capacity to someone else or disallow the use. Mr. Page said that he had not yet discussed that with the City Attorney, and that even if that were possible, it would take time to do it and to figure how much sewage space would be freed. Mr. Poger said that he could not vote to give them capacity that the Engineer said was not there, and said that he would rather vote now and have them reapply later. Kr. Woolery moved to re -word stipulation #5 of the October 25 approval motion for this project as follows: "This approval shall expire six months from January 1, 1978 for phase 1 and six months from January 1, 1979 for phase 2; construction shall be completed orior to January 1. 1979 for phase 1 and prior to January 1, 1980 for phase two An extension may be ap:lied for by the develouer and ranted by the Commission The motion died for lack of a second. Mr. Poger moved to deny the application for the Brand Farm Condominiums, phase Z. Mr. Morency seconded this motion. Mr. Ewing said that he would vote to deny because the report from Hamlin did not speak to the question of suspended solids in the sewage or that of the amount of oxygen present in the flow and he felt that these were critical issues. :Mr. 'foolery disagreed, saying that all the Commission's previous decisions had been based on amount of flow, not the BOD or suspended solids. Mr. Foger said that he would vote against phase 2 because of the difference between the City Engineer and the Hamlin report and because he believed that it was better to be conservative as far as sewer capacity went. He said, however, that when the capacity was there, approval should be given speedily. 'Kr. Morency felt that the Commission had dealt with estimates for long enough and that it was time for some actual measuring to be done before more capacity was given out on a long-term basis. The notion passed with Messrs.. Levesoue and Woolery voting no. Continuation cf public hearing- on preliminary plat of `'mart Associates Van Sick2en and Hinesburg Roads _.�..� Mr. Wessel removed himself from this discussion. Mr. Page briefly went through Fir. Szymanski's memo of November 4, 1977 on this 3. PLANNING COPi'MISSION NOVE14BER 8, 1977 application. He said that the State Highway Department would review the inter- section and that it would have to meet their criteria on design. He said that there was a potential pedestrian trail into the back of some land owned by Mr. Mikell and he suggested that Jerry Olsen, representative from the Natural Resources Committee, meet with Smart Associates and work something out. Mr. Tyler Hart said that they could live with the stipulations in the memo but that they would like a chance to discuss them further. Mr. Page asked when they would have the State Highway permit for the intersection and was told that they would get it before final plat. He said that the Commission would like to see it before the final hearing. Mr. Wessel stated that he had disqualified himself as a Commission member for this application., He said that he was an abutting property owner, however, and wished to represent his own interests but that the testimony he would present would be as an individual private citizen. He filed a statement to that effect in the record (see attached copy). He said that he felt that there was a problem with traffic at that intersection and cited several recent accidents there. There were more less serious accidents at that spot when a ceramics business had located there several years ago. Because of the danger and the high accident rate, the State installed new lighting in the area. The sight -distance is too short there, he said, and the school bus will not stop at the intersection, but rather some distance beyond it. A school bus sign has also been erected. An average of 3 cars per year, he said, were forced off the road because they were going too fast or tried to avoid someone else. He felt that sight -distance to both north and south was inadequate at 50 mph, and added that it seemed that many cars traveled in excess of that speed. In his opinion, he said, some traffic solutions would be a change in the road grade, a caution light, or access at a different place. Gn the issue of public vs private road, he felt that public would be much better for all concerned, but felt that the road should be 24' wide rather than 30' since the wider road would encourage speeding and that would be dangerous to the children in the area. He felt that the usual things such as curbs, lighting,etc. should be waived here. He said further that he would like written assurance from the City Engineer that development of the land would not aggravate the ponding already present in the area and added that if possible, he would like to see that the views of the present property owners were not lost. Sewer systems in the area do not always work well in the wet periods of the year and he said that he would like both water and sewer systems checked carefully by the City Engineer. Finally, he said that he would rather the new street not be named "Sally's Way", but rather be chosen from the list the Commission has of suggested street names. :r. Collins felt that views could not be protected and Mr. Levesque.agreed. .fr. Poger said that 2 story houses could be carefully placed. It was established that the road will be public and 24' wide. Mr. Segal said that the septic systems would be worked out by a qualified engineer and that a right of way had been given for access to the uppeAortion of the land. 1M.r. Poger asked whether, if access were gained to Hinesburg Road over the Dubois property and the present intersection proved unsafe, they would consider closing off the Fresent end of the street. :fir. Segal replied that that would be up to the city. Yr. Kerwin said that he would like to see the hedgerow presently there remain intact and this desire was indicated by all parties. Xr. Hart said that it would be protected as much as possible. ?<r. Vessel suggested that the developer post bond for it. Ir. Richard Taft said that he supported everything Yr. vessel had said in his statement and expressed concern for the safety of schoolchildren. ,..r. Schuele said that Mr. Szymanski had proposed a level spot long enough for a car to be level at the intersection and he suggested that maybe that should be long enough for a scnool bus. Xr. rioolery suggested lowering the speed limit 4. PLANNING COMMISSION NOVEMBER 8, 1977 to 35 mph. Mr. Page said that Mr. Szymanski had said that if septic systems went in there that conformed to the standards, he felt that there would not be a problem. Mr. Woolery moved that the South Burlington Planning Commission _.approve the preliminary plat application of Smart Associates, Inc., for a 5 lot residential subdivision, as depicted on a plan set of 4 pages, entitled Sally's Way, and a revised site plan P. 1 entitled "Site Plan for Smart Associates, Inc., dated 9 77 by Trudell Consulting Engineers, subject to the following stipulations: ,41) Applicant shall meet with a representative of the Natural resources Committee on the layout of a pedestrian trail on the eastern half of the property and show it on the final plat. "2) An area of land for a school bus turnaround on Van Sicklen Road _shall be deeded to the City, if deemed necessary by the City Engineer and shown on the final plat. d3) The area labeled "existing drive" shall be deleted as part of the City street and shown simply as an easement. 4) A recreation fee of $64.00 for lots 1-4 shall be paid prior to the issuance of any building permits. 15) Specifications and layout of the city street and storm drainage shall be as approved by the City ngineer. 6) Lot #5 information before a house site may be de is subject to submission of further soils and flooding building permit will be issued, so that an appropriate ermined. 7) It is understood that Sally's Way may be extended to the Dubois property to the north, to connect to Route 116. 8) The following required improvements are waived: curbs, sidewalks lighting and landscaping. 9) In order to preserve the existing hedgerow along the north -south segment of Sally's Way, applicant shall confer with the Cit Engineer on such measures as setting the pavement off center, widening the right of way, etc., wFiicFi shall �e shown on the aT' plat.i.andscaping bond for preservation of the hedgerow shall be set at final plat 10) State Highway Department comments and recommendations for the intersection at Route 116 shall be made available prior to the final plat hearing. The motion was seconded by Mr. Morency, and it passed unanimously. Continue review of revised access to Econolodge Mr. Page said that the Police Chief had not thought that there was any problem - there has not been any increase in accidents since the access went in. I:essrs. Poger and 1-loolery felt that they would like to see a speed dip anyway. Yr. Graves had no objection. :fir. Poger moved that the South Burlington Planning Commission approve a speed dip and review it in one year's time. The motion was seconded by Mr. Levesque and passed unanimously. M E M O R A N D U M To: South Burlington Planning Commission From: Stephen Page, Planning Assistant Re: Next meeting's agenda items Date: November 4, 1977 Meadowbrook Condominiums - Final Review Phase IV This is the next to the last phase of this 50 unit project, consisting of two buildings totalling 14 units. The previous phase was reviewed and approved by the Commission in May of this year. Layout is fine with the exception of one building which must be shifted away from a drainageway. Brand Farm Condominiums - Final Plat I have no further comments - the report of the applicant's engineering consultant was sent to you last week. Presumably, this report and approval for additional phases beyond phase I will be the only discussion items. Smart Associates - Preliminary Plat Engineering has been reviewed by Bill Szymanski - see his memo. With regard to the proposed intersection with Route 116, a State Highway permit will be required. The District Highway Office has indicated that adequate sight distance and proper approach grade among other things, must be demonstrated before such a permit will be issued. There is a narrow roadway at the southeast corner of the property, extending northward from VanSicklen Road across Smart Associate's land leading to an active hayfield, owned by Mr. Mikell. This roadway is relatively high and dry for the most part and has high potential for a pedestrian trail; this roadway could also be used for access to the hayfield by farm equipment and also possibly by the owners of lots 1 - 4 for access to the wooded, rear portions of their lots. Econolodge revised access With regard to the connection to the Gulf Station, I recommend an approval for the connector as is, conditione4 on a review in 1 year's time by the Commission. This is based on the fact that Chief Carter could attribute no increased traffic hazards to this drive- way and the alternatives, such as a speed dip or placement of bollards have the disadvantages of increased maintenance and possibly greater hazards to moving traffic. M E M O R A N D U M To: South Burlington Planning Commission From: Stephen Page, Planner Re: Next Meeting's Agenda items Date: December 8, 1978 #2 Smart Associate's Final Plat Lot layout,roadway, and sewage disposal plans have been revised in accord with recommendations made at sketch plan review. The lots and road are planned so that there is a short city street, with a turnaround, and individual driveways to each lot; sewage lines and leach fields are separate for each lot. The common open space will be permanently encumbered against development. A written summary of the necessary legal documentation will be submitted at the hearing. There are no substantive issues; however, there is the usual list of trivia which can be incorporated in the approval motion. #3 Amendment to Stonehedge Final Plat A pool and tennis court are proposed within the 92 unit first phase of this project, which received final approval 6/6/78. The siting of these features caused some minor changes to the location of other units and carports in adjoining clusters. As long as acceptable building separations are maintained, and there is no encroachment over utility easements, I have no concerns on this proposal. Rather, these facilities will reduce demand on public recreation facilities. #4 Garden Way Addition An addition of about 4900 square feet is proposed for the rear of the Garden Way building. Because of the 20' of frontage on this property, access is fixed. The proposed landscaping should make a significant dent in this intensively utilized site. The parking and circulation plan is compatible with the "north side service road" discovered in the Comprehensive Plan. I have some concerns about the location and number of parking spaces and expect to have some further resolution of this matter before the meeting. 12/12/78 SSP SUGGESTED MOTION OF APPROVAL - SMART ASSOCIATES I move that the South Burlington Planning Commission approve the final plat application of Smart Associates, for a 3 lot sub- division, as depicted on a plan set of 2 pages, prepared by Trudell Consulting Engineers, dated 11/1 & 11/3/78, subject to the following stipulations: (1) A bond shall be posted for the construction of the city street and the common portion of the private drive, in an amount determined by the City Engineer, prior to issuance of building permits. (2) Street name, lot line distances and bearings, existing momuments, monuments to be set,,,,(at all lot cor.rprs),,public road- way distances, bearings and curve data, shall all be shown on the final plat. (3) All utilities shall be underground. (4) The common portion of the private drive shall be constructed per the City Engineer's recommendations (memo of 12/8/78) (5) The final plat shall be recorded within 90 days. (6) The recreation fee of $47 is... (7) Street trees shall be planted M (8) The following legal documents shall be as approved by the City Attorney: (a) restrictions on the Watson conveyance and the common open space shoring they are not usable for building purposes. (b) Easements or covenants over the common open space for the purpose of the private drive, sewer pipe, and leach field associated with each lot. (c) City street deed. 1L/ 1L/ 10 `-' SSP SUGGESTED MOTION OF APPROVAL - SMART ASSOCIATES • I move that the South Burlington Planning Commission approve the final plat application of Smart Associates, for a 3 lot sub- division, as depicted on a plan set of 2 pages, prepared by Trudell Consulting Engineers, dated 11/1 & 11/3/78, subject to the following stipulations: (1) A bond shall be posted for the construction of the city street and the common portion of the private drive, in an amount determined by the City Engineer, prior to issuance of building permits. (2) Street name, lot line distances and bearings, existing momuments, monuments to be set,,(at all lot corners),,public road- way distances, bearings and curve data, shall all be shown on the final plat. (3) All utilities shall be underground. S(4) The common portion of the private drive shall be constructed per the City Engineer's recommendations (memo of 12/8/78) (5) The final plat shall be recorded within 90 days. 6) The recreation fee of $47 isA. (8) The following legal documents shall be as approved by the City Attorney: (a) restrictions on the Watson conveyance and the common open space showing they are not usable for building purposes. (b) Eas'ments or covenants over the common open space for the purpose of the private drive, sewer pipe, and leach field associated with each lot. (c) City street deed. M E M O R A N D U M To: South Burlington Planning Commission From: William Szymanski, City Manager Re: Smart Association, Van Sicklen Road Date: December 8, 1978 (1) There exists an extensive ledge outcrop along the west side of the proposed street. Some ledge will have to be removed to provide sight distance in a westerly direction. (2) The private common drives should be constructed with a minimum sand subbase of 6 inches and a minimum base of gravel of 12 inches. The minimum width shall be 20 feet with side ditches and culverts. M E M O R A N D U M To: South Burlington Planning Commission From: William Szymanski, City Manager Re: Smart Association, Van Sicklen Road Date: December 8, 1978 (1) There exists an extensive ledge outcrop along the west side of the proposed street. Some ledge will have to be removed to provide sight distance in a westerly direction. (2) The private common drives should be constructed with a minimum sand subbase of 6 inches and a minimum base of gravel of 12 inches. The minimum width shall be 20 feet with side ditches and culverts. 174+6 �.or � ter,-kc.►5 eavv- crs--P St"4tt'-C qVT LOVIWVOPILoa ds l7P-1 ice#-�7`� � - : E-t1Y/`�= P �`✓tL1`aGC�-.." F b f�. 5 C 1, / dd ,i. to lal7 L*-4, Bmri%�� l / "� x •'s " A47 No Text 1 w PUBLIC HEARING SOUTH BURLINGTON PLANNING COMMISSION The South Burlington Planning Commission will hold a public hearing at the South Burlington City Hall, Conference Room, 1175 Williston Road, South Burlington, Vermont on Tuesday, December 12 , 197 8, at 7:30 p.m., to consider the following: Final plat application of Smart Associates, Inc. to subdivide a 40.5 acre parcel into three 3 acre lots and a 31.5 acre open space area. The proposed subdivision is bounded on the south by Van Sicklen Road and lands of Kendall and Watson, on the west by lands of Liu and Taft, on the north by lands of Kuda, and on the east by lands of Mikell in the town of Williston. Copies of the application are available for public inspection at the South Burlington City Hall. Sidney B. Poger, Chairman South Burlington Planning Commission 11/25/78 SMART ASSOCIATES ABUTTORS William Mikel( Van Sicklen Road John Kuda 2 Highland Terrace Ying Liu 1 Highland Terrace Richard Taft 1468 Hinesburg Road Robert Watson 200 Van Sicklen Road Douglas Kendall 300 Van Sicklen Road o �1 Gun�,-.�+�y� ce cua��� r -ILI U/� jlllot� M E M O R A N D U M To: South Burlington Planning Commission 10/6/78 #7 Hurley 7 unit Condominium project - Final Plat The plan submitted complies with all stipulations of preliminary approval. With the exception of some minor details to be added to the final plat, and the usual raft of legalese (all of which can be taken care of administratively), all is in order. #8 Smart Associates - 3 lot subdivision sketch plan This is the first proposal for a clustered subdivision under the recently enacted amendments to the A-R district. Three 3 acre lots are proposed on a site approximately 40 acres in size. The access road should be a city street. Septic tanks will be on in- dividual lots; the effluent from the tanks will be piped to a common leaching field, where soils are best for this purpose. Legal agree- ments on the use of common sewage facilities, as well as restrictions on the use and ownership of open space, must be worked out. \V T--vOtil __ _- so ���eb��!►fr•1�-r►�j �• 1 CITY OF SOUTH BURLINGTON Subdivision Application - SKETCH PLAN 1) Name, address, and phone number of: a. Owner of record �w.�, (j,.�.d g�c,a�a 6 Dy t b. Applicant c. Contact person 2 G -r$ - y z 2) Purpose, location, and nature of subdivision or development, including number of lots, units, or parcels involved as well as p_ r/o p. o s e d use (s) . 3 (.�- s ,,�,� �, , s � ,�h 06-, S 3) Applicant's legal interest in the property (fee simple, option, etc) 4) Namesof owners/ of record of all contiguous properties t 0, , \AA L%3 ;�• I l i �J� i s .� T� Q i� 1 e 1 V o l 5) Type of existing or proposed encumbrances on property such as eCa.asements, covenants, Leases, rights of way, etc. p 0 �-.-5 L -2- 6) Proposed extension, relocation, or modification of - municipal facilities such as sewerage, water supply, streets, storm drainage, etc. V\. 7) Describe any actions taken by the Zoning Board of Adjustment or previous actions by the South Burlington Planning Co:m-nission, which affect the proposed subdivision anvinclude dates: j+Ct 8) Attach a sketch plan showing all information required under items 2 through 7 on p. 5 of the Subdivision Regulations. (signature) applicant ocont ct person 9 _ ►� `� date FOR OFFICE USE ate - submission of application and sketch plan to administrative officer - this proposal is classified as a major or minor subdivision application deemed complete - proposal tentatively scheduled for first Planning COMMAssion meeting on Confirmed For t, State of Vermont AGENCY OF ENVIRONMENTAL CONSERVATION + - 05601 Montpelier, Vermont DIVISION OF PROTECTION Department of Fish and Game Departgtent of Forests, Parks, and Recreation Depart1i1ent of Water Resources Environ,nental Board Divisionof Environmental Engineering Division i)f Protection Natural Resources Conservation Council Attn : Tyler Hari Trudell Consulting Engineers, Inc. Route 2A, Box 308 Williston, VT 05495 111 West street Essex Junction, VT 05452 August 31, 1978 Re: Segal property, South Burlington Dear Mr. Hart: This letter is to serve as written record of the position of the protection Division for this proposed three lot subdivision. As stated in our joint site inspection on August 22, 1978, the main concern here is high seasonal ground water. To complicate matters, the proposed dual alternating disposal fields must be located in a plateau area that is com- pose& df_a limited amount of permeable soil. This plateau is bordered on two sides by a drainage swale. your proposal to de -water the site by use of an interceptor trench may result in an approvable site. But to obtain an accurate evaluation, the protection Division will require that inspection take place in the spring. Should you have any questions please contact me at this office. Sincerely, Paul Duchesneau Regional Engineer �r- SOIL PROFILE_: July 19, 1978 Test Pit #1 0 - 211 Top so it 2" - 36" Brown sand 36" - 42" Clay 4211 - 6011 Sand 6-01' - 9611 Clay No water _ No ledge Test Pit #2 0 - 3" Topsoil 3" - 42" Brown sand 4211 - 9611 Silty clay No water No ledge Test Pit #3 0 - 411 Topsoil 411 - 3611 Brown sand 3611 - 96" Clay - No water No ledge Test Pit #4 0 - 8" Topsoil 8t1 - �411 Brown sand 24" - 4811 Medium sand damp 48" - 54f1 Brown sand 54f1 - 66" Medium sand 661' - 96" Clay Seepage at 54" No ledge Test Pit #5 0 - 8" Topsoil 811 - 18" Brown sand 1811 - 6011 Silty sand 6011 - 70" Medium sand, moist 70" - 84" Silty clay 8411 - 96" Blue clay No water No ledge Test Pit #6 0 - 611 Topsoil 6" - 24" Clayey silt 24" - 60" Silty clay 60" - 90" Blue clay No water No ledge Test Pit #7 0 - 6" Topsoil 6" - 2411 Fine sandy silt 241' - 7211 Medium sand moist 72" - 9611 Blue clay No water No ledge Test Pit #8 0 - 8" Topsoil 8" - 24" Loose dry silt 24" - 3611 Brown sand 3611 - 60" Clayey silt 6011 - 9011 Blue clay Moist at 60" No ledge Test Pit #9 0 - 8" Topsoil 81f - 12011 Clay TRUDELL , - CONSULTING ENGINEERS, Inc. August 18, 1978 Mr. Paul Duchesneau Regional Engineer Agency of Environmental Conservation 111 West Street Essex Junction, Vermont 05452 Dear Paul: ROUTE 2A BOX 308 WILLISTON, VT. 05495 879.6331 The following test results and sketches are submit',:.ed for your consideration under Chapter 5, Subchapter 10, Part III, 5-966(B) of the Health Regulations. Our proposal is for 3 single family lots on 148.5 acres in South Burlington. The propsosal will be submitted under a newly proposed zoning amendment to allow PUD projects in Agricultural areas, where considerable open space or common area is set aside. The test results indicate presence of a 6000 ft.2 area of sand of 5 - 6 foot depth. My feeling is this area could be filled, 1 - 2 and a community type sewage disposal system built for the three houses. Since this constitutes a site modification your preliminary approval to proceed with design drawings is needed. May we set up an appointment to inspect the site? Very truly yours, TRUDr�.L CONS TING ENGINEERS, INC. 7�A Tyler Hart TH/slp Enclosures