Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BATCH - Supplemental - 0000 Twin Oaks Terrace (4)
Ott : TV14 666 <.V"00!-') LISMAN & LISMAN ATTORNEYS AT LAW 191 COLLEGE STREET BURLINGTON. VERMONT 05402 LOUIS LISMAN B02-864-5756 BERNARD LISMAN ROBERT E. MANCHESTER July 18, 1979 CARL H. LISMAN ALLEN D. WEBSTER Mr. Stephen Page. City Planner City of South Burlington Williston Road South Burlington, VT MU7TM nAVC Dear Steve: In connection with this matter, I am enclosing the original of a partial discharge, executed by Vermont National Bank on June 16, 1979, with respect to two `q strips of the roadway, to com to your file. If you have questions/ pAeasp" let me know. ly yours, Carl H. Lisman CHL;ces Enc. 1F'kUE:• T�,4t" d'44f i�h-tax Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 1,:ay 15, 1979 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: The directors of the Forest Park Condominium Association would like to alert you about our concerns in reference to the present developments now being constructed around our complex. These concerns are as follows: 1. We object to a proposed roadway along -our Western property line. This would reduce the treed buffer zone between our property line and that of Twin Oaks, therefore seriously effecting the privacy now enjoyed by members of this association. If any type of road is constructed near or in the trees, we would antici- pate the loss of most of the trees due to destruction and disturbance of their root systems. 2. We are concerned about a road bordering our South mast perimeter. That road, now a marshland, would seriously disrupt our storm drainage at its South - East extremity. This drainage problem is critical for both developments and should be resolved before any real construction begins in these areas. 3. The proposed tie into Timber Lane would add to already existing traffic conjestion on that street and the hazardous conditions at the Intersections of Timber Lane and Kennedy Drive. We would appreciate your consideration of these issues and a response at your earliest convenience. Sincerely, BO RD OF DIR CTORS, FPCA Philli Atwood, Pres. rdg l Oil/ D O S May 24, 1979 Mr. Phillip Atwood P.O. Box 2079 South Burlington, Vermont 05401 Dear Mr. Atwood: Thank you for your letter of May 15, 1979. All three issues you mentioned will be given careful -consideration during subdivision review. We anticipate that a revised plan for Twin Oaks Condominiums will be submitted in the near future; we also expect a preliminary plan for development of the former Tilley property (directly to the south of Forest Park Condcaniniums) to be submitted soon. The developers of both properties have been given copies of your letter, and I have urged them to be prepared to resolve your concerns, and to meet with you prior to the hearings, if necessary. You will be notified by mail when the hearings for both projects are to be held. Yours truly, Stephen Page, Planner SP/mcg cc: files 'M�G : v M4.f &Abl�', 6"-ftt> STATE OF VERMONT ENVIRONMENTAL BOARD DISTRICT ENVIRONMENTAL COMMISSION # 4 REQUEST TO AMEND LAND USE PERMIT #4CO294-2A TWIN OAKS CONDOMINIUMS KENNEDY DRIVE SOUTH BURLINGTON VERMONT NOTICE OF HEARING TO: All Parties FROM: Susan H. Cain, District Coordinator DATE: May 15, 1979 SUBJECT: Amendment Request #4CO294-3 District Commission #4 will conduct a site inspection at 2PM, Friday, May 25, 1979. A hearing will follow at the City of South Burlington conference room, City Hall, 1175 Williston Road, South Burlington to consider a request to amend Land Use Permit #4CO294-2A as follows: to construct an additional 32 units to be known as Cluster III, of the the Twin Oaks Condominiums. BY Susan H. Cain, District Coordinator For the District #4 Commission 111 West Street, Essex Junction, VT 879-6563 .hrilol Deuelopm enl Gorporallon 159 PEARL STREET ESSEX JUNCTION, VERMONT 05452 (802) 879-7188 January 4, 1979 Mr. Peter Collins, Esquire Paul, Frank & Collins, Inc. 135 College Street Burlington, Vermont 05401 Dear Peter: In regard to your letter of December 26, 1973, I offer the following as it seems that our telephone conversation concerning this matter was not sufficient: It is true that at the beginning of our relationship I understood that you had a potential conflict of interest with respect to the Hickock & Boardman project on the adjoining land and that I told you that I would do nothing to compromise your fiduciary relationship with that client. T expected the same professional conduct from you. I fully expected that before you would violate our trust and confidence in you that you would resign as our counsel. Let me once again explain our rational behind our actions as you do not seem to appreciate the facts in this situation as I have heard the very intimate details of our relationships directly from many sources in the community including several competitors and I am fully aware that the source of this information is you. The turning point in our relationship came when I disclosed to you that we had acquired building permits from the City of South Burlingtin with the understanding that the necessary paper- work would follow shortly thereafter. The only two areas being undecided were the,retention of sewage capacity in the pumping station and releases from Dimeo on the parcels to be deeded to the city. In a conversation with Richard Ward, Zoning Administrator, who issued the permits, I found out that you had contacted him and complained about the issuance of these permits without the sewage pumping station actually being deed to the City. Mr. Ward was confused as to why our attorney would be concerned about us receiving building permits at a time when it was critical to our development to acquire these permits. At that point I confronted you and you denied ever complaining about the issuance of these permits. I knew then that you were not representing our best interest but rather were taking a very protective stance with regard to the position of Hickok & Boardman. In the same telephone conversation I asked you a question concerning the ability of the City Manager to commit the capacity of the sewage pumping station as I thought that this was the function of -2- the City Council. You told me that the City Manager may have been granted special powers in these matters and that you would research this and get back to me with an answer. After this time I did not ask you to represent me in any matter concerning our permits with South Burlington or any other matter to do with the sewage pumping station. ?Je, as a partnership, agreed to retain you for the purpose of our loan closing only since you had already done title and secured title insurance and we felt that this activity would in no way compromise your relationship with your other client. It is unfortunate for us that you did not resign prior to your confrontation with South Burlington about our permits and that you carried on under the guise of never making that confrontation; apparently to protect the interest of Hickok & Boardman as it was clear that you had a definite conflict at that point. This still left us a problem of protecting our interest in the sewage pumping station so we sought legal advice on this matter, which contrary to your letter we are not compelled to notify you of such a decision. Edward J. Cashman acted as our lawyer in this matter and his decision was that the best way to protect the sewage capacity of the pumping station was to include a restriction in the deed and he also felt that we would be able to deed the pumping station to the City with such a restriction in place, All the partners were in agreement with this approach and Mr. Cashman's office prepared a new deed to reflect these changes. Your letter infers that I tried to have these documents recorded without notifying you of these changes, I could not, at that point, trust you. -and I did not feel that I must notify you of our business decisions. I turned the document over to the City pointing out to Richard [card that we had changed the deed in question and that it must be reviewed by Dick Spokes prior to filing. I also pointed out to Dick Ward that it was not our intention to cause a problem with the City and we only wanted to protect our legal rights. The thing that bothers me the most, Peter, is that you breached our trust and did not notify us of your intent. Then, upon finding out that we had sought other legal advice and upon this legal advice we changed some original document from your office, you felt it necessary to not only notify us, but to notify anyone that might have an interest in this project, in such a manner as to depict me as being underhanded and not to be trusted. This caused great injury to my reputation and several delays in our project. I can assure you that neither myself nor my partners take this action on your part lightly and plan to take the paths available to us to rectify this matter. Very truly yours, Gerald C . Milot GCM/rb (see following page for cc notation.§) MCI! CC: Richard Spokes Richard Ward Peter Gebauer Claude B. Gagne Carl Lisman Richard Bruce Robert Kessel William Duffy Edward J. Cashman Thomas Dimeo Judson Babcock Pete Monte M E M O R A N D U M To: Twin Oaks, Brand Condos. files From: Steve Page, Planner Re: Pedestrian easement in Green Mountain Power rights of way Date: November 28, 1978 GMP (Bruce Ellison, Montpelier office) has concerns over pedestrian easements in their power line rights of way which must be resolved before these easements are accepted and used. M E M O R A N D U M To: Dick From: Steve Re: Twin Oaks Condominiums - Conveyances to the City Date: November 6, 1976 Peter Collins asked me to review the following, and pass it on to you (see attached map): A. offer of irrevocable dedication for pedestrian easement - the deed and transfer return will be prepared when we specify the exact location of the easement. B. offer of irrevocable dedication for present and future roadways: 1. we will accept (OK'd by WJS) parcel #1 only at this time, when it can be scheduled on a Council agenda, and to in- clude the pumping station and the existing road. 2. this parcel to be accepted when the utility work along- side this portion of the road is completed. 3. this parcel involves a proposed road, which will be bonded for, and to be accepted when it is properly completed. 4. this to be accepted when the proposed roadway associated with the Brand Condominiums is completed. On page 2 of this offer, "counsel" should be changed to "Council" and 4 transfer returns should be submitted. Please call if you have any questions. Building permits are being witheld until these documents, plus the escrow arrange- ment get your O.K. i.../ c-kl io r SSP SUGGESTED MOTION OF APPROVAL -� TWIN OAKS I ;nove that the South Burlington Planning Commission approve the revised final plat application of Gerald Milot and Claude Gagne, for phase I (80 units) of a 3 phase, 184 unit s project, as depicted on a 60 scale plan entitled "Twin Oaks Condo- miniums...", dated 10/11/78, drawn by Oby's Design, and two acc- ompanying 20 scale site plans, subject to the following stipulations: 1. This approval is contingent upon formal confirmation of adequate school capacity by the School Board. 2. Condominium by-laws and articles of association shall be reviewed and approved by the City Attorney prior to occupancy. 3. This approval supplements the conditions of final approvals previously granted 11/8/77 and 9/13/77 except as otherwise noted herein or on the plan. } 4. Phase I approval,is hereby extended until 7/l/79. 5. Final engineering details shall be as approved by the City Engineer, the Water Department, and the Fire Chief. (ref: Blake -Duff letter of 10/24/78 and WJS-SBPC memo of 10/19/78). 6. Each cluster shall have 2 access points to the city street; the double width parking shelters shall be moved 10' closer to the public ROW to allow for protective curbing and wider circulation lanes. 7. Fire lanes shall be signed as directed by the Fire Chief. 8. Off -site water main extension shall be constructed simul- taneously with on -site work, so that adequate fire flow will be provided as soon as possible. Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 October 21, 1978 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: Forest Park Condominium Association objects to the placement of a roadway by the owner of the Twin Oaks multi -family housing development twenty two(22)lk feet from this Association's western property line. Our objections are for the following reasons: 1. Reducing the treed buffer zone between the two properties by any amount will seriously effect the privacy now enjoyed by members of this Association. 2. The presence of the trees preserves and enhances the individuality and identity of each of the two projects. Reducing this buffer zone jeopardizes that identity and individuality. 3. If the road is constructed according to plans as we understand them we anticipate the loss of most of the trees in the buffer zone due to destruction and disturbance of their root systems by adjacent road construction activity. We would appreciate your consideration of these issues and a written response at your earliest convenience. ry r oar d o Xirectors, FPCA Fred Horton, President Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 October 21, 1978 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: This Association, Forest Park Condominium Association, objects to the change of ownership of the Twin Oaks Housing Development because the change appears to nullify previous agreements between the former developer and the Directors of this Association. In the spring of 1978, having been made aware of the intention of Twin Oaks Developers to place a perimeter roadway along our western property limits, Forest Park Condominium Association contacted the developer, THA Inc. of Waitsfield. Mr. Fred Horton, President of the Board of FPCA spoke several times with fir. Michael Ram, project manager for the developer. They discussed the Association's concerns which were as follows: 1. That the proposed roadway shown on the site plans appeared to encroach into the treed buffer zone between FPCA and the development. 2. That the new road and proposed building locations south west of our property would be in a marsh land and would seriously disrupt storm drainage from our property at its south west extremity. Mr. Ram assured Mr. Horton in the end that: 1. The perimeter road would be placed outside the existing treed buffer zone; 2. The resolution of the drainage problem was indeed critical for both the new development and FPCA and would be remedied with an approved solution prior to any construction activity; 3. Phases 2 $ 3 of the development were far enough in the future to allow formal resolution of our concerns with proper documentation by both FPCA and THA Inc. This Association has no assurances from the new owner of the proposed development that the agreed upon actions noted above will be honored. Thus we must object to the change of ownership. J�y r Rbar of irectors, FPCA Fred Horton, President ti. Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 October 21,1978 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: Forest Park Condominium Association wishes to be on record at this time as being in objection to the proposed roadway through woodlands adjacent to our southern property line. Our objections are based upon the following reasons: 1. That the noise and traffic along the proposed road will substantially reduce the feeling of privacy and the peace and quiet now enjoyed by members of this Association. 2. Construction activity within the right of way now sought by the city will substantially reduce the treed buffer zone between our perimeter road and the edge of the proposed pavement due to disturbance of the existing root systems. 3. The proposed tie into Timber Lane would unduly add to already existing traffic congestion on that street and it will increase the hazardous conditions now existing at the intersection of Timber Lane and Kennedy Drive. 4. The creation of a new roadway will aggravate an already existing problem with our storm drainage unless appropriate measures are taken. 5. The present marshy forest environment is a narrow strip of'natural wilderness bounded by I-89 on the one side, cut by a power line easement and bordered on the other side by dense housing. It is of utmost importance to preserve the sylvan character of what remains, by not encroaching upon it any further. 6. We believe that the creation of a roadway through this forest will disrupt the flora, fauna and wildlife of this region. We would appreciate your consideration of these issues and a written response at your earliest convenience. Ver Boa o it c ors, FPCA Fred Horton, President M E M O R A N D U M To: South Burlington Planning Commission From: Stephen Page, Planner Re: Next Meeting's Agenda Items Date: 10/20/78 #2 Trono Final Plat - All is in order #3 Allen Building Corporation Final Plat - ditto #4 Sketch Plan - Jenkins 1 lot subdivision- The division of a 3/4 acre parcel with a house, into lots of 1/4 (with house) and ' acres, is proposed. Access to the "back" lot is via a 20' ROW to the south of the existing house. TI)is access is adequate until the Dorset -Hinesburg connector is built; at that time, the ease- ment should be extinguished and the driveway relocated from Hines- burg Road to the connector. Sewer and water plans (including asse- ments) should accompany the final plat. 7 eP PRo r3 `'• �� • �T. O 2 I O dr.3 j :�LL r3 �NORM}{ #5 Twin ©a?:s Revised Final F; - The following revisions are proposed to a previously approved 3 phase, 184 unit apartment project: 1) conversion from apartments to condominiums. 2) increase parking from 111 to 2 spaces per unit, including one covered space per unit, and revised parking lot layout. 3) unit types are now all two bedroom (an increase in total bedrooms from 348 to 368). Memorandum Next Meeting's Agenda Items 10/20/78 Page 2 These revisions apply to Phase I (80 units) only; Planning Commission review shall be required for the similar revisions anticipated for subsequent phases. The developer's plans have been reviewed by the Fire Chief, City Manager, and myself. The vast majority of changes we have suggested are minor engineering details. The more substantive issues include school impact, improved parking lot and shelters layout, and expiration of Phase I approval and proposed phasing schedule. I am satisfied that these matters will be fully re- solved at or before Tuesday's meeting. #6 Chittenden Cider Mill Additiona An 11,000 sq. ft. addition is planned, of which about 80. is devoted to the wholesale produce and cider making operation, and the balance will be retail sales area. The addition will replace the existing 4,000 sq. ft. structure closest to the road. This plan was granted a variance to the front yard setback requirement from 75' to 30'. Access, via two --existing curb cuts, is O.K.-circulation and parking would be improved by extending the grave'�ed parking area to the south. Because of existing vegetation on site, I believe a waiver is warranted, although some new plantings should be re- quired, to complement the new structure, because it is so large and so close to the road (i.e., perhaps '1 of the required land- scaping). -- E:;, \ TIE / C)" 1/\,t� M E M O_R A N _D—U M To: South Burlington Planning Com,Assion From: William J. Szymanski Re: Twin Oaks Final Plat Date: 10/19/7 1) Sidewalks should continue across entrances and on R.O.W. or 1 foot inside. 2) Sidewalks on city street shall be 5' in width, private should be at least 4' wide. 3) Sewer lines that are to be city owned and maintained are to be 8" minimum. 4) Place sewer manhole near station 15+00 in street. 5) Storm drainage system cannot be constructed under structures. 6) Water system to be reviewed by Champlain Water District -- however, the mains must be further away from the curb, 5 feet is recommended. 7) Curbs shall be continuous across driveways. Additional street inlets may be needed. 8) The curb cuts to cluster 3 will cause snow removal -- problems. I would like to see them reduced to 2. 9) Sidewalks against garages, houses, and parking lots will present a snow removal problem. Three foot walks against parking areas leaves little room for pedestrians. 10) Total road base shall be 18 inches gravel with 6" sand. 11) Storm water inlets shall be placed so that edge of grate is against curb. The x-sections indicate a separation. 12) Sewer pipe to be bedded in 3/8 crushed stone. 13) Extent of fill and conflict with drainage is not accurately defined. 14) Street lighting should be planned. 15) The streets drainage system is insufficient. There must be inlets at least every 300 feet. M E M O_R _A N D_U M To: South Burlington Planning Commission From: William J. Szymanski Re: Twin Oaks Final Plat Date: 10/19/78 1) Sidewalks should continue across entrances and on R.O.W. or 1 foot inside. 2) Sidewalks on city street shall be 5' in width, private should be at least 4' wide. 3) Sewer lines that are to be city owned and maintained are to be 8" minimum. 4) Place sewer manhole near station 15+00 in street. 5) Storm drainage system cannot be constructed under structures. 6) Water system to be reviewed by Champlain Water District — however, the mains must be further away from the curb, 5 feet is recommended. 7) Curbs shall be continuous across driveways. Additional street inlets may be needed. 8) The curb cuts to cluster 3 will cause snow removal problems. I would like to see them reduced to 2. 9) Sidewalks against garages, houses, and parking lots will present a snow removal problem. Three foot walks against parking areas leaves little room for pedestrians. 10) Total road base shall be 18 inches gravel with 6" sand. 11) Storm water inlets shall be placed so that edge of grate is against curb. The x-sections indicate a separation. 12) Sewer pipe to be bedded in 3/8 crushed stone. 13) Extent of fill and conflict with drainage is not accurately defined. 14) Street lighting should be planned. 15) The streets drainage system is insufficient. There must be inlets at least every 300 feet. t 4UBLIC HEARING SOUTH BURLINGTON PLANNING COMMISSION The South Burlington Planning Commission will hold a public hearing at the South Burlington City Hall, Conference Room, 1175 Williston Road, South Burlington, Vermont on Tuesday, October 24 , 197 -6, at 7:30 p.m., to consider the following: Application of Claude Gan e for revisions to a previously approved final plat known as Twin Oaks Apartments. The revisions include _ revised building' configurations and bedroom composition, resiting of units, and a r st to extend duration of approval on Phase I. f Copies of the application are available for public inspection at the South Burlington City Hall. Sidney B. Poger, Chairman South Burlington Planning Commission 10/7/78 Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 October 21,1978 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: Forest Park Condominium Association wishes to be on record at this time as being in objection to the proposed roadway through woodlands adjacent to our southern property line. Our objections are based upon the following reasons: 1. That the noise and traffic along the proposed road will substantially reduce the feeling of privacy and the peace and quiet now enjoyed by members of this Association. 2. Construction activity within the right of way now sought by the city will substantially reduce the treed buffer zone between our perimeter road and the edge of the proposed pavement due to disturbance of the existing root systems. 3. The proposed tie into Timber Lane would unduly add to already existing traffic congestion on that street and it will increase the hazardous conditions now existing at the intersection of Timber Lane and Kennedy Drive. 4. The creation of a new roadway will aggravate an already existing problem with our storm drainage unless appropriate measures are taken. 5. The present marshy forest environment is a narrow strip of natural wilderness bounded by I-89 on the one side, cut by a power line easement and bordered on the other side by dense housing. It is of utmost importance to preserve the sylvan character of what remains, by not encroaching upon it any further. 6. We believe that the creation of a roadway through this forest will disrupt the flora, fauna and wildlife of this region. We would appreciate your consideration of these issues and a written response at your earliest convenience. Ver�ytx ,', Boa o it c ors, FPCA Fred Horton, President Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 October 21, 1978 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: This Association, Forest Park Condominium Association, objects to the change of ownership of the Twin Oaks Housing Development because the change appears to nullify previous agreements between the former developer and the Directors of this Association. In the spring of 1978, having been made aware of the intention of Twin Oaks Developers to place a perimeter roadway along our western property limits, Forest Park Condominium Association contacted the developer, THA Inc. of Waitsfield. Mr. Fred Horton, President of the Board of FPCA spoke several times with Mr. Michael Ram, project manager for the developer. They discussed the Association's concerns which were as follows: 1. That the proposed roadway shown on the site plans appeared to encroach into the treed buffer zone between FPCA and the development. 2. That the new road and proposed building locations south west of our property would be in a marsh land and would seriously disrupt storm drainage from our property at its south west extremity. Mr. Ram assured Mr. Horton in the end that: 1. The perimeter road would be placed outside the existing treed buffer zone; 2. The resolution of the drainage problem was indeed critical for both the new development and FPCA and would be remedied with an approved solution prior to any construction activity; 3. Phases 2 & 3 of the development were far enough in the future to allow formal resolution of our concerns with proper documentation by both FPCA and THA Inc. This Association has no assurances from the new owner of the proposed development that the agreed upon actions noted above will be honored. Thus we must object to the change of ownership. Ve31y ,tr�iz1�41. Board of Oirecttrs, FPCA Fred Horton, President Forest Park Condominium Association P.O. Box 2074 South Burlington, Vermont 05401 October 21, 1978 South Burlington Planning Commission South Burlington City Hall Williston Road South Burlington, Vermont 05401 Dear Sirs: Forest Park Condominium Association objects to the placement of a roadway by the owner of the Twin Oaks multi -family housing development twenty two(22)* feet from this Association's western property line. Our objections are for the following reasons: 1. Reducing the treed buffer zone between the two properties by any amount will seriously effect the privacy now enjoyed by members of this Association. 2. The presence of the trees preserves and enhances the individuality and identity of each of the two projects. Reducing this buffer zone jeopardizes that identity and individuality. 3. If the road is constructed according to plans as we understand them we anticipate the loss of most of the trees in the buffer zone due to destruction and disturbance of their root systems by adjacent road construction activity. We would appreciate your consideration of these issues and a written response at your earliest convenience. VoaroAirectors, y FPCA Fred Horton, President n CHAMPLAIN WATER DISTRICT 403 QUEEN CITY PARK ROAD SO. BURLINGTON, VERMONT05401 Kessel/Duff Construction Corp. Main Street Essex Junction, Vermont 05452 Attention: Mr. Duff Re: Dear Mr. Duff: October 24, 1978 Tw:.n Oaks Condominiums off Kennedy Drive, So. Burlington Phase 1 I have reviewed the set of plans submitted by you dated 10/11/78, revised10/17/78, for the referenced project; and in response to your request, I have the following comments regarding water supply system. 1. General layout and main line ripe location is accept- able as shown for Phase 1. 2. The water supply point at the existing 8" main ser- vicing the indoor tennis center is an acceptable tap -on point. 3. The present flow capacity and volume at the supply point is not adequate for fire fighting requirements for your planned Phase 1 clusters 1, 2 & 3. 4. The water line size of 8" as shown on page 4 of the drawings is not large enough to supply required fire .flows for the project. 5. The Water Department's preliminary approval is contin- gent upon reinforcing the available water supply at the supply point, and installing pipe of greater than 8" diameter in the development mainline distribution system. 6. Prior to tccupancy of the condominiums, you will be required to have in service a 12" water line from Dorset Street, connecting to the present 8" service main to the i Kessel/Duff -2- tennis center. This 12" line will tie into an existing 14" line on Dorset Street; and could have alternate routes, either across the Brand property from the west, or along the north side of Kennedy Drive, whichever you elect. The main line for water distribution within the proposed complex will be a minimum of 10" diameter, and will. continue throughout phase 1, 2 & 3 at that si:e. Prior to construction of p$'ases 2 or 3, this 10" main shall be looped back onto the north side of Kennedy drive into the existing 12" Line. This approval is riven with the understanding that all required,hydr ants and valves will be installed along the lines, and that all construction will be done and materials furnished in full compliance with the South Burlington Water Department Specifications, dated March 8, 1978. Submittal of Proposed constructio drawings in detail will be required prior to final approval of his project water supply system. Very truly yours, SOU'.rf-T BURLINGTON WATER DEPT . Edward Blake General Manaaer EB/s, t • MENT OR DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT AREA OFFICE NORRIS COTTON FEDERAL BUILDING 275 CHESTNUT STREET REGION I MANCHESTER, NEW HAMPSHIRE 03103 Room 800 John F. Kennedy Federal Building Boston, Massachusetts 02203 August 4, 1978 IN REPLY REFER TO: 1.3FC Project #026- 35007-PM Dimeo Construction Company Twin Oaks Apt's 75 Chapman Street S. Burlington, VT Providence, RI 02901 Gentlemen: We have reviewed the Contractor's/Mortgagor's Cost Breakdown, Form 23287 dated May 30, 1978, for the referenced project and will require clarification of several items prior to its acceptance. Please indicate whether the costs shown for each trade item in the breakdown covers both labor and materials or just one or the other. If an item covers materials only, for instance, please also paren- thetically note where labor for this item appears. We note that the electrical trade on the 2338 contains the amount for heat and ventilation. We would appreciate a breakdown of this figure as it will facilitate completion of our estimate of this job. Finally, please provide a breakdown of your estimate for Other Fees in the amount of $4,000. The information requested should be incorporated in a revised Form 2328 (blanks enclosed) and submitted for our review as soon as possible, since the 2328 must be accepted prior to issuance of a firm commitment. Your prompt attention to this matter will be greatly appreciated. If you have any uestions, please call Loren Cole, Chief of the Cost Branch, at NO3) 666-7696. S4cerely, '1 araff a Housing Development Division Enclosures (3) Pi `i h V E D AUG 71978 Dim UNST UCt1DN CDYPay OeNr OR s IIIIIIII e L Hill �c 0?aA30 V REGION I Room 800 John F. Kennedy Federal Building Boston, Massachusetts 02203 DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT AREA OFFICE NORRIS COTTON FEDERAL BUILDING 275 CHESTNUT STREET MANCHESTER, NEW HAMPSHIRE 03103 Twin Oaks Associates c/o Judson Babcock Route 100 Waitsfield, Vermont 05673 Dear Mr. Babcock: IN REPLY REFER TO: July 14, 1978 1.3FE 026-35007—PM Please refer to our letter dated July 51 1978 with regard to Item 5 under Plans. Please disregard this requirement because we have learned from subsequent telephone conversations with Mx. Dunham that this concern had been addressed and resolved with the HUD Office in Burlington, Vermont during earlier processing of this project. Sincerely, i oseph Garaffa " Director busing Development Division A. Judson Babcock Valley Professional Center Waitsfield, Vermont 05673 802-496-2580 March 23, 1978 Mr. Rihcard Moran HUD AREA OFFICE Federal Building 275 Chestnut Street Manchester, New Hampshire 03103 Dear Dick: This letter should serve as a supplement to my preliminary proposal, which I sent you yesterday, unfortunately before I received 7420. Appendix 1 The following are either now enclosed or submitted in yes- terdays submission: 1. HUD Form 2013 2. Site location map 3. Sketch plan of site 4. Elevations and floor plans (enclosed) 5. Special amenities include childrens play area, tennis facilities next door. 6. All services are included in the rent except for the tenants heat, electricity, and telephone. 7. Site option agreement 8. There is no local H.A.P. 9. Zoning and A-250 permits are all issued and attached 10. No site occupants will be displaced 11. HUD Form 917 has been signed and sent 12. Resumes of Sponsors, Architect and Builder (Dimeo) have been sent 13. HUD Form 2530 14. Management will be provided by my own company, T.H.A. 15. There will be more than 20% of the units assisted (i.e. 20 of 80 units = 250). I enclose a new mix of the assist- ed units in the project. 16. Financing is through the Mortgage Insurance program. 17. Form 2013 18. N.A. 19. N.A. 20. A-95 Clearance has been obtained. (Enclosed) y(M/ O0 d` ooll,�rnjD ~`;s DEPARENT OF HOUSING AND URBAN DEC LOPMENT ( * IIIhJ�°II* o FEDERAL HOUSING ADMINISTRATION ' `s c BURLINGTON INSURING OFFICE 10tAA70 M+.'� 630 FEDERAL BUILDING, ELMWOOD AVENUE BURLINGTON, VERMONT 05402 REGION I Room 800 John F.Kennedy Federal Bu11d1ng Boston, Massachusetts 02203 Mortgagee: State Street Bank & Trust Co. Street Address: 225 Franklin Street City: Boston, Massachusetts 02101 IN REPLY REFER T01 Date:' February 16, 1978 Conditional Commitment On: 2116178 Name of project: Twin Oaks Apartments Location: Kennedy Dr., So. Burlington,Vt. Section of the 'Act: 221 (d) (4)PM Mortgagor: Twin Oaks Associates Project Number: 026-35007-PM Gentlemen: Your application for Firm Commitment for project mortgage insurance -on the cap- tioned project will be accepted at any time during the life of this commitment. Your application must conform in content to.previous submissions in connection with the proposal and must be accompanied by the commitment fee of'$1;527.10. (Firm Commitment applications must be accompanied also by contract drawings and detailed specifications, as well as firm cost estimates shown on FHA Form 2328). The project will have the following characteristics: Total.Units 80 Type Building . Row" with unit compositions of: Type of Unit Sq: Ft. "Number Monthly Market Recital Efficiency ..... $ One Bedroom " .576 24 61240.00 ' ate Two Bedroom 768 44 12, 980 - 00 . NIV Three Bedroom 1000 12 3;840:00 ' .................... Four Bedroom Total 80 $ "23,060:00" Equipment and Services included in rent are: Ranges, Refrig., Kitchen Exhaust Fan, Laundry Facilities '(coin -op), Window shades or Curtain Rods, Dishwashers (3BR units), Carpet, Water, Sewer, Gar- bage & Trash, TV Jacks Number of Parking Spaces: Enclosed"" Open 120 Estimated Monthly Parking Rental $ --- D - -TVVkt ou,,& February 6, 1978 Mr. Michael Ram T.H.A., Inc. Valley Professional Center waitsfield, Vermont 05673 Re: Legalese Dear Mike, be used as a Enclosed insthepacket blanks)fforrms to guideline (do not your attorney in drafting fill up the necessary legal documents: 1) Offer of Irrevocable Dedication - when we have finalized the location of the pedestrian easement, you will give us a deed and transfer return which will be kept in "cold this cold storageed t the offer of dedication, which is simply an easement when we request it, will be recorded in the land records. 2) Certificate of Title - self explanatory 3) Agreement and Waiver - this is a private road agree- ment, which pertains to Phase III. t•arranty Deed for utility Easements - this applies to Phase III only, I assume, where sewer and water mains will be extended over private property. 5) Agreement - this is the 3 party (City, Sank, Twin Oaks Associates escrow agreement for site improvements, which is to be used if you do not post a corporate surety bond. A standard Warrant_ - Deed will be needed for the conveyance of the City Street and Associated lands. To minimize any legal G}� with respect to the development of the grand property and the use of Twin Oaks Terrace, this conveyance should come to us ra the form Boy ner easement,arranty deeds: e tendingthe fromfirst KennedywDriOaks all Terrace, plus 9 the way south, to the lfiE shown on the plat, west of the existing Mr. Michael Ram February 6, 1978 Page II tennis center building; the second deed to be for the balance of the city street, around the existing parking lot and through the development to the Tilley property. Finally, with regard to Phase III, we would like to obtain an easement for emergency vehicle access to Aesculopius. We can discuss this further at a later date. Please call if you have any questions. Sincerely, Stephen Page Planner SP/mcg 1 Encl CITY OF SOUTH BURLINGTON APPLICATION FOR A DEVELOPMENT OR SUE -DIVISION PERMIT !^ 1. Applicant's Name, Address, and Phone Number —T-Jlj 0-kr—s sue- non t 2. Name, Address, and Phone Number of the Person Whom the Commission should contact regarding this Application 3. Nature of the Development or Subdivision �t�Ls l00-1 Df 4-w a Ws Ca c1 4&¢ 4. Location of Development or Subdivision 5. High and Low 7levations of the Tract of Land involved with the Development or Subdivision 6. Address of each of the Applicant's Offices in Vermont !' 7. Applicant's Legal Interes#L in he Property -(Fee Simple ,- - - - - - - - - ---------Option,-Et-c.}--�iP �- - 2 - 8. If the Applicant is not an individual, the Form, Date, and Place of Formation of the Applicant FORM: DATE: PLACE: 9. Estimated Cost, Exclusive of Land Cost of the Development (Applicant for a Subdivision Need Not hswer) ___ 10. Application for a Subdivision, the Number of Lots 11. What Restrictive Covenants are Planned for any Deed(s) to be issued? ViOcV4c—: 12. Description of the Proposed Development of Subdivision A. Plans and Specifications: (1) Attach a detailed plat or plot plan of the proposed project drawn to scale, showing the location and dimensions of the entire tract. This plan should also show: all lots, streets, roads, water lines, sewage systems, drain systems, buildings, existing or intended. (2) In subdivisions where individual water and sewage facilities are intended, indicate the proposed location(s). (3) Show all easements, parks, playgrounds, parking areas, water courses, and other bodies of water, natural or artificial, existing or intended. (4) Include a contour map of the land involved drawn on a scale of 5 foot contour intervals. (5) Indicate on the plans the location and width of any easements for utilities, roads, etc., exist- ing or intended. Attach a written explanation of any such easements. -3- 13. What is the purpose of this Subdivision or Development and What is the intended use of the land after Subdivision or Development? 14. Describe the Site of the Proposed Development or Subdivis- ion including information, if available, on Soils, Streams or Other bodies of Water, Bedrocks, Etc. - —15. Acreage: A. Number of acres owned or in which you have a legal interest -S4 . of B. Number of acres in this project -;S. I C. Number of acres previously developed D. When do you anticipate beginning the project � When will this development or subdivision be completed 0 - k 16. Water System: A. What type of water system is to be provided, such as: Individual system on each lot, community system, municipal system, etc. B. Where is the nearest municipal water system and is it available and feasible to use it? 17. Sewage System: A. What type of sewage disposal system is to be provided or intended, such as: Individual system on each lot, community system, or municipal system? B. Where is the nearest community sewage system and is it available and feasible to use it? C. If the sewage system is other than a community, municipal, or individual lot septic tank and leaching field, include competent professional engineering evidence that it will perform satisfactorily. 18. Adjacent Property: A. List below the names and addresses of adjacent property owners. B. What is the adjacent property used for at present? C. What is the future usage intended for the adjacent property? 19. Zoning: A. Which'District or Districts is the proposed site with- in according to the official zoning map of the City? F-- ` 7 DATE 3 4 7 r� ;>loop SIGNAT IME 7a/IA) ft�pw4i- Loc t kxtq;r, Jj- 7-Rt� �,rt � � gLµU �K�Ut..E' S; C�yC�• � 1SY��lI�� OLT zi No Text T. H. A., INC. CONSTRUCTION AND MANAGEMENT ROUTE 100 WAUMELD, TERMONT 05673 TELEPHONE 802 - 496-3121 October 2, 1978 Steve Page Planning Assistant City of South Burlington 1175 Williston Rd. South Burlington, VT 05401 RE: TWIN OAKS PROJECT Dear Steve: Pursuant to our telephone conversation of September 29th, I am requesting the extention of approvals for construction of Phase I on the project from calander year 1978 to the calander year 1979. Phase II and III would presumably be shifted to the preauthorized calander year 1980. The reason we have been delayed to date on the project, is the interminable delays we have experienced with the H.U.D. bureau- cracy. Perhaps the single most exasperating delay was caused by the local H.U.D. multi -family office being transferred last Spring to the regional office in Manchester, New Hampshire. The effect of this action was having to start the project almost from the beginning again with all new people since the staff from the local office either retired or did not make the transition to Manchester. In essence we have been delayed in starting the project thru events not easily within our knowledge or direct control. I trust this information will add insight to our problem, and allow for the necessary extensions requested. Any questions please contact me. Respectfplly, Frank W. Avlling FWA/sg cc: A J Babcock